Loading...
Item 6B - Drainage PlansHAMILTON DUFFY, P.C. Civil & Environmental Engineers · Planners · Construction Managers Texas Firm Reg. No. F-5260 ____________________________________________________ 8241 Mid-Cities Blvd., #100 North Richland Hills, TX 76182 (817) 268-0408 www.hamiltonduffy.com July 17, 2026 City of Southlake Public Works Department RE: Drainage Concept for Bridlegate Subdivision 4000 North White Chapel Blvd. (9.562 Acres, 8 lots) Southlake, Texas We are pleased to present you this explanation of our preliminary drainage concept design for Bridlegate Subdivision. We have prepared some color renderings showing where the pre- developed storm water runoff travels and where the post-developed runoff travels. Below is a detailed narrative explanation of our drainage drawings: C1.10 (Pre-Developed Drainage Area Map) – This map shows pre-developed drainage conditions. Areas labeled with an O are offsite areas to our west draining onto and through our property. Areas O1+A1 (RED) drain north to a grate inlet in West Bob Jones Road and through Saddleback Ridge Estates. Areas O2+B1 (GREEN) drain east to a concrete flume in Rainey Court Subdivison. Areas O3+C1 (PURPLE) drain east to N. White Chapel Blvd. bar ditch. Area D1 (BLUE) drains east into the backyards of Lots 1 and 2 of Rainey Court. Area E1 (YELLOW) drains east down West Bob Jones Road bar ditch. C1.11 (Post-Developed Drainage Area Map) – This map shows proposed post-developed drainage conditions. Notice how the color codes match the Pre-Developed Map and how consistent in size and direction the drainage areas are maintained. Areas O1+A1 (RED) continue to go to the existing Bob Jones Road grate inlet. Pre-Developed flow rates are maintained so there is no need for a detention pond. Areas 02+B’s (GREEN) are ultimately directed to proposed Detention Pond B. This pond has been preliminarily sized such that pre-developed flow rates are maintained and discharged directly to the existing concrete flume in Rainey Court. Areas 03+C’s (PURPLE) are ultimately directed to proposed Detention Pond C. This pond has been preliminarily sized such that pre-developed flow rates are maintained and discharged to the N. White Chapel Blvd. bar ditch. Area D1 (BLUE) has been minimized and less than pre- developed flow rates drain east into the backyards of Lots 1 and 2 of Rainey Court. Area E1 (YELLOW) drains east down West Bob Jones Road bar ditch at pre-developed flow rates. C1.12 (Drainage Calculations) – This drawing shows Post-Developed flow rates for areas depicted on Sheet C1.11. The drawing also shows the preliminary sizing of the detention ponds. We have left more than enough available area for the future design and construction of the detention ponds. Drainage Concept for Bridlegate Page 2 of 2 4000 N. White Chapel (9.562 Ac) – Southlake, Texas July 17, 2026 We have attached mentioned Drainage Area Maps to this letter. We are available to discuss this project at any time. Sincerely, HAMILTON DUFFY, P.C. Keith Hamilton Keith Hamilton, P.E. Attachments 0 SCALE 1" = 60' 30 60 120 C1.10 PRE-DEVELOPED DRAINAGE AREA MAPPDRAINAGE AREA COMPUTATIONS Q = CIA (Rational Method) Q = Storm discharge (cubic feet per second) C = runoff coefficient, based on land use A = area contributing runoff (acres) BASIS: RUNOFF COEFFICIENT: ground to the storm drain inlet (onsite + offsite, if applicable) being the time for water to flow over the surface of the Combination of inlet time and time of flow in the drain STORM FREQUENCY: TIME OF CONCENTRATION: MINIMUM INLET TIME OF CONCENTRATION: 100 Years - Combined Enclosed Pipe System + Street + R.O.W. 5 Years - Enclosed Pipe System Commercial, Business Residential, Single Family Parkland, Undeveloped Land 10 minutes 15 minutes 20 minutes OS1 DRAINAGE AREA DRAINAGE DIVIDE FLOW DIRECTION ARROW LEGEND (inches per hour) (per ISWM) I = average rainfall intensity for time of concentration MARK AREA (AC) C Tc (MIN.) QI (IN/HR) COMMENTS (CFS) 100I (IN/HR) 10 Q (CFS) 10100 0.350.52 1.51.0A1 0.35 154.19 11.85.34 8.02O1 I (IN/HR) 10 3.23 Q (CFS) 1 0.6 4.7 PRE-DEVELOPED SITE DRAINAGE DATA O1 O2 O3 A1 B1 E1 D1 C1 C = 0.95 Paved Areas/Roofs C = 0.45 Single Family (1+ acre lots) C = 0.35 Partially Developed Areas C = 0.30 Unimproved Areas 20 4.52 6.762.73 15 5.34 8.023.23 0.352.45 6.94.6B1 0.35 151.68 3.95.34 8.02 2.6O23.23 2.8 1.6 15 5.34 8.023.23 TO 3' GRATE INLET Q100 (DESIGN) = 12.9 CFS RIDGE ESTATES (2016) FROM PLANS FOR SADDLEBACK Q100 DESIGN = 2 CFS COURT (2024) FROM PLANS FOR RAINEY Q100 DESIGN = 8 CFS COURT (2024) FROM PLANS FOR RAINEY 0.354.13 9.86.53.9 TO 3' GRATE INLET TO 3' GRATE INLET TO B1 TO RAINEY COURT 0.356.09 17.111.4C1 0.35 151.01 2.85.34 8.02 1.9O33.23 6.9 1.1 15 5.34 8.023.23 TO C1 0.350.63 1.81.2D1 0.35 150.28 0.85.34 8.02 0.5E13.23 0.8 0.3 15 5.34 8.023.23 TO RAINEY COURT O2+B1 20 4.52 6.762.730.357.10 16.811.26.8O3+C1 TO N. WHITE CHAPEL TOTAL TO N. WHITE CHAPEL TO BOB JONES RD. 7.8 RAINEY CT SHOW Q100 = 8 CFS) TOTAL TO RAINEY COURT (PLANS FOR Q100 PRE = 16.8 CFS BAR DITCH N WHITE CHAPEL DISCHARGES TO JOBDATECHECKEDBYDATENO.SHEETREVISION DRAWNDESIGNED K.M.H.999-640K.M.H.K.M.H.C O N S U L T I N GNUMBER F-5260ENGINEERING FIRMTEXAS REGISTERED CIVIL & ENVIRONMENTAL ENGINEERS - PLANNERS - CONSTRUCTION MANAGERS8241 MID-CITIES BLVD., SUITE 100 - NORTH RICHLAND HILLS, TEXAS 76182 PHONE (817) 268-0408 www.hamiltonduffy.com4-27-26 DATEBRIDLEGATECITY CASE NO: ZA26-0040 CITY OF SOUTHLAKE, DENTON COUNTY, TEXASDOCUMENT NUMBER 2015-340 P.R.D.C.T.LOT 2R, R.D. PRICE NO. 992-ADDITION1REVISED PER CITY CONCEPT REVIEWKMH5-6-26578 ft 579 ft 580 ft 580 ft 581 ft 581 ft 581 ft 581 ft 581 ft 581 ft 582 ft 582 ft 582 ft 582 ft 582 ft 582 ft 583 ft 583 ft 583 ft 583 ft 583 ft 583 ft 583 ft 583 ft 584 ft 584 ft 584 ft 584 ft 584 ft 585 ft 585 ft 587 ft 587 ft 588 ft 588 ft 588 ft 588 ft 590 ft 590 ft 591 ft 595 ft 595 ft 600 ft 600 ft 600 ft 602 ft 603 ft 604 ft 605 ft 605 ft 606 ft 607 ft 609 ft 610 ft 610 ft 610 ft 610 ft 610 ft 610 ft 610 ft 610 ft 610 ft 610 ft 610 ft 610 ft 610 ft 610 ft 610 ft 611 ft 612 ft 612 ft 612 ft 613 ft 613 ft 615 ft 616 ft 617 ft 618 ft 620 ft 621 ft 624 ft 625 ft 626 ft 627 ft 628 ft 630 ft 631 ft 632 ft 634 ft 635 ft 636 ft 637 ft 642 ft 643 ft 644 ft 645 ft 645 ft 646 ft 647 ft 648 ft 649 ft 650 ft 651 ft 652 ft 653 ft 654 ft 654 ft 655 ft 656 ft 657 ft 658 ft 658 ft 659 ft 660 ft 661 ft 662 ft 662 ft 663 ft 664 ft 665 ft 666 ft 667 ft 667 ft 667 ft 667 ft 667 ft S SEWER MANHOLE FL RCP 18" POWER POLE POWER POLE DELIVERY BOX FL RCP 18 TPED TELEPHONE PEDESTAL FL RCP 18" UNDERGOUND TELEPHONE SIGN FL RCP 18" POWER POLE POWER POLE GAS SIGN S SEWER MANHOLE MB KEYPAD GATE MOTOR GATE MOTOR POWER POLE GUY WIRE EM ELECTRIC METER FL PVC 6" FL PVC 6" GM GAS METER POWER POLEPOWER POLE TPED TELEPHONE PEDESTAL MH UNKNOWN MANHOLE (MFDSD) POWER POLE TELEPHONE SIGN ABOVE NET COVERED PUMP COVERED PUMP EB ELECTRIC BOX WM WATER METER UTILITY BOX SEPTIC LID WM WATER METER POWER POLE POWER POLEGUY WIRE MP MP MP MP MP MP MP MP MP MP MP MP MP MP MP MP MP MP MP MP MP MP MP MP MP MP MP MP MP MP MP MP MP MPMP MP RAINEY COURT(50' R.O.W.)W. BOB JONES ROAD (60' R.O.W.)N. WHITE CHAPEL BLVD(R.O.W. VARIES)CAB. V, PG. 822 P.R.D.C.T.R.D. PRICE NO. 992 ADDITIONLOT 4PG. 121 D.R.D.C.T.) (DESCRIPTION VOL. 1221, DOC. NO. 2013-41309 D.R.D.C.T. MARIE W. GRIBSBY 1.000 ACRES LOT 19 CAB. U, PG. 19, P.R.D.C.T. BLOCK 1, CLARIDEN RANCH, PHASE II LOT 18LOT 17LOT 16LOT 15LOT 14LOT 13LOT 12 CAB. N, PG. 48 P.R.D.C.T. LOT 2, BLOCK 1, REEDER ADDITION 4913 SQ. FT. AREA IN QUESTION P.R.D.C.T.DOCUMENT NUMBER 2015-340LOT 2R, R.D. PRICE NO. 992 ADDITION ACRES9.562 40' BUILDING LINE 40' BUILDING LINE40' BUILDING LINE20' BUILDING LINE20' BUILDING LINE 20' BUILDING LINE CAB. V, PG. 822 P.R.D.C.T. R.D. PRICE NO. 992 ADDITION LOT 4 1/2" IRF, SOUTHEAST CORNER OF LOT 4 5.595 ACRE TRACT IN THE SOUTH LINE OF TRACT 11-1.83 ACRES 1/2" IRF (C.M.), SOUTHEAST CORNER OF 5.20' 270.06' DOCUMENT NUMBER 2017-459, P.R.D.C.T. SADDLEBACK RIDGE ESTATES LOT 1, BLOCK 1 WEST BOB JONES ROAD (60' R.O.W.)SADDLEBACK LANEDOCUMENT NUMBER 2017-459, P.R.D.C.T.(LOT 43, BLOCK 1 - PRIVATE STREET)DOCUMENT NUMBER 2017-459, P.R.D.C.T. SADDLEBACK RIDGE ESTATES LOT 34, BLOCK 1 2024-120, P.R.D.C.T. DOCUMENT NUMBER RAINEY COURT LOT 1 2024-120, P.R.D.C.T. DOCUMENT NUMBER RAINEY COURT LOT 2 2024-120, P.R.D.C.T. DOCUMENT NUMBER RAINEY COURT LOT 3 2024-120, P.R.D.C.T. DOCUMENT NUMBER RAINEY COURT LOT 4 "X" CUT FOUND "X" CUT FOUND 1/2" IRF RED CAP "PEISER & MANKIN" "X" CUT FOUND 1/2" IRF WITH RED CAP STAMPED "PRISM SURVEYING" 3/8" IRF 1/2" IRF WITH YELLOW CAP STAMPED "GOODWIN & MARSHALL" 1/2" IRF WITH ORANGE CAP STAMPED "SPRY RPLS 5647" 1/2" IRF RED CAP "PEISER & MANKIN" "Y" CUT FOUND 1/2" IRF 1/2" IRF "SPRY' 1/2" IRF WITH RED CAP STAMPED "PRISM SURVEYING" 1/2" IRF WITH RED CAP STAMPED "PRISM SURVEYING" 1/2" IRF WITH ORANGE CAP STAMPED "SPRY RPLS 5647" 1/2" IRF WITH YELLOW CAP STAMPED "GOODWIN & MARSHALL" 3/8" IRF P O N D P O N D P O N D IRRIGATION CONTROL VALVEIRRIGATION CONTROL VALVE AREA DRAIN AREA DRAINPOOL CLEANOUT POOL CLEANOUTAREA DRAIN AREA DRAIN POOL CLEANOUT JUMP BOARD AC EM ELECTRIC METER POOL EQUIPMENT AC AC AC BASKETBALL HOOP AREA DRAIN FIREPLACE FIREPLACE GRILL & BAR FOUNTAIN STONE RUNNER RUNNER STONE STAIRCASE TO BALCONY 0 SCALE 1" = 60' 30 60 120 C1.11 OS1 DRAINAGE AREA DRAINAGE DIVIDE FLOW DIRECTION ARROW LEGEND POST-DEVELOPED DRAINAGE AREA MAPPDRAINAGE AREA COMPUTATIONS Q = CIA (Rational Method) Q = Storm discharge (cubic feet per second) C = runoff coefficient, based on land use A = area contributing runoff (acres) BASIS: RUNOFF COEFFICIENT: ground to the storm drain inlet (onsite + offsite, if applicable) being the time for water to flow over the surface of the Combination of inlet time and time of flow in the drain STORM FREQUENCY: TIME OF CONCENTRATION: MINIMUM INLET TIME OF CONCENTRATION: 100 Years - Combined Enclosed Pipe System + Street + R.O.W. 5 Years - Enclosed Pipe System Commercial, Business Residential, Single Family Parkland, Undeveloped Land 10 minutes 15 minutes 20 minutes (inches per hour) (per ISWM) I = average rainfall intensity for time of concentration C = 0.95 Paved Areas/Roofs C = 0.45 Single Family (1+ acre lots) C = 0.35 Partially Developed Areas C = 0.30 Unimproved Areas Q100 DESIGN = 2 CFS COURT (2024) FROM PLANS FOR RAINEY TO 3' GRATE INLET Q100 (DESIGN) = 12.9 CFS RIDGE ESTATES (2016) FROM PLANS FOR SADDLEBACK O1 O2 A1 E1 D1 B1 C2 POND B DETENTION POND C DETENTION COURT (2024) FROM PLANS FOR RAINEY EQUAL TO 8 CFS (100 YR) POND TO BE LESS THAN OR RELEASE FROM DETENTION (SEE PRE-DEVELOPED MAP) EQUAL TO 16.8 CFS (100 YR) POND TO BE LESS THAN OR RELEASE FROM DETENTION B3 B2 C1 C4 C5 O3A O3B C3 3' D.I. 3' D.I. 3' D.I. 3' D.I. 10' C.I. 10' C.I. S SEWER MANHOLE FL RCP 18" FL RCP 18 TPED FL RCP 18" FL RCP 18" POWER POLE POWER POLE S SEWER MANHOLE MB EM GM GAS METER POWER POLEPOWER POLE TPED TELEPHONE PEDESTAL MH POWER POLE TELEPHONE SIGN ABOVE NET WM GUY WIRE MP RAINEY COURT(50' R.O.W.)W. BOB JONES ROAD (60' R.O.W.)N. WHITE CHAPEL BLVD(R.O.W. VARIES)CAB. V, PG. 822 P.R.D.C.T.R.D. PRICE NO. 992 ADDITIONLOT 4PG. 121 D.R.D.C.T.) (DESCRIPTION VOL. 1221, DOC. NO. 2013-41309 D.R.D.C.T. MARIE W. GRIBSBY 1.000 ACRES LOT 19 CAB. U, PG. 19, P.R.D.C.T. BLOCK 1, CLARIDEN RANCH, PHASE II LOT 18LOT 17LOT 16LOT 15LOT 14LOT 13LOT 12 CAB. N, PG. 48 P.R.D.C.T. LOT 2, BLOCK 1, REEDER ADDITION CAB. V, PG. 822 P.R.D.C.T. R.D. PRICE NO. 992 ADDITION LOT 4 1/2" IRF, SOUTHEAST CORNER OF LOT 4 5.20' 270.06' DOCUMENT NUMBER 2017-459, P.R.D.C.T. SADDLEBACK RIDGE ESTATES LOT 1, BLOCK 1 WEST BOB JONES ROAD (60' R.O.W.)SADDLEBACK LANEDOCUMENT NUMBER 2017-459, P.R.D.C.T.(LOT 43, BLOCK 1 - PRIVATE STREET)DOCUMENT NUMBER 2017-459, P.R.D.C.T. SADDLEBACK RIDGE ESTATES LOT 34, BLOCK 1 2024-120, P.R.D.C.T. DOCUMENT NUMBER RAINEY COURT LOT 1 2024-120, P.R.D.C.T. DOCUMENT NUMBER RAINEY COURT LOT 2 2024-120, P.R.D.C.T. DOCUMENT NUMBER RAINEY COURT LOT 3 2024-120, P.R.D.C.T. DOCUMENT NUMBER RAINEY COURT LOT 4 "X" CUT FOUND "X" CUT FOUND 1/2" IRF RED CAP "PEISER & MANKIN" "X" CUT FOUND 1/2" IRF WITH RED CAP STAMPED "PRISM SURVEYING" 3/8" IRF 1/2" IRF WITH YELLOW CAP STAMPED "GOODWIN & MARSHALL" 1/2" IRF WITH ORANGE CAP STAMPED "SPRY RPLS 5647" 1/2" IRF RED CAP "PEISER & MANKIN" "Y" CUT FOUND 1/2" IRF 1/2" IRF "SPRY' 1/2" IRF WITH RED CAP STAMPED "PRISM SURVEYING" 1/2" IRF WITH RED CAP STAMPED "PRISM SURVEYING" 1/2" IRF WITH YELLOW CAP STAMPED "GOODWIN & MARSHALL" 3/8" IRF 1/2" IRF WITH ORANGE CAP STAMPED "SPRY RPLS 5647" 5.595 ACRE TRACT IN THE SOUTH LINE OF TRACT 11-1.83 ACRES 1/2" IRF (C.M.), SOUTHEAST CORNER OF 15' D&UE JOBDATECHECKEDBYDATENO.SHEETREVISION DRAWNDESIGNED K.M.H.999-640K.M.H.K.M.H.C O N S U L T I N GNUMBER F-5260ENGINEERING FIRMTEXAS REGISTERED CIVIL & ENVIRONMENTAL ENGINEERS - PLANNERS - CONSTRUCTION MANAGERS8241 MID-CITIES BLVD., SUITE 100 - NORTH RICHLAND HILLS, TEXAS 76182 PHONE (817) 268-0408 www.hamiltonduffy.com4-27-26 DATEBRIDLEGATECITY CASE NO: ZA26-0040 CITY OF SOUTHLAKE, DENTON COUNTY, TEXASDOCUMENT NUMBER 2015-340 P.R.D.C.T.LOT 2R, R.D. PRICE NO. 992-ADDITION1REVISED PER CITY CONCEPT REVIEWKMH5-6-26578 ft 579 ft 580 ft 580 ft 581 ft 581 ft 581 ft 581 ft 581 ft 581 ft 582 ft 582 ft 582 ft 582 ft 582 ft 582 ft 583 ft 583 ft 583 ft 583 ft 583 ft 583 ft 583 ft 584 ft 584 ft 584 ft 584 ft 584 ft 585 ft 587 ft 587 ft 588 ft 590 ft 590 ft 603 ft 610 ft 610 ft 610 ft 610 ft 610 ft 610 ft 610 ft 618 ft 620 ft 621 ft 624 ft 625 ft 626 ft 627 ft 628 ft 630 ft 631 ft 632 ft 634 ft 635 ft 636 ft 637 ft 642 ft 643 ft 644 ft 645 ft 645 ft 646 ft 647 ft 648 ft 649 ft 650 ft 651 ft 652 ft 653 ft 654 ft 654 ft 655 ft 656 ft 657 ft 658 ft 658 ft 659 ft 660 ft 661 ft 662 ft 662 ft 663 ft 664 ft 665 ft 666 ft 667 ft 667 ft 667 ft 667 ft 667 ft 40' BL 40' BL40' BL40' BL 1 2 3 4 5 7 8 6 40' BL40' BL20' BL 20' BL 20' BL 20' BL40' BL20' BL20' BL 40' BL40' BL40' BL40' BL20' BL 20' BL 20' BL 20' BL 20' BL 20' BL 20' BL 20' BL 15' DE 25' SSE & DE 20' SSE & DE15' WE40' BL DEBLBL DE DE DE DE DE DE DE DE D E D E 3' LWE 3' LWE 40' BL 15' WE CURB/DROP OPENING INLET IN SUMP: Q/L = 3.0Y INLET CAPACITY CALCULATIONS 3/2 Y = (Depth of flow at Opening) (ft) L = Length of Inlet Opening (ft) Q = Storm Drainage Discharge (cfs) Where: 8" Depth (ROW depth): Qcap = 16.3 cfs 6" Depth (curb depth): Qcap = 10.6 cfs For 10' Curb Inlet in sump: 9" Depth: Qcap = 15.6 cfs 6" Depth: Qcap = 8.5 cfs For 2' Drop Inlet: 12" Depth: Qcap = 48.0 cfs 6" Depth: Qcap = 17.0 cfs For 4' Drop Inlet: 12" Depth: Qcap = 36.0 cfs 6" Depth: Qcap = 12.7 cfs For 3' Drop Inlet: 8" Depth: Qcap = 9.8 cfs 6" Depth: Qcap = 6.3 cfs (*assume 50% open due to Grate) For 3' Grate Inlet in sump: MARK AREA (AC) C Tc (MIN.) QI (IN/HR) COMMENTS (CFS) 100I (IN/HR) 10 Q (CFS) 10100 0.450.33 1.20.8A1 0.35 154.19 11.85.34 8.02O1 I (IN/HR) 10 3.23 Q (CFS) 1 0.5 4.7 15 5.34 8.023.23 0.450.83 3.02.0B1 0.35 151.68 3.95.34 8.02 2.6O23.23 1.2 1.6 15 5.34 8.023.23 2.51 6.9 TO 3' GRATE INLET TO B1 0.451.00 3.62.4C1 0.35 150.89 2.55.34 8.02 1.73.23 1.5 1.0 15 5.34 8.023.23 TO C1 0.450.18 0.60.4D1 0.45 150.23 0.85.34 8.02 0.6E13.23 0.3 0.3 15 5.34 8.023.23 O2+B1 1.89O3A+C1 7.8 POST-DEVELOPED SITE DRAINAGE DATA 2. WEIGHTED RUNOFF COEF. = [1.01(0.35)+6.08(0.45)]/7.09 = 0.44 1. WEIGHTED RUNOFF COEF. = [1.68(0.35)+3.14(0.45)]/4.82 = 0.42 TO BOB JONES RD. (EQUALS PRE-DEV) TO 3' GRATE INLET (LESS THAN PRE-DEV) TOTAL TO 3' GRATE INLET 01+A1 13.0 TO 3' DROP INLET TOTAL TO 3' DROP INLET 0.451.18 4.32.8B31.7155.34 8.023.23 0.451.13 4.12.7B21.6155.34 8.023.23 TO DETENTION POND B TO 2-10' CURB INLETS 0.424.82 13.79.25.520 TOTAL TO DETENTION POND B +B2+B3 O2+B1 1 4.52 6.762.73 O3A TO 3' DROP INLET TOTAL TO 3' DROP INLET6.1 0.450.68 2.51.6C2 0.35 150.12 0.35.34 8.02 0.23.23 1.0 0.1 15 5.34 8.023.23 TO C2 0.80O3B+C2 O3B TO 3' DROP INLET TOTAL TO 3' DROP INLET2.8 0.447.09 21.114.18.520 TOTAL TO DETENTION POND C 2 4.52 6.762.73 0.450.31 1.10.7C30.5155.34 8.023.23 0.450.97 3.52.3C41.4155.34 8.023.23 TO 3' DROP INLET 0.453.12 11.37.5C54.5155.34 8.023.23 ...C5 O3A TO 10' CURB INLET TO DETENTION POND C TO RAINEY COURT (LESS THAN PRE-DEV) RUNOFF. DOES NOT EXCEED THE PRE-DEVELOPED POST-DEVELOPED RUNOFF LEAVING THE SITE DETENTION POND DESIGNED SUCH THAT THE DETENTION POND B DESIGN (100 YR) Q100 = 13.7 CFS TC = 20 MIN C = 0.42 AREA = O2+1+B2+B3 = 4.82 ACRES Q100 TO DETENTION: Q100(ALLOWABLE) = 8 - 0 = 8 CFS Q100(ALLOWABLE) = QPRE - QBYPASS Q100(BYPASS) = 0 CFS Q100(PREDEVELOPED) = 8 CFS = (SEE RAINEY CT PLANS) RUNOFF. DOES NOT EXCEED THE PRE-DEVELOPED POST-DEVELOPED RUNOFF LEAVING THE SITE DETENTION POND DESIGNED SUCH THAT THE DETENTION POND C DESIGN (100 YR) Q100 = 21.1 CFS TC = 20 MIN C = 0.44 AREA = 03A+C1+03B+C2+C3+C4+C5 = 7.09 ACRES Q100 TO DETENTION: Q100(ALLOWABLE) = 16.8 - 0 = 16.8 CFS Q100(ALLOWABLE) = QPRE - QBYPASS Q100(BYPASS) = 0 CFS Q100(PREDEVELOPED) = 16.8 CFS = (SEE PRE-DEV MAP) C1.12 DRAINAGE CALCULATIONSJOBDATECHECKEDBYDATENO.SHEETREVISION DRAWNDESIGNED K.M.H.999-640K.M.H.K.M.H.C O N S U L T I N GNUMBER F-5260ENGINEERING FIRMTEXAS REGISTERED CIVIL & ENVIRONMENTAL ENGINEERS - PLANNERS - CONSTRUCTION MANAGERS8241 MID-CITIES BLVD., SUITE 100 - NORTH RICHLAND HILLS, TEXAS 76182 PHONE (817) 268-0408 www.hamiltonduffy.com4-27-26 DATEBRIDLEGATECITY CASE NO: ZA26-0040 CITY OF SOUTHLAKE, DENTON COUNTY, TEXASDOCUMENT NUMBER 2015-340 P.R.D.C.T.LOT 2R, R.D. PRICE NO. 992-ADDITION1REVISED PER CITY CONCEPT REVIEWKMH5-6-26