ABOUT THE CIP REPORT
The City of Southlake is committed to keeping the community informed about the progress of major
infrastructure investments. This monthly report shares updates on all active Capital Improvements
Program (CIP) projects.
HOW TO READ THIS REPORT
This monthly Capital Improvements Program (CIP) Report provides the current status
of all active projects, meaning projects that are currently in preconstruction, which
includes design, property or easement acquisition, study, or those actively in construction.
Each project highlight includes key details such as its current phase, percentage of
completion, adopted budget, and whether it is tracking under, at, or over budget.
Only active projects are included in this report. Projects that have not yet
entered preconstruction, or those that have been completed, are not shown here.
By reviewing this report each month, readers can track the City's progress in delivering CIP projects,
from early design through construction completion, ensuring transparency and accountability in how
public funds are invested.
UNDERSTANDING THE PROJECT HIGHLIGHTS
Each project highlight includes:
• Project Description - A short description of the outcome of the project.
• CIP Project Number - Reference to the Capital Improvements Program (CIP) Adopted Budget
project number. Useful for cross-referencing for more information about the project.
• Project Status - A quick reference to whether the project is on track, delayed, or otherwise
impacted.
• Project Phase - Indicates the current phase of the project.
• Overall Progress (Current Phase) - Percentage of completion for the current phase.
• CIP Funding Source(s) - Reflects the fund or funds that the project is receiving money through.
• Adopted Budget- The amount of funding currently awarded through the FY 2025 Capital Budget
and prior fiscal years. This does not include planned funding for future fiscal years.
• Future Planned Funding:The amount of funding currently planned for future fiscal years.Typicially
these will be an estimate based on the design.
• Budget Adherence - Shows whether the project is currently under budget, on target, or over
budget.
• Project Update - Gives a short summary of progress since the end of the previous month,
highlighting major milestones, current work, upcoming activities, or public impacts. Updates are
intentionally brief, focusing on information most relevant to City Council and the public.
• Department/ Engineering Firm / General Contractor - Identifies the City department managing
the project and, if awarded, the firms responsible for design and construction.
For full project descriptions and more details, visit www.CityofSouthlake.com/CIP.
No Text
a-
�•. �:.fir, '�-� '
��i 7•
t _
S
N. CARROLL AVE. CORRIDOR
Project Description: Improves the corridor with medians,
T
turn lanes, pavement markings, and safer intersections
for vehicles and pedestrians.
CIP Project Number: 2022-09
� r
Project Status: In Progress
Project Phase: Construction
Overall Progress (Current Phase): 95%
r 114
CIP Funding Source(s): General Fund
Adopted Budget: $2,070,000
Future Planned Funding: $0 9O1m'LAKEBLVD
Budget Adherence: On Target i
I
Project Update:Construction remains substantially complete.The contractor is installing the internally light
street name signs at the SH 114 and N. Carroll Avenue intersection and the remaining retroreflective signal
backplates. Additional coordination is underway to complete the remaining radar detector relocations
requested by TxDOT. Once these items are complete, TxDOT will perform a final inspection and accept the
intersection. Project completion remains anticipated in September 2026. Staff is also evaluating pavement
rehabilitation along N. Carroll Avenue for inclusion in the FY27 pavement management program. If included
in the adopted budget,the corridor striping would be completed in conjunction with this pavement project.
Department: Public Works
Engineering Firm: Kimley Horn
General Contractor: Tejas Cutters
RANDOL MILL WATER AND SIDEWALK IMPROVEMENTS
Project Description: Constructs a new sidewalk and
upsizes the existing water line from 8 inches to 12
inches along Randoll Mill Avenue, along with drainage ==J
improvements. N
CIP Project Number: 2022-33c P, L" r
Project Status: In Progress s
Project Phase: Construction "VWk`°'"`°"
Overall Progress (Current Phase): 95% -.
•Lnry rnriory us
CIP Funding Source(s): General Fund, Utility Fund,
Water Impact Fee Fund ...,.,o
Adopted Budget: $3,400,000
Future Planned Funding: $0 s
Budget Adherence: On Target
Project Update: This project is substantially complete. Pre-walkthroughs were conducted in July, and the
contractor is addressing the remaining punch-list items. A state accessibility inspection was performed
on August 18 by a Registered Accessibility Specialist on behalf of the Texas Department of Licensing
and Regulation (TDLR), and the resulting report identified no required corrections. Staff has identified
additional safety and quality enhancements beyond the project's legal requirements. A change order is
currently being negotiated to complete these improvements, including concrete and handrail adjustments.
The project is expected to be fully completed within the next few months.
Department: Public Works
Engineering Firm: KSA
General Contractor: Quality Excavation, LLC
CIP REPORT SEPTEMBER 2026 12
CONTINENTAL • IMPROVEMENTS
Project Description: Realigns the intersection with a new 3
traffic signal, turn lane, and paving to reduce congestion, �: LU
;
and drainage improvements. This project is a companion o � �
project to S. Peytonville & W. Continental Intersection " ��� _
Improvements. Project Location ^
CIP Project Number: 2022-07c z
Project Status: In Progress
Project Phase: Construction
Overall Progress (Current Phase): 80% feR
UNION CHURCH
CIP Funding Source(s): General Fund, Roadway Impacts
Fee Fund, Tarrant County Bond
Adopted Budget: $8,900,000 -
Future Planned Funding: $0
Budget Adherence: On Target
Project Update: All major signal improvements for this intersection have been installed and signal timing
corrections were completed this Summer. Roadway improvements on the W Continental Blvd side of the
intersection restarted the second week of August, after a 4-week pause in this area. The northbound right-
turn lane on Davis is open and construction on Continental is nearing completion with the last pavement
operation completed September 4th. Work on this phase is expected to be substantially complete in
October.
Department: Public Works
Engineering Firm: Kimley Horn
General Contractor: McMahon Contracting LP
COURTMUSTANG
Project Description: Extends Southwestern Street to
Brumlow Avenue to provide improved industrial area
access.
NAY_
CIP Project Number: 2022-15
Project Status: In Progress
Project Phase: Design
Overall Progress (Current Phase): 99%
CIP Funding Source(s): General Fund, Utility Fund,
Storm Water Utility System
Adopted Budget: $1,975,000
Future Planned Funding: $5,050,000 (Estimate)
Budget Adherence: On Target
Project Update: The 99% design has been completed. The City's consultant is continuing to conduct ROW
acquisition negotiations with adjacent property owners. Discussions are also being conducted with the
utility companies regarding relocation of existing facilities. The consultant will complete the design once
the ROW negotiations approach finalization. Once the ROW is acquired and the design is completed, the
project will be let out for bid.
Department: Public Works
Engineering Firm: Kimley Horn
General Contractor: Not Awarded Yet
CIP REPORT SEPTEMBER 2026 13
S. • NVILLE & W. CONTINENTAL INTERSECTIONIMPROVEMENTS
Project Description: Installs a landscaped roundaboutit LU
with drainage upgrades at the Continental Boulevard �: a
and South Peytonville Avenue intersection. This project
is a companion project to FM 1938 & Continental Blvd.
Intersection Improvements. Project Location
CIP Project Number: 2022-17c z
Project Status: In Progress
Project Phase: Construction
Overall Progress (Current Phase): 1% «a
UNION CHURCH €
CIP Funding Source(s): General Fund, Utility Fund, _
Roadway Impact Fee Fund, Storm Water Utility System,
Tarrant County Bond -
Adopted Budget: $6,185,000
Future Planned Funding: $0
Budget Adherence: On Target
Project Update: To minimize impacts during the school year, the City approved a revised construction
sequencing plan that temporarily shifted work from the Davis Boulevard roadway improvements to culvert
and isolation valve installation while construction activities near Davis were paused. During July, the
contractor successfully completed the culvert installation and a new mid-block crossing Infront of Carroll
Elementary School, as well as restoring the roadway before the school year began. City Utility relocations
are expected to resume in October 2026, with overall project completion anticipated in Summer 2028.
Department: Public Works
Engineering Firm: Kimley Horn
General Contractor: McMahon Contracting LP
DOVE SIDEWALK PHASE
Project Description: Constructs sidewalk between
Lonesome Dove Road and Heather Lane
CIP Project Number: 2022-02 1
Project Status: On Hold
Project Phase: Pre-Design e. p
Overall Progress (Current Phase): 98% t
CIP Funding Source(s): General Fund
Adopted Budget: $505,000
Future Planned Funding: $0 (estimate)
x
Budget Adherence: On Target 3
Project Update: Final schematic design was provided
to staff in early March. Staff has begun coordination efforts with affected residents as well as, the City's
concrete contractor, Apex Concrete Construction, Inc. Staff plans to submit to Texas Department of
Licensing and Regulation (TDLR) for regulatory review in September and construction is anticipated to
begin this Fall. Apex's contract with the City covers the scope of work for this project and was already
competitively bid. Utilizing Apex's contract for this work will greatly expedite this project and allow the
City to provide amenities requested by the community.
Department: Public Works
Engineering Firm: KSA
General Contractor: Not Awarded Yet
CIP REPORT SEPTEMBER 2026 14
FM • • & PEARSON • IMPROVEMENTS
Project Description: Improves the intersection at ,,,,
Southlake Boulevard and Pearson/Union Church with
new turn lanes, better traffic flow, and a sidewalk along 7
Pearson.
' ,
CIP Project Number: 2022-13c
Project Status: On Hold
Project Phase: Design
Overall Progress (Current Phase): 90%
CIP Funding Source(s): General Fund, Roadway Impact
Fee Fund, Storm Water Utility System, City of Keller °
Adopted Budget: $960,000
Future Planned Funding: $2,440,000 (Estimate)
Budget Adherence: On Target
Project Update: No major changes since last update. The most recent milestone was the completion of
design in May 2024.Construction of the project was placed on hold to prioritize the Continental Intersections
improvements in the corridor. The project will resume once those improvements are complete in order to
maintain alternate means of travel for area residents.
Department: Public Works
Engineering Firm: DEC
General Contractor: Not Awarded Yet
CIP REPORT SEPTEMBER 2026 15
in Ily /oft bla
CIP REPORT SEPTEMBER 2026 6
' ram'• ��.#�'- 'x- � w,4
1
� � ' _
•
38 MEDIAN LANDSCAPING
Project Description: Constructs landscape, irrigation,
and hardscape improvements on FM 1938 from FM 1709 o, .KEa,o
to the Southlake City limits, consistent with landscaped oI
median improvements north of FM 1709.The City's scope
includes landscape, irrigation, and hardscape only. ------------
°,o
CIP Project Number: 2024-06
Project Status: In Progress _•a .M°°
Project Phase: Design ,.yn.o.
Overall Progress (Current Phase): 100%
CIP Funding Source(s): General Fund aLE6o ,
Adopted Budget: $1,650,000 e e r
Future Planned Funding: $0
Budget Adherence: On Target
Project Update: This project involves the construction of a raised concrete median from FM 1709 in
Southlake, through Keller and into North Richland Hills. The City aims to partner with TxDOT to include
landscape improvements on the new medians. The City consultant submitted the 100% design. The next
phase is to approve an Advanced Funding Agreement (AFA) and Landscape Maintenance Agreement
(LMA) with TxDOT. TxDOT completed construction of the medians with temporary landscaping (sod)
within the City of Southlake. It is anticipated that that the landscape improvements will be constructed by
Summer 2027 as a later phase of the project.
Department: Community Services
Engineering Firm: Kimley Horn
General Contractor: Not Awarded Yet
PARK)TURF REPLACEMENT PHASE 11 (NORTH
Project Description: Implements high impact park
improvements including conversion of athletic fields e
from grass to turf as recommended in the Southlake
2035 Parks, Recreation & Open Space Master Plan. This
project will complete turf installations at North Park.
CIP Project Number: 2024-05 2
Project Status: In Progress
Project Phase: Construction
Overall Progress (Current Phase): 0%
CIP Funding Source(s): Southlake Parks Development
Corporation
Adopted Budget: $5,673,000
Future Planned Funding: $0
Budget Adherence: On Target
Project Update: The award of the construction contract to North Rock Construction & Associates, LLC
was brought to Council on 9/1/2026. Construction is anticipated to begin shortly. It is anticipated that the
improvements will be completed in Spring 2027.
Department: Community Services
Engineering Firm: Baird, Hampton & Brown
General Contractor: North Rock Construction & Associates, LLC
CIP REPORT SEPTEMBER 2026 18
MUNICIPAL SERVICE CENTER AND PUBLIC SAFETY TRAINING •
Project Description: Constructs a new Municipal Service
Center with space for Streets & Drainage, Water,
Wastewater, Environmental Services, and Traffic,
Facilities, along with administrative offices for Utility
Billing and a public safety training tower.
CIP Project Number: 2022-79c
Project Status: In Progress - - - -
Project Phase: Construction
Overall Progress (Current Phase): 80%
CIP Funding Source(s): General Fund and Utility Fund
Adopted Budget: $46,600,000
Future Planned Funding: $0
Budget Adherence: On Target
Project Update: During August, overhead mechanical, electrical, and plumbing (MEP) work continued and
the slabs for both levels were poured at the Administration Building. Outside of the building both visitor
and employee parking lots were poured. At the Service Bay Building the walls were closed up. Sitewide,
the contractor was working on the installation of the light poles, irrigation system, and covered parking
areas. At the Training Tower, rough-in for the tower utilities was completed foundation work is underway.
The project continues to track with the overall construction schedule and is anticipated for completion in
early 2027.
Department: Public Works
Engineering Firm: RPGA (Architect)
General Contractor: Byrne (CMAR)
TOWN HALL PLAZA PARK
Project Description: Completes the redevelopment
of Family Park in Town Square with new landscape,
hardscape,park amenities,fountain upgrades,pedestrian ,
and safety enhancements, and repair/replacement of
existing infrastructure to enhance visitor experience and
event use.
CIP Project Number: 2024-66c
Project Status: In Progress
Project Phase: Design
Overall Progress (Current Phase): 30%
CIP Funding Source(s): Southlake Parks Development
Corporation
Adopted Budget: $7,938,319
Future Planned Funding: Pending final design
Budget Adherence: On Target
Project Update: The consultant is currently completing the 60% design. Staff is currently finalizing the
agreement with the CMAR for this project. The CMAR has been onboarded on the project and is currently
engaged in the design meetings. The CMAR will play a critical role during preconstruction, particulary with
providing construction cost estimates and alternatives for the project.
Department: Community Services
Engineering Firm: Kimley-Horn
General Contractor: Fransen Pittman Construction
CIP REPORT SEPTEMBER 2026 19
INTERSECTION ENHANCEMENTS ON SH 114 GREEN RIBBON
Project Description: Enhances intersections along SH -
114 with landscaping and corridor beautification.
CIP Project Number: 2024-07 2
Project Status: In Progress
Project Phase: Construction
Overall Progress (Current Phase): 60%
CIP Funding Source(s): General Fund and TxDOT
Green Ribbon Funding
Adopted Budget: $400,000
Future Planned Funding: $0GREEN RIBBON PROJECT PHASEJ
- -
Budget Adherence: On Target SOUTH SIDE OF DOVE RD&SH 114 INTERSECT10T
Project Update: Phase 2 design is complete and this phase of the project has broken ground on the North
side of the Dove and 114 intersection. The project will take approximately 42 working days to complete
and strong progress has been made thus far. This phase should be complete and move into the warranty
phase later this spring.
Department: Community Services
Engineering Firm: Kimley Horn
General Contractor: Central North Construction LLC.
INTERSECTION ENHANCEMENTS ON SH 114 GREEN RIBBON
Project Description: Enhances intersections on SH 114
with landscaping and corridor beautification. I
CIP Project Number: 2024-07 3
Project Status: In Progress `
Project Phase: Pre-Design
Overall Progress (Current Phase): 95%
CIP Funding Source(s): General Fund and TxDOT '
Green Ribbon Funding
Adopted Budget: $420,000
Future Planned Funding: $0
Budget Adherence: On Target
Project Update: Phase 3 was awarded the full $420,000 to begin work at the intersection of White
Chapel and SH 114. Phase 3 bids were opened earlier this summer, and TxDOT has recently provided
concurrence of City Staff and Kimley Horn's selection of a lowest qualified bidder. City staff will be bringing
an award for construction to Council this fall.
Department: Community Services
Engineering Firm: Kimley Horn
General Contractor: Not Awarded Yet
CIP REPORT SEPTEMBER 2026 110
�� �, r ,- 'Y��I/d4. "•'vn�" 'R. A sJ ` �CN•4 af� `+ , " j�.
i �� /�, �� � � � �� ��.r: !1�!'�f `{ ,.lad 94 '►I'��,, / ''i�t•V ,t.i8'� tt• �{�d� �!�v4 �1.' ,
>. •t�:a � � ��y;�t' ,i �\ �, n r-.,� 1 ti,. ;�,r4�'� �s�` 7��//sryry�dye 9i► d'►"t;�'i�4'i
AN
061
ow
tq
�•i- � ► > , �--'. 1•• � j ' Ott °� .� `t *..,
IF
Vv
Aot '�"' I lye w *wab�ei\
1 it
••• !i:
Project Description: Installs a new 8-inch sewer line
along East Highland street to North Kimball Avenue. This m
project is a companion project to upsize existing 6-inch x
to 12-inch water line along East Highland from Blythe
Lane to North Kimball Avenue.
CIP Project Number: 2022-85c
Project Status: In Progress
s
Project Phase: ROW/ Easement AcquisitionNWMANDsT
Overall Progress (Current Phase): 65%
j
CIP Funding Source(s): Sanitary Sewer Impact Fee and
Utility Fund _
Adopted Budget: $245,000
Future Planned Funding: $2,395,000 (Estimate)
Budget Adherence: On Target
Project Update: Coordination with property owners for required easements is ongoing. Updated offers
were sent to three of the five property owners, and a meeting has been held with one; one property is
currently in probate, and one remains under legal review regarding prescriptive right-of-way.TNP has been
in ongoing negotiations and one easement has been finalized so far. Depending on negotiation outcomes,
alternative alignments may be considered as the project advances toward anticipated construction in
Summer 2027.
Department: Public Works
Engineering Firm: TNP
General Contractor: Not Awarded Yet
CIP REPORT SEPTEMBER 2026 1121
JONES BRANCH NEAR RAINTREE DR.
Project Description: Provides erosion control and sewer
protection improvements along Jones Branch near
Raintree Drive.
CIP Project Number: 2022-45c 2
Project Status: In Progress —�
Project Phase: Design V
Overall Progress (Current Phase): 5% r
CIP Funding Source(s): Utility Fund and Storm Water 114
Utility System
Adopted Budget: $158,000 _eg
Future Planned Funding: $2,838,000 (Estimate)
Budget Adherence: On Target
Project Update: Engineering field investigations are progressing for the Jones Branch Sewer Protection
Improvements Project. Topographic survey, aerial LiDAR mapping, and sanitary sewer CCTV inspections
have been completed. A geomorphologic field assessment is anticipated in mid-September to further
evaluate existing creek and erosion conditions. Information collected will support the development of
prioritized stabilization improvements to protect existing sanitary sewer infrastructure within the Jones
Branch corridor.
Department: Public Works
Engineering Firm: Westwood
General Contractor: Not Awarded Yet
JONES BRANCH NEAR SIMMONS
Project Description: Provides erosion control and sewer
protection improvements along Jones Branch near
Simmons Court.
CIP Project Number: 2022-51
Project Status: In Progress
Project Phase: Design
Overall Progress (Current Phase): 5%
CIP Funding Source(s): Utility Fund and Storm Water Z714
Utility System
Adopted Budget: $885,000
Future Planned Funding: $0 (Estimate)
Budget Adherence: On Target
Project Update: Engineering field investigations are progressing for the Jones Branch Sewer Protection
Improvements Project. Topographic survey, aerial LiDAR mapping, and sanitary sewer CCTV inspections
have been completed. A geomorphologic field assessment is anticipated in mid-September to further
evaluate existing creek and erosion conditions. Information collected will support the development of
prioritized stabilization improvements to protect existing sanitary sewer infrastructure within the Jones
Branch corridor.
Department: Public Works
Engineering Firm: Westwood
General Contractor: Not Awarded Yet
CIP REPORT SEPTEMBER 2026 113
LOCH MEADOWS • - •
Project Description: Expands the Loch Meadows Lift s a �-
Station capacity from 0.4 MGD to 0.8 MGD to support
future development and provide additional wastewater $
capacity for planned septic-to-sewer conversion projects
within the N-18 basin. 3
Yy
Y
CIP Project Number: 2026-05 SURNQ
Project Status: In Progress
Project Phase: Pre-Design4aM g S
Overall Progress (Current Phase): 30%
CIP Funding Source(s): Utility Fund a
Adopted Budget: $550,000 0
Future Planned Funding: $3,850,000 _.._---
Budget Adherence: On Target
Project Update: The consultant completed testing and continued monitoring the lift station system during
August for the Loch Meadows Lift Station Expansion Project. The consultant is reviewing the collected
information, and a workshop will be scheduled for late September to discuss the findings. Following the
workshop, FNI will continue developing recommendations for improvements to the lift station system.
Department: Public Works
Engineering Firm: Freese and Nichols, Inc.
General Contractor: Not Awarded Yet
LONESOME DOVE/SHADY • IMPROVEMENTS
Project Description: Installs emergency backup pumps '*
and generators at both lift stations. Upgrades electric
and SCADA systems at Lonesome Dove lift station.
CIP Project Number: 2024-04
Project Status: In Progress
Project Phase: Construction
Overall Progress (Current Phase): 0% Q
J
CIP Funding Source(s): Utility Fund
Adopted Budget: $2,810,000 Z
Future Planned Funding: $0
Budget Adherence: On Target r
Project Update: The contractor has provided an updated project schedule reflecting the revised design
and anticipated material lead times. Construction is currently anticipated to begin at the Lonesome Dove
Lift Station in early January 2027, followed by the Shady Lane Lift Station in mid-March. Staff will continue
coordinating with the contractor and design consultant as materials are procured and construction
approaches. Overall project completion is currently anticipated by July 2027.
Department: Public Works
Engineering Firm: Garver, LLC.
General Contractor: Felix Construction
CIP REPORT SEPTEMBER 2026 114
BIG BEAR CREEK IMPROVEMENTSCOURT
Project Description: Provides erosion control and sewer
realignment to protect sewer infrastructure along Big
4
Bear Creek near Timber Court.
CIP Project Number: 2022-45c 3 — WCWnN8IfAL BLVD
Project Status: On Hold
Project Phase: ROW/ Easement Acquisition gc" 7 / P!
Overall Progress (Current Phase): 59%
CIP Funding Source(s): Storm Water Utility System A�
Adopted Budget: $135,000
Future Planned Funding: $620,000 (Estimate)
Budget Adherence: On Target
Project Update: No major changes since last update. Design reached 90 percent completion in July 2024,
after which the project was placed on hold due to reprioritization. Staff has been coordinating with a
Colleyville resident regarding a required sanitary sewer easement. Work will resume as other projects are
completed or if reprioritization occurs.
Department: Public Works
Engineering Firm: VRX
General Contractor: Not Awarded Yet
EAGLE BEND & STRATHMORE SANITARY SEWER RECONSTRUCTION
Project Description: Replaces the existing 8-inch sewer
with a 10-inch line under Timarron Golf Course Creek. E CONTINENTAL BLVD
LW-WL4 'WOWOA Ax
CIP Project Number: 2023-14 ► W„V
Project Status: On Hold
Project Phase: ROW/ Easement Acquisition '
Overall Progress (Current Phase): 76% a Y
CIP Funding Source(s): Utility Fund U0
Adopted Budget: $200,000 �
Future Planned Funding: $820,000 (Estimate) } r
Budget Adherence: On Target *�
Project Update: No major changes since last update.
Design reached 90 percent completion in July 2024, and property owner coordination for easements is
ongoing. One of the three permanent easements has been acquired, while agreements with the Timarron
HOA and Golf Course remain under legal review. A required temporary easement has not yet been secured.
The project is on hold due to reprioritization and will resume as other projects conclude.
Department: Public Works
Engineering Firm: Westwood
General Contractor: Not Awarded Yet
CIP REPORT SEPTEMBER 2026 115
HIGGINS BRANCH NEAR • • - - • •
Project Description: Provides erosion control and sewer - FORIMTLN J
protection improvements along Higgins Branch near a z
Woodbrook Lane. BEM OR
""0 �
W
CIP Project Number: 2022-45c 1Z
Project Status: On Hold 1,40WOODDR $g WOODB200KLN
Project Phase: ROW/ Easement Acquisition - CROSS TIMBER DR
Overall Progress (Current Phase): 73% s ��
A �a
CIP Funding Source(s): Utility Fund and Storm Water
Utility System TRa`
GIFFORD CT BqA q
Adopted Budget: $185,000
Future Planned Funding: $525,000 (Estimate)
Budget Adherence: On Target "
Project Update: No major changes since last update. Coordination with property owners regarding access
easements is ongoing. Two temporary easements have been acquired, while one permanent access
easement remains under legal review. The project is on hold due to reprioritization and will resume as
other projects are completed.
Department: Public Works
Engineering Firm: VRX
General Contractor: Not Awarded Yet
CIP REPORT SEPTEMBER 2026 116
`rr
r
ol
. �RIM
t...:,. � � `� � •gyp+•+•
-x �• •g"_:'.:�;;..,�.,,..tel: - - _ �� •:
�.
AWN 44
STORMWATER
_ I
_+`•lam— ' —'�^ �• � ��Q.j � _ �.y♦*r.;� _ � r � •_
IMPROVEMENTSMORGAN ROAD DRAINAGE
Project Description: Constructs a new drainage ditch,
culvert, and channel to reduce flooding risk on Morgan f'
Road. ,■` , "°"°�'
CIP Project Number: 2022-47
Project Status: In Progress
Project Phase: Design
Overall Progress (Current Phase): 90%
CIP Funding Source(s): Storm Water Utility System
Adopted Budget: $1,425,000 W4PO�A99K
Future Planned Funding: $0 (Estimate) /(
Budget Adherence: On Target
Project Update: The design consultant is finalizing construction plans following completion of the 100%
design review. With the alignment of underground facilities established, City staff began coordinating with
franchise utilities in March to identify and address potential conflicts. Coordination with franchise utilities
continued in August with Atmos Energy, currently identified as the only conflict. Atmos Energy relocations
are now complete. City staff is working to coordinate with residents in the area and expects to hold a
community meeting prior to advertising the project for construction this Winter.
Department: Public Works
Engineering Firm: TNP
General Contractor: Not Awarded Yet
CIP REPORT SEPTEMBER 2026 118
. mar
JF
WATER
DOVE ELEVATED STORAGE
Project Description: Repaints the interior and exterior -
of the Dove Elevated Storage Tank, replaces structural H
steel and yard piping components as needed, and
updates the tank's exterior graphics to extend the life
and appearance of this critical water system asset.
a PpL
CIP Project Number: 2022-39
Project Status: In Progress
Project Phase: Design DOVE RD
Overall Progress (Current Phase): 85% _
CIP Funding Source(s): Utility Fund
Adopted Budget: $490,000
Future Planned Funding: $0 u
Budget Adherence: On Target
Project Update: The Dove Elevated Storage Tank (EST) Repaint Project is currently being advertised
for construction bids, with a bid opening scheduled for September 24. City Council reviewed graphic
branding concepts for the Dove and Bicentennial Park ESTs during the August 18 Council Meeting and
provided direction on the tower face graphics. Additional rooftop graphic options will be presented to
City Council at the September 1 meeting for final direction. Council's direction on the rooftop graphics
will be incorporated into the bid documents through an addendum prior to bid opening. Rehabilitation is
anticipated to start Winter 2027.
Department: Public Works
Engineering Firm: Bartlett & West
General Contractor: Not Awarded Yet
SOUTHLAKE PARK WATERLINE IMPROVEMENTS (PHASE
Project Description: Constructs a new 8-inch water
main along Crescent Drive, Hillside Drive, and Southlake
Park Drive to provide adequate fire protection, enhance
water quality, and make service available if requested.
CIP Project Number: 2026-03
Project Status: In Progress
Project Phase: Pre-Design
Overall Progress (Current Phase): 0%
w l �CIP Funding Source(s): Utility Fund
Adopted Budget: $4,125,000
Future Planned Funding: Pending Final Design
Budget Adherence: On Target
Project Update:No major changes since last update.A funding application to the Texas Water Development
Board (TWDB) was submitted July 30th 2026 and funding awards are expected to be announced this Fall.
Staff is currently working with the design consultant to scope this project with a Kickoff meeting being
held late May. Staff intends to award the design contract this Fall pending notification from the TWDB.
Department: Public Works
Engineering Firm: Not Awarded Yet
General Contractor: Not Awarded Yet
CIP REPORT SEPTEMBER 2026 120
STATIONTW KING PUMP D•
Project Description:Installs additional pumps and related
infrastructure improvements, including a protective
masonry enclosure,fencing,and drainage enhancements, „r„
to increase water system capacity, improve flow and
pressure to the north and east portions of the City, and
enhance the safety, security, and reliability of the City's
water infrastructure.
CIP Project Number: 2023-06 ,,,o�,
Project Status: Not Started
Project Phase: Pre-Design
Overall Progress (Current Phase): 0%
CIP Funding Source(s): Utility Fund and Water Impact
Fee Fund
Adopted Budget: $1,990,000
Future Planned Funding: $24,460,000 (Estimate)
Budget Adherence: On Target
Project Update: The design team met in August to discuss project scope and expectations. The team
expects to hold another meeting in September on-site to ensure operational needs are discussed and
included in the design appropriately. Staff expects to bring the design contract to council January 2027.
Department: Public Works
Engineering Firm: Not Awarded Yet
General Contractor: Not Awarded Yet
STATIONTW KING PUMP D•
Project Description: Upgrades the pump station with a
generator, replaces the existing pumps and motors and
adds a new pump and motor to the Low Pressure Plane.
CIP Project Number: 2022-96c
Project Status: In Progress
Project Phase: Bidding/Pre-Con
Overall Progress (Current Phase): 100%
CIP Funding Source(s): Utility Fund and Water Impact
Fee Fund '000Tk
Adopted Budget: $15,475,000
Future Planned Funding: $0 (Estimate)
Budget Adherence: On Target
Project Update:Staff is recommending awarding the construction contract to Taknek,LLC at this September
15th council meeting. Staff and the design team are currently working to negotiate a construction phase
contract for resident inspection by the design consultant (Freese and Nichols, Inc). After award and
contract execution is complete the team will hold a pre-construction meeting and begin the submittal
process.
Department: Public Works
Engineering Firm: Freese and Nichols
General Contractor: Not Awarded Yet
CIP REPORT SEPTEMBER 2026 121
UPSIZE EXISTING 6-INCH TO 12-INCH WATER LINE ALONG EAST HIGHLAND FROM
BLYTHE LANE TO NORTH KIMBALL AVENUE
Project Description: Replaces the existing 6-inch water
line with a 12-inch line to improve service and capacity. 3
This project is a companion project to the East Highland/
Kimball 8-inch Sewer Line.
CIP Project Number: 2022-28c
Project Status: In Progress
Project Phase: ROW/ Easement Acquisition A
Overall Progress (Current Phase): 65% + t
CIP Funding Source(s): Utility Fund and Water Impact
Fee Fund
Adopted Budget: $825,000 "
Future Planned Funding: $2,475,000 (Estimate)
Budget Adherence: On Target
Project Update: Coordination with property owners for required easements is ongoing. Updated offers
were sent to three of the five property owners, and a meeting has been held with one; one property is
currently in probate, and one remains under legal review regarding prescriptive right-of-way.TNP has been
in ongoing negotiations and one easement has been finalized so far. Depending on negotiation outcomes,
alternative alignments may be considered as the project advances toward anticipated construction in
Summer 2027.
Department: Public Works
Engineering Firm: TNP
General Contractor: Not Awarded Yet
ALTA VISTA WATER LINE REPLACEMENT - PLANNING
Project Description: Completes design, easement
acquisition, and coordination for the rehabilitation of the
Alta Vista 30-inch and 36-inch water transmission main
through sliplining, along with a condition assessment of
S
'" ez ao
the Alta Vista Pump
Station to support the long-term frort Worth
reliability of one of the City's primary water supply lines. ; =� K.
" 1�" ,
CIP Project Number: 2023-05
Project Status: Not Started f
him' Suv(h,ski S
Project Phase: Inactive
Overall Progress (Current Phase): 0%
CIP Funding Source(s): Utility Fund and City of Keller
Adopted Budget: $3,600,000
Future Planned Funding: $37,000,000
Budget Adherence: On Target
Project Update: The City continues to coordinate with the City of Keller to advance the Alta Vista Water
Line Replacement Project. The updated Interlocal Agreement is scheduled for discussion during Keller's
September 1 City Council work session, with the cities continuing to coordinate the project responsibilities,
federal funding requirements, and next steps for procurement for design services.
Department: Public Works
Engineering Firm: Not Awarded Yet
General Contractor: Not Awarded Yet
CIP REPORT SEPTEMBER 2026 122