Item 4N - MemoCITY OF SOUTH LAKE MEMORANDUM December 31, 2025 To: Alison Ortowski, City Manager From: David Miller, Director of Community Services Item 4N Subject: Award a bid with Central North Construction LLC for Phase 2 of the Green Ribbon Improvements Project along the State Highway 114 and Dove Road in an amount not to exceed $370,000 Action Requested: Award a bid with Central North Construction LLC for Phase 2 of the Green Ribbon Improvements Project along the State Highway 114 and Dove Road in an amount not to exceed $370,000 Background Information: The purpose of this item is to award a bid to Central North Construction LLC. for the construction of Phase 2 of the Green Ribbon Improvements Project along State Highway 114 and Dove Road. The Green Ribbon Project is a TxDOT reimbursable grant program designed to improve the visual character of highway corridors and minimize the negative impacts of air pollution by planting trees and shrubs. The City Council directed staff to begin the implementation of the State Highway 114 Green Ribbon Master Plan at the 2023 Summer Workshop. City staff worked with Kimley Horn on the engineering and design for Phase 2 of the project, and received bids that were opening in late July 2025. There were two bidders: Central North Construction LLC and C Green Scaping LP. Central North Construction was the lowest qualified bidder, which is a requirement for this funding, has received approval as a TxDOT certified contractor and has a positive track record of completing Green Ribbon projects within the DFW area. Funding in the amount of $400,000 was award by TxDOT for Phase 2 in early 2024, and construction is set to begin in early 2026. All costs associated with the construction of Phase 2 are reimbursed up to $400,000 and staff do not anticipate any increases above the awarded reimbursable amount. Funding for this project is available within the adopted FY 2025 CIP budget. Financial City of Southlake Values: Integrity ♦ Innovation ♦ Accountability ♦ Commitment to Excellence ♦ Teamwork Alison Ortowski, City Manager Meeting Date —January 06, 2026 Page 2 of 2 Considerations: This request is in alignment with the approved FY 2026 CIP budget. All costs associated with the construction of phase 2 are reimbursed up to $400,000. Strategic Link: This item is linked to the City's Strategy Map related to the focus area of Quality Development and Infrastructure and meets the corporate objective to Invest to provide and maintain high -quality public assets and collaborate with select partners to implement services solutions. Alternatives: 1) Approval of the proposed contract as presented 2) Approval with modifications to the proposed contract 3) Denial of the proposed contract Supporting Documents: • Copy of proposed contract agreement with Central North Construction • Copy of bid submission from Central North Construction • Copy of Green Ribbon Implementation Plan Staff Recommendation: Award a bid with Central North Construction LLC for Phase 2 of the Green Ribbon Improvements Project along the State Highway 114 and Dove Road in an amount not to exceed $370,000 City of Southlake Values: Integrity ♦ Innovation ♦ Accountability ♦ Commitment to Excellence ♦ Teamwork Copy of proposed contract agreement with Central North Construction STANDARD FORM OF AGREEMENT BETWEEN THE CITY OF SOUTHLAKE AND CONTRACTOR THIS AGREEMENT is dated as of the 6th day of January in the year 20 26 by and between the City of Southlake (hereinafter called OWNER) and; Central North Construction LLC of the City of Allen , County of Collin State of Texas (hereinafter called CONTRACTOR). OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree as follows: Article 1. WORK. The PROJECT for the Work detailed under the Contract Documents (see Article 8 of this Agreement for items included in the "Contract Documents") is generally identified as following: SH 114 Landscape Enhancement Project No. F2025(760) City of Southlake Bid No. RFB2506B200TS250009 CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents. The Work is generally described as follows: Median Landscape Enhancement along SH 114 from North of W. Dove Rd to W. Dove Rd. Article 2. ENGINEER. The Project has been designed by: Kimley-Horn and Associates, Inc. but the term ENGINEER in these Contract Documents shall refer to the City Engineer, or his authorized representative, who shall exercise the rights and authority assigned to ENGINEER in the Contract Documents and in connection with completion of the Work in accordance with the Contract Documents. Article 3. CONTRACT TIME. 3.1. The Contractor will achieve 100% final completion of the Work, with no punch -list items remaining, and will be ready to submit Application for final payment in accordance with the Contract Documents within forty-two (42) working days from the date written notice to proceed is provided to the Contractor by the City. Page 1 of 6 3.2. LIQUIDATED DAMAGES The Contract Time is of the essence and will be strictly enforced. Liquidated damages will be assessed against the Contractor for failure to achieve Final Completion by the date established by the parties for Final Completion of the Work. The Contractor and surety agree that the liquidated damages provisions in this Contract are reasonable, facially valid, are not a penalty, and do not otherwise operate as a penalty. For each and every calendar day that any Work shall remain incomplete after the expiration of the date established by the parties for Final Completion of the Work as specified in the Contract Documents, including any time extension authorized in writing by the Owner, the sum of $500.00 per calendar day may be deducted from the moneys due to the Contractor, or may be charged against the Contractor, not as a penalty, but as liquidated damages. The Contractor agrees that for purposes of Texas Gov't Code Ch. 2252, a bona fide dispute exists if liquidated damages are assessed under this Contract and the Owner may withhold payment to satisfy liquidated damages owed to the Owner hereunder. The sum of money thus deducted or charged as liquidated damages is not to be considered as a penalty, but shall be deemed, taken, and treated as reasonable liquidated damages, representing a reasonable estimate of damages, or a reasonable forecast of just compensation, because the harm caused by the breach is incapable or extremely difficult of estimation due to the public nature of the work and the likely loss to be sustained by the Owner and the general public, estimated at or before the time of executing this Contract. Further, the parties acknowledge the Owner's paramount purposes and duty to protect the "public fisc" and the general health, safety, and welfare of the public, and the parties agree that any alleged disparity between actual and liquidated damages shall be construed as bridgeable and acceptable as a matter of law and public policy and shall be calculated and construed in favor of the Owner. Article 4. CONTRACT PRICE. 4.1. OWNER shall Pay the CONTRACTOR according to in place quantities multiplied times the price or prices shown in the Bid Proposal, which form a part of this Contract, or according to an approved Schedule of Values, plus (or minus) any approved extra work or change orders. Article 5. PAYMENT PROCEDURES. CONTRACTOR shall submit Application for Payment in accordance with the Standard General Conditions of the Construction Contract (EJCDC) (the "General Conditions"). Application for Payment will be processed by the ENGINEER as provided in the General Conditions. 5.1. Progress Payments. OWNER shall make progress payments on the basis of CONTRACTOR'S Applications for payment as recommended and approved by ENGINEER. On or about the last day of each month during the construction CONTRACTOR shall meet with ENGINEER'S representative to determine number of units completed and/or value of completed work. All progress payments will be on the basis of the progress of the Work measured by the number of units completed or, if applicable, by the schedule of values established in the General Conditions. Page 2 of 6 5.1.1. Prior to Final Completion, in accordance with paragraph 15.01 of the General Conditions, progress payments will be subject to a retainage in an amount equal five (5%) of the total Contract Price, as indicated in paragraph15.01 of the General Conditions and less the aggregate of payments previously made. 5.2 Final Payment. Upon Final Completion and acceptance of the Work in accordance with the General Conditions, OWNER shall pay the remainder of the Contract Price as recommended by the ENGINEER. Article 6. CONTRACTOR'S REPRESENTATIONS. In order to induce OWNER to enter into this Agreement CONTRACTOR makes the following representations: 6.1. CONTRACTOR has familiarized itself with the nature and extent of the Contract Documents, Work, site, locality and all local and State and Federal Laws and Regulations that in any manner may affect cost, progress, performance or furnishing of the Work. 6.2. CONTRACTOR has studied carefully all reports of explorations and test of subsurface conditions and drawings of physical conditions. 6.3. CONTRACTOR has obtained and carefully studied (or assumes responsibility for obtaining and carefully studying) all examinations, investigations, explorations, test, reports and studies which pertain to the subsurface or physical conditions at or contiguous to the site or otherwise may affect the cost, progress, performance or furnishing of the Work as CONTRACTOR considers necessary for the performance or furnishing of the Work at the Contract Price, within the Contract Time and in accordance with the other terms of and conditions of the Contract Documents, including the General Conditions; and no additional examinations, investigations, explorations, test, studies or similar information or data are or will be required by the CONTRACTOR for such purposes. 6.4. CONTRACTOR has reviewed and checked all information and data shown or indicated on the Contract Documents with respect to existing Underground Facilities at or contiguous to the site and assumes responsibility for the accurate location of said Underground Facilities. No additional examinations, investigations, exploration, test, reports studies or similar information or data in respect of said Underground Facilities are or will be required by CONTRACTOR in order to perform and furnish the Work at the Contract Price, within the Contract Time and in accordance with other terms and conditions of the Contract Documents, including the General Conditions. 6.5. CONTRACTOR including assigned Project Manager has visited the site prior to bidding. 6.6. CONTRACTOR has correlated the results of all such observations, investigations, explorations, test, reports and studies with the terms and conditions of the Contract Documents. 6.7. CONTRACTOR has given ENGINEER written notice of all conflicts, errors or Page 3 of 6 discrepancies that he has discovered in the Contract Documents and in the written resolution thereof by ENGINEER is acceptable to CONTRACTOR. Article 7. MISC. 7.1. Terms in this agreement are defined in Article 1 of the General conditions will have the meanings indicated in the General Conditions. 7.2. No assignments by a party hereto of any rights under or interest in the Contract Documents will be binding on another party hereto without written consent of the party sought to be bound; and specifically but without limitation moneys that may come due and moneys that are due may not be assigned without such consent (except to the extent that the effect of this restriction may limited by law), and unless specifically stated to the contrary in any written consent to an assignment will release or discharge the assignor from any duty or responsibility under the Contract Documents. 7.3. OWNER and CONTRACTOR each binds itself, its partners, successors, assigns and legal representatives to the other party hereto, its partners, successors, assigns and legal representatives in respect of all covenants, agreements and obligations contained in the Contract Documents. Article 8. CONTRACT DOCUMENTS. The Contract Documents that comprise the entire agreement between the OWNER and CONTRACTOR concerning the work consist of these items listed in the Table of Contents. The Drawings and Plans, consisting of a cover sheet and sheets numbered 001-054 inclusive with each sheet bearing the following general title: (may not be attached). SHEET # SHEET NAME 001 Title Sheet 002 Index of Sheets 003 Overall Layout Plan 004-009 General Notes 010 Estimate and Quantity Sheet 011 Proposed Project Quantities 012 Existing Conditions 013-031 Traffic 032-033 Hardscape Plans 034-038 Landscape Plans 039-044 Irrigation Plans 045-046 Electrical Details 047-054 Erosion Control Plan Other published specifications and standard drawings manuals (Texas State Department of Highways and Public Transportation Standard Specifications for Construction) as may be referenced in other portions of the Contract Documents. Page 4 of 6 There are no Contract Documents other than those listed above in this Article 8. The Contract Documents may be only being amended, modified or supplemented as provided in paragraphs 3.04. and 3.05. of the General Conditions. Article 9. OTHER PROVISIONS. INDEMNITY THE SUCCESSFUL BIDDER AGREES TO DEFEND, INDEMNIFY, AND HOLD THE CITY AND ALL OF ITS OFFICERS, AGENTS, EMPLOYEES, AND ELECTED OFFICIALS WHOLE AND HARMLESS TO THE EXTENT AUTHORIZED BY LAW AGAINST ANY AND ALL CLAIMS FOR DAMAGES, COSTS, AND EXPENSES OF PERSONS OR PROPERTYTHAT MAYARISE OUTOF, OR BE OCCASIONED BY, OR FROM ANY NEGLIGENT ACT, OR OMISSION OF THE SUCCESSFUL BIDDER, OR ANY AGENT, SERVANT, OR EMPLOYEE OF THE SUCCESSFUL BIDDER IN THE EXECUTION OF THE PERFORMANCE OF THIS AGREEMENT, WITHOUT REGARD TO WHETHER SUCH PERSONS ARE UNDER THE DIRECTION OF CITY AGENTS OR EMPLOYEES. THIS INDEMNITY OBLIGATION IS MADE IN ADDITION TO THE INDEMNITY OBLIGATION REQUIRED BY PARAGRAPH 7.18 OF THE GENERAL CONDITIONS. Page 5 of 6 IN WITNESS WHEREOF, OWNER and CONTRACTOR have signed this Agreement. This Agreement will be effective on the day of. 20 CITY OF SOUTHLAKE 1400 MAIN ST. SOUTHLAKE, TEXAS 76248 By: Signature CONTRACTOR: Central North Construction, LLC By: Signature Paul Anderton Owner/ Principal Title e Print Name and Title Attest Attest Recommended By: Alison Ortowski, City Manager Approved as to Form and Legality this City Attorney 5970 Lindsey Lane Street Address Allen,Texas 75002 City, State & Zip By: 469*569*9781 Phone Number Seal (if Corporation) day of 20 Page 6 of 6 Copy of bid submission from Central North Construction SH 114 LANDSCAPE ENHANCEMENT NORTH OF W. DOVE RD TO W. DOVE RD FEDERAL AID PROJECT F 2025 (760) CSJ 0353-03-114 CITY OF SOUTHLAKE RFB25068200TS250009 ACKNOWLEDGE OF RECEIPT OF ADDENDA The undersigned Bidder hereby acknowledges receipt of the following Addenda: —)— 29- t4X5, No addenda were received: (Name of Bidder) By: (Signature of Authorized Representative) Name: �9r�0-�.i `.t�t�l�✓ Title: Date: tie7{, SH 114 Landscape Enhancement Southlake, Texas Bid Bond -0ONTRACTOR: SURETY: `.:. (Name, legal status and address) (Name, legal status and principal place Central North Construction, LLC of business) 5970 Lindsey Lane Employers Mutual Casualty Company Allen, Texas 75002 717 Mulberry Street Des Moines, IA 50309 OWNER: (Name, legal status and address) Southlake, Texas 1400 Main Street Southlake, Texas 76092 BOND AMOUNT: $Five percent (5%) of Bid Amount PROJECT: (Name,' location or address,' and Project number, if any) -'SH114 Landscape Enhancements F2025(760) City of Southlake, Texas The Contractor and Surety are bound to the Owner in the amount set forth above, for the :.payment of which the Contractor and Surety bind themselves, their heirs, executors, administrators, successors and assigns, jointly and severally, as provided herein. The conditions of this Bond are such that if the Owner accepts the bid of the Contractor within the time specified in the bid documents, or within such time period as may be agreed to by the Owner and. Contractor, and the Contractor either (1) enters into a contract with the Owner in accordance with the terms of such bid, and gives such bond or bonds as may be specified in the bidding or Contract Documents, with a surety admitted in thejurisdiction of the Project and otherwise acceptable to the Owner, for the faithful performance of such Contract and for the prompt payment of labor and material furnished -. in the prosecution thereof or (2) pays to the Owner the difference, not to exceed the amount of this Bond, between the amount specified in said bid and such larger amount for which the Owner may in good faith contract with another party to perform the work covered by said bid, then this obligation shall be unit and void, otherwise to remain in full force and effect. The Surety hereby waives any notice of an agreement between the .'.Owner and Contractor. to extend the time fit which the Owner may accept the bid. Waiver of notice by the Surety shall not apply to any extension exceeding sixty (60) days in the aggregate beyond the time for acceptance of bids specified in the bid documents, and the Owner and Contractor shall obtain the Surety's consent for an extension beyond sixty (60) days. If this Bond is issued in connection with a subcontractor's bid to a Contractor, the term Contractor in this Bond shall be deemed to be Subcontractor and the tens Owner shall be deemed to be Contractor. When this Bond has been furnished to comply with a statutory or other legal requirement in the location of the Project, any provision in this Bond conflicting with said statutory or legal requirement shall be deemed deleted herefrom and provisions conforming to such statutory or other legal requirement shall be deemed incorporated herein. When so furnished, the intent is that this Bond shall be construed as a statutory bond and not as a common law bond. ADDITIONS AND DELETIONS: The author of this document has added information needed for its completion. The author may also It revised the text of the original AIA standard form. An Additions and Deielions Report that notes added in as well as revisions to the standard form text is available from revie the author and should be wed. A vertical line in the left margin of this document indicates where the author has added necessary information and where the author has added to or deleted from the original AIA text. This document has important legal consequences. Consultation with an attorney is encouraged with respect to its completion or modification. Any singular reference to Contractor, Surety, Owner or other party shall be considered plural where applicable. AIA Document A310^'-20f0.Copyright®196a. 1970 and 2010 by Tha AmeriwnlnsOtute of Architects. All rights reaorvod. Init. WARNIcNG: ThIa AIAe Document Is protected by U.S. Copyright Law and Interneflonal booties. unauthorized reproduction or distribution of this AIA Document, or any ponlon of II, mey rosult In sovere civil end cdminel panollles, and will he prosecuted to the maximum extent possible under the law. Sipted and sealed this 3Qth day 01 JUIy, 2025. G I r OK ess) (Witness) ( ncipal) (Seal) (Till s4pw simv (SSrrely) (Seal) Sam Sealer, Attorney in Fact (Tffle) tittnna, u� uht r; t„>,; trr SEAL ,=o �a1NE9 t nt"�" IniL AIA Document A3f0^'-20f0. Copyright01t1G3. 1970 end 20106y The American lnatlNle of Arohllecls. All riphls reserved.WARN®ND: Thia AIA' Document Ia protected by U.9. Copyright Lew and Intemetlonal Trea<lea. Unauthorized raproducllon or diatrihuUon of thla AIA Documem, er any poAlon of II, may reauit in severe Uvll antl Mminal penaltlea, and will ha prosecuted to the maximum eaten( poaa161e under tha law, User Notes: (0770990a0) /EMC. P.O. Box 712 • Des Moines, Iowa 50306,0712 INSURANCE POWER OF ATTORNEY APPOINTING INDIVIDUAL ATTORNEY -IN -FACT KNOW ALL MEN BY THESE PRESENTS, that: 1. Employers Mutual Casualty Company, an Iowa Corporation 2. EMCASCO Insurance Company, an Iowa Corporation 3. Union Insurance Company of Providence, an Iowa Corporation 4. Illinois EMCASCO insurance Company, an Iowa Corporation 5. Dakota Fire Insurance Company; a North Dakota Corporation 6, EMC Property & Casualty Company, an Iowa Corporation hereinagef referred to severally as "Company' and collectively as °Companies', each tloes, by these presents, make, constitute and appoint: Sam Sealer its true and lawful attorney -in -fact, with full power and authority conferred to sign; seal, and execute the Bid Bond Any and All Bonds andlo bind each Company thereby as fully atxl to the same extent as it such instmments were signed by the duty authorized officers of each such Company, and all of the acts of said attorney pursuant to the authority hereby given are hereby ratified and txin imied. AUTHORITY FOR POWER OF ATTORNEY This Power-ot-Atlontey is made and executed pursuant to and by the authority of the foliovdng resolution of the Boards of Directors of each of the Companlesat the first regularly scheduled meeting of each company duty called and held in 1999: RESOLVED: The President and Chief Executive Officer, any Vice President, the Treasurer and the Secretary of Employers Mutual Casualty Company shall have power and authority to (1) appoint attorneys•io, act and authorize them to execute on behalf of each Company and attach the seal of the Company thereto, bonds and undertakings, recogniz2rx;es, contracts of indemnity and other writings obligatory in the nature thereof; and (2) to remove any such attorney -In -fact at any time and revoke the power and authority given to him or her. Altomeys-io-fact shall have power and authority, subject to the terms and limitations of the power-of-ahomey issued to them, to execute and deliver on behalf of the Company, and to attach the seat of the Company thereto: bonds and undertakings, recognizances, contracts of indemnity and other writings obligatory in the nature thereof, and any such instrument executed by any such attomey4n-fact shall be fully and In all respects binding upon. the Company. Codification as to the validity of any power-ol-attorney authorized herein made by an officer of Employers Mutual Casualty Company shall be fully and in all respects binding upon this Company, The facsimile or machanica Illy reproduced signature of such officer, whether made heretofore or hereafter, wherever appearing upon a certified copy of any power-of-allomey of the Company, shall be valid and binding upon the Company with the same force and elf act as though manually affixed. INWITNESS THEREOF, the Companies have caused these presents tobesign dfor each bytreirofficers asshown, and the Corporate seals to be hereto affixed this 22nd dayof September 2022 Seats `�/ GTioL'T .-A lot z ':,,, 0 o p , s a Ott R Jean, P ant & CEO Todd Strother,Exeaaive Vice President do'_F?P ,=ai; i - a^ Oof Company 1; uman, President Chief Legal Officer& Secretary of do "sS SEAL o ,'1B63 6 19b3 &CEO of Corn les 2, 3, 4,5&6 Companies 1, 2, 31 4, 5 & 6 OWA , o VMA�, NtI, loop OE do Ue( ,. `�ly ; e M- ' �. SEAL g,,SEAL -_w- SEAL -S olle look MYCamiWbn IWiE OommYtion IAm6r f�{07f9 awoer. », lal� Onthis 22nd day of September 2022 beforemeallotaryPublicinandfortheSlate of Iowa, personally appeared Scott R. Jean and Todd Slroiher, wtw, being by me duly warn, tlio say that they are, and are known to me to be the CEO, Chairman, President, Executive Vice President, Chief Legal Officer andfor Secretary, respectively, of each of the Companies above; that the seals affixed to this Instrument are the seals of said corporations; that sad instrument was signed and sealed on behalf of each of the Companies by authority of their espective Boards of Directors; and that the said Scott R. Jean and Todd Soother, as such officers, acknowledged the execution of said instrument to be their voluntary act and dead, and the voluntary act and deed of each of the Companies. figy Commission Expires October 10, 2025. Nota�n arid the State Active CERTIFICATE I, Ryan J. Springer, Vice Presidonl of the Companies, do hereby ceNiy that the foregoing resolution of lho Boards of Directors by each of the Companies, and tMs Power of Attorney issued pumuantlhereto on 22nd tlay of September 2022 ,are true and correct and are still in full force and effect. In Testimony Whereol I have subscribed my name aid affixed the facsimile seal of each Company this 301h may of July 2025 i 6' Vice President 7654 (9-22) B025623-NA 10123 902 A 000000 "For verification of the authenticity of the Power of Attorney you may call (515) 345-7548 " BID PROPOSAL FOR SH 114 LANDSCAPE ENHANCEMENT for the CITY OF SOUTHLAKE, TEXAS (THIS BIDPROPOSAL MUST NOT BE REMOVED FROM THE CONTRACT DOCUMENTS) DATE: �' 3�' -Zhe 2S TO: CITY of SOUTHLAKE, TX 1400 MAIN STREET, SUITE 270 SOUTHLAKE, TX 76092 FOR: SH 114 LANDSCAPE ENHANCEMENT 6� The budget estimate for this project is Pursuant to the foregoing "NOTICE TO BIDDERS", the undersigned bidder, having thoroughly examined the Contract Documents, the site of the project and understanding the amount of work to be done and the prevailing conditions, hereby proposes to fully complete all of the work and requirements as provided in the plans and Contract Documents and binds himself 1 herself upon acceptance of this bid proposal to execute a Contract and furnish such bonds as required and proposes to complete the work within the time stated and for the following price: BID PROPOSAL FORM: SH 114 LANDSCAPE ENHANCEMENT City of Southlake Federal Aid Project No. F2025(760) BASE BID Item Description Unit CITY UNIT COST ITEM COST 1007002 PREPARING ROW STA 4 $ kSIWOV $ (03,24904 AO 1007013 TREE PROTECTION (INSTALL) EA 3 $ `w.4.� $ 3oc mo 1647004 BROADCAST SEED (PERM) (URBAN) SY 31693 $ t i $ 553, `t6 (CLAY) 1667001 FERTILIZER AC 0.8 $ tS 0�0 $ l �• Oo 1687001 VEGETATIVE WATERING MG 10 $ /p. tDd Igo $ tom• 1707001 IRRIGATION SYSTEM LS 1 $ U+�Of• (5 $ �O�Qr�S`L • �5 1927009 PLANT BED PREP SY 1,653 $ �• $ "'t b «' mO 00 1927024 LOOSE AGGR GRND COVER (TY 1) CY 184 �__^^�__�5�t��� 1927040 PLANT MATERIAL (45 GAL) (TREE) EA 7 $ (000. QO $ L41260• Ao 927041 PLANT MATERIAL (65 GAL) (TREE) EA 6 $ 00 $ L '6m•QO 927047 PLANT MATERIAL (5 GAL) (SHRUB) EA 20012 $ 1 t►o $ 3(0 1 im 10 937001 LANDSCAPE ESTABLISH MO 12 $ 't QyCO•0O $ a t 600"' 937007 IRRIG SYS OPER AND MAINT MO 12 $ is 00• ^0 $ Clam •00 4327013 RIPRAP (MOW STRIP) (4 IN) CY 18 $ 4ttsco— 0$ �j�tQOO 5007001 MOBILIZATION LS 1 $ 1 (t'Jrc OF$ '1`-�t3O5' 5027001 BARRICADES, SIGNS AND TRAFFIC MO 3 $ 1f too., $ `St3� PORTABLE CHANGEABLE MESSAGE 502 7001 SIGN EA 2 $ $ VC/ 5067043 BIODEG EROSN CONT LOGS (INSTL) (8") LF 634 $ ,�5 $ LA'' f225 .�� 506 7046 BIODEG EROSN CONT LOGS (REMOVE) LF 634 $n 10 $ W• Go 207007 ELEC CONDR (NO.8) BARE LF 100 $ /1 ' 50 $ 0 BASE BID $ 3770I TOTAL BASE BID $Z) O, COO, 2 The undersigned bidder agrees to execute and file with the Owner a Contract and bonds on the forms provided within ten (10) days after written notification of award of the Contract to him I her and to begin work to be performed under the Contract within ten (10) days after written authorization to begin the work (Work Order) and to complete the work in full within forty-two (42) contract working days after the date specified in the "Notice to Proceed I Work Order". Enclosed with this bid is a certified check or cashier's check or bid bond payable to the CITY OF SOUTHLAKE in the amount of five percent (5%) of the total bid, which is to become the property of the CITY OF SOUTHLAKE, or the attached Bidder's Bond is to be forfeited in the event the Contract and bond are not executed within the time set forth, as liquidated damage ✓-delay and additional work caused thereby. , , n SIGNED: SUBMITTED BY: DOING BUSINESS AS: SEAL IF BIDDER ISA CORPORATION (Corporation), (Co -Partnership), (Individual), (Other) t� u 125 E 11th St Austin, Texas 78701 rra512.463.8588 °txdot. ov or rrxn:ponsnon g April 14, 2025 CENTRAL NORTH CONSTRUCTION, LLC 5970 LINDSEY LANE ALLEN TX, 75002 RE: TxDOT Vendor Number 18142 Dear Contractor: Your Confidential Questionnaire is satisfactory and qualifies you to bid an projects let by the Texas Department of Transportation (TXDO I I from the date of this letter through December 31, 2025. Your bidding capacity has been set at $84,092,400.00. You may request and receive bidding proposals for projects on which the engineers estimate does not exceed your bidding capacity, less any uncompleted work currently under contract with TXDOT. If we may be of further assistance, please contact our Pre -qualification Branch at 512/416-2584. Sincerely, Greg Williams Director, Letting Management Section Construction Division Connecting You with Texas An Equal Opportunity Employer CONFLICT OF INTEREST QUESTIONNAIRE FORM CIO For vendor doing business with local governmental entity This questionnaire reflects changes made to the law by H.B. 23, 84th Leg., Regular Session. OFFICE USE ONLY This questionnaire is being filed In accordance with Chapter 176, Local Govemment Code, by a vendor who Date 17eceivod has a business relationship as defined by Section 176.001(1-a) with a 1=1 governmental entity and the vendor meets requirements under Section 176.006(a). By law this questionnaire must be filed with the records ad millstmtor d the local governmental entity not later than the 7th business day after the date the vendor becomes aware of fads that require the statement to be filed. See Section 176.0D6(a-I), Local Government Code. A vendor commits an offense r the vendor knowingly violates Section 176.DD6, Local Government Cale. An offense under this section is a misdemeanor. t Name of vendor who, has a business relationship with local governmental entity. 1(.`111., Nc 2 Check this box if you are filing an update to a previously filed questionnaire.(ft law requires that you file an updated completed questonnalre with the appropriate filing authority not later than the 7th business day after the date on which you became aware that the originally filed questionnaire was Incomplete or Inaccurete.) 3 Name of local government officer about whom the Information is being disclosed, Name of officer 4 Describe each employment or other business relationship with the local government officer, or a family member of the officer, as described by Section 176.003(a)(2)(A)• Also describe any family relationship with the local govemment off leer, Completesubparts A and B foreach employment or business relationship described. Attach additional pages to this Form CID as necessary. A. Is the local government officer or a family member of the officer receiving or likely to receive taxable Income, other than Investment Income, from the vendor? Yes Jo B. Is the vendor receiving or likely to receive taxable Income, other than Investment Income, from or at the direction of the local govemment officer or a family member of the officer AND the taxable Income Is riot received from the kcal governmental entity? DYes L�"0 s Describe each employment or business relationship that the vendor named in Section l maintains with a corporation or other business entity with respect to which the local govemment officer serves as an officer or director, or holds an ownership Interest of one percent or more. 1� IF this box if the vendor has given the local government officer orafamily member of the officer one or more gibs ❑Check as described In Section 176.003(a)(2)(B), excl I grtg'i'y"�Irascribed In Section 176.003(a-1). 7 Signature of vendor d ing business with the govemmental eMW Date Form prevlded by Taus Ethics Commission www.ethlcs.slale.lx.us Revised 1/12021 State of Texas Child Support Business Ownership Form County: TARRANT TXDOT CSJ: 0353-03-114 Project Name: SH714 Landscape Enhancemenls LG Project Number: F2o2s (76o) Business Entity Submitting Bid: Central North Construction, LLC Section 231.006I Family Code, requires a bid for a contract paid from state funds to include the names and social security number of individuals owning 26% or more of the business entity submitting the bid. 1. In the spaces below please provide the names and social security number of individuals owning 25% or more of the business. Paul Anderton Owner/ Principal Social Security Number 462-43-0160 2. Please check the box below if no individual owns 25% or more of the business. individual own 25% or more of the business. Except as provided by Section 231.302(d), Family Code, a social security number is confidential and may be disclosed only for the purpose of responding to a request for information from an agency operating under the provisions of Part A and D to Title IV of the Federal Social Security Act (42 USC Section 601-617 and 651-699). Under Section 231.006, Family Code, the vendor or applicant certifies that the individual or business entity named in this contract, bid, or application is not ineligible to receive the specified grant, loan, or payment and acknowledges that this contract may be terminated and payment may be withheld if this certification is inaccurate. The information collected on this form will be maintained by City of Soutlake Texas .With few exceptions, you are entitled on request to be informed about the information collected about you. Under Sections 552.021 and 552.023 of the Texas Government Code, you also are entitled to receive and review the information. Under Section 559,004 of the Government Code, you are also entitled to have information about you corrected that you believe is incorrect. 07-30-2025 Signature Date Paul Anderton Owner/ Principal Printed Name IF THIS PROJECT IS A JOINT VENTURE, ALL PARTIES TO THE JOINT VENTURE MUST PROVIDE A COMPLETED FORM. CERTIFICATE OF INTERESTED PARTIES FORM 1295 lore Complete Nos. 1- 4 and 6 if there are interested parties. Complete Nos. 1, 2, 3, 5, and 6 if there are no interested parties. OFFICE USE ONLY CERTIFICATION OF FILING Certificate Number: 2025-1343519 Date Filed: 07/30/2025 Date Acknowledged: 1 Name of business entity filing form, and the city, state and country of the business entity's place of business. Central North Construction, LLC Allen, TX United Slates 2 Name of governmental entity or state agency that is a party [o the contract for which the form is being tiled. City of SoOthlake, Texas 3 Provide the identification nwnber used by the governmental entity or state agency to track or identify the contract, and provide a description of the services, goods, or other property to be provided under the contract. F2025(760) CSJ: 0353-03-114 Landscape Irrigation Green Ribbon SH114 RFB25068200TS250009 4 Name of Interested Part y Cit State, Count lace of business y, ry (p ) Nature of interest (check applicable) Controlling Intermediary 5 Check only if there is NO Interested Party. ❑ X 6 UNSWORN DECLARATION ('� My name is 1 LW� �J'WV.�I�OrV`' ,and my date of birth is �b�� � My address is � � � �.I�ICSt�1 L.IS. 1���[r.:l � ��, �I Soot w�1T ,. (city) (state) (zip code) (country) I declare under penalty of perjury that the forego�i1ng`'is true) and correct. T Executed in CMG IJ County, State of 1 , on the��ay of 20�5 . (mon h) (year) Sig ature of authorized agent of contracting business entity (Declarant) Forms provided by Texas Ethics Commission vrwv.ethicsstate.tx.us version vv.i.u.l CONFLICT OF INTEREST DISCLOSURE STATEMENT Proposers attention is directed to 23 CFR Section 636 Subpart A and in particular to Subsection 636,116 regarding organizational conflicts of interest. Section 636.103 defines "organizational conflict of interest" as follows: Organizational conflict of interest means that because of other activities or relationships with other persons, a person is unable or potentially unable to render impartial assistance or advice to the owner, or the person's objectivity in performing the contract work is or might be otherwise impaired, or a person has an unfair competitive advantage. Proposers are advised that in accordance with TxDOT's Conflicts of Interest Policy, certain firms will not be allowed to participate on any Proposer's team for the Project because of their work with TxDOT in connection with the Project procurement and document preparation and the CDA program. 1. Disclosure Pursuant to Section 636,116t2)(v) In the space provided below, and on supplemental sheets as necessary, identify all relevant facts relating to past, present, or planned interest(s) of the Proposers team (including the Proposer, the Developer, the Major Participants, proposed consultants and proposed subcontractors, and their respective chief executives, directors, and key project personnel) which may result, or could be viewed as, an organizational conflict of interest in connection with this RFP. Proposer should disclose (a) any current contractual relationships with TxDOT, (b) any past, present, or planned contractual or employment relationships with any TxDOT member, officer, or employee; and (c) any other circumstances that might be considered to create a financial interest in the contract by any TxDOT member, officer, or employee if Proposer is awarded the contract. Proposer shall also disclose matters such as ownership of 10% or more of the stock of, or having directors in common with, any of the RFP preparers. Proposer shall also disclose contractual relationships with an RFP preparer in the nature of a joint venture, as well as relationships wherein the RFP preparer is a contractor or consultant (or subcontractor or subconsultant) to Proposer or a member of Proposer's team. The foregoing is provided by way of example, and shall not constitute a limitation on the disclosure obligations. Col 1-3 2. Explanation In the space provided belowI and on supplemental sheets as necessary, identify steps that have been or will be taken to avoid, neutralize, or mitigate any organizational conflicts of interest described herein. Co1 2-3 3. Certification The undersigned hereby certifies that, to the best of his or her knowledge and no interest exists that is required to be disclosed in this Conflict of Interest 0000 Discsure Statement, other than as disclosed above. Name Title Name Col 3-3 DISADVANTAGED BUSINESS ENTERPRISES (DBE) REQUIREMENTS Project: For the construction of landscape enhancements including landscape planting, irrigation, and hardscape. Highway: SH I l4 County: Tarrant TxDot CSJ: 0353-03-114 The following goal for disadvantaged business enterprises is established as: DBE: 0 A% ✓ Based on the Federal funding and cost estimates for this project, the number and types of certified DBE firms in the vicinity of the project location, the types of bid items listed with estimated values and the total size of the project; the Office of Civil Rights recommends race conscious DBE goal of zero percent (01/o) for this project proposal. Race neutral participation is encouraged and suggested, and can possibly be achieved through various opportunities such as hauling, material supplier, etc. I O �0 �1(3o(2cSZT� Disadvantaged Business Enterprise (DBE) Program Commitment Agreement Form if�r a n,Nvau;w This commitment is subject to the award and receipt of a signed contract from the Texas Department of Transportation for the subject project. Form SMS.4901 (Rev. 06108) Page 1 of 1 Project#: *7%oJ m1Vo The County: Contract-CSJ: 074S# . C)q& ItUt Items of work to be performed (attach a list of work items if more room is required): Bid Item # Item Description Unit of Measure Unit Price Quantity Total Per Item A)a l� d v Total The contractor certifies by signature on this agreement that subcontracts will be executed between the prime contractor and the DBE subcontractors as listed on the agreement form. If a DBE Subcontractor is unable to perform the work as listed on this agreement form, the prime contractor will follow the substitution/replacement approval process as outlined in the Contract DBE Special Provision, IMPORTANT: The signatures of the prime contractor and the DBE, and the total commitment amount must always be on the same page. P e Co tractor : /� jAcW)� uodlot t//T:i`Y�.IJI• Na a (please print) Address:�'40 („4^0 , Signa Date: Phone. Fa 44 Fax:olccat E-mail: at DBE: Name/fit e e print): Vendor No.: Address: Signature: Phone: Fax: E-mail: Date: Subcontractor (if the DBE will be a second tier sub): Name/Title (please print): Address: Signature: A 0 Phone:flax: 1 E-mail: I Date: "Texas Department of'I'ransportation maintains the information collected tnrougn this tom1. with rew excepnons, you are emmea on request to be infomted about the information that we collect about you. Under §§552.021 and 552.023 of the Texas Government Code, you also are entitled to receive and review the information. Under §559.004 of the Government Code, you are also entitled to have us correct information about you that is incorrect. To ensure prompt and efficient handling of your project file we are requesting that all commitments to be presented to the Office of Civil Rights, using this basic format. 49 CFR Part 29 - Appendix B CERTIFICATION REGARDING DEBARMENT, SUSPENSION, INELIGIBILITY AND VOLUNTARY EXCLUSION --LOWER TIER COVERED TRANSACTIONS Instructions For Certification By signing and submitting this proposal, the prospective lower tier participant is providing the certification set out below. 2. The certification in this clause is a material representation of fact upon which reliance was placed when this transaction was entered into. If it is later determined that the prospective lower tier participant knowingly rendered an erroneous certification, in addition to other remedies available to the Federal Government the department or agency with which this transaction originated may pursue available remedies, including suspension and/or debarment. 3. The prospective lower tier participant shall provide immediate written notice to the person to which this proposal is submitted if at any time the prospective lower tier participant learns that its certification was erroneous when submitted or had become erroneous by reason of changed circumstances. 4. Thetermscoveredtransaction,debared,suspended,ine]igible,lowertiercoveredtransaction, participant, person, primary covered transaction, principal, proposal, and voluntarily excluded, as used in this clause, have the meaning set out in the Definitions and Coverage sections ofrules implementing Executive Order 12549. You may contact the person to which this proposal is submitted for assistance in obtaining a copy of those regulations. 5. The prospective lower tier participant agrees by submitting this proposal that, should the proposed covered transaction be entered into it shall not knowingly enter into any lower tier covered transaction with a person who is proposed for debarment under 48 CFR part 9, subpart 9.4, debarred, suspended, declared ineligible, or voluntarily excluded from participation in this covered transaction, unless authorized by the department or agency with which this transaction originated. 6. The prospective lower tier participant further agrees by submitting this proposal that it will include this clause titled "Certification Regarding Debarment, Suspension, Ineligibility and Voluntary Exclusion -Lower Tier Covered Transaction," without modification, in all lower tier covered transactions and in all solicitations for lower tier covered transactions. T A participant in a covered transaction may rely upon a certification of a prospective participant in a lower tier covered transaction that it is not proposed for debarment under 48 CFRpart 9, subpart 9.4, debarred, suspended, ineligible, or voluntarily excluded from covered transactions, unless it knows that the certification is erroneous. A participant may decide the method and frequency by which it determines the eligibility of its principals. Each participant may, but is not required to, check the List of Parties Excluded from Federal Procurement and Nonprocurement Programs. 8. Nothing contained in the foregoing shall be construed to require establishment of a system of records in order to render in good faith the certification required by this clause. The knowledge and information of a participant is not required to exceed that which is normally possessed by a prudent person in the ordinary course of business dealings. 9. Except for transactions authorized under paragraph 5 of these instructions, if a participant in a covered transaction knowingly enters into a lower tier covered transaction with a person who is proposed for debarment under 48 CFR part 9, subpart 9.4, suspended, debarred, ineligible, or voluntarily excluded from participation in this transaction, in addition to other remedies available to the Federal Government, the department or agency with which this transaction originated may pursue available remedies, including suspension and/or debarment. CERTIFICATION REGARDING DEBARMENT, SUSPENSION, INELIGIBILITY AN VOLUNTARY EXCLUSION --LOWER TIER COVERED TRANSACTIONS (1) The prospective lower tier participant certifies, by submission of this proposal, that neither it nor its principals is presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation in this transaction by any Federal department or agency. (2) Where the prospective lower tier participant is unable to certify to any of the statements in this certification, such prospective participant shall attach an explanation to this proposal. ape S a re/Authorized Certifying Official Typed Name and Title �1�+eovo l.ens►n�c�ta+�,1�C �0X25 Applicant/Organization Date Signed Form 2510 (Rev. I o 1 DEBARMENT CERTIFICATION Page of 1 ARCHITECTURAL, ENGINEERING AND SURVEYING ("PROVIDER") CONTRACTS (1) The PROVIDER certifies to the best of its knowledge and belief that it and its principals: (a) Are not presently debarred, suspended, proposed for debarment, declared ineligible or voluntarily excluded frOM covered transactions by any federal department or agency: (b) Have not within athree-year period preceding this proposal been convicted of or had a civil judgment rendered against them for commission of fraud or a criminal offense in connection with obtaining, attempting to obtain, or performing a public* transaction or contract under a public transaction; violation of federal or state antitrust statutes or commission of embezzlement, theft, forgery, bribery, falsification or destruction of records, making false statements, or receiving stolen property; (c) Are not presently indicted for or otherwise criminally or civilly charged by a governmental entity* with commission of any of the offenses enumerated in paragraph (1)(b) of this certification; (d) Have not within athree-year period preceding this application/proposal had one or more public transactions* terminated for cause or default; and (e) Have not been disciplined or issued a formal reprimand by any State agency for professional accreditation within the past three years. Title of Certifying Official `Lybpo ss Date (2) Where the PROVIDER is unable to certify to any of the statements in this certification, such PROVIDER shall attach an explanation to this certification. Exceptions will not necessarily result in denial of award. Providing false information may result in criminal prosecution or administrative sanctions. * federal, state or local LOBBYING CERTIFICATION For Grants, Contracts, Loans, and Interagency Cooperation Contracts The undersigned certifies to the best of his or her knowledge and belief, that: (1) No federal appropriated funds have been paid or will be paid by or on behalf of the undersigned, to any person for influencing or attempting to influence an officer or employee of any federal agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with the awarding of any federal contract, the making of any federal grant, the making of any federal loan, the entering into of any cooperative agreement, and the extension, continuation, renewal, amendment, or modification of any federal contract, grant, loan, or cooperative agreement. (2) If any funds other than federal appropriated funds have been paid or will be paid to any person for influencing or attempting to influence an officer or employee of any agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with this federal contract, grant, loan, or cooperative agreement, the undersigned shall complete and submit Standard Form - LLL, "Disclosure Form to Report Lobbying," in accordance with its instructions. (3) The undersigned shall require that the language of this certification be included in the award documents for all subawards at all tiers (including subcontracts, subgrants, and contracts under grants, loans, and cooperative agreements) and that all subrecipients shall certify and disclosure accordingly. This certification is a material representation of fact upon which reliance was placed when this transaction was made or entered into. Submission of this certification is a prerequisite for making or entering into this transaction imposed by Section 1352, Title 31, U.S. Code. Any person who fails to file the required certification shall be subject to a civil penalty of not less than $10,000 and not more than $=,000 for each such failure. �cy�ature Title Agency "i' �%c�Ole Date Approved by OMB 0348-0046 Disclosure of Lobbying Activities Complete this form to disclose lobbying activities pursuant to 31 U.S.C. 1352 (See reverse for nublic burden disclosure) 1. Type of Federal Action: 2. Status of Federal Action: 3. Report Type: a. contract a. bid/offer/application a. initial filing b. grant b, initial award b. material change C. cooperative agreement c, post -award d. loan For material change only: e.loan guarantee Year quarter f. loan insurance �' Or Date of last report 4. Name and Address of Reporting Entity: 5. If Reporting Entity in No. 4 is Subawardee, Prime Subawardee Enter Name and Address of Prime: Tier if Known: , Congressional District, i known: Congressional District, i known: 6. Federal Department/Agency: 7. Federal Program Name/Description: iit NN/' p CFDA Numbe ' 11t bowk, 8. Federal Action Number, ifknown: 9. Award Amount, l(known: aloe S(N _1Z 10. a. Name and Address of Lobbying Registrant b. Individuals Performing Services (including address if (if individual, last name, first name, MI): different from No. I0a) (last name, first name, NI/): I"l N 11, Information requested through [his form is auth title 31 U.S.C. section 1352. This disclosure of lobbying Signature: activities is a material representation of fact upon which reliance was placed by the tier above when this transaction Print Name: s�,�,J►/Vf�`f• was made or entered into. This disclosure is required pursuant to 31 U.S.C. 1352. This information will be reported Title: ,�• to the Congress semi-annually and will be available for public inspection. Any person who fails to file the required �r Telephone No.: Date: lklidvc disclosure shall be subject to a civil penalty of not less than o S10 000 and not more than $100 000 for each such failure. fy., LJOU16 i Federal Use Only Authorized for Local Reproduction Standard Form -LLL (Rev. 7-97) INSTRUCTIONS FOR COMPLETION OF SF-LLL, DISCLOSURE OF LOBBYING ACTIVITIES This disclosure form shall be completed by the reporting entity, whether subawardee or prime Federal recipient, at the initiation or receipt of a covered Federal action, or a material change to a previous filing, pursuant to title 31 U.S.C. section 1352. The filing of a form is required for each payment or agreement to make payment to any lobbying entity for influencing or attempting to influence an officer or employee of any agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with a covered Federal action. Complete all items that apply for both the initial filing and material change report. Refer to the implementing guidance published by the Office of Management and Budget for additional information. 1. Identify the type of covered Federal action for which lobbying activity is and/or has been secured to influence the outcome of a covered Federal action. 2. Identify the status of the covered Federal action. 3. Identify the appropriate classification of this report. If this is a followup report caused by a material change to the information previously reported, enter the year and quarter in which the change occurred. Enter the date of the last previously submitted report by this reporting entity for this covered Federal action. 4. Enter the full name, address, city, State and zip code of the reporting entity. Include Congressional District, if known. Check the appropriate classification of the reporting entity that designates if it is, or expects to be, a prime or subaward recipient. Identify the tier of the subawardee, e.g., the first subawardee of the prime is the Ist tier. Subawards include but are not limited to subcontracts, subgrants and contract awards under grants. 5. If the organization filing the report in item 4 checks "Subawardee," then enter the full name, address, city, State and zip code of the prime Federal recipient. Include Congressional District, if known. 6. Enter the name of the federal agency making the award or loan commitment. Include at least one organizational level below agency name, if known. For example, Department of Transportation, United States Coast Guard. 7. Enter the Federal program name or description for the covered Federal action (item 1). If known, enter the full Catalog of Federal Domestic Assistance (CFDA) number for grants, cooperative agreements, loans, and loan commitments. 8. Enter the most appropriate Federal identifying number available for the Federal action identified in item 1 (e.g,, Request for Proposal (RFP) number; Invitations for Bid (IFB) number; grant announcement number; the contract, grant, or loan award number; the application/proposal control number assigned by the Federal agency). Included prefixes, e.g., "RFP-DE-90-001." 9. For a covered Federal action where there has been an award or loan commitment by the Federal agency, enter the Federal amount of the award/loan commitment for the prime entity identified in item 4 or 5. t0. (a) Enter the full name, address, city, State and zip code of the lobbying registrant under the Lobbying Disclosure Act of 1995 engaged by the reporting entity identified in item 4 to influence the covered Federal action. (b) Enter the full names of the individuals) performing services, and include full address if different from 10(a). Enter Last Name, First Name, and Middle Initial (MI). 11. The certifying official shall sign and date the form, print his/her name, title, and telephone number. According to the Paperwork Reduction Act, as amended, no persons are required to respond to a collection of information unless it displays a valid OMB control Number. The valid OMB control nunber for this information collection is OMB No. 0348-0046. Public reporting burden for this collection of information is estimated to average 10 minutes per response, including time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding the burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Office of Management and Budget, Paperwork Reduction Project (0348-0046), Washington, DC 2050 CHILD SUPPORT STATEMENT Under Section 231.006, Family Code, the vendor or applicant certifies that the individual or business entity named in this contract, bid, or application is not ineligible to receive the specified grant, loan, or payment and acknowledges that this contract may be terminated and payment may be withheld if this certification is inaccurate. Signature: (Signature of Authorized Representative) Name: Cull C� Title: Date: `�31�ZjLsa OSHA Implementation Procedures The following requirements are to be followed for this project. § 635.108 Health and safety. Contracts for projects shall include provisions designed: (a) To insure full compliance with all applicable Federal, State, and local laws governing safety, health and sanitation; and (b) To requue that the contractor shall provide all safeguards, safety devices, and protective equipment and shall take any other actions reasonably necessary to protect the life and health of persons working at the site of the project and the safety of the public and to protect property in connection with the performance of the work covered by the contract. 23 CFR 635.112 NON -COLLUSION STATEMENT Each bidder shall file a statement executed by, or on behalf of the person, firm, association, or corporation submitting the bid certifying that such person, firm, association, or corporation has not, either directly or indirectly, entered into any agreement, participated in any collusion, or otherwise taken any action, in restraint of free competitive bidding in connection with the submitted bid. Failure to submit the executed statement as part of the bidding documents will make the bid nonresponsive and not eligible for award consideration. Signature Typed Name and Title Applicant /Organization Date Signed TNT� v TGrO § 635.409 such as borrow aggregates, that have been investigated by the State trans- portation department and found to contain materials meeting specifica- tion requirements. The use of mate- rials from such designated sources shall not be mandatory unless there is a finding of public interest as stated in paragraph (a) of this section. (e) Federal funds may participate in the cost of specifications materials made available by a public agency when they have been actually incor- porated in accepted items of work, or in the cost of such materials meeting the criteria and stockpiled at the loca- tions specified in §635,114 of this chap- ter. (d) To be eligible for Federal partici- pation 1n its cost, any material, other than local natural materials, to be pur- chased by the State transportation de- partment and furnished to the con- tractor for mandatory use in the project, must have been acquired on the basis of competitive bidding, ex- cept when there is a finding of public interest justifying the use of another method of acquisition. The location and unit price at which such material wIll be available to the contractor must be stated in the special provisions for the benefit of all prospective bid- ders. The unit cost eligible for Federa- tion participation will be limited to the unit cost of such material to the State transportation department. (e) When the State transportation de- partment or another public agency owns or has control over the source of a local natural material the unit price at which such material will be made available to the contractor must be stated in the plans or special provi- sions. Federal participation will be limited to (1) the cost of the material to the State transportation depart- ment or other public agency; or (2) the fair and reasonable value of the mate - 23 CFR Ch. I (4-1-24 Edition) source or the right to take materials from it will not be eligible for Federal participation if the source is not used by the contractor. (g) The contract provisions for one or a combination of Federal -aid projects shall not specify a mandatory site for the disposal of surplus excavated mate- rials unless there is a finding by the State transportation department with the concurrence of the FHWA Division Administrator that such placement is the most economical except that the designation of a mandatory site may be permitted based on environmental con- siderations, provided the environment woOld be substantially enhanced with- out excessive cost. $ 836.409 Restrictions upon materials. No requirement shall be imposed and no procedure shall be enforced by any State transportation department in connection with a project which may operate: (a) To require the use of or provide a price differential in favor of articles or materials produced within the State, ar otherwise to prohibit, restrict or discriminate against the use of articles or materials shipped from or prepared, made or produced in any State, terri- tory or possession of the United States; or (b) To prohibit, restrict or otherwise discriminate against the use of articles or materials of foreign origin to any greater extent than is permissible under policies of the Department of 'pransportation as evidenced by re- quirements and procedures prescribed by the FHWA Administrator to carry out such policies. §836.410 Buy America requirements. over 06I8 Federal Highway Adminisfralion, DOT (1) The project either: (i) Includes no permanently incorporated steel or iron materials, or (ft) if steel or iron mate- rials are to be used, all manufacturing processes, including application of a coating, for these materials must occur in the United States. Coating includes all processes which protect or enhance the value of the material to which the coating is applied. (2) The State has standard contract provisions that require the use of do- mestic materials and products, includ- ing steel and iron materials, to the same or greater extent as the provi- sions set forth in this section. (3) The State elects W include alter- nate bid provisions for foreign and do- mestic steel and iron materials which comply with the following require- ments. Any procedure for obtaining al- ternate bids based on furnishing for- eign steel and iron materials which is acceptable to the Division Adminis- trator may be used. The contract pro- visions must (1) require all bidders to submit a bid based on furnishing do- mestic steel and iron materials, and (11) clearly state that the contract will be awarded to the bidder who submits the lowest total bid based on fur- nishing domestic steel and iron mate- rials unless such total bid exceeds the lowest total bid based on furnishing foreign steel and iron materials by more than 25 percent. (4) When steel and iron materials are used in a project, the requirements of this section do not prevent a minimal use of foreign steel and iron materials, if the cost of such materials used does not exceed one -tenth of one percent (0.1 percent) of the total contract cost or 52,500, whichever is greater. For pur- poses of this paragraph, the cost is that shown to be the value of the steel and iron products as they are delivered to the project. (c)(1) A State may request a waiver of the provisions of this section If;(i) The application of those prOVi- sions would be inconsistent with the public interest; or (11) Steel and iron materials/products are not produced in the United States in sufficient and reasonably available quantities which are of a satisfactory quality. § 635d11 (2) A request Cor waiver, accompanied by supporting information, must be submitted in writing to the Regional Federal Highway Administrator (RFHWA) through the FHWA Division Administrator. A request must be sub- mitted sufficiently in advance of the need for the waiver in order to allow time for proper review and action on the request. The RFHWA will have ap- proval authority on the request. (3) Requests for waivers may be made for specific projects, or for certain ma- terials or products in specific geo- graphic areas, or for combinations of both, depending on the circumstances. (4) The denial of the request by the RFHWA may be appealed by the State to the Federal Highway Administrator (Administrator), whose action on the request shall be considered administra- tively final. (5) A request for a waiver which in- volves nationwide public interest or availability issues or more than one F NA region may be submitted by the RFHWA to the Administrator for ac- tion. (6) A request for waiver and an appeal from a denial of a request must include facts and justification to support the granting of the waiver. The FHWA re- sponse to a request or appeal will be in writing and made available to the pub - upon request. Any request for a na- tionwide waiver and FHWA's action on such a request may be published in the FEDERAL REGISTER for public comment. (7) In determining whether the waiv- ers described in paragraph (0)(1) of this section will be granted, the FHWA will consider all appropriate factorsinclud- ing, but not limited to, cost, adminis- trative burden, and delay that would be I if the provision were not waived. (d) Standard State and Federal -aid contract procedures may be used to as - re compliance with the requirements of this section. [98 FR 53104, Nov. 25, 1983, as amended at 49 FR 18821, May 3, 1984; 58 FR 38975, July 21, 19931 $836.411 Culvert and storm sewer ma- teriel types. State Departments of Transportation (State DOTS) shall have the autonomy to determine culvert and storm sewer 297 Statement for Loan Guarantees and Loan Insurance The undersigned states, to the best of his or her knowledge and belief, that: If any funds have been paid or will be paid to any person for influencing or attempting to influence an officer or employee of any agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with this commitment providing for the United States to insure or guarantee a loan, the undersigned shall complete and submit Standard Form-LLL, "Disclosure Form to Report Lobbying," in accordance with its instructions. Submission of this statement is a prerequisite for making or entering into this transaction imposed by section 1352, title 31, U.S. Code. Any person who fails to file the required statement shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 for each such failure. gnature/Authorized Certifying Official Applicant/Organization f C Typed Name and Title �b�zkxozb Date Signed 23 U.S.C. I I2(E) DIFFERING SITE CONDITIONS e) Standardized Contract Clause Concerning Site Conditions.— (1) General rule. —The Secretary shall issue regulations establishing and requiring, for Inclusion in each contract entered into with respect to any project approved under section 106 of this title a contract clause, developed in accordance with guidelines established by the Secretary, which equitably addresses each of the following: (A) Site conditions. (B) Suspensions of work ordered by the State (other than a suspension of work caused by the fault of the contractor or by weather). (C) Material changes in the scope of work specified in the contract. The guidelines established by the Secretary shall not require arbitration. (2) Limitation on applicability. — (A) State law.— Paragraph (1) shall apply in a State except to the extent that such State adopts or has adopted by statute a formal procedure for the development of a ,,contract clause described in paragraph (1) or adopts or has adopted a statute which does not permit inclusion of such a contract clause. (B) Design -build contracts.— Paragraph (1) shall not apply to any design -build contract approved under subsection (b)(3). PRISON PRODUCED MATERIALS Prison -produced materials are products made by convict labor. There are limitations on using materials produced by convict labor in a federal -aid highway project. Materials produced after July 1, 1991, by convict labor may only be incorporated in a federal -aid highway construction project if: ■ such materials have been produced by convicts who are on parole, supervised release or probation from a prison; or such material has been produced in a qualified prison facility (Texas does not have a qualified prison facility meeting the requirements of the regulation). The LGPP Manual describes the federal statute prohibiting the use of prison produced materials. The undersigned below understand and acknowledges this requirement. 0 Signature Applicant /Organization Typed Name and Title Date Signed Copy of Green Ribbon Implementation Plan Kimley»>Horn State Highway 114 Green Ribbon Implementation Plan To: David Miller, Director of Community Services City of Southlake, Texas From: Laura Presley, PLA Kimley-Horn and Associates, Inc. Report Date: October 18, 2023 Mr. Miller, Page 1 The following document identifies proposed intersection improvements along State Highway 114 in Southlake, Texas with respective preliminary opinions of probable construction costs as funded by the TXDOT Green Ribbon Grant. Funding from the TXDOT Green Ribbon Grant can be applied to construction costs for tree and shrub planting, groundcover for plant beds (mulch, decomposed granite, river rock, etc.) concrete mow strips, and irrigation systems (excluding overhead spray irrigation). The funding cannot be applied to hardscape improvements (such as sidewalks), sod, or overhead irrigation systems. The improvements are organized from west to east along State Highway 114 with the intention of phasing over multiple years to beautify the corridor as a whole. Each intersection's improvements include native and adaptive vegetation, canopy trees, hardwood mulch, concrete mow strips, and underground irrigation systems for the new plantings. Projects have been divided into phases and they will be implemented over multiple years. The TXDOT Green Ribbon funding may provide up to $400,000 per year. As costs continue to rise, the award amount, or the anticipated number of phases for completion, may vary from what is listed in this document. The proposed phasing order is as follows: West Dove Road and State Highway 114 o West Dove Road enhancements are projected to be completed within three (3) Green Ribbon phases and consist of twelve (12) planting beds and associated improvements. 2. North White Chapel Boulevard and State Highway 114 o North White Chapel Boulevard enhancements are projected to be completed in three (3) Green Ribbon phases and consist of four (4) planting beds and associated improvements. 3. North Carroll Avenue and State Highway 114 o North Carroll Avenue enhancements are projected to be completed within four (4) Green Ribbon phases and consist of sixteen (16) planting beds and associated improvements. Kimley»>Horn Page 2 Kimball Avenue and State Highway 114 o Kimball Avenue enhancements are projected to be completed in three (3) Green Ribbon phases and consist of four (4) planting beds and associated improvements. The following implementation plan includes opinions of probable construction cost (OPCC) for the intersection improvements. These OPCCs are intended to inform, budget, and prioritize phasing of the intersection improvements per Green Ribbon funding for the City. Kimley-Horn and Associates, Inc. has no control over the cost of labor, materials, equipment, or over the contractor's methods of determining prices or over competitive bidding or market conditions. Estimates are based on the information known to Kimley-Horn and Associates, Inc. atthe time and represent only Kimley-Horn and Associates, Inc.'s judgement as a design professional firm familiar with the construction industry. Kimley-Horn and Associates, Inc. cannot guarantee that proposals, bids, or actual construction costs will not vary from its opinion. If you have additional questions or inquiries about this document, feel free to reach out to me at Iaura.presley(@kimley-horn.com. Sincerely, Laura Presley, PLA Kimley-Horn and Associates, Inc. No Text No Text 00W D ve Rd 3 2 1< 0 a, 671 ft W Highland St Bicentennial Park W Southlake Blvd m Q v Boulder Dr Northwest Enclave Park es rd F Srdte tP yi9h yi yd 9h�dy y 77 A E Highland St O �0, 687ft ell? Blvd z 0 J E Dove Rd Lake Park ou 17 99 E Southlake Blvd Flo o1- E Highland St F Kirkwood g/,d a 9 Oi��s/off dy S r in a Southlake v Q N Q E Y z z 71. 0- D ro GREEN RIBBON PHASING v 10 -13 total phases to complete Green Ribbon Improvements. **Can be completed in 1 less phase depending on pricing and fees in year completed. 0 W. DOVE ROAD 3 Green Ribbon Phases Landscape improvements to be installed at the intersection of West Dove Road and West State Highway 114. Enhancements include curvilinear beds incorporating various native vegetation, concrete mow strips, and mulch. Canopy trees will also be added in the seeded areas for a full vegetative appearance. These improvements will take approximately 3 Green Ribbon phases to complete. 0 N. WHITE CHAPEL BLVD. 3 Green Ribbon Phases" Landscape improvements to be installed at the intersection of North White Chapel Boulevard and West State Highway 114. The enhancements will include plant beds with native vegetation, concrete mow strips, hardwood mulch, and canopy trees. This intersection will be completed in 3 years and 3 Green Ribbon Phases. Depending on the time frame and associated inflation costs this intersection will approximately take 2 Green Ribbon phases to complete. N. CARROLL AVENUE 4 Green Ribbon Phases** Landscape improvements to be installed at the intersection of North Carroll Avenue and West State Highway 114. Enhancements include various plant beds that contain native vegtetation, hardwood mulch, v, and concrete mow strips. Canopy trees will additionally be placed to v provide a full vegetated look. This intersection will be completed in 4 z years and 4 Green Ribbon Phases. Depending on the time frame and z ; associated inflation costs this intersection will take approximately 3 3 Green Ribbon phases to complete. a D N. KIMBALL AVENUE _ E 3 Green Ribbon Phases** Landscape improvements to be installed at the intersection of Kimball Avenue and West State Highway 114. Enhancements include four plant beds that include concrete mow strips, native vegetation, hardwood mulch, and canopy trees. These improvements will take approximately 3 years and 3 Green Ribbon E SOUth/ake eit ng on the d time frame and associated inflationflsc costs thto is intersection l will take approximately 2 Green Ribbon phases to complete. SOUTHLAI<E 1�" Imley>>> Horn 13 OCTOBER 2023 5 ORNAMENTAL GRASSES IMAGERY c a lie- ,,. IV! : .9 - � t'•��} - S'f I 'f, �,- '. �� _ -,,�- - 4,i. ,I l:::. a4®. ,E'@ ..i: �-pr �N. � �.:-� .•1�� ..C�p�';=y'r3 _ �, I9-y• r i !) - n7 ,. f I ,: ,' ,: - ,. � x. :c,s.•. r:r 'V,�; :" r,.:,=.X, i k S'. 1� :. i .. - I �- � � ', _ _ �9q\�` �q'� L: i .0 '- �"� aGr•' �j'." �'- rs j_ r s.. <k c.., :. .. .. ..1 ., ��.1 `\c:.: 'a, .xl, -.. .,.. : 1 j w 1 `✓l/TI) ' - ;1 - r. <.. :, ... .' ..tom--'.> 0 .• ,.'Oa o F_...-,..: , _�� � �., ,. ..�. 'r -L:.. ,.'.i 1� n .1 .. \.: k ..-+�i:5.� _� g .�,.. .ir �! ...::... ( . r- I.. 9„._.•-.... r...:. :. Y. •.,..; - .. .a „ fir, � ,�y �..d; e:C ...�. -... •�� � , `4.r,,. _. � ,.;.: r,;, „ �.... _,. ,• .: ,: �:,.:_��,• 1 . �- INN - y�,r � i,.-, -, ,_ o.,.le�.-.�;. � Ifs, f. _ � m - - - ''. _^. ,._.:`,�_,. � ..n. 7. �`•.`a�� .. �,: _ a _ _.: BLUE GRAMA GRASS FOUNTAIN GRASS MUHLY GRASS SIDE OATS 'BLONDE AMBITION' INDIAN GRASS ACCENT SHRUBS DESERT SHRUBS ` r All Wf 4_. r i• KALEIDOSCOPE ABELIA SAVLIA TEXAS SAGE COLORGAURD YUCCA SOFT LEAF YUCCA far Y "'ti;y > _.'�- . w\i �~_� :- ma..; .SIR 1�?r` �Vr, '°-r`-a'�`i� •%. �� r'A _ ....s.:-�•} y ti c 1 r, i r r Ilk - E I d • �,.:,, _ , .,� .: i. - •,,, ., y�,^1Y +,: - <' .�,+- --•ram.: y : �:. � a�,r .,...<e , Y r f `� y r�`r�,. j � ':.• I ,X"y - ,,�',� ;r I .,� I�il k� , sy;,� �`<� � \ ��q' ,�,,, m SOUTHLAKE Kimley»)Horn 91 JUNE2023 6 PERSPECTIVE VIEWPOINT 1' CONCRETE MOW STRIP (TYP.) CANOPY TREE' ` HARDWOOD MULCH (TYP.) EVERGREEN SHRUB (TYP.) ^* EXISTING TREE (TYP) ACCENT SHRUB (TYP) EXISTING PAVERS TO REMAIN _ DESERT SHRUB (TYP.) ORNAMENTAL GRASS (TYP.) EXISTING CONCRETE EMBANKMENT TO REMAIN i E.tJ l~ .� ..1� SEED (TYP.) en, o ' SEED (TYR) W. STATE HWY 114 141*9 ACCENT SHRUB (TYP.) ORNAMENTAL GRASS (TYP) W. STATE HWY 114 'lJ S EVERGREEN SHRUB (TYP) SEED (TYP.) €f SEED (TYP) LEGEND: EXISTING CONCRETE EMBANKMENT TO REMAIN CANOPY TREE (TYP) SEED ORNAMENTAL GRASSES EXISTING PAVERS TO REMAIN 1' CONCRETE MOW STRIP (TYP) HARDWOOD MULCH (TYP.) 0 HARDWOOD MULCH F ORNAMENTAL GRASSES a - ~ Q EXISTING TREE (TYP.) - DESERT SHRUB (TY EVERGREEN SHRUBS 0 DESERT SHRUBS �Q P.) ACCENT SHRUBS EXISTING TREES~ 3 �� ���"�"'N c P T " U ACCENT SHRUBS CANOPY TREES SCALE: -3a _ — . - SOUTHLAI<E 00VE ROADGREEN Kimley»)Horn THIS GRAPHIC IS CONCEPTUAL. THE INFORMATION SHOWN IS BASED ON THE JUNE 2023 UTHLAKE,TEXAS CONCEPTUAL DESIGN BEST INFORMATION AVAILABLE AND IS SUBJECT TO CHANGE WITHOUT NOTICE. ® 7 1 --% . ; DOVE ROADCURRENT CONDITIONS ' SOUTHLAKE, TEXAS CONCEPTUAL DESIGN THIS INFORMATIOAPHIC IS N ON THE BEST INFONMATION AVAILABLE AND IS SUBJECT TO CHANGE WITHOUT NOTICE. AVAILABLE THEINFORMATIONSHOWN I WITHOUT l{y) owmw" %. 21 ��[�'� ' Kph � �• Yj 1'4r F 1 DOVE ROADGREEN RIBBON I�I N THE SHOWN IS WITHOUT BEST INFORMATION AVAILABLE AND IS SUBJECT TO CHANGE WITHOUT NOTICE. ION AVAILABLE THESSUB SUBJEATIONCT SOUTHLAKE, TEXAS CONCEPTUAL DESIGN THIS INFORMAAPHIC TION l{yJ • West Dove Road Improvements - Green Ribbon Southlake, Texas Opinion of Probable Costs SOUTHLAKE 9 6/14/2023 Green Ribbon Applicable Items Unit Quantity Cost Item Cost 1006002 PREPARING ROW STA 20.5 $3,500.00 $71,750.00 1646008 BROADCAST SEED (PERM) (RURAL) (CLAY) AC 1.8 $2,000.00 $3,600.00 1666001 FERTILIZER AC 1.8 $2,500.00 $4,500.00 1686001 VEGETATIVE WATERING MG 122.2 $130.00 $15,886.00 1706001 IRRIGATION SYSTEM (DRIP & BUBBLERS) LS 1 $130,000.00 $130,000.00 1926003 PLANT MATERIAL (3-GAL) EA 8,700 $25.00 $217,500.00 192 613 MULCH SY 5,200 $2.50 $13,000.00 1926025 PLANT MATERIAL (45 GAL) (TREE) EA 30 $800.00 $24,000.00 1926016 PLANT BED PREP SY 5,200 $10.00 $52,000.00 1936001 PLANT MAINTENANCE MO 12 $2,200.00 $26,400.00 1936007 IRRIGATION SYSTEM OP AND MAINT MO 12 $950.00 $11,400.00 5006001 MOBILIZATION LS 1 $35,000.00 $35,000.00 5026001 BARRICADES, SIGNS, AND TRAFFIC HANDLING MO 6 $5,500.00 $33,000.00 5066040 INSTALL EROSION CONTROL LOGS LF 2,500 $6.00 $15,000.00 5066043 REMOVE EROSION CONTROL LOGS LF 2,500 $3.00 $7,500.00 4326001 RIP RAP (CONC)(12"Wx4"D) CY 52 $1,000.00 $52,000.00 6206007 ELEC CONDR (NO. 8) BARE LF 430 $2.50 $1,075.00 1004 6001 TREE PROTECTION EA 44 $325.00 $14,300.00 Green Ribbon Construction Subtotal $727,911.00 Green Ribbon Contingency (t20%) $148,009.00 Green Ribbon Indirect Costs - 5-10 Year Phasing (t35%) $254,080.00 Green Ribbon Design Fees - Landscape Architecture, Engineering, Survey (t15)% $110,000.00 Green Ribbon Total Estimated Project Cost $1,240,000.00 The Engineer has no control over the cost of labor, materials, equipment, or over the Contractor's methods of determining prices or over competitive bidding or market conditions. Opinions of probable costs provided herein are based on the information known to Engineer at this time and represent only the Engineer's judgment as a design professional familiar with the construction industry. The Engineer cannot and does not guarantee that proposals, bids. or actual costs will not vary from its opinions of probable costs. Jk EXISTING PAVERS TO REMAIN WW �,. EXISTING TREE (TYP) *' _s ys F CANOPY TREE (TYP) - ��; HARDWOOD MULCH (TYP) ORNAMENTAL GRASS (TYP.) ORNAMENTAL GRASS (TYP) 3 " 3 r " 14 ACCENT SHRUB (TYP.) -., . EXISTING CONCRETE EMBANKMENT TO REMAIN s .°, SEED (IYP.) } W. STATE HWY 114 0 SEED (TYP) H PERSPECTIVE VIEWPOINT EXISTING CONCRETE EMBANKMENT TO REMAIN ACCENT SHRUBS (TYP)01- W ORNAMENTAL GRASS (TYP) ti, o' LEGEND: CANOPY TREE (TYP) Ll—SEED ORNAMENTAL GRASSES f ORNAMENTAL GRASS (TYP) 0 0�•� EXISTING TREE (TYP) 00 0 EXISTING PAVERS TO REMAIN ORNAMENTAL GRASSES — HARDWOOD MULCH 0 SEED(TYP) - EVERGREEN SHRUBS 0 DESERT SHRUBS tAc) 9z 4 0 ACCENT SHRUBS EXISTING TREES s r y� _ GRAPHIC SCALE 1N FEET fill0 15 30 60 0 ACCENT SHRUBS CANOPY TREES CITY OF A J. WHITE CHP BLVIDGREEN R B B , soUTHLAKE Kimley»>Horn THIS GRAPHIC IS CONCEPTUAL. THE INFORMATION SHOWN IS BASED ON THEMTHLAKE,"ll"EXAS CONCEPTUAL DESIGN BEST INFORMATION AVAILABLE AND IS SUBJECT TO CHANGE WITHOUT NOTICE. I 1 g JUNE2023 11 e� Ef• _mdr,M' i V5 x N . WHITE CHAPEL BLVDCURRENT CONDITIONS SOUTHLAKE, TEXAS N THE SHOWN IS WITHOUT BEST INFORMATION AVAILABLE AND IS SUBJECT TO CHANGE WITHOUT NOTICE. ION AVAILABLE THESSUB SUBJEATIONCT CONCEPTUAL DESIGN THIS INFORMAAPHIC TION {Y1 I C7 N. WHITE CHAPEL BLVIDGREEN RIBBON 7 _ + ��7p� _ rF ' : vim` •,�.r .�'•_. r 'jBl" �j, 4•Y.*, _, '.� VI. THIS GRAPHIC IS CONCEPTUAL. THE INFORMATION SHOWN IS BASED ON THE l{Y1 ONCEPTUAL DESIGN BEST INFORMATION AVAILABLE AND IS SUBJECT TO CHANGE WITHOUT NOTICE. North White Chapel Boulevard Improvements - Green Ribbon Southlake, Texas Opinion of Probable Costs SOUTHLAKE 91 6/14/2023 Green Ribbon Applicable Items Unit Quantity Cost Item Cost 1006002 PREPARING ROW STA 10.5 $3,500.00 $36,750.00 1646008 BROADCAST SEED (PERM) (RURAL) (CLAY) AC 1 $2,000.00 $2,000.00 1666001 FERTILIZER AC 1 $2,500.00 $2,500.00 1686001 VEGETATIVE WATERING MG 82 $130.00 $10,660.00 1706001 IRRIGATION SYSTEM (DRIP & BUBBLERS) LS 1 $115,000.00 $115,000.00 1926003 PLANT MATERIAL (3-GAL) EA 7,200 $25.00 $180,000.00 192 613 MULCH SY 4,270 $2.50 $10,675.00 1926025 PLANT MATERIAL (45 GAL) (TREE) EA 35 $800.00 $28,000.00 1926016 PLANT BED PREP SY 4,270 $10.00 $42,700.00 1936001 PLANT MAINTENANCE MO 12 $2,200.00 $26,400.00 1936007 IRRIGATION SYSTEM OP AND MAINT MO 12 $950.00 $11,400.00 5006001 MOBILIZATION LS 1 $30,000.00 $30,000.00 5026001 BARRICADES, SIGNS, AND TRAFFIC HANDLING MO 6 $5,500.00 $33,000.00 5066040 INSTALL EROSION CONTROL LOGS LF 1,700 $6.00 $10,200.00 5066043 REMOVE EROSION CONTROL LOGS LF 1,700 $3.00 $5,100.00 4326001 RIP RAP (CONC)(12"Wx4"D) CY 21 $1,000.00 $21,000.00 6206007 ELEC CONDR (NO. 8) BARE LF 585 $2.50 $1,462.50 1004 6001 TREE PROTECTION EA 20 $325.00 $6,500.00 Green Ribbon Construction Subtotal $573,347.50 Green Ribbon Contingency (t20%) $114,652.50 Green Ribbon Indirect Costs - 5-10 Year Phasing (t35%) $202,000.00 Green Ribbon Design Fees - Landscape Architecture, Engineering, Survey (f15)% $90,000.00 Green Ribbon Total Estimated Project Cost $980,000.00 The Engineer has no control over the cost of labor, materials, equipment, or over the Contractor's methods of determining prices or over competitive bidding or market conditions. Opinions of probable costs provided herein are based on the information known to Engineer at this time and represent only the Engineer's judgment as a design professional familiar with the construction industry. The Engineer cannot and does not guarantee that proposals, bids. or actual costs will not vary from its opinions of probable costs. PERSPECTIVE VIEWPOINT m % S7L \ EXISTING PAVERS TO REMAIN ACCENT SHRUB (TYP.) F ORNAMENTAL GRASS (TYP.) Or EXISTING CONCRETE EMBANKMENT TO REMAIN W. STATE HWY 114 EVERGREEN SHRUB (TYP) EXISTING TREE (TYP) DESERT SHRUB (TYP.) LEGEND: Ll SEED 0 HARDWOOD MULCH - EVERGREEN SHRUBS - ACCENT SHRUBS 0 ACCENT SHRUBS LAID I IIV\I UUIYUIIL I L LIVIUMI V I\IVILIN I I U IILIVIf1I IN A ORNAMENTAL GRASSES 0 ORNAMENTAL GRASSES DESERT SHRUBS 0 EXISTING TREES CANOPY TREES V CONCRETE MOW STRIP (TYP.) EXISTING TREE (TYP.) CANOPY TREE (TYP) /DESERT SHRUB (TYP.) EVERGREEN SHRUB (TYP) SEED (TYP.) 114 EXISTING CONCRETE EMBANKMENT TO REMAIN 1 1 li ty ! 4V �. I r, 4, t, 'SrN r .. % c. SEED (TYP.) 1 CITY 01 SOUTHLAKE 9 N C P T H 0 5' 1590' 60' SCALE: V-30' Kimley»)Horn JUNE2023 15 .PdPF + ! Y + •• ' + y I • -fif- r �. +16 7.6 , 4 + • irk+ ; • ' ` ! •�`4 _ l L yy;' T �r•�"{ '�y,ti ' T�fyl' r ram"� 1�,, y �odra �' %,Lip se L '.�`�irY.' J'��, t� •� ��•' �t�� f�y"'�y?+ • '•.�•�Y_. .�� ��i Y � ,cam _ .: ��.�=. _ �1 M1 1 F ri CITY 01 SOUTHLAKE Kl m l ey ») Ho n TuJUNE 2023 16 t-. -XIi 1y J t � .� •'�, +, e'1 �' e � r , i , � 1. , . ! N . CARROLL AVENUEGREEN RIBBON I�I , ON THE INFORMATION SHOWN IS WITHOUT BEST INFORMATION AVAILABLE AND IS SUBJECT TO CHANGE WITHOUT NOTICE. SOUTHLAKE, TEXAS CONCEPTUAL DESIGN THIS INFORMAIS TION AVAILABLE AND {y) North Carroll Avenue Improvements - Green Ribbon Southlake, Texas Opinion of Probable Costs SOUTHLAKE 91 6/14/2023 Green Ribbon Applicable Items Unit Quantity Cost Item Cost 1006002 PREPARING ROW STA 23.0 $3,500.00 $80,500.00 1646008 BROADCAST SEED (PERM) (RURAL) (CLAY) AC 3.9 $2,000.00 $7,800.00 1666001 FERTILIZER AC 3.9 $2,500.00 $9,750.00 1686001 VEGETATIVE WATERING MG 210 $130.00 $27,300.00 1706001 IRRIGATION SYSTEM (DRIP & BUBBLERS) LS 1 $115,000.00 $115,000.00 1926003 PLANT MATERIAL (3-GAL) EA 7,500 $25.00 $187,500.00 192 613 MULCH SY 4,426 $2.50 $11,065.00 1926025 PLANT MATERIAL (45 GAL) (TREE) EA 30 $800.00 $24,000.00 1926016 PLANT BED PREP SY 4,426 $10.00 $44,260.00 1936001 PLANT MAINTENANCE MO 12 $2,200.00 $26,400.00 1936007 IRRIGATION SYSTEM OP AND MAINT MO 12 $950.00 $11,400.00 5006001 MOBILIZATION LS 1 $40,000.00 $40,000.00 5026001 BARRICADES, SIGNS, AND TRAFFIC HANDLING MO 6 $5,500.00 $33,000.00 5066040 INSTALL EROSION CONTROL LOGS LF 4,550 $6.00 $27,300.00 5066043 REMOVE EROSION CONTROL LOGS LF 4,550 $3.00 $13,650.00 4326001 RIP RAP (CONC)(12"Wx4"D) CY 100 $1,000.00 $100,000.00 6206007 ELEC CONDR (NO. 8) BARE LF 600 $2.50 $1,500.00 1004 6001 TREE PROTECTION EA 61 $325.00 $19,825.00 Green Ribbon Construction Subtotal $780,250.00 Green Ribbon Contingency (t20%) $155,750.00 Green Ribbon Indirect Costs - 5-10 Year Phasing (t35%) $274,000.00 Green Ribbon Design Fees - Landscape Architecture, Engineering, Survey (t15)% $120,000.00 Green Ribbon Total Estimated Project Cost $1,330,000.00 The Engineer has no control over the cost of labor, materials, equipment, or over the Contractor's methods of determining prices or over competitive bidding or market conditions. Opinions of probable costs provided herein are based on the information known to Engineer at this time and represent only the Engineer's judgment as a design professional familiar with the construction industry. The Engineer cannot and does not guarantee that proposals, bids. or actual costs will not vary from its opinions of probable costs. SEED (TYP) lippT � W. STATE HWY 114 LEGEND: 0 SEED 0 HARDWOOD MULCH EVERGREEN SHRUBS ACCENT SHRUBS 0 ACCENT SHRUBS i,et: ye, ; SEED (TYP) Am. imob. mmmahm - ORNAMENTAL GRASSES 0 ORNAMENTAL GRASSES DESERT SHRUBS EXISTING TREES CANOPY TREES N 1 —ORNAMENTAL GRASS (TYP) `• �# —1' CONCRETE MOW STRIP (TYP.) . —HARDWOOD MULCH (TYP.) —CANOPY TREE (TYP.) —ACCENT SHRUB (TYP.) —ORNAMENTAL GRASS (TYP.) uj EXISTING CONCRETE EMBANKMENT TO REMAIN EXISTING CONCRETE EMBANKMENT TO REMAIN W i Q J a m S_ ORNAMENTAL GRASS (TYP) %,,NCRETE MOW STRIP (TYP.) HARDWOOD MULCH (TYP.) CANOPY TREE (TYP) a! ACCENT SHRUB (TYP.) 'in_i. _,A ORNAMENTAL GRASS (TYP.) 0% W. STATE HWY 114 M;ll SEED (TYP) SEED (TYP) PERSPECTIVE VIEWPOINT i Y —1 14`�LF N 0 H T H C 5' 15' 36' 60 SCAt E' VAD: CITY or SOUTHLAKE Kimley>>)Horn ® JUNE 2023 19 r AbPL EL Simms ---.r. - 4 16 31 ti r L IN "..1 4 if .4 4' 1 " fit, %Lf IN p I":' A IL c", 0, CURRENT CONDITIONS SOUTHLAKE Kimley)))Horn T IS GRAPHIC IS CONCEPTUAL. THE INFORMATION SHOWN IS BASED ON THE JUNE 2023 CONCEPTUAL DESIGN BHEST INFORMATION AVAILABLE AND IS SUBJECT TO CHANGE WITHOUT NOTICE. I I I 1 9 20 .., xz�' , 41 y,� r • f. YtiA. 4 -1+'' ' . 5 KIMBALL AVENUEGREEN RIBBON ON THE BEST INFORMATION AVAILABLE AND IS SUBJECT TO CHANGE WITHOUT NOTICE. ION AVAILABLE THE INFORMATION SHOWN I WITHOUT SOUTHLAKE, TEXAS CONCEPTUAL DESIGN THIS INFORMATION ' Kimball Avenue Improvements - Green Ribbon Southlake, Texas Opinion of Probable Costs SOUTHLAKE 91 6/14/2023 Green Ribbon Applicable Items Unit Quantity Cost Item Cost 1006002 PREPARING ROW STA 11 $3,500.00 $38,500.00 1646008 BROADCAST SEED (PERM) (RURAL) (CLAY) AC 0.6 $2,000.00 $1,200.00 1666001 FERTILIZER AC 0.6 $2,500.00 $1,500.00 1686001 VEGETATIVE WATERING MG 66 $130.00 $8,580.00 1706001 IRRIGATION SYSTEM (DRIP & BUBBLERS) LS 1 $115,000.00 $115,000.00 1926003 PLANT MATERIAL (3-GAL) EA 7,500 $25.00 $187,500.00 192 613 MULCH SY 4,280 $2.50 $10,700.00 1926025 PLANT MATERIAL (45 GAL) (TREE) EA 30 $800.00 $24,000.00 1926016 PLANT BED PREP SY 4,280 $10.00 $42,800.00 1936001 PLANT MAINTENANCE MO 12 $2,200.00 $26,400.00 1936007 IRRIGATION SYSTEM OP AND MAINT MO 12 $950.00 $11,400.00 5006001 MOBILIZATION LS 1 $30,000.00 $30,000.00 5026001 BARRICADES, SIGNS, AND TRAFFIC HANDLING MO 6 $5,500.00 $33,000.00 5066040 INSTALL EROSION CONTROL LOGS LF 1,700 $6.00 $10,200.00 5066043 REMOVE EROSION CONTROL LOGS LF 1,700 $3.00 $5,100.00 4326001 RIP RAP (CONC)(12"Wx4"D) CY 23 $1,000.00 $23,000.00 6206007 ELEC CONDR (NO. 8) BARE LF 400 $2.50 $1,000.00 Green Ribbon Construction Subtotal $569,880.00 Green Ribbon Contingency (t20%) $115,000.00 Green Ribbon Indirect Costs - 5-10 Year Phasing (t35%) $200,120.00 Green Ribbon Design Fees - Landscape Architecture, Engineering, Survey (T15)% $90,000.00 Green Ribbon Total Estimated Project Cost $975,000.00 The Engineer has no control over the cost of labor, materials, equipment, or over the Contractor's methods of determining prices or over competitive bidding or market conditions. Opinions of probable costs provided herein are based on the information known to Engineer at this time and represent only the Engineer's judgment as a design professional familiar with the construction industry. The Engineer cannot and does not guarantee that proposals, bids. or actual costs will not vary from its opinions of probable costs.