Loading...
Item 6A - PresentationZoning Change and Concept/Site Plan for White’s Chapel Methodist Church Item 6A ZA25-0075 Applicant: Brent Kline, Kline Hardin Owner: White’s Chapel Methodist Church Request: Approval of a Zoning Change and Concept/Site Plan on property described as Lot 1R, Block 1, White Chapel Methodist Church Addition, City of Southlake, Tarrant County, Texas, and located at 185 S. White Chapel Boulevard, Southlake, Texas. Current Zoning: “CS” Community Service District. Requested Zoning: “S-P-2” Generalized Site Plan District with “CS” uses. Location: 185 S. White Chapel Boulevard Aerial View Stratfort Parc Timmarron Chapel Hill Office Park Future Land Use Office Commercial Office Commercial Public/Semi- Public Low Density Residential Medium Density Residential Current Zoning CS S-P-2S-P-1 SF-20A SF-1A O-1 Street View – From S. White Chapel Boulevard Street View – From E. Southlake Boulevard Drone View – Showing Parking Lot Towards Education Building Drone View – Showing Parking Lot Towards Foundry Building Street View – Youth Activity Building Street View – Showing Education Building Existing Site Plan (ZA25-0069) Proposed Addition Area Proposed Site Plan Phase 1 – Proposed Addition of the new Youth Activity Center and Education Building and parking lot expansion Phase 2 – Proposed Addition of the Foundry Building Phase 1 – Parking lot expansion Proposed Site Plan – Phase 1 Parking Site Data Summary Site Data Summary Existing Proposed Zoning CS S-P-2 with CS uses Land Use Designation Public/Semi Public Public/Semi Public Gross Acreage 23.28 23.28 Net Acreage 23.28 23.28 Number of Lots 1 1 Percentage of Site Coverage 13.99%17.04% Area of Open Space (Sq. Ft.)424,058 381,988 Percentage of Open Space 41.82%37.67% Area of Impervious Coverage 590,019 632,089 Percentage of Impervious Coverage 58.18%62.33% Building Area (Foot Print in Sq. Ft.)141,884 172,846 Number of Stories 2 stories 2 stories: Foundry Building 3 stories: Youth Activity Center Maximum Building Height 37’2 stories: 37’ 3 stories: 58’ Floor Area 195,707 252,919 New Floor Area by Use (Sq. Ft.) - New Youth Activity Center - New 3rd Floor Building B - New Foundry Building 17,337 10,273 29,602 Total Square Footage Added 57,212 Required Parking (Total)667 667 Provided Parking (Total)974 988 Standard 945 959 Handicap 29 29 Parking Provided on Adjacent lot (Chapel Hill Office Park) via access and parking agreement with neighbor 166 166 Total Available Parking 1,140 1,154 *Note: The required parking count is based on the Sanctuary seating 2,000 people, which calculates a parking ratio of 1 parking space per 3 seats or 667 parking spaces. Existing Tree Plan Utility Plan Relocating 8” water line for Phase 2 Existing 15’ stormwater easement Existing 12” water line main Grading Plan Drainage Plan Phase 1 - Landscape Plan Phase 2 - Landscape Plan Rendering – Youth Activity Center and Education Building Existing Existing PHASE ONE Youth Activity Center Elevations - West Height: 42’-6” Youth Activity Center Elevations - East Youth Activity Center Elevations - South Education Building Elevations - North Height: 49’ Education Building Elevations – West and East Rendering – Foundry Building PHASE TWO Rendering – Foundry Building Rendering Existing Foundry Building Elevations - East Max Height: 57’-6” Height of Midpoint: 44’-5” Foundry Building Elevations - North Foundry Building Elevations - South Surrounding Property Owner Responses For: Opposed: Undecided: Planning and Zoning Commission Action January 8, 2026; Approved (6-0) subject to the Staff Report dated January 2, 2026, and the Site Plan Review Summary No. 2 dated January 2, 2026. City Council 1st Reading Action 1st Reading; February 3, 2026; Approved (6-0) subject to the Staff Report dated January 26, 2026, and the Site Plan Review Summary No. 2 dated January 2, 2026, noting the approval is for a Zoning Change and Concept/Site Plan, as presented, for construction of a new Youth Activity Center, expansion of Education Building B, and the new Foundry addition to the existing worship center. Questions?