Item 15 - SPIN Report OSOUTHLAK,E SPIN MEETING REPORT SPIN Item Number: SPIN2020-19 City Case Number: ZA20-0040 Project Name: GMI Headquarters SPIN Neighborhood: 8 Meeting Date: September 22, 2020 Meeting Location: Virtual Total Attendance: Virtual Host: Sherry Berman, Community Engagement Committee Applicant(s) Presenting: Clay Cristy, Claymoore Engineering; Phone: 817-281-0572 City Staff Present: Jerod Potts, Policy & Strategic Initiative Principal Planner Town Hall Forums can be viewed in their entirety by visiting http://www.cityofsouthlake.com and clicking on"I Want to"and "View""Video on Demand"—forums are listed under SPIN by meeting date. FORUM SUMMARY: Property Situation: The property is located at 2450 Crooked Lane. Development Details: GMI Commercial Contractors have plans to develop a 13.16-acre site located at 2450 Crooked Lane. The Project would rezone the property to an S-P-2 for phase 1 and phase 2 of the project. The first phase of the project will have a base zoning of I-1 and will include an 80,000 sf facility that GMI will using for light manufacturing and their corporate headquarters and the second phase of the project will consist of a mixed-use flex space and have a base zoning of 1-1. Presentation: Narrative: GMI COMMERCIAL CONTRACTORS TOTAL-13.2 ACRE DEVELOPMENT September 22.2020 - 2-PHASES - PHASE I-GMI COMMERCIAL CONTRACTORS-80,000 SF HEADQUARTERS FACILITY. 7.1+/-ACRES INCLUDES CORPORATE OFFICES AND PRODUCTION LINE Presented by. I Clay Crispy - PROPOSED USE WILL BE SP-2 W/1-1 Base Zoning - Claymoore Engineering (817)458-8yg7 - PHASE 2-FLEX OFFICE SPACE ALONG NOLAN. day@claymooreeng.com - - 6.1+/-ACRES FLEX OFFICE SPACE. ARCHITECTURE WOULD BE SIMILAR TO GMI FACILITY WCORla! dBRI�! ,. SITE LOCATION I v I Southlake 2035 ` Plan shows recommended use of Mixed Use. 6 i� i 75'LDN' C'tlBRIFN PROBRIEN !9 -:_�. :�,.. - '�6rM bete,•,..,, - _ SITE PLAN — geaRN e, P W UII ge GnT r DH o PL �q Site Location as shown on the Master AFL ,.'`\ �' °DM Thoroughfare Plan — - — 3W = _ 1 g m CJBRIEN °°rnH WC7bRl�! TRAFFIC Lj THE PROPOSED SITE PRESENTS 4 ACCESS POINTS. ---- ------ -- NOLAN DRIVE i,� TREE PRESERVATION - VILLAGE CENTER DRIVE EMPHASIS OF PRESERVATION MADE ALONG •, ACCESS TO KIMBALL THROUGH PINNACLE t R ` CROOKED LANE AND EXISTING RESIDENTIAL POINTACCESS EASEMENTS I ZONING. TRUCK TRAFFIC y C' - THE PRESERVAD NJ WRHIN THE SITE IS — - GMi EXPECTS ONLY 1 EIGHTEEN WHEELER • ' i CHALLENGING AS THERE IS OVER 36 Of FALL DELIVERY PER WEEK WITH SUPPLIES . ACROSS THE SITE. Ji "^_ T - DELIVERIES LEAVING THE FACIUTY ARE S` TYPICALLY DELIVERED VIA TRX:KS V f • ' FLATBED TRAILERS OR SMALLER BOX TRUCKS. TRUCK TRAFFIC TO ENTER OFF NOLAN TO THE TRUCK DOCKS AND BACK TO NOLAN FOR CIRCULATION .� Vail - TRAFFIC IMPACT ANALYSIS l �� ANALYZEDALLACCESSPOINTSANT - ��. MINICIPATMALI PACT TO CHEDOES NOT GTRAF1PRESENT A MINIMAL IMPACT TRAFFIC THE EXISTING TRAFFK / INFRASTRUCTURE \\ ��C�BRIEN 0BRIEN _ ----*- _- =---_ DRAINAGE - - -- - '- FACILITY EXISTING DRAINAGE PATTERNS WILL BE FOLLOWED. >) ROW TO CROOKED LANE WILL BE REDUCED _ I _ WITH THE ULTIMATE CONFIGURATION DRAINAGE I I t . P"A T J CANEN I CFDRI=N Questions and Concerns: 1. What is the grade fall across the property? It is a 10% slope that will be regraded (trees will be removed) to be able to construct the buildings. There will be retaining walls installed to level the property and to protect the remaining trees. 2. How are you going to handle the drainage on Crooked Lane and how the construction will affect the drainage? The development will include a detention pond that will handle most of the site drainage (this water will not discharge onto Crooked Lane). The detained water will be released at a slower rate into a 36-inch pipe that goes under S. Nolen Drive. The development will install over 1,000 ft. of drainage pipe to convey the water to the S. Nolen Drive pipe. Some of the property with existing trees and undisturbed grass will drain towards Crooked Lane. 3. Concerned about the commercial property across the street where the development filled in a ditch and placed a sidewalk on it causing flooding on Crooked Lane. The company was not part of this development and cannot speak on it. 4. How much noise will this development generate once it is operational? Noise will be limited to interior assembly of the wall units, no large machines. A truck will be delivering materials once a week. 5. Have you been in contact with the neighbors directly affected by the development? Yes. We have spoken with the two neighbors across the street at the P&Z meeting and tried to work with their concerns about the drainage and everything else. 6. Along Crooked Lane, what is the distance from tree line to the street pavement. Ten foot landscape buffer is required, but we are installing a 20 ft. of landscaping and the parking lot. 7. Who maintains the landscaping on the property? The property owner is required to maintain the property. 8. Is there any requirement to replace any trees that die during construction? We will be required to protect trees and mitigate any saved tree that dies during construction. 9. Will there be any construction traffic on Crooked Lane during construction? No access onto Crooked Lane. 10.Will there be any access from the property onto Crooked Lane? No. Site access will be from S. Nolen Drive, through the two drives to the west to S. Kimball Avenue, and north to Village Center Drive. 11. Will there be a lot of traffic generated from this development? There is a detailed traffic study generated for the development. There will be lower traffic generated from the light industrial use and will not negatively impact the site. SPIN Meeting Reports are general observations of SPIN Meetings by City staff and SPIN Representatives.The report is neither verbatim nor official meeting minutes; rather it serves to inform elected and appointed officials, City staff, and the public of the issues and questions raised by residents and the general responses made. Responses as summarized in this report should not be taken as guarantees by the applicant. Interested parties are strongly encouraged to follow the case through the Planning and Zoning Commission and final action by City Council. Southlake Connect Results for the September 22, 2020 SPIN Town Hall Forum Virtual SPIN Town Hall Forum-September 22,2020 Details Call Results Nollloahen U 53532901097507 Noleloafbn �� • 0 Tea 10159(71.52%) s Dr. e� ,zom ADe Aed-W w n Cortltrmed a4Rir t3562 COT ■1909(13.44`X)AD M*d -Nal connected io CrreD 0 338(238`X)Not AtD fed a 7Y6ti6 Tb 0 1796(12.66`X)OD1ef Dfwklm 4 Mq H V efTcd Ctlt fte char DlMy P-111l) Tobi %N Tbw �bloem4n I I Attempted-Not Confrmed PrerHenea MeflaaDe� 8e*1 1239 Q72% Oa4very Otg�Orpnlr.A.Oef.•ID Not Dell -Retlplerlt Hap Up 159e tl25% O464t7 « Dell—I-b W1[anal 2322 1635% 1.Prtnmy ISMS 2.attarkery Ma Not De1NVM-V 1-4 Hung Do 1029 720% 3.Prl Ertl Not D YNtrM-No MNuer 3197 24.42% 4.Prtnmy Mao! S.Secpr W Ema4 G b—1 474 331% 6.a-pr M k Attempted-Not Connected 7.H P - 8,Home PNOM a2 Not DellrefM-LM aufy 149 1175% 9.smlil—PI—E Not OC1-1-out of Smte 1694 11.93% 1W TTT/TTDDellm Nat DNtnyctl-r41M Nunleef 66 ll 6% Not DNtnYeg-Dupwete Pe 317 223% Not Aft.Md-InaclNe Path 17 0.12% Not Dtl6ereE-Confect Pa Not DeYrE 4 OA3% Nvt AlRmphV-UnwoavEe4 2ae 2.03% DeW—l-b Hwdmt 1024 7.21% Nat Dtltrtveg-C—E.0— 6 OA1% Not DCt -Doa tm—COTTunlcetbn E— 37 026% Not Dell -Confect Unwae a N3 3.12% E—t. -Rapaft AHwWts over Time 1s2 1ai si ai Ip 8ep 102031, P1aDar7 14:06A0 am 0 a 0 0 0 0 a 0 0 CDT �Deamy anemvt nnemvt nkempl pYAI A•esl A•pe01 A`el aYr.M AYe�a 3ecanaery n.. a.•ea : . a c a 7 i a o 0 a a a D o a a a6 a aea x1, xaxa nev,..r aw<a aa0 a 0 a o D D D D EPA 1' o o 2s6 a o 0 o a a CD, awa +, x69 a a D D D a D S/pn� o a 20 166 a o o a a Er r3 <n 0 a 0 D D 0 o aecanaary Email 0 a 32 79 a 0 0 0 a w/aale is rzs 0 a D D D a D am,.nde No03e 0 0 16 17 a 0 o a 0 t t0 0 0 0 0 D a 0 — 0 a 12 7 a 0 0 a a Nmve x 3 0 a D a D a D PM Prarc >� 5 0 a 0 a D a 0 IP1a ,s2 0 a 0 3 a 0 D 0 a 0 2 0 0 0 0 D a 0 aP•0�u 0 0 a Z] 0 0 0 0 0 11t Pam: x861 3 0 0 0 0 0 a 0 Tr1Tro 0 a 2 11 a 0 a a 0 0 0 a a a D a D SM 21, em3, 2020 141% 0 14M'a tlea .2 o a o a D a o 1 COT 0 0 Sao 31a 0 0 D 0 a 0021, 1 ll" a 0 a 0 189 0 a a 0 CM aw Albmpt DMv l7 Akampt Aibmpt Akampl AlYa1a1 AlYlapf Atialp! A/Yelp! A�at A-.1 TMali TM MOtkaO 1 2 i i • 7 i 0 9a02t, saP 2" 20''0 P""`s 0 0 c 0 0 0 a 0 0 tam Pr`" 0 0 0 0 0 0 0 0 a 'AA6 3w N11:10 a.es COT carr aecpn0ary 0 0 0 0 0 0 a 0 0 aeSUG0allmr7 0 0 0 a 0 0 0 a 0 3aKi P 0 0 c 0 0 0 a 0 0 EP+'011 eary 0 0 0 0 0 0 0 a a Eryl Prr moek o a o 0 0 o a 0 0 etoDle o 0 0 0 0 o a a o am. q 3e<000ary 0 0 a 0 0 0 a a 0 E+til 0 0 0 0 69 o D 0 a Erall aeca+. amwdary 0 0 a 0 0 69 a 0 0 0 0 0 0 i9 0 a 0 a AbD4 NO"K 0 0 0 0 < 0 a 0 a rip. 0 0 0 0 0 5 6 0 0 Pint �O 0 0 0 0 0 0 D 0 a 0 0 0 0 0 1 2 a 0 Pfnr t2 PI'K i2 0 0 0 0 10 0 0 0 0 o�mesf 0 0 a 0 0 6 9 a 0 Pry p� ICe� 0 o 0 o /9 o o o a DmeNr<� 0 0 a 0 0 11 3 a 0 am 21, 8.21, 20 0 2a20 11 11 U 16:a0 cDi 0 0 0 0 1p 0 0 0 0 CUT 0 - C 0 0 z 20 0 0 e sue rxvs Txa: �lae•e�2 —1, attempt 2 7 Al1�j 1 6 D IA141 Albmpt attempt A*-* AIYa1.1 70•a i\00 1 7 • • 21, 20-ro Peary 0 0 0 0 0 0 0 a a IP1men 0 0 0 3 0 D 0 0 1<_b:a9 3lAS CDT lio<ne Ptnre u o 0 0 0 o D o 0 0 aG°"mD' o 0 0 0 0 o D a a sus 6—PMrn o a 0 0 0 0 0 3 0 Privy o 0 0 0 0 o D o D P i0 mr ro 0 0 0 0 0 o D 1 1 k 0 0 0 a 0 0 D 0 0 DeAce Bea 21, E%l a 0 0 0 0 0 0 a a 1430:e9 0 0 0 0 0 0 0 / 1 am—, COT WD4 0 0 0 D 0 0 0 0 0 10YT*, r i 1 1 9t2 su 310 I" 9x < 1 1 a