Item 9A - PresentationITEM 9A - AUGUST 18, 2026
CONSIDER DESIGN CONCEPTS FOR THE DOVE AND BICENTENNIAL PARK ELEVATED STORAGE TANKS
PROJECT BACKGROUND
GRAPHIC DESIGN CONCEPTS
COUNCIL DIRECTION
ITEM PURPOSE
BACKGROUND
& PROJECT TIMELINE
DOVE TOWER BICENTENNIAL TOWER
1986 - 19 8 7 TOWERS CONSTRUCTED
2008 DRAGON LOGO ADDED TO DOVE
(Funded through Community Donations)
2006/2007 TOWERS REPAINTED
DECEMBER 2025 DESIGN CONTRACT AWARDED FALL 2026
WINTER 2027 REHABILITATION BEGINS WINTER 2028
MAY 2027 REHABILITATION ANTICIPATED
COMPLETION MAY 2028
DOVE
TOWER
BICENTENNIAL
TOWER
SUMMER 2026 SUMMER 2027DESIGN COMPLETE AND ISSUE FOR
CONSTRUCTION BID
•REVIEWED AT 2026 WINTER WORKSHOP
•CHOSE TO MODERNIZE WITH CURRENT CITY BRANDING,
BUT KEEP TRADITIONAL LOOK
•BRING BACK ADDITIONAL OPTIONS FOR REVIEW
PREVIOUS COUNCIL DIRECTION
DECISIONS FOR
CITY COUNCIL
TONIGHT
SELECT
PREFERRED
DESIGN OPTION
OR ALTERNATIVE
“S” LOGO ON
TOP?
MATCH DESIGN ON
BOTH TOWERS?
DRAGON ONLY
PRESERVES THE EXISTING
TOWER IDENTITY WITH
UPDATED BRANDING
ELEMENTS
SHIELD + DRAGON
INCORPORATES THE CITY’S
SHIELD WITH THE DRAGON
SIGNATURE “S” + DRAGON
INTRODUCE THE CITY’S NEW
“S” BRANDING WHILE
MAINTAINING THE DRAGON
GRAPHIC DESIGN CONCEPTS
PRESERVES THE
EXISTING DOVE
TOW ER IDENTITY
UPDATED
“SOUTHLAKE”
DRAGON
ONLY
PRESERVES THE
EXISTING DOVE
TOW ER IDENTITY
UPDATED
“SOUTHLAKE”
DRAGON
ONLY
PRESERVES THE
EXISTING DOVE
TOW ER IDENTITY
UPDATED
“SOUTHLAKE”
DRAGON
ONLY
+“S” ON ROOF
PRESERVES THE
EXISTING DOVE
TOW ER IDENTITY
UPDATED
“SOUTHLAKE”
DRAGON
ONLY
THE CITY’S SHIELD WITH THE DRAGON
SHIELD +
DRAGON
THE CITY’S SHIELD WITH THE DRAGON
SHIELD +
DRAGON
THE CITY’S SHIELD WITH THE DRAGON
SHIELD +
DRAGON
THE CITY’S SHIELD WITH THE DRAGON
SHIELD +
DRAGON
+“S” ON ROOF
CITY’S “S” BRANDING WHILE MAINTAINING THE DRAGON
SIGNATURE
“S” +
DRAGON
CITY’S “S” BRANDING WHILE MAINTAINING THE DRAGON
SIGNATURE
“S” +
DRAGON
CITY’S “S” BRANDING WHILE MAINTAINING THE DRAGON
SIGNATURE
“S” +
DRAGON
+“S” ON ROOF
CITY’S “S” BRANDING WHILE MAINTAINING THE DRAGON
SIGNATURE
“S” +
DRAGON
COUNCILDIRECTION
PREFERRED GRAPHIC
CONCEPT
ROOFTOP GRAPHIC GRAPHIC
CONSISTENCY
→ DRAGON ONLY
→ SHIELD + DRAGON
→ SIGNATURE “S” + DRAGON
→ SHOULD THE ROOFTOP
“S” BE INCORPORATED INTO
THE FINAL DESIGN?
→ SHOULD BOTH DOVE AND
BICENTENNIAL WATER
TOWERS SHARE THE SAME
GRAPHIC THEME?
Council direction received tonight will establish the basis for final design.
→ EST. COST: $25,000 (EACH)
→ EST. COST: $30,000
THANK YOU!
DOVE TOWER
BICENTENNIAL PARK TOWER
DRAGON ONLY
OPTIONAL “S” ON ROOF
SHIELD + DRAGON
OPTIONAL “S” ON ROOF
SIGNATURE “S” + DRAGON
OPTIONAL “S” ON ROOF