Item 6A - PresentationZoning Change and Concept/Site Plan for
White’s Chapel Methodist Church
Item 6A
ZA25-0075
Applicant: Brent Kline, Kline Hardin
Owner: White’s Chapel Methodist Church
Request: Approval of a Zoning Change and Concept/Site Plan on property
described as Lot 1R, Block 1, White Chapel Methodist Church Addition,
City of Southlake, Tarrant County, Texas, and located at 185 S. White
Chapel Boulevard, Southlake, Texas. Current Zoning: “CS” Community
Service District. Requested Zoning: “S-P-2” Generalized Site Plan District
with “CS” uses.
Location: 185 S. White Chapel Boulevard
Aerial View
Stratfort Parc
Timmarron
Chapel Hill
Office Park
Future Land Use
Office
Commercial
Office
Commercial
Public/Semi-
Public
Low Density
Residential
Medium Density
Residential
Current Zoning
CS
S-P-2S-P-1
SF-20A
SF-1A
O-1
Street View – From S. White Chapel Boulevard
Street View – From E. Southlake Boulevard
Drone View – Showing Parking Lot Towards Education Building
Drone View – Showing Parking Lot Towards Foundry Building
Street View – Youth Activity Building
Street View – Showing Education Building
Existing Site Plan (ZA25-0069)
Proposed
Addition Area
Proposed Site Plan
Phase 1 –
Proposed Addition of the new
Youth Activity Center and
Education Building
and parking lot expansion
Phase 2 –
Proposed Addition of the
Foundry Building
Phase 1 –
Parking lot expansion
Proposed Site Plan – Phase 1 Parking
Site Data Summary
Site Data Summary Existing Proposed
Zoning CS S-P-2 with CS uses
Land Use Designation Public/Semi Public Public/Semi Public
Gross Acreage 23.28 23.28
Net Acreage 23.28 23.28
Number of Lots 1 1
Percentage of Site Coverage 13.99%17.04%
Area of Open Space (Sq. Ft.)424,058 381,988
Percentage of Open Space 41.82%37.67%
Area of Impervious Coverage 590,019 632,089
Percentage of Impervious Coverage 58.18%62.33%
Building Area (Foot Print in Sq. Ft.)141,884 172,846
Number of Stories 2 stories 2 stories: Foundry Building
3 stories: Youth Activity Center
Maximum Building Height 37’2 stories: 37’
3 stories: 58’
Floor Area 195,707 252,919
New Floor Area by Use (Sq. Ft.)
- New Youth Activity Center
- New 3rd Floor Building B
- New Foundry Building
17,337
10,273
29,602
Total Square Footage Added 57,212
Required Parking (Total)667 667
Provided Parking (Total)974 988
Standard 945 959
Handicap 29 29
Parking Provided on Adjacent lot (Chapel Hill Office Park)
via access and parking agreement with neighbor 166 166
Total Available Parking 1,140 1,154
*Note: The required parking count is based on the Sanctuary seating 2,000 people, which calculates a parking ratio of 1 parking space per 3 seats or 667 parking spaces.
Existing Tree Plan
Utility Plan
Relocating
8” water line
for Phase 2
Existing 15’
stormwater
easement
Existing 12”
water line main
Grading Plan
Drainage Plan
Phase 1 - Landscape Plan
Phase 2 - Landscape Plan
Rendering – Youth Activity Center and Education Building
Existing
Existing
PHASE ONE
Youth Activity Center Elevations - West
Height: 42’-6”
Youth Activity Center Elevations - East
Youth Activity Center Elevations - South
Education Building Elevations - North
Height: 49’
Education Building Elevations – West and East
Rendering – Foundry Building
PHASE TWO
Rendering – Foundry Building
Rendering Existing
Foundry Building Elevations - East
Max Height: 57’-6”
Height of Midpoint: 44’-5”
Foundry Building Elevations - North
Foundry Building Elevations - South
Surrounding Property Owner Responses
For:
Opposed:
Undecided:
Planning and Zoning Commission Action
January 8, 2026; Approved (6-0) subject to the Staff Report dated January
2, 2026, and the Site Plan Review Summary No. 2 dated January 2, 2026.
City Council 1st Reading Action
1st Reading; February 3, 2026; Approved (6-0) subject to the Staff Report
dated January 26, 2026, and the Site Plan Review Summary No. 2 dated
January 2, 2026, noting the approval is for a Zoning Change and
Concept/Site Plan, as presented, for construction of a new Youth Activity
Center, expansion of Education Building B, and the new Foundry addition to
the existing worship center.
Questions?