Loading...
Item 4H - Memo CITY OF MEMORANDUM SOUTHLAKE April 13, 2026 To: Alison Ortowski, City Manager From: Sharen Jackson, Chief Financial Officer Subject: Item 4H Approve the purchase of equipment and services from Superior Fiber and Data Services for structured cabling and network infrastructure for the Municipal Service Center and Public Safety Training Tower in an amount not to exceed $164,000. Action Requested: Approve the purchase of structured cabling equipment and related installation services from Superior Fiber and Data Services, Inc. for the Municipal Service Center (MSC) and Public Safety Training Tower(PSTT) project, in an amount not to exceed $164,000. Background Information: The purpose of this item is to seek City Council approval for the purchase of structured cabling equipment and related installation services for the Municipal Service Center and Public Safety Training Tower. The proposed project includes: • Station cabling and patch panels to support computers, printers, and wireless access points across all facilities. • Installation of IT room infrastructure, including racks, cabinets, and overhead ladder rack systems. • USB/HDMI connectivity in offices within the main building to support display integration. • Fiber optic backbone cabling and connectors to provide connectivity between buildings. The structured cabling system will provide the foundational infrastructure necessary to support the City's network, communications systems, and future technology needs for the facilities. The proposal from Superior Fiber& Data Services includes all materials, labor, testing, and documentation required for installation across the Administration Building, Service Bay Building, and Training Tower. The procurement of these goods and services complies with State and City purchasing requirements. Honorable Mayor and City Council Page 2 of 2 Superior Fiber and Data Services is an approved vendor through the Interlocal Purchasing Systems (TIPS) Cooperative Contract, which satisfies competitive bidding requirements under Texas Local Government Code. Use of the TIPS cooperative purchasing contract: • Satisfies competitive bidding requirements under Texas Local Government Code • Provides competitively solicited pricing and terms. • Allows the City to streamline procurement while ensuring best value. Financial Considerations: Funding for this project is available in the Capital Improvement Program for the Municipal Service Center and the Public Safety Training Tower project. The total requested authorization amount of $164,000 includes equipment, installation services, and contingency for potential changes, coordination needs, or minor scope adjustments. Strategic Link: This item aligns with the City's Strategy Map focus areas of: • Infrastructure • Performance Management and Service Delivery • Safety and Security It supports reliable technology infrastructure and long-term operational readiness. Citizen Input/ Board Review: N/A Legal Review: The cooperative purchasing contracts and associated agreements have been reviewed and are compliant with applicable procurement requirements. Alternatives: The City Council may approve or deny the proposed purchase. Supporting Documents: Proposal from Superior Fiber and Data Services Staff Recommendation: Staff recommends approving the item as proposed. �1 C U P E R 10 R F I B E R & D A T A S E R V I C E S, I N C . STRUCTURED CABLING BID RESPONSE FOR CITY OF SOUTH LAKE - MUNICIPAL SERVICE CENTER CAMPUS City of Southlake RE:Structured Cabling Bid Response for City of Southlake-Municipal Service Center Campus TIPS Contract#:230105 On behalf of all of us at Superior Fiber&Data Services,we appreciate the opportunity to provide you with the enclosed bid response for Structured Cabling Bid Response for City of Southlake-Municipal Service Center Campus Superior supports many of the top Dallas Fort Worth area companies with turnkey technology services.Our core service is the design, building and maintenance of the technological infrastructure throughout the life cycle of the facility.Our success is largely due to our ability to partner with all project team members to ensure a productive,efficient,and cohesive approach to servicing the end user.We have been in business for over 20-years and we have never missed a cutover date in the history of our firm. It would be my pleasure to discuss with you a time to meet and review this proposal.If you have any questions,please do not hesitate to contact me via my contact information listed below. Again,thank you for consideration of our services.I personally look forward to the opportunity to work with you on this project and establish our firm as an entrusted technology partner. Acknowledgement of Plans,Specs,Addenda Superior Fiber&Data Services acknowledges receipt and full understanding of the plans,specifications and addenda for this project. This proposal package cannot be accepted or awarded separately. Individual Scope of Works for the following must be awarded together. Questions regarding this proposal may be directed to: Superior Fiber&Data Services,Inc. Darrell Maxey CTPM/Estimator 1711 Briercroft Court Suite 154 Carrollton,TX 75006 Mobile: 817-819-1053 Office: 972-245-6014 Fax: 972-245-6586 dmaxey@sfdcab[ing.com www.sfdcabling.com Estimate #: P-925 1 of 11 Version 1.0, April 14, 2026 r�1 C U P E R 10 R F I B E R & D A T A S E R V I C E 5, I N C . PROJECTSUMMARY LOCATIONS EQUIPMENT LABOR TOTAL ADMIN BUILDING $56,197.49 $52,290.02 $108,487.51 SERVICE BAY BUILDING $18,242.47 $17,189.14 $35,431.61 TRAINING TOWER $10,486.05 $6,399.57 $16,885.62 PROJECT TOTAL $160,804.75 City of Southlake Municipal Service Center Campus 2 of 11 Project #: P-925 Version 1.0,April 14,2026 �1 C U P E R 10 R F I B E R & D A T A S E R V I C E S, I N C . ADMIN BUILDING SCOPE HORIZONTAL CABLING Superior shall provide and install a total of(194)Category 6 Blue UTP Plenum Cables for the following devices: • DATA-(134)Category 6 Blue Cables,terminated with Blue Jacks at the Workstation&Blue Jacks at the Patch Panel • TV DATA-(28)Category 6 Blue Cables,terminated with Blue Jacks at the Workstation&Blue Jacks at the Patch Panel • WAPS-(32)Category 6 Blue Cables,terminated with Blue Jacks at the Workstation&Blue Jacks at the Patch Panel All category cables shall originate from the nearest IDF or MDF and terminate on new 48-Port Modular,Flat,Empty Patch Panels Data&TV Data Shall be terminated on a single patch panel. WAP Cabling shall be terminated on an individual patch panel All category cables terminated in wall boxes shall be housed in a 2-Port or 4-Port White Faceplate,with any unused ports filled with white blank inserts. All category cables terminated above ceiling shall be housed in a 2-port plastic surface mount box,coiled above ceiling on a j-hook nearest to the symbol location per the drawings. PATHWAYS Superior shall provide and installj-hooks sized to support the horizontal cables. Superior shall provide and install grid wire to support thej-hooks or directly attached to walls using appropriate screws. Superior assumes all pathways across hard-lid,exposed,or specialty ceiling spaces that are not drop-tile ceiling shall have conduit furnished and installed by others for our use. Superior assumes any outside plant conduit,underground conduit,and pull-boxes shall be furnished and installed per EIA/TIA/BICSI Standards. Superior assumes any conduit,pull-box shall be furnished and installed by others. Superior assumes any and all conduits for our use,shall be equipped with pull-string and installed by others. Superior assumes any and all cable tray pathways shown outside the MDF/IDF rooms per the technology drawings shall be furnished&installed by others for our use. MDF/IDF BUILDOUT Superior shall buildout the MDF 114A&IDF 209A per the TN-A-4.01&TN-A-4.02 drawings • 2-Post Racks • 6"Vertical Wire Managers • 10"Vertical wire Managers • 18"Ladder Rack All bonding connections shall be#6 AWG Green insulated ground wire and terminate using 2-hole compression ground lugs. Main Electrical/Building Ground for rooms busbar shall be furnished and installed by others. BACKBONE CABLING Superior shall provide and install backbone fiber segments as per the following breakdown: • (1)12-Strand Armored,Indoor/Outdoor,Plenum Singlemode fiber from MDF 114Ato IDF 209A All Fiber strands shall be terminated within a rack mount fiber enclosure and connected to 12-Port,6-Duplex,Fiber Adapter Panels MDF 114A shall receive(1)41J Rack Mount Fiber Enclosure IDF 209A shall receive(1)1U Rack Mount Fiber Enclosure All fiber segments shall be terminated using splice on LC Fiber Connectors PATCH CORDS Superior shall provide and transmit to the owner,(2)Patch cords for each category 6 cable installed. City of Southlake Municipal Service Center Campus 3 of 11 Project #: P-925 Version 1.0,April 14,2026 �1 C U P E R 10 R F I B E R R D A T A S E R V I C E S, I N C . (1)Workstation Patch Cord-10'in Length (1)Closet Patch Cord-7'in Length Superior is not responsible for providing nor installing Fiber Patch cords Superior is not responsible for providing labor to patch in any workstation or closet end patch cords. Superior shall provide and transmit to the owner,(2)HDMI Patch Cords for each HDMI segment ran from faceplate to faceplate. AV CABLING Superior shall provide and install(1)HDMI Cable,terminating both ends with a female HDMI faceplate at(14)total locations as indicated per the project TN-A-1.01&TN-A-1.02 drawings. INSTALL T/ON SERVICES Superior shall provide labor to install(32)Owner provided Wireless Access Points and Owner Provided Hardware EXCL USIONS&NOTES Superior is NOT responsible for providing,nor installing any of the following: • Conduit Pathways • Building Penetrations or Coring • Pull-boxes,Pull-string,Mule-Tape or Bushings for conduit that has been provided by others for our use • Sleeves or conduit for pathways into classrooms,offices and other building spaces with horizontal cabling indicated. • Cable Tray outside of MDF/IDF rooms • Innerduct • Cameras • Camera Category Cabling • Fiber or copper cabling to site camera or access control locations TESTING/DOCUMENTATION/CUTOVER SUPPORT All cabling shall be tested after termination. As-built's for workstation shall be provided at the completion of the project in AutoCAD format with customer provided floor plans in AutoCAD. Superior requires the AutoCAD files to be in.DWG format to complete shop drawings and provide final As-Built Drawings. PATHWAYS& ROUGH-IN QTY DESCRIPTION PRICE EXT 2 L.H.Dottie CWC6 6'Grid Wire W/Clip(Pkg 100) $290.24 100 Panduit JP131W-L20 1.31"Wall MountJ-Hook-Black $267.00 100 Panduit JP2W-L20 2"Wall MountJ-Hook-Black $321.00 20 Panduit JP4W-X20 4"Wall Mount J-Hook-Black $125.00 37 General Cable 7131100 Category 6 UTP Plenum Cable-Blue 1,000'Box $12,076.80 FIELD &CLOSET TERMINATION QTY DESCRIPTION PRICE EXT 388 Panduit CJ688TGBU Category 6 Jack Outlet-Blue $4,675.40 72 Panduit CFPE2WHY 2 Port Executive Faceplate-White $221.76 4 Panduit CFPE4WHY 4 Port Executive Faceplate-White $12.32 20 Panduit CBXQ2WH-A 2-Port Surface Mount Box-White $119.40 1 Panduit CMBWH-X Blank Insert-White(Pkg.10) $3.64 4 Panduit CPPL48WBLY 48-Port Modular Flush Patch Panel $321.92 2 Panduit CPPL48WBLY 48-Port Modular Flush Patch Panel $160.96 12 Panduit SRB19BLY 19"Strain Relief Bar $258.36 14 Panduit CMHDMITWH Mini-Com HDMI 2.0 Coupler Module with Pigtail,White $582.54 28 Panduit CFPE2WHY 2 Port Executive Faceplate-White $86.24 City of Southlake Municipal Service Center Campus 4of 11 Project #: P-925 Version 1.O,April 14,2026 r"" UPERIOR '�) F I B E R & D A I A SERVICES, I NC . QTY DESCRIPTION PRICE EXT 14 Liberty AV Solutions HALO-HCP23M HALO 18G HDMI CMP BLACK23M $3,246.04 CLOSET BUILDOUT QTY DESCRIPTION PRICE EXT 7 CPI 55053-703 7'2-Post Equipment Rack-Black $1,921.78 7 CPI 10595-712 2-Post Equipment Rack Top Plate-Black $423.99 4 Panduit PR2VD06 7',6"Front/Rear Vertical Wire Manager-Black $5,265.12 5 Panduit PR2VD10 7',10"Front/Rear Vertical Wire Manager-Black $8,690.75 10 CPI 10250-718 18"Ladder Rack-Black $1,928.70 8 CPI 11421-718 18"Ladder Rack Wall Angle Support Bracket-Black $354.40 4 CPI 11312-718 18"Ladder Rack Triangle Support Bracket-Black $418.84 4 CPI 11302-701 Ladder Rack Junction Splice Bracket-Black $63.08 4 CPI 11301-701 Ladder Rack Butt-Splice Bracket-Black $63.36 8 CPI 10608-701 Ladder Rack Vertical Wall Bracket-Black $199.20 300 Generic THHN-6-STR-GRN-CUT REEL #6AWG Green Insulated Ground Wire $390.00 40 Burndy YA6CL2TC14 #6AWG 2-Hole Compression Ground Lug $195.20 1 CPI 40153-020 Telecommunications Primary Bonding Busbar(PBB) $481.14 1 CPI 13622-012 Telecommunications Secondary Bonding Busbar(SBB) $173.95 BACKBONE CABLING QTY DESCRIPTION PRICE EXT 300 Corning 012E8P-31131-A3 12-Strand,Indoor/Outdoor,Armored,Plenum,Singlemode Fiber Cable $738.00 1 Panduit FCElU lU Rack Mount Fiber Enclosure $324.08 1 Panduit FCE41J 41J Rack Mount Fiber Enclosure $507.74 24 Sumitomo LYNX3-LCUPCSM-250900 LC Singlemode Splice-On Connector $405.84 2 Panduit FAP6WBUDLCZ 12-Strand,6-Duplex,LC Singlemode Fiber Adapter Panel $242.02 PATCHING QTY DESCRIPTION PRICE EXT 28 Liberty AV Solutions HDPMM10F 1OFtHDMICable $518.84 194 Panduit UTPSP10BUY 24AWG-Category 6 Patch Cord-10'Blue $2,684.96 194 Panduit UTP28SP7BU 28AWG-Category 6 Patch Cord-7'Blue $2,780.02 misc. QTY DESCRIPTION PRICE EXT 2 SFD Connex Rental Connex Rental $857.14 1 SFD 26'Scissor Rental 26'Scissor Lift Rental(Monthly) $1,714.29 EQUIPMENTTOTAL $54,111.06 LABOR TOTAL $52,290.02 MISC.MATERIALS $2,086.43 ADMIN BUILDING TOTAL $108,487.51 City of Southlake Municipal Service Center Campus 5 of 11 Project #: P-925 Version 1.0,April 14,2026 �'�_")" U P E R 10 R F I B E f & D A T A S E R V I C E S, I N C . SERVICE BAY BUILDING SCOPE HORIZONTAL CABLING Superior shall provide and install a total of(50)Category 6 Blue UTP Plenum Cables forthe following devices: • DATA-(38)Category 6 Blue Cables,terminated with Blue Jacks at the Workstation&Blue Jacks at the Patch Panel • TV DATA-(2)Category 6 Blue Cables,terminated with Blue Jacks at the Workstation&Blue Jacks at the Patch Panel • WAPS-(10)Category 6 Blue Cables,terminated with Blue Jacks at the Workstation&Blue Jacks at the Patch Panel All category cables shall originate from the nearest OF or MDF and terminate on new 48-Port Modular,Flat,Empty Patch Panels Data&TV Data Shall be terminated on a single patch panel. WAP Cabling shall be terminated on an individual patch panel All category cables terminated in wall boxes shall be housed in a 2-Port or4-Port White Faceplate,with any unused ports filled with white blank inserts. All category cables terminated above ceiling shall be housed in a 2-port plastic surface mount box,coiled above ceiling on a j-hook nearest to the symbol location per the drawings. PATHWAYS Superior shall provide and installj-hooks sized to support the horizontal cables. Superior shall provide and install grid wire to support thej-hooks or directly attached to walls using appropriate screws. Superior assumes all pathways across hard-lid,exposed,or specialty ceiling spaces that are not drop-tile ceiling shall have conduit furnished and installed by others for our use. Superior assumes any outside plant conduit,underground conduit,and pull-boxes shall be furnished and installed per EIA/TIA/BICSI Standards. Superior assumes any conduit,pull-box shall be furnished and installed by others. Superior assumes any and all conduits for our use,shall be equipped with pull-string and installed by others. Superior assumes any and all cable tray pathways shown outside the MDF/IDF rooms perthe technology drawings shall be furnished&installed by others for our use. MDF/IDF BUILDOUT Superior shall buildout the IDF 118B as shown per drawing TN-B-1.01,Plan note#1 • (1)Enclosed Network Cabinet All bonding connections shall be#6 AWG Green insulated ground wire and terminate using 2-hole compression ground lugs. Main Electrical/Building Ground for rooms busbar shall be furnished and installed by others. BACKBONE CABLING Superior shall provide and install backbone fiber segments as per the following breakdown: • (1)12-Strand Armored,Indoor/Outdoor,Plenum Singlemode fiber from MDF 114Ato OF 118B All Fiber strands shall be terminated within a rack mount fiber enclosure and connected to 12-Port,6-Duplex,Fiber Adapter Panels IDF 114A shall receive(1)lU Rack Mount Fiber Enclosure All fiber segments shall be terminated using splice on LC Fiber Connectors PATCH CORDS Superior shall provide and transmit to the owner,(2)Patch cords for each category 6 cable installed. (1)Workstation Patch Cord-10'in Length (1)Closet Patch Cord-7'in Length Superior is not responsible for providing nor installing Fiber Patch cords Superior is not responsible for providing laborto patch in any workstation or closet end patch cords. Superior shall provide and transmit to the owner,(2)HDMI Patch Cords for each HDMI segment ran from faceplate to faceplate. City of Southlake Municipal Service Center Campus 6 of 11 Project #: P-925 Version 1.0,April 14,2026 �1 C U P E R 10 R F I B E R & D A T A S E R V I C E S, I N C . AV CABLING Superior shall provide and install(1)HDMI Cable,terminating both ends with a female HDMI faceplate within room 107B. INSTALL TION SERVICES Superior shall provide labor to install(10)Owner provided Wireless Access Points and Owner Provided Hardware EXCL USIONS&NOTES Superior is NOT responsible for providing,nor installing any of the following: • Conduit Pathways • Building Penetrations or Coring • Pull-boxes,Pull-string,Mule-Tape or Bushings for conduit that has been provided by others for our use • Sleeves or conduit for pathways into classrooms,offices and other building spaces with horizontal cabling indicated. • Cable Tray outside of MDF/IDF rooms • Innerduct • Cameras • Camera Category Cabling • Fiber or copper cabling to site camera or access control locations TESTING/DOCUMENTATION/CUTOVER SUPPORT All cabling shall be tested after termination. As-built's for workstation shall be provided at the completion of the project in AutoCAD format with customer provided floor plans in AutoCAD. Superior requires the AutoCAD files to be in.DWG format to complete shop drawings and provide final As-Built Drawings. PATHWAYS & ROUGH-IN QTY DESCRIPTION PRICE EXT 10 General Cable 7131100 Category 6 UTP Plenum Cable-Blue 1,000'Box $3,264.00 FIELD &CLOSET TERM I NATION QTY DESCRIPTION PRICE EXT 100 Panduit CJ688TGBU Category 6 Jack Outlet-Blue $1,205.00 14 Panduit CFPE2WHY 2 Port Executive Faceplate-White $43.12 3 Panduit CFPE4WHY 4 Port Executive Faceplate-White $9.24 5 Panduit CBXQ2WH-A 2-Port Surface Mount Box-White $29.85 1 Panduit CPPL48WBLY 48-Port Modular Flush Patch Panel $80.48 1 Panduit CPPL48WBLY 48-Port Modular Flush Patch Panel $80.48 4 Panduit SRB19BLY 19"Strain Relief Bar $86.12 1 Panduit CMHDMITWH Mini-Com HDMI 2.0 Coupler Module with Pigtail,White $41.61 2 Panduit CFPE2WHY 2 Port Executive Faceplate-White $6.16 1 Liberty AV Solutions HALO-HCP23M HALO 18G HDMI CMP BLACK23M $231.86 CLOSET BUILDOUT QTY DESCRIPTION PRICE EXT 50 Generic THHN-6-STR-GRN-CUT REEL #6AWG Green Insulated Ground Wire $65.00 2 Burndy YA6CL2TC14 #6AWG 2-Hole Compression Ground Lug $9.76 1 CPI 13622-012 Telecommunications Secondary Bonding Busbar(SBB) $173.95 1 CPI 12419-736 Wall-Mount Cabinet 36"H x 24"W x 30"D-Black $1,381.17 BACKBONE CABLING City of Southlake Municipal Service Center Campus 7 of 11 Project #: P-925 Version 1.0,April 14,2026 r1�1 C U P E R 10 R F I R E R & ❑ A T A S E R V I C E S, I N C . QTY DESCRIPTION PRICE EXT 950 Corning 012E8P-31131-A3 12-Strand,Indoor/Outdoor,Armored,Plenum,Singlemode Fiber Cable $2,337.00 500 Corning 012E8P-31131-A3 12-Strand,Indoor/Outdoor,Armored,Plenum,Singlemode Fiber Cable $1,230.00 1 Panduit FCE1U 1U Rack Mount Fiber Enclosure $324.08 1 Panduit CBXF6WH-AY 6-Port Fiber Surface Mount Box-White $22.85 3 Panduit CMDSLCZBU LC Duplex Singlemode Fiber Adapter Insert-Blue $70.26 48 Sumitomo LYNX3-LCUPCSM-250900 LC Singlemode Splice-On Connector $811.68 3 Panduit FAP6WBUDLCZ 12-Strand,6-Duplex,LC Singlemode Fiber Adapter Panel $330.24 PATCHING QTY DESCRIPTION PRICE EXT 2 Liberty AV Solutions HDPMM10F 1OFtHDMICable $37.06 50 Panduit UTPSP10BUY 24AWG-Category 6 Patch Cord-10'Blue $692.00 50 Panduit UTP28SP7BU 28AWG-Category 6 Patch Cord-7'Blue $716.50 misc. QTY DESCRIPTION PRICE EXT 2 SFD Connex Rental Connex Rental $857.14 2 SFD 26'Scissor Rental 26'Scissor Lift Rental(Monthly) $3,428.58 EQUIPMENT TOTAL $17,565.19 LABOR TOTAL $17,189.14 MISC.MATERIALS $677.28 SERVICE BAY BUILDING TOTAL $35,431.61 City of Southlake Municipal Service Center Campus 8 of 11 Project #: P-925 Version 1.0,April 14,2026 +�1 C U P E R 10 R F I B E R & ❑ A T A SERVICES, I NC . TRAININGTOWER SCOPE HORIZONTAL CABLING Superior shall provide and install a total of(11)Category 6 Blue UTP Plenum Cables for the following devices: • DATA-(9)Category 6 Blue Cables,terminated with Blue Jacks at the Workstation&Blue Jacks at the Patch Panel • WAPS-(2)Category 6 Blue Cables,terminated with Blue Jacks at the Workstation&Blue Jacks at the Patch Panel All category cables shall originate from the nearest IDF and terminate on new 48-Port Modular,Flat,Empty Patch Panels Data&TV Data Shall be terminated on a single patch panel. WAP Cabling shall be terminated on an individual patch panel All category cables terminated in wall boxes shall be housed in a 2-Port or 4-Port White Faceplate,with any unused ports filled with white blank inserts. All category cables terminated above ceiling shall be housed in a 2-port plastic surface mount box,coiled above ceiling on a j-hook nearest to the symbol location per the drawings. PATHWAYS Superior shall provide and installj-hooks sized to support the horizontal cables. Superior shall provide and install grid wire to support thej-hooks or directly attached to walls using appropriate screws. Superior assumes all pathways across hard-lid,exposed,or specialty ceiling spaces that are not drop-tile ceiling shall have conduit furnished and installed by others for our use. Superior assumes any outside plant conduit,underground conduit,and pull-boxes shall be furnished and installed per EIA/TIA/BICSI Standards. Superior assumes any conduit,pull-box shall be furnished and installed by others. Superior assumes any and all conduits for our use,shall be equipped with pull-string and installed by others. Superior assumes any and all cable tray pathways shown outside the MDF/IDF rooms per the technology drawings shall be furnished&installed by others for our use. MDF/IDF BUILDOUT Superior shall buildout the IDF within classroom 101C closet,as shown per drawing TN-C-1.01,Plan note#1 • (1)Enclosed Network Cabinet All bonding connections shall be#6 AWG Green insulated ground wire and terminate using 2-hole compression ground lugs. Main Electrical/Building Ground for rooms busbar shall be furnished and installed by others. BACKBONE CABLING Superior shall provide and install backbone fiber segments as per the following breakdown: • (1)12-Strand Armored,Indoor/Outdoor,Plenum Singlemode fiber from MDF 114Ato IDF within classroom 101C closet All Fiber strands shall be terminated within a rack mount fiber enclosure and connected to 12-Port,6-Duplex,Fiber Adapter Panels IDF within classroom 101C closet shall receive(1)1U Rack Mount Fiber Enclosure All fiber segments shall be terminated using splice on LC Fiber Connectors PATCH CORDS Superior shall provide and transmit to the owner,(2)Patch cords for each category 6 cable installed. (1)Workstation Patch Cord-10'in Length (1)Closet Patch Cord-7'in Length Superior is not responsible for providing nor installing Fiber Patch cords Superior is not responsible for providing labor to patch in any workstation or closet end patch cords. INSTALL TION SERVICES City of Southlake Municipal Service Center Campus 9 of 11 Project #: P-925 Version 1.0,April 14,2026 f �,�_")" U P E R 10 R 4e f F I B E R & D A I A SERVICES, I N C . Superior shall provide labor to install(2)Owner provided Wireless Access Points and Owner Provided Hardware EXCL US/ONS&NOTES Superior is NOT responsible for providing,nor installing any of the following: • Conduit Pathways • Building Penetrations or Coring • Pull-boxes,Pull-string,Mule-Tape or Bushings for conduit that has been provided by others for our use • Sleeves or conduit for pathways into classrooms,offices and other building spaces with horizontal cabling indicated. • Cable Tray outside of MDF/IDF rooms • Innerduct • Cameras • Camera Category Cabling • Fiber or copper cabling to site camera or access control locations TEST/NG/DOCUMENTAT/ON/CUTOVER SUPPORT All cabling shall be tested after termination. As-built's for workstation shall be provided at the completion of the project in AutoCAD format with customer provided floor plans in AutoCAD. Superior requires the AutoCAD files to be in.DWG format to complete shop drawings and provide final As-Built Drawings. PATHWAYS& ROUGH-IN QTY DESCRIPTION PRICE EXT 1 L.H.Dottie CWC6 6'Grid Wire W/Clip(Pkg 100) $145.12 50 Panduit JP2W-L20 2"Wall MountJ-Hook-Black $160.50 10 Panduit JP4W-X20 4"Wall MountJ-Hook-Black $62.50 3 General Cable 7131100 Category 6 UTP Plenum Cable-Blue 1,000'Box $979.20 FIELD &CLOSET TERM I NATION QTY DESCRIPTION PRICE EXT 26 Panduit CJ688TGBU Category 6 Jack Outlet-Blue $313.30 4 Panduit CFPE2WHY 2 Port Executive Faceplate-White $12.32 1 Panduit CFPE4WHY 4 Port Executive Faceplate-White $3.08 1 Panduit CBXQ2WH-A 2-Port Surface Mount Box-White $5.97 1 Panduit CMBWH-X Blank Insert-White(Pkg.10) $3.64 1 Panduit CPPL48WBLY 48-Port Modular Flush Patch Panel $80.48 1 Panduit CPPL48WBLY 48-Port Modular Flush Patch Panel $80.48 4 Panduit SRB19BLY 19"Strain Relief Bar $86.12 CLOSET BUILDOUT QTY DESCRIPTION PRICE EXT 50 Generic THHN-6-STR-GRN-CUT REEL #6AWG Green Insulated Ground Wire $65.00 2 Burndy YA6CL2TC14 #6AWG 2-Hole Compression Ground Lug $9.76 1 CPI 13622-012 Telecommunications Secondary Bonding Busbar(SBB) $173.95 1 CPI 12419-736 Wall-Mount Cabinet 36"H x 24"W x 30"D-Black $1,381.17 BACKBONE CABLING QTY DESCRIPTION PRICE EXT 1250 Corning 012E8P-31131-A3 12-Strand,Indoor/Outdoor,Armored,Plenum,Singlemode Fiber Cable $3,075.00 1 Panduit FCElU lU Rack Mount Fiber Enclosure $324.08 24 Sumitomo LYNX3-LCUPCSM-250900 LC Singlemode Splice-On Connector $405.84 City of Southlake Municipal Service Center Campus 10 of 11 Project #: P-925 Version 1.0,April 14,2026 r"" UPERIOR '�) F I B E R & ❑ A I A SERVICES, I N C . QTY DESCRIPTION PRICE EXT 2 Panduit FAP6WBUDLCZ 12-Strand,6-Duplex,LC Singlemode Fiber Adapter Panel $220.16 PATCHING QTY DESCRIPTION PRICE EXT 13 Panduit UTPSP10BUY 24AWG-Category 6 Patch Cord-10'Blue $179.92 13 Panduit UTP28SP7BU 28AWG-Category 6 Patch Cord-7'Blue $186.29 MISS. QTY DESCRIPTION PRICE EXT 1 SFD Connex Rental Connex Rental $428.57 1 SFD 26'Scissor Rental 26'Scissor Lift Rental(Monthly) $1,714.29 EQU I PM ENT TOTAL $10,096.74 LABOR TOTAL $6,399.57 MISC.MATERIALS $389.31 TRAINING TOWER TOTAL $16,885.62 City of Southlake Municipal Service Center Campus 11 of 11 Project #: P-925 Version 1.O,April 14,2026 PANDUIT CORP. HEREBY RECOGNIZES Superior Fiber & Data Carrollton, Texas (United States) As a Platinum Panduit Certified Installer(PCI), authorized to Deploy Panduit® Network Infrastructure Solutions and participate in the Certification PlusSM System Warranty Program. Partner Since: 5-3-2002 Date Printed: 1-12-2024 'This certificate is only valid,and a Certification Plus System Warranty will only be issued,if the required number of company employees are current in their Panduit trainings at all times. It is the responsibility of the company to ensure their employees renew their training certifications at the required intervals.The company has access to all employee training certifications and expiration dates.This certificate can extend no longer than 2 years from the date it is printed. FMOHIT CERTIFIED ONEINSTALLER it I Texas Historically Underutilized Business (HUB) Certificate Certificate/VID Number: 1752754261100 Approval Date: July 21,2023 Scheduled Expiration Date: July 21,2027 The Texas Comptroller of Public Accounts (CPA), hereby certifies that Superior Fiber & Data Services, Inc. has successfully met the established requirements of the State of Texas Historically Underutilized Business (HUB) Program to be recognized as a HUB. This certificate printed July 21, 2023, supersedes any registration and certificate previously issued by the HUB Program. If there are any changes regarding the information (i.e., business structure, ownership, day to day management, operational control, business location) provided in the submission of the business; application for registration/certification as a HUB, you must immediately (within 30 days of such changes) notify the HUB Program in writing. The CPA reserves the right to conduct a compliance review at any time to confirm HUB eligibility. HUB certification may be suspended or revoked upon findings of ineligibility. Statewide HUB Program Statewide Procurement Division Note: In order for State agencies and institutions of higher education (universities) to be credited for utilizing this business as a HUB, they must award payment under the CertificateNlD Number identified above. Agencies, universities and prime contractors are encouraged to verify the company's HUB certification prior to issuing a notice of award by accessing the Internet(httpsJ/mycpa.cpa.state.bLusttpasscmbisearch/index.jsp)or by contacting the HUB Program at 512-463-5872 or toll-free in Texas at 1-888-863-5881. THCA Women Business Enterprise (WBE)NC Superior Fiber & Data Services, Inc. Superior Fiber & Data Services, Inc. has filed with the Agency an Affidavit as defined by NCTRCA Women Business Enterprise (WBE)Policies & Procedures and is hereby certified to provide service(s) in the following areas: NAICS 237130: POWER AND COMMUNICATION LINE AND RELATED STRUCTURES CONSTRUCTION This Certification commences December 11, 2024 and supersedes any registration or listing previously issued. This certification must be updated every two years by submission of an Annual Update Affidavit.At any time there is a change in ownership, control of the firm or operation, notification must be made immediately to the North Central Texas Regional Certification Agency for eligibility evaluation. Certification Expiration: December 31, 2026 Issued Date: December 11, 2024 CERTIFICATION NO. WFWB19939N1226 _ r Certification Administrator ��• ��;. � � i !ram.;:�; �'�� �Iftfj 1f �1+�,,-ter• I � I I ,�jfflfff1fftf`1� to I PIP �l`�j`��+, ► ► I I I :�is�is`�S��st�s�l�s':�iZ�� �•�,s,�,�,�,tsis�isii�siiisi 1�