Item 8 - SPIN Report OSOUTHLAK,E
SPIN MEETING REPORT
SPIN Item Number: SPIN2020-19
City Case Number: ZA20-0040
Project Name: GMI Headquarters
SPIN Neighborhood: 8
Meeting Date: September 22, 2020
Meeting Location: Virtual
Total Attendance: Virtual
Host: Sherry Berman, Community Engagement Committee
Applicant(s) Presenting: Clay Cristy, Claymoore Engineering; Phone: 817-281-0572
City Staff Present: Jerod Potts, Policy & Strategic Initiative Principal Planner
Town Hall Forums can be viewed in their entirety by visiting http://www.cityofsouthlake.com and clicking on"I Want to"and
"View""Video on Demand"—forums are listed under SPIN by meeting date.
FORUM SUMMARY:
Property Situation:
The property is located at 2450 Crooked Lane.
Development Details:
GMI Commercial Contractors have plans to develop a 13.16-acre site located at 2450 Crooked Lane.
The Project would rezone the property to an S-P-2 for phase 1 and phase 2 of the project. The first
phase of the project will have a base zoning of I-1 and will include an 80,000 sf facility that GMI will
using for light manufacturing and their corporate headquarters and the second phase of the project
will consist of a mixed-use flex space and have a base zoning of 1-1.
Presentation:
Narrative:
GMI COMMERCIAL CONTRACTORS TOTAL-13.2 ACRE DEVELOPMENT
September 22.2020 - 2-PHASES
- PHASE I-GMI COMMERCIAL CONTRACTORS-80,000 SF
HEADQUARTERS FACILITY.
7.1+/-ACRES
INCLUDES CORPORATE OFFICES AND PRODUCTION
LINE
Presented by. I Clay Crispy - PROPOSED USE WILL BE SP-2 W/1-1 Base Zoning
-
Claymoore Engineering
(817)458-8yg7 - PHASE 2-FLEX OFFICE SPACE ALONG NOLAN.
day@claymooreeng.com - - 6.1+/-ACRES
FLEX OFFICE SPACE.
ARCHITECTURE WOULD BE SIMILAR TO GMI FACILITY
WCORla! dBRI�!
,.
SITE LOCATION I
v I
Southlake 2035
` Plan shows
recommended use
of Mixed Use.
6
i�
i
75'LDN'
C'tlBRIFN PROBRIEN
!9 -:_�. :�,.. - '�6rM bete,•,..,,
- _ SITE PLAN — geaRN
e,
P W UII ge GnT r DH o
PL �q Site Location as shown
on the Master
AFL ,.'`\ �' °DM Thoroughfare Plan
— - — 3W =
_ 1
g m CJBRIEN °°rnH WC7bRl�!
TRAFFIC Lj
THE PROPOSED SITE PRESENTS 4 ACCESS POINTS. ----
------ -- NOLAN DRIVE i,� TREE PRESERVATION
- VILLAGE CENTER DRIVE EMPHASIS OF PRESERVATION MADE ALONG
•, ACCESS TO KIMBALL THROUGH PINNACLE t R ` CROOKED LANE AND EXISTING RESIDENTIAL
POINTACCESS EASEMENTS I ZONING.
TRUCK TRAFFIC y C' - THE PRESERVAD NJ WRHIN THE SITE IS
— - GMi EXPECTS ONLY 1 EIGHTEEN WHEELER • ' i CHALLENGING AS THERE IS OVER 36 Of FALL
DELIVERY PER WEEK WITH SUPPLIES . ACROSS THE SITE.
Ji "^_ T - DELIVERIES LEAVING THE FACIUTY ARE
S` TYPICALLY DELIVERED VIA TRX:KS V f •
' FLATBED TRAILERS OR SMALLER BOX TRUCKS.
TRUCK TRAFFIC TO ENTER OFF NOLAN TO THE
TRUCK DOCKS AND BACK TO NOLAN FOR
CIRCULATION .� Vail -
TRAFFIC IMPACT ANALYSIS l ��
ANALYZEDALLACCESSPOINTSANT -
��. MINICIPATMALI PACT TO
CHEDOES NOT GTRAF1PRESENT A
MINIMAL IMPACT TRAFFIC
THE EXISTING TRAFFK
/ INFRASTRUCTURE
\\ ��C�BRIEN 0BRIEN
_ ----*- _- =---_ DRAINAGE
- -
-- - '- FACILITY EXISTING DRAINAGE PATTERNS WILL BE
FOLLOWED.
>) ROW TO CROOKED LANE WILL BE REDUCED
_ I _
WITH THE ULTIMATE CONFIGURATION DRAINAGE
I
I t
. P"A T
J
CANEN I CFDRI=N
Questions and Concerns:
1. What is the grade fall across the property? It is a 10% slope that will be regraded
(trees will be removed) to be able to construct the buildings. There will be retaining
walls installed to level the property and to protect the remaining trees.
2. How are you going to handle the drainage on Crooked Lane and how the construction
will affect the drainage? The development will include a detention pond that will handle
most of the site drainage (this water will not discharge onto Crooked Lane). The
detained water will be released at a slower rate into a 36-inch pipe that goes under S.
Nolen Drive. The development will install over 1,000 ft. of drainage pipe to convey the
water to the S. Nolen Drive pipe. Some of the property with existing trees and
undisturbed grass will drain towards Crooked Lane.
3. Concerned about the commercial property across the street where the development
filled in a ditch and placed a sidewalk on it causing flooding on Crooked Lane.
The company was not part of this development and cannot speak on it.
4. How much noise will this development generate once it is operational? Noise will be
limited to interior assembly of the wall units, no large machines. A truck will be
delivering materials once a week.
5. Have you been in contact with the neighbors directly affected by the development?
Yes. We have spoken with the two neighbors across the street at the P&Z meeting and tried
to work with their concerns about the drainage and everything else.
6. Along Crooked Lane, what is the distance from tree line to the street pavement. Ten
foot landscape buffer is required, but we are installing a 20 ft. of landscaping and
the parking lot.
7. Who maintains the landscaping on the property? The property owner is required to
maintain the property.
8. Is there any requirement to replace any trees that die during construction? We will be
required to protect trees and mitigate any saved tree that dies during construction.
9. Will there be any construction traffic on Crooked Lane during construction? No
access onto Crooked Lane.
10.Will there be any access from the property onto Crooked Lane? No. Site access will
be from S. Nolen Drive, through the two drives to the west to S. Kimball Avenue, and
north to Village Center Drive.
11. Will there be a lot of traffic generated from this development? There is a detailed
traffic study generated for the development. There will be lower traffic generated from
the light industrial use and will not negatively impact the site.
SPIN Meeting Reports are general observations of SPIN Meetings by City staff and SPIN Representatives.The report is neither verbatim nor official meeting
minutes; rather it serves to inform elected and appointed officials, City staff, and the public of the issues and questions raised by residents and the general
responses made. Responses as summarized in this report should not be taken as guarantees by the applicant. Interested parties are strongly encouraged to
follow the case through the Planning and Zoning Commission and final action by City Council.
Southlake Connect Results for the September 22, 2020 SPIN Town Hall Forum
Virtual SPIN Town Hall Forum-September 22,2020
Details
Call Results
Nollloahen U 53532901097507
Noleloafbn �� • 0
Tea 10159(71.52%)
s Dr. e� ,zom ADe Aed-W
w n
Cortltrmed
a4Rir t3562 COT ■1909(13.44`X)AD M*d
-Nal connected
io
CrreD
0 338(238`X)Not
AtD fed
a 7Y6ti6 Tb 0 1796(12.66`X)OD1ef
Dfwklm 4 Mq H
V efTcd Ctlt fte char DlMy P-111l) Tobi %N Tbw
�bloem4n I I Attempted-Not Confrmed
PrerHenea MeflaaDe�
8e*1 1239 Q72%
Oa4very Otg�Orpnlr.A.Oef.•ID Not Dell -Retlplerlt Hap Up 159e tl25%
O464t7 « Dell—I-b W1[anal 2322 1635%
1.Prtnmy ISMS
2.attarkery Ma Not De1NVM-V 1-4 Hung Do 1029 720%
3.Prl Ertl Not D YNtrM-No MNuer 3197 24.42%
4.Prtnmy Mao!
S.Secpr W Ema4 G b—1 474 331%
6.a-pr M k Attempted-Not Connected
7.H P -
8,Home PNOM a2 Not DellrefM-LM aufy 149 1175%
9.smlil—PI—E Not OC1-1-out of Smte 1694 11.93%
1W TTT/TTDDellm
Nat DNtnyctl-r41M Nunleef 66 ll 6%
Not DNtnYeg-Dupwete Pe 317 223%
Not Aft.Md-InaclNe Path 17 0.12%
Not Dtl6ereE-Confect Pa Not DeYrE 4 OA3%
Nvt AlRmphV-UnwoavEe4 2ae 2.03%
DeW—l-b Hwdmt 1024 7.21%
Nat Dtltrtveg-C—E.0— 6 OA1%
Not DCt -Doa tm—COTTunlcetbn E— 37 026%
Not Dell -Confect Unwae a N3 3.12%
E—t. -Rapaft
AHwWts over Time
1s2
1ai
si
ai Ip
8ep
102031, P1aDar7
14:06A0 am 0 a 0 0 0 0 a 0 0
CDT
�Deamy anemvt nnemvt nkempl pYAI A•esl A•pe01 A`el aYr.M AYe�a 3ecanaery
n.. a.•ea : . a c a 7 i a o 0 a a a D o a a
a6 a
aea x1,
xaxa nev,..r
aw<a aa0 a 0 a o D D D D EPA 1' o o 2s6 a o 0 o a a
CD,
awa +, x69 a a D D D a D S/pn� o a 20 166 a o o a a
Er r3 <n 0 a 0 D D 0 o aecanaary
Email 0 a 32 79 a 0 0 0 a
w/aale is rzs 0 a D D D a D am,.nde
No03e 0 0 16 17 a 0 o a 0
t t0 0 0 0 0 D a 0
— 0 a 12 7 a 0 0 a a
Nmve x 3 0 a D a D a D PM
Prarc >� 5 0 a 0 a D a 0 IP1a ,s2 0 a 0 3 a 0 D 0 a
0 2 0 0 0 0 D a 0 aP•0�u 0 0 a Z] 0 0 0 0 0
11t
Pam: x861 3 0 0 0 0 0 a 0 Tr1Tro
0 a 2 11 a 0 a a 0
0 0 a a a D a D
SM 21,
em3, 2020
141% 0
14M'a tlea .2 o a o a D a o 1 COT 0 0 Sao 31a 0 0 D 0 a
0021,
1 ll" a 0 a 0 189 0 a a 0
CM
aw
Albmpt DMv l7 Akampt Aibmpt Akampl AlYa1a1 AlYlapf Atialp! A/Yelp! A�at A-.1 TMali
TM MOtkaO 1 2 i i • 7 i 0
9a02t,
saP 2" 20''0 P""`s 0 0 c 0 0 0 a 0 0
tam Pr`" 0 0 0 0 0 0 0 0 a 'AA6 3w
N11:10 a.es COT
carr
aecpn0ary 0 0 0 0 0 0 a 0 0
aeSUG0allmr7 0 0 0 a 0 0 0 a 0 3aKi
P 0 0 c 0 0 0 a 0 0
EP+'011 eary 0 0 0 0 0 0 0 a a Eryl
Prr
moek o a o 0 0 o a 0 0 etoDle o 0 0 0 0 o a a o
am. q 3e<000ary 0 0 a 0 0 0 a a 0
E+til 0 0 0 0 69 o D 0 a Erall
aeca+. amwdary 0 0 a 0 0 69 a 0 0
0 0 0 0 i9 0 a 0 a AbD4
NO"K 0 0 0 0 < 0 a 0 a rip. 0 0 0 0 0 5 6 0 0
Pint
�O 0 0 0 0 0 0 D 0 a 0 0 0 0 0 1 2 a 0
Pfnr t2 PI'K i2
0 0 0 0 10 0 0 0 0 o�mesf 0 0 a 0 0 6 9 a 0
Pry p�
ICe� 0 o 0 o /9 o o o a DmeNr<� 0 0 a 0 0 11 3 a 0
am 21, 8.21,
20 0 2a20
11 11 U 16:a0
cDi 0 0 0 0 1p 0 0 0 0 CUT 0 - C 0 0 z 20 0 0
e sue
rxvs Txa:
�lae•e�2 —1, attempt 2 7 Al1�j 1 6 D IA141 Albmpt attempt A*-*
AIYa1.1
70•a i\00 1 7 • •
21,
20-ro Peary 0 0 0 0 0 0 0 a a IP1men 0 0 0 3 0 D 0 0
1<_b:a9 3lAS
CDT lio<ne
Ptnre u o 0 0 0 o D o 0 0
aG°"mD' o 0 0 0 0 o D a a
sus 6—PMrn o a 0 0 0 0 0 3 0
Privy o 0 0 0 0 o D o D
P i0 mr ro
0 0 0 0 0 o D 1 1
k 0 0 0 a 0 0 D 0 0 DeAce
Bea 21,
E%l a 0 0 0 0 0 0 a a 1430:e9 0 0 0 0 0 0 0 / 1
am—, COT
WD4 0 0 0 D 0 0 0 0 0 10YT*,
r
i 1 1
9t2 su 310 I" 9x < 1 1 a