Loading...
Item 4FItem 4F Approve amendment for design services on F.M. 1709 deceleration lanes to the existing Professional Services Agreement with Transystems Corporation in the amount of $7,735.00 Amend PSA with Transystems Corporation Background: Transystems Corporation was hired in 2006 to design the FM1709 Deceleration Lanes. March 2008 amendment was approved by the City Manager in the amount of $48,996.00 for the design of the utility relocations required by TxDOT. TxDOT bid letting scheduled September 2009 Financial Considerations: The proposed amendment is for the redesign of a driveway and sidewalk to meet ADA (American Disabilities Act) standards. The proposed amendment amount is $7,735.00. Cumulative amendment amount of $56,731.00 is above the City Manager’s signature authority. Funds for the engineering design of the FM1709 Deceleration Lanes are included in the 1999 Traffic Management Bond Program. Amend PSA with Transystems Corporation PROJECT LOCATION MAP Location of Driveway Redesign Driveway Location Recommendation Approve amendment for design services on F.M. 1709 deceleration lanes to the existing Professional Services Agreement with Transystems Corporation in the amount of $7,735.00 Questions?