Item 9A - Memo City of Southlake Values:
Integrity ♦ Innovation ♦ Accountability ♦ Commitment to Excellence ♦ Teamwork
M E M O R A N D U M
November 12, 2025
To: Alison Ortowski, City Manager
From: David Miller, Director of Community Services
Subject: Consider and select remaining design alternatives for the Town Hall
Plaza Park project
Action
Requested: Consider and select remaining design alternatives for the Town Hall
Plaza Park project
Background
Information: The purpose of this item is for Council to consider and select
remaining design alternatives for the Town Hal Plaza Park project
related to Artificial Turf versus Natural Grass and whether to construct
bathroom/amenity centers.
In June of 2025, the City Council approved a design contract with
Kimley Horn and Associates Inc. for engineering, design services, and
construction administration for the Town Hall Plaza Park project. The
scope of that agreement included the following:
Project management and design coordination – This task includes
managing the contract and monitoring the project schedule and
deliverables.
Schematic design, design development, and construction
documents – This task includes design, design development, and
construction documents for landscape architecture, civil engineering,
mechanical, electrical, plumbing, subsurface, structural, architectural,
and all other elements included in the project.
Construction phase services – This task includes bidding phase
services for all elements of the project, construction phase services,
and construction phase public communication and coordination.
In addition to a larger scope of visual enhancements within the park,
necessary maintenance and infrastructure improvements were also
identified and are included within the scope of work. These
enhancements include upgrading underground utilities to allow for
increased electrical capacity, food truck water and electrical, and tent
electrical capacity, as well as addressing the pond and the condition of
the retaining wall. Adding bollards is also included as part of the
Alison Ortowski, City Manager
Meeting Date –November 18, 2025
Page 2 of 5
City of Southlake Values:
Integrity ♦ Innovation ♦ Accountability ♦ Commitment to Excellence ♦ Teamwork
necessary improvements to improve the safety of large community
events. Finally, work will be done on the existing site drainage
environment to address drainage concerns across the site.
Other prioritized enhancements included creating a flexible Main
Street, closing Fountain Place, which will become a large plaza space,
installing a larger Pavilion made of composite materials with AV and
lighting infrastructure, including the potential for artificial turf in place of
natural grass, and installing a larger fountain. Shade structures with
additional seating will also be constructed on the site, and
infrastructure will be put in place for A/V and mechanical storage as
well as restroom and vending areas that could be built now or in the
future.
When the design agreement was presented to the City Council, staff
noted that at the 30% design milestone final decisions would need to
be made on artificial turf versus natural grass and whether restroom
and amenity centers would be built, fully designed, or removed from
the project.
The Town Hall Plaza Park project is currently at the 30% design
milestone and staff are now seeking Council direction on the noted
decision points above.
Decision Point 1: Artificial Turf Versus Natural Grass
The following chart shows maintenance data relevant to this decision
point.
Alison Ortowski, City Manager
Meeting Date –November 18, 2025
Page 3 of 5
City of Southlake Values:
Integrity ♦ Innovation ♦ Accountability ♦ Commitment to Excellence ♦ Teamwork
With the above data in mind, the following chart details two options
related to decision point 1.
Option 1: Complete Project
with Natural Grass
Option 2: Complete Project with
Artificial Turf
Initial Project Cost $97,000 $577,920
Annual Maintenance Costs $71,202 $22,260
Maintenance escalated 5% over
15 years
$1,536,436 $480,338
Construction Cost upfront
savings
$480,000 N/A
15-year total cost $1,633,436 $1,058,258
Note that option one includes the conservative best practice approach
to replace the SOD in the environment on an annual basis to provide a
high level user experience from an operational and aesthetic
standpoint. There may be years where this approach is not necessary
and savings associated with a SOD replacement every two years
would result in approximately a $300,000 reduction to the total cost.
Also note that option two contemplates the manufacturers estimated
annual maintenance cost and then triples that figure to include
unknowns based on event usage and how that may impact the turf.
Option 2 also includes irrigation costs as part of the annual
maintenance calculation.
Decision Point 2: Restroom/Amenity Centers?
Staff will present Council with a visual overview of how the
Restroom/Amenity Centers will look within Town Square.
Please note the following options and associated cost impacts for the
restroom/amenity center portion of this project.
Option 1: Complete
Design and Construct
Restroom/Amenity
Centers
Option 2: Complete
Design and Stub up of
utilities
Option 3: No Further
Design or Construction
Site Grading $50,000 N/A N/A
Utility Infrastructure $40,000 N/A N/A
Remaining Design Costs $169,000 $169,000 N/A
Design of Alternate
Conditioned Space
N/A 32,500 $32,500
Construction Costs* $1,239,000 $260,000 $210,000
Total Associated Costs $1,498,000 $551,500 $242,500
Total Project Savings N/A $946,000 $1,255,500
Alison Ortowski, City Manager
Meeting Date –November 18, 2025
Page 4 of 5
City of Southlake Values:
Integrity ♦ Innovation ♦ Accountability ♦ Commitment to Excellence ♦ Teamwork
For Option one it is important to note that these costs are not new
costs and have been contemplated with the design and construction
costs should this portion of the project be fully designed and built out.
For option two, it is important to note that the need for an alternative-
conditioned space in lieu of restroom/amenity centers is a necessary
component to house the needed A/V and IT infrastructure related to
A/V and IT improvements to the gazebo and park environment. The
alternate-conditioned space would either be located within the park
itself or would be built into the existing Town Hall environment.
Construction costs for this option include $210,000 for the alternate
conditioned space and $50,000 to stub up utilities for potential
restrooms in the future.
For option three, it is important to note that the need for an alternative-
conditioned space in lieu of restroom/amenity centers is a necessary
component to house the needed A/V and IT infrastructure related to
A/V and IT improvements to the gazebo and park environment. The
alternate-conditioned space would either be located within the park
itself or would be built into the existing Town Hall environment. It is
also important to note that a stub up for required utilities for future
restroom/amenity centers could be included in the project without
further design at a cost of $50,000 in addition to the $210,000 that will
be necessary for the alternate conditioned space.
Next Steps
1. FY 2026 – FY 2031 Capital Improvements Program: Staff will
identify costs at 30% of design that are necessary to fully fund this
project as part of the 2026 Capital Improvements Program budget
process.
2. Construction Manager at Risk Selection: Staff have identified the
Construction Manager at Risk method as the ideal project delivery
method for this project. Staff will begin the process of bringing on a
Construction Manager at Risk as soon as possible. Onboarding a
CMAR will allow staff to provide a clear set of costs and ultimately
a Guaranteed Maximum Price on the project as soon as possible.
Financial
Considerations: Financial considerations are dependent on the decisions made by
Council in relation to decision points 1 and 2.
Alison Ortowski, City Manager
Meeting Date –November 18, 2025
Page 5 of 5
City of Southlake Values:
Integrity ♦ Innovation ♦ Accountability ♦ Commitment to Excellence ♦ Teamwork
.
Strategic Link: This item is linked to the City’s Strategy Map related to the focus areas
of Infrastructure and Development and Partnership and Volunteerism
and meets the corporate objectives of investing to provide and maintain
high-quality public assets and collaborating with select partners to
implement service solutions.
Citizen Input/
Board Review: City Council consideration November 18, 2025
Legal Review: The design contract for this project is a standard contract that was
reviewed by the City Attorney. The design alternatives under
consideration require no additional legal review.
Alternatives: Alternatives are presented as part of this consideration item.
Staff
Recommendation: City Council direction on decision points 1 and 2.