Item 4D - MemoItem 4D Page 1 of 3 M E M O R A N D U M December 2, 2025 To: Alison Ortowski, City Manager From: Lauren LaNeave, Interim Director of Public Works Subject: Approve an Engineering Services Agreement with Bartlett & West, Inc. to provide engineering design, inspection, and construction phase services for the Repainting of the Dove Elevated Storage Tank in an amount not to exceed $390,000. Action Requested: Approve an Engineering Services Agreement with Bartlett & West, Inc. to provide engineering design, inspection, and construction phase services for the Repainting of the Dove Elevated Storage Tank in an amount not to exceed $390,000. Background Information: The Dove Elevated Storage Tank (EST) was originally constructed in 1986 and provides water supply and pressure to the north side of the City’s low-pressure plane. The City inspects all its water storage tanks on an annual basis to ensure the protective coatings have not been compromised. The Dove EST was last repainted in 2006. Proactive replacement of protective coating systems safeguards the existing structural steel structure from unnecessary corrosion and degradation, prolonging the usable service life of the tank. Recent inspections have indicated the paint on the Dove EST is starting to wear and requires repainting. Under this agreement, Bartlett & West, Inc. will provide full engineering design, inspection, and construction services to repaint the Dove EST. The agreement includes: pre-design inspection of the tank to verify all components of the tank meet or exceed current regulations; design phase services to specify proper paint coatings, linings and structural steel replacement details, yard piping and valve replacement details as necessary; franchise coordination with the various cell providers to eliminate impacts to service during construction; resident construction inspection services to verify cleaning, painting and structural steel replacement meet industry standards; coordination with the Federal Aviation Administration (FAA) including; any FAA permitting that may be required; and construction administration services. Item 4D Page 2 of 3 Coordination for the art elements of the repainting is also included in the scope of services. This includes working with City staff and the appropriate stakeholders to finalize the branding elements that will be applied to the tank, preparing scaled layout drawings, and coordinating color selections. The agreement for these services is not to exceed $390,000. This project is aligned with Comprehensive Plan Objective 10.6. Inspection, design, and franchise coordination is expected to be complete by summer of 2026 with construction expected to begin in early 2027 to minimize impacts to the water supply. Financial Considerations: This ESA is not to exceed $390,000. Funding for this agreement is budgeted in the approved FY 2025 Utility Fund. This award is within the project budget. These services include inspection and cleaning, rehabilitation design, engineering services, construction phase services, resident project inspection, and franchise utility coordination. Strategic Link: This item links to the City’s Strategy Map strategic focus area of Infrastructure and Development. It specifically relates to the City’s Objective, F2: Investing to Provide and maintain High-Quality Public Assets. Citizen Input/ Board Review: No formal citizen input or board review has been completed for this item. As the design progresses, staff will work with the City Council to ensure the final graphic concept aligns with the City’s established branding and standards. Legal Review: The proposed agreement is a standard agreement that the City Attorney has reviewed and approved. Alternatives: The City Council may approve or deny the contract. Staff Recommendation: Approve an Engineering Services Agreement with Bartlett & West to provide engineering design, inspection, and construction phase services for Repainting of the Dove Elevated Storage Tank in an amount not to exceed $390,000. Item 4D Page 3 of 3 Supporting Documents: Attachment A: Engineering Services Agreement Staff Contact: Lauren LaNeave, Interim Director of Public Works Jeff Ginn, P.E., Interim City Engineer Josue Hernandez, P.E., Civil Engineer