Loading...
Item 9A - PresentationITEM 9A - AUGUST 18, 2026 CONSIDER DESIGN CONCEPTS FOR THE DOVE AND BICENTENNIAL PARK ELEVATED STORAGE TANKS PROJECT BACKGROUND GRAPHIC DESIGN CONCEPTS COUNCIL DIRECTION ITEM PURPOSE BACKGROUND & PROJECT TIMELINE DOVE TOWER BICENTENNIAL TOWER 1986 - 19 8 7 TOWERS CONSTRUCTED 2008 DRAGON LOGO ADDED TO DOVE (Funded through Community Donations) 2006/2007 TOWERS REPAINTED DECEMBER 2025 DESIGN CONTRACT AWARDED FALL 2026 WINTER 2027 REHABILITATION BEGINS WINTER 2028 MAY 2027 REHABILITATION ANTICIPATED COMPLETION MAY 2028 DOVE TOWER BICENTENNIAL TOWER SUMMER 2026 SUMMER 2027DESIGN COMPLETE AND ISSUE FOR CONSTRUCTION BID •REVIEWED AT 2026 WINTER WORKSHOP •CHOSE TO MODERNIZE WITH CURRENT CITY BRANDING, BUT KEEP TRADITIONAL LOOK •BRING BACK ADDITIONAL OPTIONS FOR REVIEW PREVIOUS COUNCIL DIRECTION DECISIONS FOR CITY COUNCIL TONIGHT SELECT PREFERRED DESIGN OPTION OR ALTERNATIVE “S” LOGO ON TOP? MATCH DESIGN ON BOTH TOWERS? DRAGON ONLY PRESERVES THE EXISTING TOWER IDENTITY WITH UPDATED BRANDING ELEMENTS SHIELD + DRAGON INCORPORATES THE CITY’S SHIELD WITH THE DRAGON SIGNATURE “S” + DRAGON INTRODUCE THE CITY’S NEW “S” BRANDING WHILE MAINTAINING THE DRAGON GRAPHIC DESIGN CONCEPTS PRESERVES THE EXISTING DOVE TOW ER IDENTITY UPDATED “SOUTHLAKE” DRAGON ONLY PRESERVES THE EXISTING DOVE TOW ER IDENTITY UPDATED “SOUTHLAKE” DRAGON ONLY PRESERVES THE EXISTING DOVE TOW ER IDENTITY UPDATED “SOUTHLAKE” DRAGON ONLY +“S” ON ROOF PRESERVES THE EXISTING DOVE TOW ER IDENTITY UPDATED “SOUTHLAKE” DRAGON ONLY THE CITY’S SHIELD WITH THE DRAGON SHIELD + DRAGON THE CITY’S SHIELD WITH THE DRAGON SHIELD + DRAGON THE CITY’S SHIELD WITH THE DRAGON SHIELD + DRAGON THE CITY’S SHIELD WITH THE DRAGON SHIELD + DRAGON +“S” ON ROOF CITY’S “S” BRANDING WHILE MAINTAINING THE DRAGON SIGNATURE “S” + DRAGON CITY’S “S” BRANDING WHILE MAINTAINING THE DRAGON SIGNATURE “S” + DRAGON CITY’S “S” BRANDING WHILE MAINTAINING THE DRAGON SIGNATURE “S” + DRAGON +“S” ON ROOF CITY’S “S” BRANDING WHILE MAINTAINING THE DRAGON SIGNATURE “S” + DRAGON COUNCILDIRECTION PREFERRED GRAPHIC CONCEPT ROOFTOP GRAPHIC GRAPHIC CONSISTENCY → DRAGON ONLY → SHIELD + DRAGON → SIGNATURE “S” + DRAGON → SHOULD THE ROOFTOP “S” BE INCORPORATED INTO THE FINAL DESIGN? → SHOULD BOTH DOVE AND BICENTENNIAL WATER TOWERS SHARE THE SAME GRAPHIC THEME? Council direction received tonight will establish the basis for final design. → EST. COST: $25,000 (EACH) → EST. COST: $30,000 THANK YOU! DOVE TOWER BICENTENNIAL PARK TOWER DRAGON ONLY OPTIONAL “S” ON ROOF SHIELD + DRAGON OPTIONAL “S” ON ROOF SIGNATURE “S” + DRAGON OPTIONAL “S” ON ROOF