Item 4B - Memo CITY OF SOUTHLAKE Item 413 MEMORANDUM September 1, 2026 To: Alison Ortowski, City Manager From: David Miller, Director of Community Services Subject: Award the construction contract for the North Park Turf & Parking Improvements Project to North Rock Construction & Associates, LLC in an amount not to exceed $6.355M. Action Requested: Award the construction contract for the North Park Turf & Parking Improvements Project to North Rock Construction &Associates, LLC in an amount not to exceed $6.355 million. Background Information: The purpose of this item is to request City Council approval to award the construction contract for the North Park Turf & Parking Improvements Project (North Park Turf Project) to North Rock Construction & Associates, LLC (North Rock) in an amount not to exceed $6.355 million. The recommended contract includes artificial turf improvements, expanded parking, lighting, drainage improvements, ADA access improvements, and related site work. This amount includes a $399,133 (6.7%) contingency to address potential unforeseen conditions during construction. In 2023, City Council approved funding to establish a project fund for high-impact park improvements recommended in the adopted Southlake 2035 Parks, Recreation & Open Space Master Plan. These improvements include converting athletic fields from natural grass to artificial turf. This project fund has previously been used to complete turf installations at: • Bob Jones Park Softball Fields 3-6; • Bob Jones Multipurpose Fields 4-6; and • Bicentennial Park Baseball Fields 3, 5, 6, and 7. Based on a feasibility study conducted in FY 2024, North Park was selected as the next location for improvements. Page 1 of 5 Alison Ortowski Item 413 Meeting Date—September 1, 2026 Upon completion, the project will provide artificial turf fields, additional practice space, and adequate parking for City Flag Football, Lady Dragon Lacrosse, Dragon Lacrosse, and Dragon Youth Football. This project, when combined with the previously described projects, will provide each of the City's seven partner athletic associations with access to artificial turf fields and additional practice facilities. Project Scope The North Park Turf Project Request for Bids (RFB) was structured with a base scope of work and several optional bid items, referred to as add alternates. The add alternates were included in the original scope of the project; however, they were included as add alternates because of the continued volatility in construction and material pricing. This approach allowed the City to receive competitive pricing for the full project, while retaining the flexibility to select project components that could be completed within the allocated funding. The base scope includes: • Artificial turf field construction; • Field drainage improvements; • Chain-link fencing; • Sidewalk improvements; • Tree removal and replacement around the fields; and • Grading of the practice field. The add alternates included three turf system options, which varied by turf product, infill material, and the inclusion of a shock pad; parking lot improvements, including 152 additional spaces, drainage, landscaping, ADA-accessible parking & lighting; field lighting upgrades; additional turf improvements; Concrete mow strips along the field fencing; and dumpster enclosure improvements. Selection Process The City issued the solicitation for the project on April 20, 2026. During the procurement process, the submission deadline was extended twice to clarify project requirements and encourage contractor participation. The City received and opened four competitive bids on July 8, 2026. The bid results are included in Attachment A. During the evaluation process, one proposer, DL Meacham, withdrew its bid from consideration. City staff evaluated the three remaining bids according to best value criteria that considered price (50%), reputation of bidder & key personnel (15%), reputation and Page 2 of 6 Alison Ortowski Item 413 Meeting Date—September 1, 2026 quality of the bidder's goods and services (15%), past relationship with the City (10%), and responsiveness (10%). Based on the evaluation, North Rock's bid was determined to provide the best value to the City. North Rock submitted the lowest base bid and lowest total bid among the three remaining bidders, has a strong industry reputation, and successfully completed the Southlake Pickleball Complex. North Rock's proposed turf vendor also demonstrated extensive relevant experience by providing references for 58 projects of similar size and scope, compared with the five references required by the solicitation. Because the base bid plus all optional improvements exceeds the available budget, staff recommends awarding the base scope together with the following add alternates: • Turf Option A, which includes reduced rubber infill, added sand infill, and a shock pad beneath the turf; • Construction of 152 additional parking spaces; • Associated parking-lot drainage improvements; • Trees along the northwest and southwest side of the parking lot; • ADA parking improvements; • Perimeter and interior lighting for the new parking area; and • Concrete mow strips along the field fencing. The recommended scope meets the project's primary objectives by providing a safe, high-quality, and pervious artificial turf system; improving ADA access throughout the site; adding a secondary parking area with appropriate lighting; and constructing the drainage infrastructure necessary to support the turf and parking improvements. Artificial Turf System: The recommended artificial turf system is designed to provide a safe, durable, and well-draining playing surface. The system will be installed over a stable, permeable gravel base designed to facilitate drainage, with an extensive drain system around the perimeter of each field. Turf Option A includes an 8-year warranty, a blended infill system that reduces the amount of rubber infill, adds sand infill, and incorporates a Pro/Play 20 shock pad beneath the turf. The shock pad provides greater impact absorption and includes a 25-year warranty, supporting long-term durability and helping reduce future replacement costs. Athlete safety was also a central consideration in the selection of this specific system. The proposed system has a GMAX value of 115, far Page 3 of 6 Alison Ortowski Item 413 Meeting Date—September 1, 2026 less than the City and project maximum of 130 and the higher industry thresholds cited for comparison, including the NFL standard of 165 and the ASTM maximum of 200. GMAX is the primary safety measure for any playing surface and evaluates how much impact force a surface absorbs versus how much is transferred back to an athlete during a fall. A lower GMAX value indicates a softer, more impact-absorbing surface, which reduces the force experienced by the athlete and provides greater protection against impact-related injuries. Secondary Parking Area: Expanding parking at North Park is a key component of the project. Existing parking is not sufficient to accommodate the current level of games and practices for City Flag Football, Dragon Youth Football, Southlake Carroll Lacrosse, and Lady Dragon Lacrosse. During heavily attended events, visitors frequently park on grass areas, resulting in damage to the park and negatively affecting the customer experience. The project will add 152 parking spaces, more than doubling the available parking at North Park. The expanded parking area will also include appropriate lighting, drainage improvements, trees, and ADA-accessible parking. These improvements will better accommodate current programming, reduce parking on grass areas, and provide additional capacity for future tournament use. Additionally, the expanded parking area provides space to support training activities for the Police Department as well as community events that promote public safety intiatives for the citizens. Drainage Considerations: Before design began on either phase of the turf conversion, the City retained a licensed civil engineering firm to perform project-specific drainage impact analyses. The purpose of these analyses was to assess the drainage impacts of installing turf fields and to determine whether the existing storm drain infrastructure would require upgrades as part of the turf improvements. The engineer modeled the anticipated runoff due to the proposed improvements and determined that no system upgrades were required. Per the City's Storm Drainage Ordinance, stormwater runoff after development should not exceed pre-development conditions. The North Park Turf Project meets and improves upon this requirement by installing a turf subdrain system that intercepts and distributes Page 4 of 6 Alison Ortowski Item 4B Meeting Date—September 1, 2026 field runoff between design points (discharge locations) one east of the fields and one east of the practice fields, rather than allowing uncontrolled surface discharge. Furthermore, additional detention storage will be created by regrading the practice field area associated with the existing retention pond. The net result will be decreased post-development peak discharge from each design point, compared to existing conditions. Project Savings: During design development, City staff worked with the project consultant to identify elements of the project that could be completed separately or with City resources to reduce construction costs. Approximately $270,000 in savings was identified through two measures: • Purchasing and installing safety netting at the north and south ends of each field separately from the construction contract; and • Retaining excavated soil on-site rather than paying to haul it away. Additional savings are expected in the FY 2027 operating budget because the excavated soil will be reused in planned landscaping projects throughout the City. Funding for this project is budgeted in the Capital Improvements Program. Construction is anticipated to begin in fall 2026 and be completed in winter 2027. Financial Considerations: Funding is available in the Capital Improvements Program through the Annual Park Enhancements — Athletic Fields Turf Conversion — Phase 2 project. The proposed contract amount is summarized below: Contract Component Amount Base Bid $4,346,533 Recommended Add Alternates $1,609,334 Contingency $399,133 Total Amount Not to Exceed $6,355,000 The total available Capital Improvements Program budget is $6,404,159. In addition to the construction contract, staff recommends reserving $40,000 for construction testing and $9,159 for engineering and design contingencies. Page 5 of 6 Alison Ortowski Item 413 Meeting Date—September 1, 2026 Strategic Link: This item links to the City's Strategy Map strategic focus area of Infrastructure & Development. It specifically relates to Corporate Objective F2: Investing to provide & maintain high-quality public assets. Citizen Input/ Board Review: SPDC recommendation September 1, 2026. Legal Review: The construction contract has been reviewed and approved by the City Attorney prior to the project being advertised for bidding. Alternatives: The City Council may approve or deny the award of the construction contract. Supporting Documents: • Attachment A: Bid Tabulation • Attachment B: Construction Contract • Attachment C: Overall Site Plan Staff Recommendation: Award the construction contract for the North Park Turf & Parking Improvements Project to North Rock Construction &Associates, LLC in an amount not to exceed $6.355 million. Staff Contacts: David Miller, Director of Community Services Fince Espinoza, Deputy Director of Community Services Mamerto A. Estepa, Jr., Project Manager Page 6 of 6 ATTACHMENTA BID TABULATION FOR TURF PARKING IMPROVEMENT AT NORTH PARK BID OPENING:JULY 8,2026 North Rock Construction Fain Construction Cole Construction ITEM NO. DESCRIPTION UNIT CITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT IM UNITPRICE AMOUNT 0 Mobilization(Base Scope) LS 1 $ 204,955.90 $ 2p4,955.90 $ 250,000.00 $ 250,000.00 $ 102,004.91 $ 102:004.11 1 Provide&Install Project Sign EA 2 $ 1,3J5.00 $ 2,750.Do $ 59].00 $ 1,194.00 $ 889.21 $ 1,776.42 2 Implement Maintain Erosion Control Measures for Field Improvements MO 3 $ ],528.07 $ 22,584.21 $ ".I oil $ 21,633.00 $ 6,742.62 $ 20,22].Sfi 3 Remove."-12"Tree EA 16 $ 584.82 $ 9,357.12 $ 695.00 $ 14,320.00 $ 981.81 $ 15,708.96 4 Remove&Reinstall Existing Signs EA 2 $ 1]3.43 $ 346.66 $ 1]9.00 $ 358.00 $ 201.36 $ 402.72 5 Demo/Remove PVC or Pipe LF 1690 $ 3.95 $ 6,675.50 $ 17.00 $ 26,730.00 $ 4.95 $ 6,365.50 6 Demo/Relocate Irrigation to Prep for Turf LS 1 $ 5,952.40 $ 5,952.40 $ 119,304.00 $ 119,309.00 $ 5,435.80 $ 5,435.60 7 Demo/Remove Concrete Mow Strip LF 145 $ 15.53 $ 2,251.85 $ B.00 $ 1,160.00 $ 2.88 $ 417.E0 8 Trench Safely LF 852 $ 1.42 $ 1,209.64 $ 1..0 $ 852.00 $ 86.43 $ ]3,638.3fi 9 Earthwork/Regrading for Turf Fields,Practice Field&Berm(haul-off by City forces) CY 4020 $ 148.60 $ 597,372.00 $ 10.00 $ 40,200.00 $ 604.65 $ 2,431,497.00 10 IB-inch Class III Reinforced Concrete Pipe LF 852 $ 12].13 $ 108,314.76 $ 232.00 $ 197,664.00 $ 19J.39 $ Lt.,176.28 11 18--inch Safety End Treatment EA 3 $ 2,202.47 $ 6,607.41 $ 3,056.00 $ 9,168.00 $ 6,136.34 $ 16,409.02 12 3'Junction Box EA 3 $ 6,819.52 $ to,458.56 $ 8,849.00 $ 26,54700 $ 6,136.34 $ 18,409.02 13 Install Prefabricated Flat Drainage Panels per Turf Installation Detail LF 14500 $ 14.50 $ 210:210.00 $ 69.00 $ 1,000,500.00 $ 4.23 $ 61,335.00 14 Install Chain-Link Fence around Fields LF 3632 $ 50.05 $ 181,]81.60 $ 49.00 $ 177,968.00 $ 81.20 $ 294,918.40 15 Install Magnetic Lock Connections EA 12 $ 2,083.33 $ 24,999.96 $ 25,054.00 $ 300,646.00 $ 3,385.24 $ 40,622.68 16 Install Mow Strip for New Net Poles LF 215 $ 32.29 $ 6,942.35 $ 25.00 $ 5,375.00 $ 28.67 $ 6,164.05 17 Insta ll Nev,Net Poles side of Field 3) EA 4 $ 1,773.01 $ 7,092.04 $ 22,106.00 $ 86,424.00 $ 5,354.26 $ 21,417.04 18 Install 3"Caliper Trees near Fields EA 9 $ 692.59 $ 6,233.3' $ J75.00 $ 6,975.00 $ 778.22 $ 7003,91 19 Install Tree Bubblers for Trees LS 1 $ 6,286.10 $ 6,286.10 $ 4,772.00 $ 4,772.00 $ 5,796.64 $ 5,796.64 20 Install Synthetic Turf w/Dual Layer Backing&2.01b/SF Rubber l nfill Sy 24180 $ 116.99 $ 2,828,818.20 $ 125.00 $ 3,022,500..0 $ 6J.26 $ 1,626,346.80 21 Construct Reinforced Concrete Sidewalk w/Compacted Subgrade near Fields 5F 7234 $ 7.49 $ 54,182.66 $ 10.00 $ 72,340.00 $ B.60 $ 62,212.40 22 Hydrom ulch for Disturbed Areas&Practice Field SF 153200 $ 0.19 $ 29,108.00 $ 0.28 $ 42,996.00 $ 0.62 $ 94,984.00 BASE BI D TOTAL $ 4,346,532.63 BASE BI D TOTAL $ 5,433,528.00 BASE BI D TOTAL $ 5,085,274.84 ADD ALTERNATES I.Parking&ADA l mpr......ts Base Parkin Lot Lighting 23 Mobilization(Add Alternate) LS 1 $ 192,282.40 $ 112,282.40 300000 $ 100,000.00 $ 46,921.38 $ 46,921.11 24 Implement&Maintain Erosion Control Measures for Parking lmprovem ents MO 3 $ 1,619.98 $ 4,859.94 $ 1,52].00 $ 4,581.00 $ 3,870.86 $ 161612.58 25 Remove."-12"Tree EA 3 $ 1,549.42 $ 4,648.26 $ .63.00 $ 2,589.DO $ 981.84 $ 2,945.12 26 Remove l3"-24"Tree EA 1 $ 229.75 $ 229.J5 $ 1,151.00 $ 1,151.00 $ 1,]3092 $ 1,J18.22 27 Sawcut,Demo,&Remove Concrete Pavement SF 1392 $ 2.38 $ 3,312.96 $ 3.00 $ 4,176.00 $ 0.90 $ 1,252.80 28 Demo/Remove Sidewalk Pavement SF 935 $ 2.04 $ 1,90J.40 $ 3.00 $ 2,805.00 $ 0.84 $ 785.40 29 Demo/Remove Concrete Curb LF 180 $ 9.0] $ 1,632.60 $ 8.00 $ 1,440.00 $ 9.29 $ 1,672.20 30 Demo/Remove 36"RCP LF 18 $ 64.75 $ 1,165.50 $ 37.00 $ 666.00 $ 83.63 $ 1,505.34 31 Demo/Re move Existing Gravel SF 370 $ 0.73 $ 270.10 $ 2.00 $ 740.00 $ 0.84 $ 330.80 32 Demo/Re move SzSore,Inlet EA 1 $ 1,411.45 $ 1,491.45 $ 1,154.00 $ 1,154.00 $ .36.30 $ .36.30 33 Demo/Remove Gate EA 1 $ 952.00 $ 952..0 $ 291.00 $ 291.00 $ 836.30 $ 836.30 34 Demo/Remove Bollards EA 2 $ 130.08 $ 26..16 $ 1]J.00 $ 354.00 $ 522.69 $ 1,045.38 35 Trench Safety LF 383 $ 11.30 $ 4,327.90 $ 1.00 $ 383.00 $ 29.31 $ 11,225.73 36 36-inch Class III Reinforced Concrete Pipe LF 8 $ 171.09 $ 1,368.J2 $ 276.00 $ 2,208.00 $ 64.48 $ 515.84 37 24-inch Class III Reinforced Concrete Pipe LF 375 $ 72.32 $ 27:120.00 $ 191.00 $ 71,625.00 $ 126.89 $ 4J,583.J5 38 Standard 10"Curb Inlet EA 1 $ 19,285.55 $ 19,285.55 $ ],60].00 $ ],60].00 $ J,852.98 $ J,652.98 39 Standard l5"Curb Inlet EA 1 $ 24,88].20 $ 24,88].20 $ 30,080.00 $ 30,080.00 $ 3.,626.18 $ 30,626.18 40 Connect to Existing 36-inch RCP with Concrete Collar EA 1 $ 1,960.50 $ 1,960.50 $ 1,441.00 $ 1,441.00 $ 1,355.33 $ 1,355.33 41 Insta113"Ca liner Trees nea r Pa rking Improvements EA 11 $ 58].45 $ 6,461.95 $ 749.00 $ 8,228.00 $ 682.68 $ ],509.33 42 Adjust 2"Water Meter Box to Grade EA 1 $ 260.15 $ 260.15 $ 1,044.00 $ 1'0".00 $ 918.48 $ 918.48 43 Adjust Gate Valve Boxto Grade EA 3 $ 289.07 $ 1, 21 $ 1,333.00 $ 3,999.00 $ 311.62 $ 952.86 44 Reinforced Concrete Curb Ramp EA 6 $ 869.62 $ 5,21J.J2 $ 2,806.00 $ 16,836.00 $ 698.91 $ 4,193.46 45 ADA Parking Signs EA 4 $ 1,133.. $ 4,533.76 $ 749.00 $ 2,996.00 $ 355.94 $ 1,423.7' 46 Provide Lime for Subgmde)36lb/Sy) TON 119 $ 43].50 $ 52,229.63 $ 374.00 $ 44,648.87 $ 453.61 $ 54,152.87 47 Insta ll Lime Siablllzed Subgrade(6") SY 6632 $ 3.90 $ 25,866.10 $ ].00 $ 46,426.33 $ 28.36 $ 188,092.9] 48 Construct Reinforced Concrete Pavement I6")for Parking Improvements SY 6429 $ 51.44 $ 331690.61 $ 10.00 $ 64,286.67 $ 71.94 $ 4: 4]8.28 49 Construct 6"Curb LF 1335 $ 28.59 $ 38,16J.65 $ 36.00 $ 48,06..00 $ 36.37 $ 48,553.95 50 Construct Reinforced Concrete Sidewalk w/Compacted Subgrade SF 6450 $ 7.91 $ 50,955.00 $ 9.00 $ 58,050.00 $ 8.]5 $ 56,43].50 51 Pavement Markings LF 3Soo $ 3.]8 $ 14,364.00 $ 2.00 $ ],600.00 $ ].36 $ 27968.10 52 Sife Light Type Pl Assemblyfor Parking Improvements EA 9 $ 6,449.]3 $ 5114J.57 $ 3,]41.00 $ 33,669.00 $ 4,909.20 $ 44,182.80 53 Sife Light Type PI Foundation for Parking Improvements EA 9 $ 1,151.39 $ 3.,362.51 $ 3,568.00 $ 32,112.00 $ 1,050.97 $ 9,458.J3 54 Ground Box EA 3 $ 13,595.23 $ 40,785.69 $ 1,726.00 $ 5,178.00 $ 1,534.13 $ 4:602.39 55 1-1/4"schedule 40 PVC(Trench) LF 830 $ 16.38 $ 13,595.40 $ 21.00 $ 1J,430.00 $ 18.34 $ 15,222.20 56 1-1/4"Schedule 40 PVC(Bore) LF LED $ 36.4: $ 5,833.60 $ 48.00 $ J,680.00 $ 42.96 $ 6,8]3.60 57 1..Schedule 40 PVC(Trench) LF 2250 $ 15.42 $ 34,695..0 $ 18.00 $ 40,500.00 $ 14.63 $ 32,91J.50 58 Ma intain Existing Site Lighting LS 1 $ 5,952.40 $ 5,952.40 $ 11,510.00 $ 11,510.00 $ 18,409.50 $ 18,409.50 59 Electrical Mobilization LS 1 $ 50,.00.00 $ 50,000..0 $ 11,530.00 $ 11,510.00 $ 9,204.75 $ 9,204.J5 60 Electrical Metering LS 1 $ 1,190.50 $ 1,190.50 $ 2,8]].00 $ 2,8]J.00 $ 11,045.]0 $ 11,045.J0 61 p10 Copper(THWN) LF 7150 $ 0.99 $ 7,573.50 $ 2.00 $ 15,3w woo $ 2.45 $ 18,742.50 62 .Copppar(THWN) LF 2700 $ 1.5fi $ 4,212.00 $ 3.00 $ 8,100.00 $ 3.68 $ 9,936.00 Subtotal $ 1,053,824.34 Subtotal $ 701,331.87 Subtotal $ 1,183,879.31 2.Field Lighting Upgrades 63 Remove Existing Flood Light EA 144 $ 244.38 $ 35,190.72 $ 1]3.00 $ 24,912..0 $ 118.65 $ 1],.85.60 64 Furnish and Install Flood Light EA 144 $ 4,]48.59 $ 683,196.96 $ 5,628.00 $ 830,432.00 $ 4,400.72 $ 633,]03.68 65 Musco Commissioning,/lOYr.Warranty LS 1 $ 11,904.75 $ 11,904.75 $ 11,510.00 $ 11,510.00 $ 126,043.71 $ 126,043.71 Subtotal $ 730,892.43 Subtotal $ 846,854.00 Subtotal $ 776,832.99 3.Parking Lot Lighting Upgrades 66 Site Light Type P2 Assembly for Parking Improvements EA 4 $ 9,458.34 $ 3J,833.36 $ 6,446.00 $ 25,J84.00 $ IJ,335.61 $ 69,342.44 6] Site Light Type P2 Foundation for Parking Improvements EA 4 $ 1,676.30 $ 6,]04.40 $ 3,568.00 $ 14,2]2.00 $ 1,892.04 $ ],568.16 68 1-1/4"Schedule 40 PVC(Trench) LF 440 $ 22.62 $ 9,952.80 $ 21.00 $ 9,240.00 $ 18.22 $ 8,016.80 69 p8 Coppper(THWN) LF 1460 $ 1.56 $ 2,2]J.60 $ 3.00 $ 4:380.00 $ 5.33 $ ],]81.80 JO Remove Existing Luminaires and Arms in Existing Parking Lot EA 16 $ 192.]3 $ 3,083.36 $ 259.00 $ 4,144:00 $ 1,511.11 $ 24,17].l6 JI Site Light Type Pl Luminaires and Armsfor Existing Parking Lot EA 10 $ 3,185.]2 $ 31,SSJ.20 $ 3,J41.00 $ 3],430.00 $ 1,779.59 $ 1],]95.90 72 Site Light Type P2 Lum inaires and Arms for Existing Parking Lot EA 6 $ 6,359.13 $ 38,154.78 $ 6,446.00 $ 38,676.00 $ 4,397.83 $ 26,386.98 Subtotal $ 129,863.50 Subtotal $ 133,906.00 Subtotal $ 161,069.94 4.Turf U,u ades J3 Install Cooling Rubber or Rubber/Sand lnfill in Lieu of Standard lnfill SY 24111 $ 11.69 $ 282,664.20 $ 11.01 $ 215,980.00 $ 12.22 $ 295,4]9.61 J4 Turf lrrigation Rotary Spray Heads Fields&Hitting Wall) LS 1 $ 259,561.90 $ 259,561.9' $ 249,861.00 $ 249,661..0 $ 182,6]4.87 $ 1852674.87 JS Install Mow Strip Under Proposed Chain Link Fence at Fields LF 1575 $ 32.29 i50,856.]5 $ 24.00 $ 3J,800..0 $ 2J.62 $ 43,501.50 76 Provide Sod in Lieu of Hydromulch in Disturbed Areas(not including practice fields) SF 74715 $ 0.91 $ 67,990.65 $ 1.00 $ 74,715.00 $ 1.34 $ 100,118.10 Subtotal $ 661,073.50 Subtotal $ 628,356.00 Subtotal $ 621,774.07 5.Dumpster Enclosure Improvements J7 Demo/Remove Dumpster Enclosure LS 1 $ 1,J68.65 $ 1,]fi8.65 $ 2,101.00 $ 2,101..0 $ 17,339.62 $ 17,339:62 J8 Sawcut,Demo,&Remove Concrete Pavement at Dumpster Enclosure IF 200 $ 8.96 $ 1,]92.00 $ 3..0 $ 600.00 $ 3.90 $ J8...0 J9 Demo/Remove Concrete Curb at Dumpster Enclosure LF 32 $ 37.17 $ 1,189.44 $ 9.00 $ 256.00 $ 51.84 $ 1,65'.88 80 Relocate Site Light near Dumpster Enclosure EA 1 $ 2,]73.80 $ 2,773.80 $ 9,632.00 $ 8,632.00 $ 2,534.98 $ 2,534.98 61 Remove&Reinstall Existing Sign near Dumpster Enclosure EA 1 $ 433.65 $ 433.65 $ 173.00 $ 173.00 $ 919.55 $ 919.55 62 Install Dumpster Enclosure&Gate LS 1 $ 33,028.00 $ 33,028.00 $ 48,629.00 $ 48,629.00 $ 55,842.15 $ 55,842.15 83 Construct Re inforcedConcrete Pavement I6")for Dumpster Enclosure SY 210 $ 73.44 $ 15,422.40 $ 165.00 $ 34,650.00 $ 111.42 $ 23,398.20 84 Construct 6"Curb near Dumpster Enclosure LF 33 $ 490.18 $ 16,175.94 $ 36.00 $ 1,188.00 $ 56.57 $ 1,866.81 Subtotal $ ]2,583.08 Subtotal $ 96,229.Do Subtotal $ 104,340.19 ADDALTTOTAL $ 2,648,23].65 ADD ALTTOTAL $ 2,406,676:87 ADD ALTTOTAL $ 2,1947,8%.40 Turf Option A:I nstall Synthetic Turf w/Due l Layer Backing&2.71b/SF Sand+0.91b/SF Rubber l nfill w/Shock Pad in Lieu of 24180 85 Item 20 SY $ 132.49 $ 3,203,608.20 $ 125.41 $ 3,032,413.80 $ 89.46 $ 2:163,142.10 86 Turf Option B:Install Synthetic Turf,/Three Layer Backing&1.]Ib/SFRubberinfillin Ueuofltem20 SY 24180 $ 142.20 $ 3,438,396.00 $ 116.85 $ 2:125,433.00 $ 79.11 $ 1,912,879.80 87 Turf Option C:Install Synthetic Turf w/Three Layer Back ing&2:51b/SF Send+l.O lb/SF Rubber lnfill w/Shock Pad in Lieu ofit, SY 24180 $ 150.16 $ 3,630,868.80 $ 132.45 $ 3,202,641.00 $ 98.07 $ 2,371,332.60 TOTAL for Recommended Scope of Work(Base .Turf Opt A+Add Alt 1,3, Mow Strip) $ 5,955,867.2.2 $ 6,316,479.67 $ 7,010,521.49 -Recommended Scope of Work Attachment B DIVISION 6 CONSTRUCTION CONTRACT STATE OF TEXAS § § KNOW ALL MEN BY THESE PRESENTS: COUNTY OF TARRANT § THIS CONTRACT is made and entered into on this the 1st day of September,2026,by and between the City of Southlake, a Texas home rule municipality(hereinafter referred to as the"City"or"Owner")and North Rock Construction&Associates LLC (hereinafter referred to as Contractor). In consideration of the mutual covenants hereinafter set forth,the Owner and Contractor agree as follows: Article I.Work The Contractor shall perform all of the work as specified in the Contract Documents. The scope of work under this Construction Contract shall include the following bid items that were submitted as part of Contractor's Bid Proposal on July 8,2026:Base Bid (Items No.0 through 22);Turf Option A—Install Synthetic Turf w/Dual Layer Backing&2.7 lb/SF Sand+0.9 lb/SF Rubber Infill w/Shock Pad in Lieu of Item 20(Item No.85);Add Alternate 1—Parking&ADA Improvements,Base Parking Lot Lighting(Items No.23 through 62);Parking Lot Lighting Upgrades(Items No.66 through 72);and Install Mow Strip Under Proposed Chain Link Fence at Fields(Item No. 75). Plans and Specifications prepared by: BHB Engineering&Surveying,All extra work shall be performed as specified or indicated in the Contract Documents; and,at the Contractor's own cost and expense,the Contractor shall furnish all the materials, supplies, machinery,equipment,tools,superintendence,labor,insurance and other accessories and services as may be necessary in order to complete the construction,as described above and in accordance with the Contract Documents unless otherwise agreed to by the Owner. Article II.Contract Documents The Contract Documents may only be altered,amended or modified as provided in the General Conditions. The Contract Documents consist of:this written agreement setting forth the work to be performed;advertisement,if any;instructions to bidders,if any; proposal; addendum; specifications, including the general, special and technical conditions, provisions, plans, or working drawings;any supplemental changes or agreements pertaining to the work or materials therefore;bonds;the Standard Specifications for Public Works Construction published by the North Central Texas Council of Governments, as amended; and, any additional documents incorporated by reference. The Contract Documents are made fully a part of the Contract as if attached to this agreement or repeated herein. Article III.Contract Time The Contractor shall perform and complete all the items of work listed and referred to in the Contract Documents within 90 working days. Article IV.Contract Price The Owner shall pay the Contractor for completion of the work in accordance with the Contract Documents using current funds in an amount not to exceed $5,955,867.22. Such payments shall be subject to the General and Special Conditions to the Contract,as contained in the Contract Documents. Article V.Miscellaneous Provisions The terms used in this Contract shall have the same meaning as designated in the General Provisions of the Standard Specifications for Public Works Construction,North Central Texas Council of Governments,as amended. The Contract Documents, which constitute the entire agreement between the Owner and Contractor, are listed in Article II. No assignment by either party hereto of any rights under or interests in the Contract Documents will be binding on the other party hereto without the written consent of the party sought to be bound. The Owner and Contractor each binds itself, its partners, successors, assigns,and legal representatives hereto to the covenants,agreements and obligations contained in the Contract Documents. IN WITNESS WHEREOF, the Owner and Contractor have executed this Contract in duplicate and on the date aforementioned. All portions of the Contract Documents have been signed or identified by the Owner and Contractor. CONTRACTOR ATTEST: OWNER ATTEST: By:Kenneth Williamson By: By: Shawn McCaskill By: Title:President Title: Title: Mayor Title: General Provisions 85 Division 6- Construction Contract DIVISION 7 PERFORMANCE BOND STATE OF TEXAS § § KNOW ALL MEN BY THESE PRESENTS: COUNTY OF TARRANT § THAT of the City of ,County of , State of Texas, (hereinafter referred to as Principal),and (hereinafter referred to as Surety),authorized under the laws of the State of Texas to act as Surety on bonds for Principals,are held and firmly bound unto City of Southlake(hereinafter referred to as Owner)in the penal sum of$5,955,867.22(not less than 100%of the approximate total amount of the contract as evidenced in the proposal)for the payment whereof,the said Principal and Surety bind themselves,and their heirs,administrators,executors,successors and assigns jointly and severally,by these presents: WHEREAS,the Principal has entered into a certain written contract with the Owner,dated the 1 st day of September,2026, to which said contract is hereby referred to and made a part hereof and as fully and to the same extent as if copied at length herein. NOW,THEREFORE,the condition of this obligation is such,that if the said Principal fully and faithfully executes the work and performance of the contract in accordance with the plans,specifications and contract documents,including any extensions thereof,and according to the true intent and meaning of said contract and the plans and specifications hereto annexed,then this obligation shall be void;otherwise,to remain in full force and effect. PROVIDED,HOWEVER,that this Bond is executed pursuant to the provisions of Texas Government Code Chapter 2253, and all liabilities on this bond shall be determined in accordance with provisions of Texas Government Code Chapter 2253 to the same extent as if they were fully copied at length herein. Surety,for value received,stipulates and agrees that this bond shall automatically be increased by the amount of any change order or supplemental agreement which increases the contract price with or without notice to the Surety and that no change, extension of time, alteration, or addition to the terms of the contract, or to the work performed thereunder, or the plans, specifications,or drawings accompanying the same shall in any way affect the Surety's obligation on this bond,and the Surety does hereby waive notice of any such change,extension of time alteration,or addition to the terms of the contract or to the work to be performed thereunder. In addition to the foregoing, Surety agrees that the bond provide for the repairs and/or replacement of all defects due to faulty materials and workmanship that appears within a period of one(1)year from the date of Final Acceptance of the Project by the Owner. IN WITNESS WHEREOF,the said Principal and Surety have signed and sealed this instrument on this the day of ,20. PRINCIPAL Title: Company: Address: SURETY Title: Company: Address: The name,address and telephone number of the Resident Agent of Surety is: Name: Address: Telephone: General Provisions 86 Division 7 - Performance Bond DIVISION 8 PAYMENT BOND STATE OF TEXAS § § KNOW ALL MEN BY THESE PRESENTS: COUNTY OF TARRANT § THAT of the City of ,County of ,State of Texas,(hereinafter referred to as Principal),and (hereinafter referred to as Surety),authorized under the laws of the State of Texas to act as Surety on bonds for Principals,are held and firmly bound unto City of Southlake(hereinafter referred to as Owner)in the penal sum of$5,955,867.22(not less than 100%of the approximate total amount of the contract as evidenced in the proposal)for the payment whereof, the said Principal and Surety bind themselves, and their heirs, administrators, executors, successors and assigns,jointly and severally,by these presents: WHEREAS,the Principal has entered into a certain written contract with the Owner,dated the day of 120 ,to which said contract is hereby referred to and made apart hereof and as fully and to the same extent as if copied at length herein. NOW,THEREFORE,the condition of this obligation is such,that the bond guarantees the full and proper protection of all claimants supplying labor and material in the prosecution of the work provided for in said contract and for the use of each claimant, and that conversely should the Principal faithfully perform said contract and in all respects duly and faithfully observe and perform all and singular the covenants,conditions and agreements in and by said contract agreed to by the Principal,and according to the true intent and meaning of said contract and the claims and specifications hereto annexed,then this obligation shall be void;otherwise,to remain in full force and effect. PROVIDED,HOWEVER,that this bond is executed pursuant to the provisions of Texas Government Code Chapter 2253, as amended, and all liabilities on this bond shall be determined in accordance with the provisions of Texas Government Code Chapter 2253 to the same extent as if they were fully copied at length herein. Surety,for value received,stipulates and agrees that this bond shall automatically be increased by the amount of any change order or supplemental agreement which increases the contract price with or without notice to the Surety and that no change, extension of time, alteration, or addition to the terms of the Contract, or to the work performed thereunder, or the plans, specifications or drawings accompanying the same shall in any way affect the Surety's obligation on this bond,and the Surety does hereby waive notice of any such change,extension of time,alteration,or addition to the terms of the Contract or to the work to be performed thereunder. IN WITNESS WHEREOF,the said Principal and Surety have signed and sealed this instrument on this the day of 20. PRINCIPAL Title: Company: Address: SURETY Title: Company: Address: The name,address and telephone number of the Resident Agent of Surety is: Name: Address: Telephone: General Provisions 87 Division 8 - Payment Bond DIVISION 9 MAINTENANCE BOND STATE OF TEXAS § § KNOW ALL MEN BY THESE PRESENTS: COUNTY OF TARRANT § THAT as Principal,and a corporation organized under the laws of the State of and authorized to do business in the State of Texas,as Sureties, do hereby expressly acknowledge themselves to be held and bound to pay unto the City of Southlake,the sum of five million,nine hundred fifty-five thousand,eight hundred sixty-seven dollars and twenty-two cents(one-hundred percent (100%)of final contract price) ($5,955,867.22)for the payment of which sum well and truly to be made unto said — and its successors,said Principal and Sureties do hereby bind themselves,their assigns and successors,jointly and severally. This obligation is conditioned,however,that,whereas said has this day entered into a written contract with said Owner,City of Southlake,to build and construct the following project: NORTH PARK TURF AND PARKING IMPROVEMENTS: The scope of work shall include the following bid items that were submitted as part of Contractor's Bid Proposal on July 8, 2026: Base Bid(Items No. 0 through 22); Turf Option A—Install Synthetic Turf w/Dual Layer Backing&2.71b/SF Sand+0.91b/SF Rubber Infill w/Shock Pad in Lieu of Item 20(Item No.85);Add Alternate 1—Parking&ADA Improvements,Base Parking Lot Lighting(Items No. 23 through 62);and Install Mow Strip Under Proposed Chain Link Fence at Fields(Item No. 75). Which contract and the plans and specifications therein mentioned and adopted by the are hereby expressly made a part thereof as though the same were written and embodied herein. WHEREAS,under the specifications and contract,it is provided that the Contractor shall maintain and keep in good repair the work constructed and/or equipment furnished by him as contemplated by the plans, specification, drawings,etc.,and perform for a period of two(2.0)years. The period shall be two(2.0)years from the date of final acceptance as shown on the Letter of Final Acceptance as issued by the Engineer. The Contractor agrees to make all necessary repairs,reconstruction and renewal of any part of said construction, and to furnish the labor and materials to make good and to repair any defective condition growing out of or on account of the breakage or failure of any substance or the improper function of any part of the constructed work. The Contractor shall reimburse the Owner for the costs of all Engineering and special services required to be furnished by the Owner which are directly attributable to the restoration of the constructed work. Said maintenance contemplates the complete restoration of the constructed work to a functional use during the said period as set forth above. It is being understood that the purpose of this section is to require the correction of all defective conditions resulting from materials furnished or work and labor performed by said Contractor under the conditions prescribed by the Contract Document;and in case the said Contractor shall fail or refuse to perform as provided within ten(10)days after proper written notifications have been furnished to him by the Owner,it is agreed that the Owner may do said work and supply such materials and the said Contractor and Sureties herein shall be subject to the liquidated damages mentioned in said Contract for each calendar days failure on its part to comply with the terms of the said provision of the said Contract and this Maintenance Bond. NOW THEREFORE,if the said Contractor shall keep and perform its said agreement to maintain said work and keep the same in good repair for the said maintenance period as provided above,then these presents shall be null and void and have no further effect,but if default shall be made by the said Contractor in the performance of its contract to do so maintain and repair damages in these premises, as provided, and it is further understood and agreed that this obligation shall be a continuing one against the Principal and Sureties hereon,and that successive recoveries maybe had hereon for successive breaches until the full amount shall have been exhausted; and it is further understood that the obligation herein to maintain said work shall continue throughout said maintenance period,and the same shall not be changed,diminished or in any manner affected from any clause during said time. General Provisions 88 Division 9 - Maintenance Bond IN WITNESS WHEREOF,the said(Contractor) has caused by these presents to be executed by(name of Contractor's authorized signer) and the said (name of surety) has caused these presents to be executed by its attorney-in-fact or official and the said attorney-in-fact or official has hereto set his hand this day of ,20. PRINCIPAL ATTEST: Name: Title: Title: Company: Company: Address: SURETY ATTEST Name: Title: Title: Company: Company: Address: The name,address and telephone number of the Resident Agent of Surety is: Name: Address: Telephone: NOTE: 1. Power of Attorney must be attached. 2. The Maintenance Bond effective date will begin when a Final Letter of Acceptance is issued by the City. General Provisions 89 Division 9 - Maintenance Bond DIVISION 10 CERTIFICATE OF INSURANCE TO: Date Proje€t No Type of Proje€t THIS IS TO CEIMFY THAT (Marts and address of imradl is,at the date of this certifirate,insured by this Comp-0riy with respect to the business operations hereinafter described,for the types of Insurance find in uccordance with the Pro-risions of the Standard policies used by this C4fnpanyr and furtFler hereinafter des€rlbed- Exceptions to Standard policy noted cn reverse side hereof- TYPE OF INSURANCE EFfrctrvo - - .- Limits of t.iabiriFj C 1 P—5 PabF.Iiabii I Jadur$ Ccrrtingti n 1 P—S P D.—q. LLjkkr'.Rii Oth., The foregoing Policies[do](do not)cover all sub-cmirractors- Lo€atiorts Coveted• Desaiptions of Operations Covered- The above poi ides either in the body thereof or by appropriate endorsement provide that they may not be changed or canceled by the insurer in less than five days after the insured has received written notice of such Mange cr aonoellation- Where applicable Ioaal laws or regulations require mare than five days actual rtoti€e of Mange or cancellation to the assured,the above polices contain sure special requirements,either in the body thereof or by appropriate endorsement thereto attached- [Name of Insurer) By Title General Provisions 90 Division 10- Certificate of Insurance Page is too large to OCR.