Item 6A - Corridor Report 10-27-25CITY C
SOUTHLAKE
0
Southlake Corridor Planning Committee Meeting Report
Meeting 52 — October 27, 2025
MEETING
LOCATION: 1400 Main St., Southlake, Texas 76092
City Council Chambers
IN
ATTENDANCE:
• City Council Members: Randy Robbins
• Planning & Zoning Commission Members: Daniel Kubiak, Michael
Forman, Michael Springer
• Other Committee Members: Dr. Magdalena Battles
• City Staff: Dennis Killough, Jenny Crosby, Cyndi Cheng, Ryan Firestone
AGENDA
ITEMS:
1. Call to Order.
2. Administrative Comments.
3. Review, discuss, and make recommendations regarding a proposed two-story, 11,563
square -foot building with general office and meeting space uses on property located
at 1360 N. Carroll Ave.
4. Review, discuss and make recommendations regarding a proposed commercial
development on an approximately 3.5-acre property located at 2530 & 2580 W.
Southlake Blvd.
5. Review, discuss and make recommendations regarding a proposed office
development on an approximately 2.8-acre property at 360 Randol Mill Ave.
6. Review, discuss, and make recommendations regarding a proposed zoning
amendment and site plan for The Overlook office building of the Willow Tree Gardens
development located at 240 N. Carroll Ave.
7. Review, discuss, and make recommendations regarding a proposed approximately
18-acre senior living development to be located on the southeast corner of N. Carroll
Ave. and E. Highland St., and generally located north of The Westin Dallas Southlake
Hotel and east of Cedar Ridge Office Park.
8. Review, discuss, and make recommendations on a Master Plan Update for Southlake
Town Square to promote and preserve the unique character of Town Square as the
community's Downtown in future development.
9. Adjournment
MEETING
OVERVIEW
On October 27, 2025 the Southlake Corridor Planning Committee held
their 52nd meeting. The Committee was sent a packet of materials prior to
the meeting that were to be discussed during the session. A meeting
agenda was posted, and the meeting time was advertised on the City's
website. The following meeting report focuses on discussion points made
during the meeting by members of the Committee, public and City staff.
This report is neither verbatim nor does it represent official meeting
minutes; rather it serves to inform elected and appointed officials, City
staff, and the public of the issues and questions raised by the Committee,
City staff, and any attendees of the meeting. Interested parties are
strongly encouraged to follow development cases through the process.
Please visit CityofSouthlake.com/Planning for more information.
( t)M
SOUTHLAKE
19
ITEM #6 DISCUSSION — Review, discuss, and make recommendations regarding a
proposed zoning amendment and site plan for The Overlook office building of the Willow
Tree Gardens development located at 240 N. Carroll Ave.
Staff presentation: Cyndi Cheng
• Aerial
• Future Land Use: Office -Commercial
• Zoning: TZD
• Master Pathways Plan: Maximum 8' sidewalk along the west side of N. Carroll
Avenue.
• Applicant Exhibits/Plans
• Summary: The applicant is proposing a site plan for The Overlook to construct a
three-story 27,179 square -foot office building in the "TZD" zoning district of the
Willow Tree Gardens development at 240 N. Carroll Avenue.
Questions for Staff
Daniel Kubiak
Is this consistent with the previous zoning case? Maybe said differently - what is being
asked for here that is inconsistent with that?
Cyndi Cheng:
I think the three things that they are requesting for a bank with a drive-thru, a private
club/bar, that there is an increase in square footage from the previous plan, and it is a
three-story building.
Daniel Kubiak
It is a three-story, not two?
Cyndi Cheng:
Yes.
Daniel Kubiak
Dennis, this is not just a site plan. This is a zoning change, right?
Dennis Killough
What they have in process concurrently with this Corridor item is a zoning amendment
for the office portion of this to add a third story and the two uses: the drive-thru use for a
bank or financial institution and the private club/bar. Those are the three reasons they
are having to revise or amend the zoning. It would also include a site plan in order for
them to physically construct the site. If they were simply coming in with a two story
building that met the approved concepts that were done with the development plan and
weren't changing the use from the office use, they would just come in with a site plan.
Southlake Corridor Planning Committee Item #6 —The Overlook
Meeting #52 — October 27, 2025 Page 3
Daniel Kubiak
Okay I just wanted to make sure we clarified that.
Michael Springer
Isn't this the one right across the street here? The one we had all the issues with?
Daniel Kubiak
Yes.
Michael Springer
When it was two story, we had to relocate the building further away from the residential.
Daniel Kubiak
That's what I remember.
Michael Springer
And now we're trying to make it three story. This makes no sense to me. It just seems
like to me that whoever this developer is going for broke now that they actually got their
foot in the door.
Daniel Kubiak
We'll call the applicant up next.
Michael Springer
Okay.
Questions for Applicant
Daniel Kubiak
Is that an outdoor area on top?
Applicant
There might be a little patio, but it is primarily indoors.
Daniel Kubiak
Is it an outdoor area that is set up to be used? Will it follow the usual ancillary items
such as noise and lights?
Applicant
don't think it is going to be a late -night type of establishment like that. It will be a lot
more lowkey.
Daniel Kubiak
Was the sidewalk on the northern boundary always right up against the property line or
is that new?
Southlake Corridor Planning Committee Item #6 —The Overlook
Meeting #52 — October 27, 2025 Page 4
Applicant
(Unable to understand) — did not speak into the microphone
Daniel Kubiak
I was more just wondering about the location because it effectively allows for even less
of a buffer, landscape wise or barrier wise to the residential property on the northern
side.
Applicant
I think the idea was to get crossing the drive a little bit further from the street. My
thought is that it could be that you could cross prior to getting to that real thin area there
to the building side of the entry drive.
Daniel Kubiak
Yeah, it just cuts down on the buffering to the residential. These proposed changes -
have you talked to any of the residential neighbors yet?
Applicant
Throughout the development, we have been in touch with most of the neighbors over
there. I am not sure if they have gotten these plans yet, but we do have email chains
with the HOA boards.
Daniel Kubiak
Yeah, I remember that from the first time, but I thought they were pretty commercial
about the whole thing and I am curious if they know about these last-minute changes to
it.
Applicant
I know they know that the building is coming, but I don't think we have gotten to the
point where we have shared anything else.
Daniel Kubiak
I am just speaking as one person. I think I am going to lean on that a lot. If a person has
this in their backyard, they should probably be allowed to weigh in.
Randy Robbins
The third -story piece is the only piece worth discussing in my opinion. I think you are
talking about one piece of the sidewalk and he's talking about a different piece of the
sidewalk. He is not talking about the sidewalk piece on Carroll, he's talking about the
sidewalk between your property and the backyards of the residential. I agree with him
you should pull that crossover closer to your building and put the sidewalk on your
building side as opposed to the residential side, so that you can buffer that residential
side with trees and landscape as opposed to a sidewalk.
Southlake Corridor Planning Committee
Meeting #52 — October 27, 2025
Item #6 —The Overlook
Page 5
As far as your outdoor patio piece, is it only going to be facing Carroll, nothing facing the
back or the residential side?
Applicant
That's right.
Randy Robbins
I think that's the piece you are going to have to be concerned about because if I am a
resident, I don't want people looking over into my backyard from the northside or the
westside or either one. The outdoor piece to me, 9 months out of the year you can't go
out there because it is too cold or too hot. Just make sure it faces Carroll and don't let it
face the residences.
Applicant
From the screening perspective I think if this were to get approved there's steps we can
take to limit, maybe put some landscape trees or stuff up top to block it out, but the idea
is that it would be facing Carroll.
Randy Robbins
just need to protect the residents. Protect the residential piece. When you talk about
speakers, lighting, anything like that, just be aware that it has to be subtle and muted
think.
Magdalena Battles
I guess my concern was also about the neighbors. Does it really need to be an open
patio space? I mean I like the idea, but if I was a neighbor there I'd probably have some
issue with it and be concerned about it keeping my kids up on the weekends with
people being up there drinking and their voices being loud and it carries. I like the idea,
but I think closed.
Daniel Kubiak
Yeah, you already got some relief on the residential adjacency piece when you got the
approval so kind of coming back and asking for this seems to be pushing it.
Applicant
Yeah, it would certainly need to be far enough away where they couldn't look down on
any of the neighbors.
Daniel Kubiak
Otherwise, we get it, the rest of the zoning was already done. We were just trying to
focus on those several pieces so hopefully you get the sentiment that you need to talk
to the neighbors. So, before we see anything at P&Z, I will assume all of that has gotten
done.
Southlake Corridor Planning Committee Item #6 —The Overlook
Meeting #52 — October 27, 2025 Page 6
STAFF PRESENTATION SHOWN TO COMMITTEE:
ICITY OF
SOUTHLAKE
. . . . . . . . . . . . .
.�
R ONO
4F -�
n
t�
,k..: t 1. dCN
r 3-
r
!
As
F
c
411,11. 1 •.li
L �1L✓'. I . 41'!�1
CT
p
'8
��� ..
��,
•
.._
1 I lf� }} 1� !
_
•5
*
�1
[V _
Or "Q4
Southlake Corridor Planning Committee Item #6 —The Overlook
Meeting #52 — October 27, 2025 Page 7
70 74 1 804 41010 415 41Q 415 02 1075
z
Medium Density405 400 ,p 465
14
3Q8 Residential809 1 54 87�I920�950�970100 300
306 5 800 60 8804 805 808
304;c
_,O C1
302•x - 918
--w 801 803 805 807 809
300 1050
800 802 804 806 808
GATES HEAD 810 0Office
100 801 803 805 807 809 D
800
S'
A� 801 807 811 905
-Wur -,, A__J, ■
1125117
71
Legend
t ° 3
300
35'.
100-Year Flood Plain
Carps of Engineers
Property
5
Public Park/Open
141
1
Space
12yp
YJ
Public
Public/Semi-Public
Cif
Law Density
�.
Residential
r
Medium Density
MAIN
Residential
200
T
O
; �;;;
'�C�
Office Commercial
Retail commercial
140
Mixed Use
FpUiV
Town Center
12b0
Regional Retail
® Industrial
)UTHI AKF -
Jk
1401
11
1201---[[
1451
1425
4
Legendnn
AG
428
--CI
RE5 C2
RE7 C3
SF1A C4
SFIB I♦NRPUD
:'•: ; [:
SF2 - HC
SF30 81
SF20A B2
1Lj.
5F208 I1
RPUD
I2
4Q1
MF1 SP1
MF2 SP2
JNTAIN
MH DT
C5 TZD
1400
01
ECZ
02 -
SOUTHLAKE
Southlake Corridor Planning Committee Item #6 —The Overlook
Meeting #52 — October 27, 2025 Page 8
OFFICE COMMERCIAL LAND USE
Purpose: The Office Commercial category is a commercial category designed and intended for the
exclusive use of office and limited office -related activities.
Definition: The Office Commercial category is suitable for supporting commercial activity of an office
character. It has been established to encourage and permit general professional and business offices
of high quality and appearance, in attractive landscaped surroundings with the types of uses and
design exterior appearance so controlled as to be generally compatible with existing and future
adjacent and surrounding residential development. Properties with this designation may serve as a
transition between established residential neighborhoods, major roadways, and retail development.
Issues
Recommendations/Policy
Mendez/Strunk Properties
Retain the Medium Density Residential land use
designation.
• Approximately 12 acres.
Far properties fronting on Carroll Ave., garden office
• The land use designation is Medium Density Residential
uses may be considered if development is planned in
and Office Corn m erci al.
a co m p reh en sive m a n n er.
• Office development adjacent to Carroll Avenue.
Buffer existing and future residential uses from office
• Cross Lane (Foxboro Subdivision) is stubbed out to the
uses.
west property line.
Any future connection of Cross Lane to Carroll Ave. is
not intended.
• Any office development along Carroll Ave. should
_
have cross access back to the traffic signal at F.M.
1709/Tower Plaza as well as to the office properties
to the south to access the existing drive cut on
Y_ ^y
Carroll Ave.
A new drive cut at Carroll Ave. and Main Street is not
i ti
I
recommended due to existing traffic
no
conditions volumes at this intersection and the close
"`.Iltiti� `. j`_
proxim ity to the light.
Southlake Corridor Planning Committee Item #6 —The Overlook
Meeting #52 — October 27, 2025 Page 9
Master Pathways Plan
S --
i+. . ,
Street View (Looking Northeast N. Carroll Ave.)
i
r
!I 10 -; 11
.I 12
I�•751 s.f1j.743 s.fjj.786 s-I.
' ''
Ir
sl
:I
=----_•---
;
1-' LaMuepe eurLerS'ard - I
Type •P
1 '
Vehicle AC
,rVehide Gates
�i.1_27�,:1795.f.
.-4„
\ ra�wK
pJMPy7g1(
J
)"TSCn F. Svunck
r=iStipg Zing: ACC
L.V-G.-4fsiiu Ce.u?t�Flma6aaSa:
10'LaFKI a e8utrayWd
Type T-1•
10• LaMl Moe Burreryard
Type 'F-1"
APPRax
L--11111 OP POWER
POLE
Town Squuw Vennlns, L.P.
Gxislfag Zanies: OT
i_L+-C•. — oat. ;:e[F•
10' LaroScW&Oeeyard -
Tvoef]'
Requested uses:
Bank with drive-thru
• Private club/bar
S' S[D.PLK
n
D
7r
4
l
Southlake Corridor Planning Committee Item #6 —The Overlook
Meeting #52 — October 27, 2025 Page 11
SITE DATA SUMMARY CHART
Existing Zoning
TZD
Current Land Use
Office Corn mercial
Gross Acreage
1.98 ac.
Net Acreage (minus R.O.W. dedication)
1.93 ac.
Net Percentage of Site Coverage
15%
Net Acreage of Open Space
0.6 ac.
Net Percentage of Open Space
30%
Total Building Area
27,179 SF (12,445 SF)
Leasable Square Footage by Use
12,445 SF - Office/Bank with Drive-thru
11,865 SF - Office
2,869 SF - Private Club/ Bar/Assembly
Total Leasable
27,179 SF
Parking Spaces Req.
1 space / 363 SF = 75 spaces
Parking Space Provided
75 spaces
Impervious Coverage
58,852 SF (68.2%)
Wt"fis] iA
Southlake Corridor Planning Committee
Meeting #52 — October 27, 2025
Connectivity and Driveways
• The northern driveway, located
approximately 180 feet north of the
southern driveway and
approximately 350 feet south of
Ownby !n, will primarily serve the
homes.
• The southern driveway, located
approximately 600 feet north of
Southlake Blvd, will primarily serve
the general office development.
• Since there is a raised median along
North Carroll Avenue spanning the
entire fro ntage of the su bject
property, the development will
install a northbound left -turn lane
to serve th e n orthe rn site driveway.
Item #6 —The Overlook
Page 12
loll
on
EEikiil
NINE ■N
■■■.II■
I
MEAN
■■■E■
snowsal
■■■■I1■
. _R�E
Mai
:o■■■■! ■!■■■■■ ■■!■i■ ■i■■■l
■1■■■! ■!■■■■ ■■!■■ 1I',i■1
■!■■■■■ ■■■■■■■ ■■111■ ■■■■■�
Southlake Corridor Planning Committee Item #6 —The Overlook
Meeting #52 — October 27, 2025 Page 13
�Ill�fill■1■1i�1-1�_" �fll
Elevations
Elevations
NEIGHBORHOOD EDGE (OFFICE);
The Neighborhood Edge will be made up of a Class A Professional Office building, occupied by general
office, bank and a private club uses.
Parking will be provided at a ratio of one space for every 363 square feet of space. Such parking will
be provided through a dedicated off-street parking lot. The parking spaces shall be available, during
off hours, for shared use by the residential neighborhood when special events, such as parties and
family gatherings require it. Bicycle parking spaces shall be provided.
'1�--
Tyye'FI'
$' S]
Fence l wall Legend
A"Rox
Lo AM v PpWF.c
8' Wawnry Wal
Private Russ
KN-F
T— 54—
8' Masonry Wal a 2.5 ma®onry wall w14' iron ferce on top
Vehicle GatES
U :-4
6' Mawnry Wal or Iron love o, Cor*-atian
12
086 s.f
0 Q
1P kfreryd.a
Bldg 1
27,179 0.
3 soo v
,,.,�
; lankmrrkaear
s A
c afse.ya�d•
Southlake Corridor Planning Committee Item #6 —The Overlook
Meeting #52 — October 27, 2025 Page 15
lO LMsr-,Y A+tiY�b
n avq.7i3 t.rb.ra6
Tree Legend
w i....aa
Saved Trees
• ..
,. , ......,_
Borderline Trees
.f 51 n
trees to be Altered
�=
rrae
r
vehipB[ieoes
t..�w.y �•r'�m nr
f
Tree Canopy Coverage
ttu�n ..a
Total site area
86,249 s.L
€
Total existing canopy
29.641 s.F. --a 34,36%
Preserved9i6 ed Bee canopy (green)
11,9s.F. --� 40.4746r.
Possible preserved tree canopy (yellow)
0 s-L a 00.00 /o
3
*:77
smrwux
Removed tree canopy Fred)
17,643 0,--� 59.53%
_
29,641 sJ. --a 100.00%
0
C's1
Legend
sSWxed Tree
is
Interior Lands PvCanwy Tree - 4"
0
Interior Landscape Accent Tree - W Melght Mln.
0
Interior Landscape Shmb • 3 Gallon Min.
■
Gmundwwer - 4" Cpntairler5 Min. car uc]
Seasonal Color- 4' Containers Min.
-
Parldrtg Lot Lighting
13E7
Legend
existing Tree
Q
Cedar Elm
•
cmne5e Aistache
Live Oak
i
REd pak
'
'
Crape Myrtle
i
',
PCSeR NRllpw
`
LRtle Gem Magnolia d
Southlake Corridor Planning Committee Item #6 —The Overlook
Meeting #52 — October 27, 2025 Page 16
Summary of Proposal:
The applicant is proposing a site plan for The Overlook to
construct a three-story 27,179 square -foot office building in the
"TZD" zoning district of the Willow Tree Gardens development
at 240 N. Carroll Avenue.
vCITY OF
SUU I t- LAKt
Southlake Corridor Planning Committee
Meeting #52 — October 27, 2025
Item #6 —The Overlook
Page 17
Do* mdmdbw
A, I�nis'spe 80l 1d
7�'F,1.
himgrn F. Si—k
Fx�m,g 2ce+og AC
L.U.B. • F.iS:r Dw.4}.%0*,rYI
me-
S;[D6w"
kp"-Oy
LOCATION'OF MWER
PoLf
Ex mg Zwecg.:
LUX. TMOM
ff w.,e nmerem -
-------
►
�#
L EGENQ
!
!
DRAINAGE AREA LABEL
A.ME
AC 1
I
I
FLOW ARROW
DRAINAGE DINDE
r 1 r
� N
E%ISTINC CONTOUR MINOR
--s- --
1
;
Ir
I
r
C%I STI7JC CONTOUR MAJOR
—
I
`4 �.;
FLOW PATH FOR TC CALCS
DESIGN POINT1
lam-
f
--
Ir i
t..s .
r
Southlake Corridor Planning Committee Item #6 —The Overlook
Meeting #52 — October 27, 2025 Page 18
I I I y l 1 I
' I LEGEND
I I I r Q I v�' .+ f f� DRAINAGE AREA LA� In£
FLOW ARROW (PAST-PRO.[CT] r r r DRAINAGE DIYICE
......: ....; .�
r ...- Imo...__.. E)USntG CONTOUR UNCR
r._f._.._r_....y__y.. w_' .. ���•' E1GS11NG CONTOUR AU.IOR
i` , _ _?�1•' I _ ... _ L _ _ L L 11 `� '. FLOW PATH FOR TIC CAlOS — —
1 a DESIGN POINT Ol
}� 1i _ �• rrye
rl `
-------
II t_�,W\ low
r'
Southlake Corridor Planning Committee
Meeting #52 — October 27, 2025
LEGEND
PROP. S' WATER LINE
} PROP. FIRE HYDRANT
• PROP. SEWER MANHOLE
PROP. S" SEWER LINE
PROP. OULvERT
FXIST. WATER MA114
EXIST. SEWER MAIN
FIRE LANE
Item #6 —The Overlook
Page 19