Loading...
Item 4C - Attachment A - [FOR SIGNATURE] Southlake MSC - NSA Standard Agreement 11.4.25 STANDARD AGREEMENT BETWEEN OWNER AND CONTRACTOR This Standard Agreement between Owner and Contractor (the “Agreement”) is hereby entered into and effective as of the day of , 2025, by and between Notification Systems of America, Inc., a company authorized to do business in the State of Texas (the “Contractor”), and the City of Southlake, a Texas home-rule municipal corporation (the “Owner” or “City”), for the Municipal Service Center and Public Safety Training Tower (MSCPSTT) Access Control and Intercom Project (collectively referred to as the “Project”). RECITALS WHEREAS, the Contractor is an approved sole source provider of goods and services for the City, pursuant to that non-expiring sole source memo dated December 14, 2018, and Contractor has submitted a quote dated November 4, 2025, to the City in the not-to-exceed amount of $121,419.00 (the “Agreement Price”) for the Project, which is attached to and incorporated into this Agreement as Exhibit A (the “Proposal”); and WHEREAS, the City desires to purchase, and Contractor desires to sell and provide certain goods and services as specified in Exhibit A; and WHEREAS, the City and Contractor intend to comply with all applicable laws relative to performance and payment bonds, as well as laws relative to workers compensation and liability insurance for services rendered pursuant to this Agreement; and NOW, THEREFORE, the City and Contractor agree that the recitals above are true and correct, and further agree mutually agree as follows: 1. Contractor agrees to furnish and deliver to the City, the goods and services requested by the City for the Project. The City agrees to pay Contractor for the goods and services at the prices shown on Exhibit A. The total amount of costs for the Project shall not exceed the Agreement Price, without further written approval by the City. Add alternates, if any, selected for the Project must be approved writing by the Contractor and City through a valid written Change Order. 2. The City shall make payment for goods and services in accordance with the Texas Prompt Payment Act, Chapter 2251,Texas Government Code. The date of any payment, whether net or gross, shall be determined by calculating the number of days after receipt of invoices from Contractor. 3. This Agreement is made and shall be construed according to the laws of the State of Texas, without regard for conflicts of law principles. Venue of any court action brought directly or indirectly by reason of this Agreement shall be in Tarrant County, Texas. This Agreement is made and is to be performed in Tarrant County, Texas. 4. All written notices shall be deemed to have been duly served if delivered in person to an individual, officer, legal representative, or member of the party for whom it is intended, or if delivered at or sent by registered mail to the last business address known to the person giving the notice. 5. The waiver or failure of either party to exercise in any respect any right provided for in this agreement shall not be deemed a waiver of any further right under this agreement. 6. If any provision of this agreement is invalid, illegal, or unenforceable under any applicable statute, court decision, or rule of law, it is to that extent to be deemed omitted. The remainder of the agreement shall be valid and enforceable to the maximum extent possible. 7. Definition of Terms: Wherever the words, forms or phrases defined herein or pronouns used in their place occur in this Agreement or Exhibit A, the intent and meaning shall be interpreted as follows: 7.1 Calendar Days: A calendar day is defined as any solar day of 24 hours; including all holidays, regardless of weather conditions, material availability, or other conditions not under the control of the Contractor. 7.2 Change Order: Shall mean a written order to the Contractor executed by the City and the Engineer, issued after execution of this Agreement, authorizing and directing a change in the Work or an adjustment in the Agreement Price or the Agreement Time, or any combination thereof, and as more specifically defined in Texas Local Gov’t Code Ch. 252. The Agreement Price and the Agreement Time may be changed only by written Change Order, which may require approval by the City Council. 7.3 City: The City of Southlake, is a Texas home-rule municipal corporation, acting by and through (a) its governing body, (b) its Mayor, or (c) its City Manager, each of whom is required by charter to perform specific duties. 7.4 City Council: The City Council of the City of Southlake, Texas. 7.5 Agreement: This Agreement shall consist of Exhibit A, and all modifications and amendments incorporated therein, and any other documents made a part of the Agreement by the mutual written agreement of the City and Contractor. 7.6 Contractor: NOTIFICATION SYSTEMS OF AMERICA, INC. 7.7 Agreement Time: The number of calendar days from the date on which the Work is permitted to proceed, by written “notice to proceed”, through the date set forth for Final Completion, which is 90 days from the date of the “notice to proceed”, as may be mutually amended by written Change Order, shall constitute the “Agreement Time”. 7.8 Engineer: The City Engineer, or his designee. 7.9 Extra Work: All work that may be required by the Engineer or City to be done by the Contractor to accomplish any changes, alterations, addition of the work shown on the Plans, or reasonably implied by the Specifications and not covered by the Contractor’s Proposal(s). 7.10 Final Completion: Shall mean total (100%) completion of the Work in accordance with the Plans and Specifications, and as finally determined in writing by the City in the City’s sole discretion. 7.11 Maintenance Bond: The approved form of security furnished by the Contractor and its surety as a guarantee on the part of the Contractor to correct any discrepancy or deficiency which may arise as a result of faulty maintenance or workmanship for a period of two (2) years from final acceptance of the Work. 7.12 Overtime: Normal working hours for City construction inspections is between 8 a.m. and 5 p.m. Monday through Friday except for City recognized holidays. The Contractor will be required to pay for overtime for any activities that the City determines needs to be performed with the presence of a City construction inspector beyond these time allowances unless approved in writing otherwise. 7.13 Payment Bond: The approved form of security furnished by the Contractor and his surety as a guarantee for the protection of all claimants supplying labor and material in the prosecution of the Work. 7.14 Performance Bond: The approved form of security furnished by the Contractor and his surety as a guarantee on the part of the Contractor to execute the Work in accordance with the Plans, Specifications, and terms of the Agreement. 7.15 Plan or Plans: All the drawings pertaining to the Project and made a part thereof, including such supplementary drawings or addenda as the Engineer may issue in order to clarify other drawings, or for the purpose of showing changes in the Work hereinafter authorized, or for showing details not shown thereon. 7.16 Proposal: The written statement or statements of the Contractor proposing to do the Work contemplated as shown on Exhibit A, including all approved City forms on which the formal bids or proposals for the Work are to be prepared. 7.17 Retainage: Means the percentage of the payment withheld in this Agreement to secure performance of the Agreement. 7.18 Specifications: The specifications as set forth in the Proposal for the Project as shown on Exhibit A. 7.19 Subcontractor: Any person, persons, partnership, company, firm, associations, or corporation having a direct contract with the Contractor, but having no privity of contract with the City. A subcontractor includes one who furnished material worked to a special design according to the Plans or Specifications of this Work but does not include one who merely furnished material not so worked. 7.20 Substantial Completion: Shall mean that stage in the progression of the Work when the Work is sufficiently complete in accordance with the Agreement, and as determined by the City in the City’s sole discretion, such that only final punch-list items or minor work remains and the Contractor can achieve Final Completion within the time period approved in the Certificate of Substantial Completion. 7.21 Sureties or Surety: The corporate bodies which are bound by such bonds as are required with and for the Contractor. Sureties are responsible for the entire and satisfactory fulfillment of the Agreement, and for any and all requirements as set out in the Project Plans and Specifications. 7.22 Warranty Period: Shall mean the period of time specified in the Agreement during which certain terms applicable to the warranting of work performed under the Agreement are in effect. 7.23 Working Hours: Work shall be done only during the regular and commonly accepted and described working hours between 7:00 a.m. and 6:00 p.m. Work may be done nights, Saturdays, Sundays, or during any City holidays with approval by the Engineer and upon payment of the City Inspector’s overtime costs. 7.24 Work or the work: Unless otherwise stipulated, the Contractor shall provide and pay for all materials, supplies, machinery, equipment, tools, superintendence, labor, insurance, and all water, lights, power, fuel, transportation, and other facilities necessary for the execution and completion of the work covered by the Agreement. All materials shall be of good quality and acceptable to the City. The Contractor shall, if required, furnish satisfactory evidence as to the quality of materials. Materials or work described in words which so applied have a commonly known technical or trace meaning shall refer to such commonly known meaning. 8. Surety Bonds: With the execution and delivery of the Agreement, the Contractor shall furnish and file with the City in the amount herein required, the following Surety Bonds: 8.1 Performance Bond: A good and sufficient Performance Bond in the amount equal to one hundred percent of the total amount of the Agreement, as evidenced by the proposal tabulation or otherwise, guaranteeing the full and faithful execution of the work in accordance with the Plans and Specifications and Texas Gov’t Code Ch. 2253, as amended. 8.2 Payment Bond: A good and sufficient bond in an amount equal to one hundred percent of the total amount of the Agreement, as evidenced by the proposal tabulation, or otherwise guaranteeing the full and proper protection of all claimants supplying labor and materials in the prosecution of the work provided for in the Agreement and for the use of each claimant, and in accordance with Texas Gov’t Code Ch. 2253, as amended. 8.3 Maintenance Bond: A Maintenance Bond in the amount equal to one hundred percent of the total Agreement price for the construction and maintenance of work shall be furnished by the Contractor. The Maintenance Bond shall be for a period of two (2) years from and after the date of completion and final acceptance of the Project. The Contractor shall maintain and keep in good repair the work contemplated under these Plans, Specifications, drawings, etc., and perform for a period as set forth in the Maintenance Bond, from the date of acceptance, all necessary repairs, reconstruction, and renewal of any part of said construction, and to finish the labor and materials to make good and to repair any defective condition growing out of or on account of the breakage or failure of any material or substance of improper function of same. Said Maintenance Bond includes the complete restoration to a functional use acceptable to the City of any work required by faulty material during the period set forth in the Maintenance Bond. 9. Sureties: No sureties will be accepted by the City who are now in default or delinquent on any bonds or who are interested in any litigation against the City. All bonds shall be made on one corporate surety authorized to do business in the State of Texas and acceptable to the City. An acceptable surety to the City shall be determined as any surety listed on the latest United States Treasury Department list of companies holding certificates of authority as acceptable sureties on Federal Bonds. Each bond shall be executed by the Contractor and the surety. Should any surety on the Agreement be determined unsatisfactory at any time by the City, notice will be given to the Contractor to that effect, and the Contractor shall immediately provide a new surety satisfactory to the City. No payment will be made under the Agreement until the new surety or sureties, as required, have qualified and been accepted by the City. The Agreement shall not be operative, nor will any payments be due or paid until approval of the bonds have been made by the City. 10. Intent of Plans and Specifications: The intent of the Plans and Specifications is to prescribe a complete work or improvement which the Contractor undertakes to do in full compliance with the Plans, Specifications, Proposals, and Agreement. The Contractor shall do all work as provided in the Plans, Specifications, Proposals, and Agreement, and shall do such additional extra work as may be considered necessary to complete the Work in satisfactory and acceptable manner. The Contractor shall furnish all labor, tools, materials, machinery, equipment, and incidentals necessary to the prosecution of the Work. 11. Increased and Decreased Quantities: The City reserves the right to alter the quantities of the work to be performed or to extend or shorten the improvements at any time when and as found necessary, the Contractor shall perform the Work as altered. No allowance will be made for any change in anticipated profits due to decreased quantities, nor shall such changes be considered as waiving or invalidating any conditions or provisions of the Agreement and bonds. 12. Alteration of Plans and Specifications: The City reserves the right to make such changes in the Plans and Specifications and in the character of the work as may be necessary or desirable to ensure completion in the most satisfactory manner, provided such changes do not materially alter the Plans and Specification or change the general nature of the work as a whole. Such changes shall not be considered as waiving or invalidating any condition or provision of the Agreement or bonds. 13. Extra Work: When any work is necessary to the proper completion of the project for which no prices are provided in the Proposal and Agreement, the Contractor shall not do such work, but only when and as ordered in writing by the Engineer, subject, however, to the right of the Contractor to require a written confirmation of such extra work order by the City. It is also agreed that the compensation to be paid the Contractor for performing said extra work shall be determined prior to commencing any extra work. No claim for extra work of any kind will be allowed unless ordered in writing by the Engineer. In case of any orders or instructions, for which Contractor should receive compensation or an adjustment in the Agreement Time, Contractor shall make written requests to the Engineer, for written order authorizing such extra work. 14. Final Clean-Up: Upon completion of the Work and before acceptance and final payment will be made, the Contractor shall clean and remove from the site of the work surplus and discarded materials, temporary structures, discarded materials, and debris of every kind, he shall leave the site of the Work in a neat and orderly condition equal to that which originally existed. Surplus and waste materials removed from the site of the Work shall be disposed of at locations satisfactory to the Engineer. 15. Engineer’s Authority and Duty: Unless otherwise specified, it is mutually agreed between the parties to this Agreement that the Engineer may inspect all work included herein. The Engineer may stop the Work whenever such stoppage may be necessary to ensure the proper execution of the Agreement. In order to prevent delays and disputes and to discourage litigation, it is further agreed that the Engineer shall in all cases determine the amounts and quantities of the several kinds of work which are to be paid for under this Agreement, and shall in all cases decide every question which may arise relative to the execution of this Agreement on the part of the said Contractor. 16. Contractor’s Duty and Superintendence: The Contractor shall give personal attention to the faithful prosecution and completion of this Agreement and shall keep on the Work, during its progress, a competent superintendent who shall represent the Contractor and all directions given to the superintendent shall be as binding as if given to the Contractor. Important directions shall be confirmed in writing to the Contractor, and other directions shall be so confirmed on written request in each case. 17. The Contractor shall give to the Work the consistent attention necessary to facilitate the progress thereof, and he shall cooperate with the Engineer, the City’s inspectors, and with other Contractors, in every way possible. The Contractor shall provide all facilities to enable the Engineer and the City’s inspectors to inspect all workmanship and materials relating to the Work. 18. Contractor’s Understanding: It is understood and agreed that the Contractor has, by careful examination satisfied itself as to the nature and location of the Work, the conformation of the ground, the character quality and quantity of the materials to be encountered, the character of equipment and facilities needed in preparation for and during the prosecution of the Work, the general and local conditions, and all other matters which can in any way affect the work under this Agreement. No verbal agreement or conversation with any officer, agent or employee of the City either before or after the execution of this Agreement, shall affect or modify any of the terms of obligations herein contained and Contractor shall have no claim for differing site conditions under any circumstance. 19. Character of Workers: The Contractor agrees to employ only orderly and competent workers, skillful in the performance of the type of Work required under this Agreement, to do the Work; and agrees that whenever the Engineer shall inform the Contractor in writing that any worker on the Work, is in his opinion incompetent, unfaithful or disorderly, such worker shall be discharged from the Work and shall not again be employed on the Work without the Engineer’s written consent. 20. Sanitation: Necessary sanitary conveniences for the use of the laborers on the Work, properly secluded from public observation, shall be constructed and maintained by the Contractor in such a manner and at such points as shall be approved by the Engineer, and their use and cleanliness shall be strictly enforced. 21. Preliminary Approval: The Engineer shall not have the power to waive the obligation of this Agreement for the furnishing by the Contractor of good materials, and of the Contractor performing good and acceptable work as herein described, and in full accordance with the Plans and Specifications. No failure or omission of the Engineer to reject defective work or materials shall release the Contractor from the obligations to at once tear out, remove and properly replace the same at any time prior to final acceptance upon the discovery of said defective work or materials; provided, however, that the Engineer shall, upon request of the Contractor inspect and accept or reject any material furnished, and in event the material has been once accepted by the Engineer, such acceptance shall be binding on the City, unless it can be clearly shown that such materials furnished do not meet the Specifications for this Work. 22. Any questioned Work may be ordered taken up or removed for reexamination by the Engineer, prior to final acceptance, and if found not in accordance with the Specifications for said Work, all expense of removing, reexamination and replacement shall be borne by the Contractor; otherwise the expense thus incurred shall be allowed as extra work, and shall be paid for by the City, provided that, where inspection or approval is specifically required by the Specifications prior to performance of certain work, should the Contractor proceed with such work without requesting prior inspection and approval the Contractor shall bear all expense of taking up, removing and replacing his work if so directed by the Engineer. 23. Defects and Remedies: It is further agreed that if the Work or any part thereof, or any materials brought on the site of the Work for use in the work or selected for the same, shall be deemed by the Engineer, as unsuitable or not in conformity with the Plans and Specifications, the Contractor shall, after receipt of written notice from the Engineer, forthwith remove such materials and rebuild or otherwise remedy such work so that it shall be in full accordance with this Agreement. 24. Changes and Alterations: The Contractor further agrees that the City may make such changes and alterations as the City may see fit, in the line, grade, form, dimensions, Plans or materials for the Work herein contemplated, or any part thereof, either before or after the beginning of the construction, without affecting the validity of the Agreement and the accompanying Bonds. 25. Conformity with Plans: All work shall conform to the lines, grades, cross-sections, and dimensions shown on the Plans. Any deviation from the Plans which may be required by the exigencies of construction will be determined by the Engineer and authorized by the Engineer in writing. 26. Existing Structures and Utilities: The location of gas mains, water mains, conduits, sewer, and other utilities or improvements is unknown, and the City assumes no responsibility for failure to show them in their exact locations. It is mutually agreed that such failure may be considered eligible for claims for additional compensation for extra work or for increasing the pay quantities through a Change Order. 27. Source of Supply of Materials: The materials shall be the best procurable, as required by the Plans, Specifications and this Agreement. The Contractor shall not start delivery of materials until the Engineer has approved the source of supply. Only materials conforming to these Specifications shall be used in the Work, and such materials shall be used only after written approval has been given by the Engineer, and only so long as the quality of said materials remains equal to the requirements of the Specifications. After approval by the Engineer, any material that becomes damaged or contaminated during delivery, handling, or storage will not be permitted to be used in the Work and must be replaced by Contractor at no cost to the City. 28. Samples and Tests of Materials: Where, in the opinion of the Engineer, or as called for in the Specifications, tests of materials are necessary, such tests will be made at the expense of the Contractor unless otherwise provided. Tests, unless otherwise specified, will be made in accordance with the latest methods of the American Society for Testing Materials. The Contractor shall provide such facilities as the Engineer may require for collecting and forwarding samples and shall not use the materials represented by the samples until tests have been made. The Contractor shall furnish adequate samples without charge to the City. 29. Storage of Materials: Materials shall be stored so as to ensure the preservation of their quality and fitness for the Work. When directed by the Engineer, they shall be placed on wooded platforms or other hard, clean surfaces, and not on the ground, and shall be placed under cover when necessary for protection. Stored materials shall be placed and located so as to facilitate prompt inspection by the City. 30. Inspection: The Contractor shall furnish the Engineer with every reasonable facility for ascertaining whether or not the work performed was in accordance with the requirements and intent of the Plans and Specifications. Any work done or materials used without suitable supervision or inspection by the Engineer may be ordered removed and replaced at the Contractor’s expense. 31. Removal of Defective, Rejected, or Unauthorized Work: All work which has been rejected shall be repaired at Contractor’s expense, or if it cannot be repaired satisfactorily, it shall be removed and replaced at the Contractor’s expense. Defective materials shall be immediately removed from the site of the work by the Contractor. Defective work, work done without line and grade having been given, work done out of the lines or not in conformity with the grades shown on the Plans or as given, save as herein provided, work done without proper inspection, or any extra or unclassified work done without written authority and prior agreement in writing as to prices shall be done at the Contractor’s expense. Upon failure of the Contractor to repair satisfactorily or to remove and replace, if so directed, defective, rejected, or unauthorized work or materials immediately after receiving notice from the Engineer or the City, the Engineer or the City will, after giving notice to the Contractor, have the authority to cause the defective, rejected, or unauthorized work or materials to be remedied or removed and replaced by the Surety, the City, or by any third-party contractor, all at the City’s sole discretion without any duty to mitigate costs, and to charge the costs thereof against the Contractor, or deduct the cost thereof from any moneys due or to become due the Contractor, without the need for a written Change Order deducting the same. 32. Final Inspection: The Engineer will make final inspection of all work included in the Agreement as practicable after the work is completed and ready for acceptance. If the work performed by the Contractor is not acceptable to the Engineer at the time of such inspection the Engineer will inform the Contractor as to the particular defect(s) before final acceptance will be made. This Agreement shall be read and construed in compliance with Texas Business & Commerce Code Ch. 59, as amended, and the Contractor must, within a reasonable time of learning of a defect, inaccuracy, inadequacy, or insufficiency in the plans, specifications, or other design documents, disclose in writing to the City the existence of any known defect in the plans, specifications, or other design documents that is discovered by the Contractor, or that reasonably should have been discovered by the Contractor using ordinary diligence, before or during construction. The Contractor shall be liable for the consequences of defects that result from the Contractor’s failure to disclose as authorized by Texas Business & Commerce Code Ch. 59. 33. Prevailing Wage Rates: Among other things, this Article provides that it shall be mandatory upon the Contractor and upon any subcontractor under him to pay not less than the prevailing rates of per diem wages in the locality at the time of construction to all laborers, workmen, and mechanics employed by them in the execution of the Agreement. No claims for additional compensation shall be considered by the City because of payments of wage rates in excess of the applicable rate provided herein. Pursuant to Texas Gov’t Code Ch. 2258, the Contractor shall forfeit, as a penalty to City, sixty dollars ($60.00) for each laborer, workman, or mechanic employed for each calendar day, or portion thereof, in which such laborer, workman, or mechanic is paid less than the stipulated prevailing wage rates for any work done under this Contract by the Contractor or any subcontractor employed on the project. 34. Dispute Resolution: All questions of dispute under this Agreement that cannot be resolved between the Engineer and Contractor shall be submitted to the City Council at the request of either party and the decision of the City Council shall be final and unappealable. 35. Law and Ordinance: The Contractor shall at all times observe and comply with all Federal, State and local laws, ordinances, and regulations, which in any manner effect the Agreement or the Work, and must maintain any and all required licenses and certificates required under the same laws, statutes, ordinances, regulations and standards for services and/or goods during the term of the Agreement. If the Contractor observes that the Plans and Specifications are a variance therewith, the Contractor shall promptly notify the Engineer in writing, and any necessary changes shall be adjusted as provided in the Agreement for changes in the Work. The City may automatically terminate this Agreement without liability to the City if the Contractor performs any Work knowing it to be contrary to such laws, ordinances, rules, and regulations. 36. Permits and Licenses: The Contractor shall procure all permits and licenses, pay all charges and fees, and give all notices necessary and incident to the due and lawful prosecution of the Work. 37. Protection against Royalties or Patented Invention: The Contractor shall pay and be liable for any and all royalties and license fees related to Contractor’s use, manner, and method of construction, and shall provide for the use of any design, device, materials or process covered by letter patent or copyright by suitable legal agreement with the patentee or owner. The Contractor warrants the accuracy, adequacy, sufficiency, or suitability of plans, specifications, or other design documents provided to the Contractor by the Contractor’s agents, contractors, fabricators, or suppliers, or its consultants, of any tier. 38. Reserved. 39. Reserved. 40. Reserved. 41. Responsibility for Damage Claims: The Contractor shall provide, maintain, and be responsible for all necessary barricades, warning lights, or signs for the Project; and will be required to pay any judgment, with costs, including reasonable attorney’s fees, which may be obtained against the City growing out of such injury or damage. 42. Contractor’s Claim for Damage: Should the Contractor claim compensation for any alleged damage by reason of the acts or omissions of the City, he shall, within three days after sustaining such damage, make a written statement to the Engineer, setting out in detail the nature of the alleged damage, and on or before the 25th day of the month succeeding that in which any such damage is claimed to have been sustained, the Contractor shall file with the Engineer an itemized statement of the details and amoun t of such alleged damaged, and upon request, shall give the Engineer access to all books of accounts, receipts, vouchers, bills of lading, and other books or papers containing any evidence as to the amount of such alleged damage, which shall be subject to the audit provisions of this Agreement. Unless such statement shall be filed as herein above required, the Contractor’s claim for compensation shall be waived and he shall not be entitled to payment on account of such damage. 47. Use of a Section or Portion of the Work: Wherever in the opinion of the Engineer any section or portion of the work or any structure is in suitable condition, it may be put into use upon the written order of the Engineer, and such usage shall not be held to be in any way an acceptance of said Work or structure or any part thereof, or as evidence of Substantial Completion of the Work, or as a waiver of any of the provisions of these Plans, Specifications, or the Agreement pending Final Completion and acceptance of the Work. All necessary repairs and removals of any section of the Work so put into use, due to defective materials or workmanship or to operations of the Contractor shall be performed by the Contractor at Contractor’s own cost and expense. 48. Contractor’s Responsibility for the Work: Until written final acceptance by the Engineer, as provided for in this Agreement and the Plans and Specifications, the Work shall be under the charge and care of the Contractor and the Contractor shall take every precaution to prevent injury or damage to the Work or any part thereof by action of the elements, weather, or from any other cause whatsoever, whether arising from the execution or non-execution of the Work. The Contractor shall rebuild, restore, and make good at Contractor’s own cost and expense, all injuries or damages to any part of the Work occasioned by any of the herein above causes. 49. Assignment and Subletting: The Contractor further agrees that it will retain personal control and will give the Contractor’s personal attention to the fulfillment of this Agreement and that the Contractor will not assign by Power of Attorney, pass through agreement, or otherwise, or sublet this Agreement, without the written consent of the City, and that no part of the work will be sublet to anyone objectionable to the Engineer of the City. This section expressly prohibits the assignment or pass through of claims, rights, or causes of action between Contractor and any subcontractors, materialmen, or suppliers, or any other third-party performing Work under the Agreement. 50. Prosecution of the Work: The Contractor shall complete the Work to be performed under this Agreement within the Agreement Time and in accordance with the Plans and Specifications, and shall conduct the work in such a manner and with sufficient equipment, materials, and labor as is necessary to insure its completion within the time limit. The sequence of all construction operations may otherwise be directed by or approved by the Engineer in writing. Such written direction or approval by the Engineer shall not relieve the Contractor from the full responsibility of the complete performance of the Agreement. Should the prosecution of the work be discontinued by the Contractor, the Contractor shall notify the Engineer at least twenty-four (24) hours in advance of resuming operation. 51. Time and Order of Completion: It is the meaning and intent of this Agreement, unless otherwise herein specifically provided, that the Contractor shall be allowed to prosecute the Work at such time and seasons, in such order of precedence, and in such a manner as shall be most conducive to economy of construction; provided, however, that the order and the time of prosecution shall be such that the Work shall be completed as a whole and in part, in accordance with this Agreement, the Plans, and Specifications, and within the time of completion designated in the Proposal; provided, also, that when the City is having other work done, either by Contractor or by the City’s own force, the Engineer may direct the timing of the Agreement, so that conflict will be avoided and the construction of the various works being done for the City shall be harmonized. The Contractor shall submit a weekly schedule, which shall show the order in which the Contractor will start the several parts of the Work, and estimated dates of completion of the several parts. The Engineer may also request the Contractor to submit additional schedules at such times as the Engineer may determine to be necessary to ensure timely completion of the Work. Failure by the Contractor to strictly comply with the provisions of this paragraph shall constitute a material breach of this Agreement. 52. Extension of Time: Should the Contractor be delayed in the completion of the Work by any act or neglect of the City or Engineer, or any employee of either, or by other Contractor’s employed by the City, or by changes ordered in the Work, or by strikes, lockouts, fires, and unusual delays by common carriers, or unavoidable cause or causes beyond the Contractor’s control, as determined in the City’s sole discretion, or by any cause which the Engineer may decide justifies delay, then an extension of the ti me may be allowed for completing the Work, sufficient to compensate for the delay, the amount of the extension to be determined by the Engineer; provided, however that the Contractor shall give the Engineer notice in writing of the cause of such delay within thirty (30) days of the beginning of the delay. 53. Hindrances and Delays: Except as provided in Section 52, no claims shall be made by the Contractor for damages resulting from hindrances or delays from any cause (except where the Work is stopped by order of the City) during the progress of any portion of the Work. In case said Work shall be stopped by an act of the City, then such expense as in the judgment of the Engineer, caused by such stoppage of said Work shall be paid for by the City to the Contractor, pursuant to a valid written Change Order. Once the work order is transmitted to the Contractor, the Contractor shall devote both manpower and equipment to the project on a continuous basis each and every workday in sufficient quantity to bring the project to Final Completion without delay. The Engineer shall be the sole judge, with appeal only to the City Council, of whether the Contractor has devoted both manpower and equipment to the project on a continuous basis to bring the project to completion. If the Engineer or his designee should determine the Contractor has failed to diligently prosecute the project and the City Council does not reverse the decision of the Engineer or his designee, the Engineer may have the remaining work performed by another contractor, or the Surety under the Performance Bond, and deduct whatever cost is paid to the substitute contractor from the Contractor’s Contract, without the need for a written Change Order deducting the same. 54. Time and Liquidated Damages: The Agreement Time is of the essence and will be strictly enforced. Liquidated damages will be assessed against the Contractor for failure to complete the project to total (100%) Final Completion within the Agreement Time. The Contractor and surety agree that the liquidated damages provisions in this Agreement are reasonable, facially valid, are not a penalty, and do not otherwise operate as a penalty. For each and every calendar day that any Work shall remain incomplete after the expiration of the Agreement Time as specified in the Agreement, including any time extension authorized in writing by the City, the sum of $250.00 per calendar day may be deducted from the moneys due to the Contractor, or may be charged against the Contractor, not as a penalty, but as liquidated damages. The Contractor agrees that for purposes of Texas Gov’t Code Ch. 2252, a bona fide dispute exists if liquidated damages are assessed under this Agreement and the City may withhold Retainage to satisfy liquidated damages owed to the City hereunder. The sum of money thus deducted or charged as liquidated damages is not to be considered as a penalty, but shall be deemed, taken, and treated as reasonable liquidated damages, representing a reasonable estimate of damages, or a reasonable forecast of just compensation, because the harm caused by the breach is incapable or extremely difficult of estimation due to the public nature of the work and the likely loss to be sustained by the City and the general public, estimated at or before the time of executing this Agreement. Further, the parties acknowledge the City’s paramount purposes and duty to protect the “public fisc” and the general health, safety, and welfare of the public, and the parties agree that any alleged disparity between actual and liquidated damages shall be construed as bridgeable and acceptable as a matter of law and public policy and shall be calculated and construed in favor of the City. 55. Insurance. Prior to the commencement of work under this Agreement, Contractor shall obtain and shall continue to maintain, in full force and effect during the term of this Agreement, insurance policies with companies licensed to do business in the State of Texas and rated not less than “A” in the current Best Key Rating Guide, which shall include commercial general liability, automobile liability and worker’s compensation coverage, in accordance with any City ordinance or directive. The minimum limits for this coverage shall be $1,000,000.00 per occurrence / $2,000,000 aggregate for general liability, $1,000,000 combined single limit for automobile liability and Texas statutory limits for workers’ compensation, unless modified in accordance with any ordinance or directive. Contractor shall also maintain cyber liability (or equivalent) insurance providing limits of no less than $1,000,000 per occurrence (inclusive of any amounts provided by an umbrella or excess policy). Insurance obtained by Contractor shall be primary and noncontributory, and City shall be named as an additional insured under the general liability and automobile policies. The City shall be given at least thirty (30) days prior notice of any material change in coverage or of cancellation of such policies, and Contractor shall provide the City with a copy of any such notice of material change in coverage or cancellation of any such policies, within three (3) business days of its receipt of such a notice. For purposes of this section, a material change in coverage includes, but is not limited to, a reduction in coverage below the amounts required under this agreement. Contractor shall provide a waiver of subrogation in favor of the City on all coverages where available and represents that it has taken all actions necessary under the policy or policies for the City to have the status of additional insured and to effectuate any required waiver of subrogation. Contractor shall furnish the City with original copies of the policies or certificates evidencing such coverage prior to commencement of any work under this Agreement. Contractor shall provide City with the certifications relating to workers’ compensation coverage in accordance with Section 406.096 of the Texas Labor Code, for itself and for each of its subcontractors on the Project. Specifically, Contractor shall certify to City in writing that the Contractor provides workers’ compensation insurance coverage for each employee of the Contractor on the Project, and shall provide the same certification from each of its subcontractors relating to coverage of subcontractor’s employees on the Project. 56. INDEMNIFICATION. THE CONTRACTOR (THE “INDEMNIFYING PARTY”), SHALL INDEMNIFY, DEFEND, AND HOLD HARMLESS THE CITY, TOGETHER WITH THE CITY’S OFFICERS, AGENTS, COUNCIL MEMBERS, EMPLOYEES, ATTORNEYS AND REPRESENTATIVES (COLLECTIVELY, INCLUDING THE CITY, THE “CITY INDEMNIFIED PARTIES”), FROM AND AGAINST ANY AND ALL DAMAGES, LIABILITIES, DEMANDS, CAUSES OF ACTION, CLAIMS, JUDGMENTS, SUITS, COSTS AND EXPENSES (INCLUDING REASONABLE ATTORNEYS’ FEES) MADE BY ANY THIRD-PARTY, TO THE EXTENT ARISING FROM OR RELATED TO THE SERVICES PROVIDED BY THE CONTRACTOR PURSUANT TO THIS AGREEMENT (COLLECTIVELY, “INDEMNIFIED CLAIMS”), REGARDLESS OF THE LEGAL THEORY ASSERTED BY ANY THIRD PARTIES AND REGARDLESS OF WHETHER THE DAMAGES OR CLAIMS OF THIRD-PARTIES ARE KNOWN OR FULLY APPRECIATED AT THIS TIME BY CONTRACTOR OR THE CITY. THE INDEMNITIES IN THIS AGREEMENT ARE SPECIFICALLY INTENDED TO OPERATE AND BE APPLICABLE EVEN IF IT IS ALLEGED OR PROVED THAT ALL OR SOME OF THE DAMAGES BEING SOUGHT WERE CAUSED IN WHOLE OR IN PART BY ANY ACT, ERROR, OMISSION, NEGLIGENCE, GROSS NEGLIGENCE, INTENTIONAL CONDUCT, BREACH OF CONTRACT, BREACH OF WARRANTY, VIOLATION OF STATUTE OR COMMON LAW, VIOLATIONS OF THE STATE OR FEDERAL CONSTITUTIONS, OR ANY OTHER CONDUCT WHATSOEVER OF THE CITY INDEMNIFIED PARTIES. CONTRACTOR SHALL GIVE TO THE CITY REASONABLE NOTICE OF ANY SUCH CLAIMS OR ACTIONS. CONTRACTOR SHALL USE LEGAL COUNSEL REASONABLY ACCEPTABLE TO THE CITY IN CARRYING OUT ITS OBLIGATIONS HEREUNDER. THE PROVISIONS OF THIS SECTION SHALL SURVIVE THE EXPIRATION OR EARLY TERMINATION OF THIS AGREEMENT. THIS INDEMNIFICATION IS NOT INTENDED TO APPLY TO CLAIMS MADE AGAINST THE CITY INDEMNIFIED PARTIES RESULTING FROM NEGLIGENT ACTS OF CITY EMPLOYEES COVERED UNDER SECTION 101.021 OF THE TEXAS CIVIL PRACTICE AND REMEDIES CODE. 57. Governmental Functions/Immunities. The parties hereby acknowledge and agree that City is entering this Agreement pursuant to its governmental functions and that nothing contained in this Agreement shall be construed as constituting a waiver of the City’s governmental immunity from suit or liability, which is expressly reserved to the extent allowed by law. Notwithstanding anything to the contrary herein, the parties hereby acknowledge and agree that to the extent this is subject to the provisions of Subchapter I of Chapter 271, TEXAS LOCAL GOVERNMENT CODE, as amended, the City’s immunity from suit is waived only as set forth in Subchapter I of Chapter 271, TEXAS LOCAL GOVERNMENT CODE. Further, the parties agree that this Agreement is made subject to all applicable provisions of the Texas Civil Practices and Remedies Code, including, but not limited to all defenses, limitations, and exceptions to the limited waiver of immunity from liability provided in Chapter 101 and Chapter 75. 58. Substantial Completion: When the Contractor believes that the Work is substantially complete, the Contractor shall submit to the Engineer a final punch-list of items to be completed or corrected. When the Engineer, on the basis of an inspection, determines that the Work is in fact substantially complete, the Engineer will prepare a Certificate of Substantial Completion, which shall (1) establish the date of Substantial Completion; (2) shall state the responsibilities of the City and the Contractor for Project security, maintenance, heat, utilities, damage to the Work, and insurance; and (3) shall fix the time within which the Contractor shall complete the items listed therein, which shall not exceed thirty (30) days. The Certificate of Substantial Completion shall be submitted to the City and the Contractor for their written acceptance of the responsibilities assigned to them in such certificate. Upon Substantial Completion of the Work, and execution by both the City and the Contractor of the Certificate of Substantial Completion, the City may pay the Contractor an amount sufficient to increase total payments to the Contractor to one hundred percent (100%) of the Agreement Price less any Retainage withheld for the reasonable cost, as determined by the City and the Engineer, for completing all incomplete Work, including punch-list items, and correcting and bringing into conformance all defective and nonconforming Work, and resolving all unsettled bona fide disputes and other claims. 59. Retainage: The City may withhold Retainage in the amount of five percent (5%) of the Agreement price, and the rate of Retainage may not exceed five percent (5%) for any item in a bid schedule or schedule of values for the Project, including materials and equipment delivered on site to be installed. 60. Warranty: The Warranty Period is two (2) years, commencing on the date of Final Completion and Acceptance of the Work by the City. The warranty provided in this section is a guarantee by the Contractor that is made in addition to the guarantees and warranties included in the any manufacturer’s or product warranty and the Maintenance Bond, and the warranty provided during the Warranty Period shall not limit the City’s rights or remedies under the Maintenance Bond, or any manufacturer’s or product warranty. The Contractor warrants and guarantees to the City during the Warranty Period that all labor furnished and Work performed under the Agreement has yielded only first-class results, that materials and equipment furnished are of good quality and new, and that the Work is of good quality, free from faults and defects and in strict conformance with this Agreement. All Work not conforming to these requirements may be considered defective, and the Contractor shall promptly repair or replace such defective Work upon demand by the City without any further objection by the Contractor. This Warranty Period shall not be construed as a limitation on any rights or remedies available the parties under Texas Civil Practice and Remedies Code Ch. 16. All products’ and manufacture’s guarantees or warranties shall be assigned to the City upon installation and Final Completion and Acceptance of the Work by the City. 61. Suspension by Court Order: The Contractor shall suspend such part or parts of the Work ordered to be suspended by a court of competent jurisdiction and will not be entitled to additional compensation by virtue of such court order. Neither will Contractor be liable to the City in the event the Work is suspended by court order, unless the court order is caused in whole or in part by the Contractor’s negligent or willful acts or omissions. 62. Temporary Suspensions: The Engineer shall have the authority to suspend the Work wholly or in part for such period or periods as the Engineer may deem necessary due to unsuitable weather conditions as are considered unfavorable for the suitable prosecution of the Work. If it should become necessary to stop the Work for an indefinite period, the Contractor shall protect the Work and store all materials in such a manner that they will not obstruct or impede the public unnecessarily nor become damaged in any way and the Engineer shall take every precaution to prevent damage or deterioration. 63. Abandonment by Contractor: In case the Contractor should abandon and fail or refuse to resume the Work within ten (10) calendar days after written notification from the City or the Engineer, then, where a performance bond exists, the Surety on the bond may be notified in writing and directed to complete the Work, and a copy of said notice shall be delivered to the Contractor. After receiving said notice of abandonment, the Contractor shall not remove from the Work or Project any materials, equipment, tools, or supplies then on the site, but the same, together with any materials and equipment and under Agreement for the Work may be held for use on the Work by the City or the Surety on the performance bond, or another contractor in completion of the Work; and the Contractor shall not receive any rental or credit therefore, it being understood that the use of such equipment and materials will mitigate the cost to complete the Work. 64. Fulfillment of Contract: The Agreement will be considered fulfilled, save as provided in any maintenance stipulations, bond, or by law, when all the Work has been 100% completed, the final inspection made by the Engineer, and final acceptance and final payment made by the City. The City shall then pay the Contractor within thirty-one (31) days of the last day of the preceding month the total amount of the Engineer’s statement, less five percent (5%) of the amount thereof as Retainage withheld by the City until final payment, and further less all previous payments and all further sums that may be retained by the City under the terms of this Agreement. It is understood, however, that in case the Contractor achieves Substantial Completion and some unexpected and unusual delay occurs due to a force majeure event or no fault or neglect on the part of the Contractor as determined by the City, the City may, upon written recommendations of the Engineer, release a reasonable and equitable portion of the Retainage to the Contractor; or the Contractor at the City's option, may be relieved of the obligation for fully completing the Work, and thereupon, the Contractor shall receive payment of the balance due him under the Agreement subject only to the conditions stated under “Final Payment.” 65. Final Completion and Acceptance: Within five (5) days after the Contractor has given the Engineer written notice that the Work has been 100% finally completed, the Engineer and the City shall inspect the Work and within said time, if the Work is found to be 100% complete in accordance with the Agreement, the City shall issue to the Contractor a Letter of Acceptance within ten calendar (10) days. 66. Final Payment: Upon the issuance of the Letter of Acceptance, the Engineer, shall proceed to make final measurements and prepare a final statement of the value of all work performed and materials furnished under the terms of the Agreement and shall certify same to the City, who shall pay to the Contractor within thirty (31) days after the date of the Letter of Acceptance, and receipt of a notarized Affidavit of Bills Paid , and Unconditional Lien Waivers, the balance due the Contractor under the terms of this Agreement, provided the Contractor has fully performed contractual obligations under the terms of this Contract; and said payment shall become due in any event upon said performance by the Contractor. Neither the Letter of Acceptance nor the final payment, nor any provisions in the Agreement, shall relieve the Contractor of the obligation for the fulfillment of any warranty, bond, or other obligation, which may be required by the Agreement, or which may survive the termination and completion of the Agreement. If no bona fide dispute or other default, breach, or claim exists under this Agreement or applicable law, the City shall release any Retainage withheld upon application for Final Payment. 67. Payments Withheld: The City may, on account of subsequently discovered evidence, bona fide dispute, or Contractor’s unexcused delay or abandonment, withhold or nullify the whole or part of any certificate, amounts due, or request for payment to such extent as may be necessary to protect itself from loss on account of any or each of the following: (a) Defective, rejected, unauthorized, or abandoned work not remedied by Contractor, (b) Claims filed or reasonable evidence indicating probable filing of claims, (c) Failure of the Contractor to make payments properly to subcontractors or for material or labor, (d) Damage to another contractor, (e) Contractor bankruptcy, insolvency, notification of any tax liens, (f) Liquidated Damages owed to the City, or (g) Unexcused delay by the Contractor in completing the Work. 68. Delayed Payments: Should the City fail to make payment to the Contractor of the sum named in any partial or final statement or invoice when an undisputed payment is due and when no bona fide dispute exists, or should the Engineer fail to issue any statement on or before the date above provided, then the City shall pay to the Contractor, in addition to the sum shown as due by such statement, interest thereon at the rate in effect on September 1 of the fiscal year in which the payment becomes overdue. The rate in effect on September 1 is equal to the sum of one percent (1%) plus the prime rate as published in the Wall Street Journal on the first day of July of the preceding fiscal year that does not fall on a Saturday or Sunday, unless otherwise specified, from date due until fully paid, which shall fully liquidate any injury to the Contractor growing out of such delay in payment not promptly made, unless such payments were withheld in accordance with the provisions of the Agreement or Texas Gov’t Code Ch. 2251. In accordance with Texas Gov’t Code Sec. 2251.042, the City shall notify the Contractor of an error or disputed amount in a partial or final statement or invoice submitted under this Agreement not later than the 21st day after the date the City receives the partial or final statement or invoice, and the City shall include in such notice a detailed statement of the amount of the partial or final statement or invoice which is disputed. The City may withhold from payments required no more than 110% percent of the amount disputed in the partial or final statement or invoice. This paragraph shall not be construed as a limitation or cap on the City’s right to withhold payments or amounts under this Agreement, or for amounts withheld for payment of Liquidated Damages owed to the City, or for Retainage withheld due to a bona fide dispute, as provided in this Agreement. 69. Termination: The City may, at any time, with thirty (30) calendar days written notice terminate the Agreement, or any part or portion thereof, for a breach of this Agreement after ten (10) days written notice to cure the alleged breach of this Agreement. Upon receipt of notice from the City of such termination, the Contractor shall: 1. cease operations as directed by the Owner in the notice and, if required by the Owner, participate in an inspection of the Work with the Owner and the Architect/Engineer to record the extent of completion thereof, to identify the Work remaining to be completed or corrected, and to determine what temporary facilities, tools, equipment and construction machinery are to remain at the site pending completion of the Work; 2. complete or correct the items directed by the Owner, and take actions necessary, or that the Owner may direct, for the protection and preservation of the Work any stored materials and equipment; and 3. except for Work directed to be performed prior to the effective date of termination stated in the notice, terminate all existing subcontracts and purchase orders and enter into no further subcontracts and purchase orders. In the case of such termination, the Contractor shall only be entitled to receive payment for work properly executed through the date of termination, and any other relief authorized by Texas Local Gov’t Code Ch. 271. The Contractor’s obligations surviving final payment under the Contract, including without limitation those with respect to records retention (audit), insurance, indemnification, and correction of Work that has been completed at the time of termination, remains effective notwithstanding termination by the Owner. The Contractor understands and agrees that consequential, punitive, and exemplary damages arising out of or relating to this Contract are not available against the Owner as a matter of law under Tex as Local Gov’t Code Ch. 271, or any other law. 70. Time Filing Claims: Unless otherwise specified in the Agreement, it is further agreed by both parties hereto that all questions of dispute or adjustment presented by the Contractor shall be in writing and filed with the Engineer within thirty (30) calendar days after the Engineer has given any directions, orders or instructions to which the Contractor so desires to take exception. The Engineer shall reply to such written exceptions by the Contractor and render his final decision in writing. It is further agreed that final acceptance of the Work by the City and the acceptance by the Contractor of the final payment shall be a waiver and a bar of any claims for delays or otherwise by the Contractor, except, where noted otherwise in the Agreement. MISCELLANEOUS 1. The terms and conditions of any exculpatory or indemnity provisions in the Agreement shall construed in favor of the party being protected and shall survive the termination and completion of the Agreement. The judicial doctrine that provides that documents or exculpatory provisions are to be construed against the drafter or provider of such documents or provisions does not apply to this Agreement, as each party has had a reasonable opportunity to obtain and consult with their own legal counsel regarding this Agreement. 2. Contractor shall perform the Work as an independent contractor and shall not be considered an employee of the City for any purpose whatsoever, including, but not limited to, entitlement to City employee benefits. Contractor hereby expressly waives any claim or entitlement to such benefits. Furthermore, this Agreement is not intended to create, nor should it be construed as creating, a partnership, association, joint venture, or trust. 3. The waiver or failure of either party to exercise, in any respect, any right provided for in this Agreement shall not be deemed a waiver of any further right under this Agreement. 4. If any provision of this Agreement is invalid, illegal, or unenforceable under any applicable statute, court decision, or rule of law, it is to that extent to be deemed omitted. The remainder of the Agreement shall be valid and enforceable to the maximum extent possible. 5. No right or remedy granted herein or reserved to either party is exclusive of any other right or remedy provided or permitted by law or equity, but each shall be cumulative of every other right or remedy given hereunder. The waiver or failure of either party to exercise, in any respect, any right provided for in this Agreement shall not be deemed a waiver of any further right under this Agreement. 6. This Agreement is subject to the appropriation of public funds by the City in its budget adopted for any fiscal year for the specific purpose of making payments pursuant to this Agreement for that fiscal year. The obligation of the City pursuant to this Agreement in any fiscal year for which this Agreement is in effect shall constitute a current expense of the City for that fiscal year only, and shall not constitute an indebtedness of the City of any monies other than those lawfully appropriated in any fiscal year. In the event of non-appropriation of funds in any fiscal year to make payments pursuant to this Agreement, this Agreement may be terminated without any liability to either party. 7. Compliance with Texas Accessibility Standards and ADA. Contractor shall construct the Work in compliance with the Texas Accessibility Standards (TAS) issued by the Texas Department of Licensing and Regulation, under the Architectural Barriers Act, Article 9102, Texas Civil Statutes. The TAS establishes minimum accessibility requirements to be consistent with minimum accessibility requirements of the Americans with Disabilities Act (P.L. 101-336). 8. Inspection of Books and Records; Audit. The Contractor shall keep a complete and accurate record to document its work on the Project and to expedite any audit that might be conducted by the City. The Contractor shall maintain records sufficient to document that funds provided under the Agreement were expended only for eligible costs that were incurred in accordance with all applicable state and local laws, rules, policies, and procedures, and in accordance with all applicable provisions of this Agreement. The requirements of Chapter 552, Texas Government Code, may apply to this Contract and the Contractor agrees that this Contract can be terminated if the Contractor knowingly or intentionally fails to comply with a requirement of that subchapter. Upon request by the Owner, the Contractor shall promptly provide to the Owner any Contracting Information related to the Contract that is in the custody or possession of the Contractor; and on completion of the contract, provide at no cost to the Owner all Contract ing Information related to the Contract that is in the custody or possession of the Contractor. 9. The City may conduct an audit or investigation of any entity receiving funds from the City directly under this Agreement, or indirectly through the Contractor or a subcontractor, materialman, or supplier. Acceptance of funds directly under the Agreement, or indirectly through the Contractor or a subcontractor, materialman, or supplier under this Agreement acts as acceptance of the authority of the City to conduct an audit or investigation in connection with those funds. An entity that is the subject of an audit or investigation must provide the City with access to any information the City considers relevant to the investigation or audit without delay. 10. To the extent required by Texas law, the Contractor verifies that: (1) It does not have a practice, policy, guidance, or directive that discriminates against a firearm entity or firearm trade association, as defined in Texas Government Code § 2274.001, and that it will not during the term of the Contract discriminate against a firearm entity or firearm trade association; (2) It does not “boycott Israel” as that term is defined in Texas Government Code § 808.001 and 2271.001, and it will not boycott Israel during the term of the Contract; (3) It does not “boycott energy companies,” as those terms are defined in Texas Government Code §§ 809.001 and 2276.001, and it will not boycott energy companies during the term of the Contract; (4) It does not engage in scrutinized business operations with Sudan, Iran, or designated foreign terrorist organization as defined in Texas Government Code, Chapter 2270; and (5) It is not owned by or the majority of its stock or other ownership interest is held or controlled by i) individuals who are citizens of China, Iran, North Korea, Russia, or a designated country as defined by Texas Government Code § 2275.0101; or ii) a company or other entity, including a governmental entity, that is owned or controlled by citizens of or is directly controlled by the government of China, Iran, North Korea, Russia, or a designated country; nor is it headquartered in China, Iran, North Korea, Russia, or a designated country. 11. Waiver of Attorney’s Fees. The parties expressly covenant and agree that in the event of any litigation arising between the parties to this Agreement, each party shall be solely responsible for payment of its attorneys and that in no event shall either party be responsible for the other party’s attorneys’ fees regardless of the outcome of the litigation. 12. This Agreement may be executed in counterparts, each of which shall be deemed an original and constitute one and the same instrument. 13. This Agreement, together with all exhibits referenced herein, embodies the complete agreement of the parties hereto, superseding all oral or written previous and contemporary agreements between the parties and relating to matters in this Agreement. {Signatures on following page} [REMAINDER OF PAGE LEFT BLANK] IN WITNESS WHEREOF, the Parties hereto have accepted the terms of this Agreement and caused this Agreement, including the exhibits attached hereto and incorporated herein by reference for all purposes, to be executed as of the dates set forth below. CITY OF SOUTHLAKE, TEXAS Shawn McCaskill, Mayor Date: ATTEST: Amy Shelley, City Secretary NOTIFICATION SYSTEMS OF AMERICA, INC.: By:__________________________ Name:________________________ Title:_________________________ Date:_________________________ STATE OF ___________ ) ) COUNTY OF __________ ) This instrument was acknowledged before me on the ____ day of _____________, 2025, by , the of NOTIFICATION SYSTEMS OF AMERICA, INC., on behalf of said company. __________________________________ Notary Public, State of EXHIBIT A [STANDARD QUOTATION/PROPOSAL DATED NOVEMBER 4, 2025] NOTIFICATION SYSTEMS OF AMERICA, Inc License B-09589 ACR 1745 PO Box 1385, Grapevine, Texas 76099 (817) 442-5442 jonellis@nsainc.pro Page 1 of 3 STANDARD QUOTATION November 4, 2025 To: Mona Hassan – City of Southlake From: Jonathan Ellis NSA, Inc. wishes to provide you with the following quote, based on the exclusions or qualifications listed below: Project Name: MSCPSTT Access Control and Intercom Quote Location: Southlake, Texas Proposal #: 04162025MSCPSTT rev1025 SCOPE OF WORK Provide and install the following Equipment: NSA proposes to provide the following material and labor for the installation of the systems and equipment listed as shown and detailed in the contract documents. The bid documents and specifications used for this quote are all dated 3/28/2025. • Provide and install the access control system as per the TS sheets and door hardware information provided. The access control hardware provided by this quote includes control panels, reader boards, enclosures, power supplies and cabling from the panel to the door. The installation provided by this quote includes the installation of the NSA provided access control equipment plus a coordinated connection to the electrified door hardware (Lock, readers, REX and DPS) that is provided by the door hardware company. (Exclusion) The network cabling, network switches and door hardware listed on the hardware schedules including lock hardware, is provided and installed by others. • Provide and install the video intercom system components necessary for the proper installation and operation of the gate intercoms. The components provided by this quote include video intercoms, base station, pedestals, surge protection and power cables. (Exclusion) The network cabling and network switches are provided by others per the project documents. • Provide and install a panic button system for the admin front office area. The system includes the alarm panel, 3 wireless desk panic buttons and one custom wall mount panic with cover. • Provide and install three (3) window passthrough intercom devices. These devices are designed to fit the scheduled window openings and have a Level 3 bullet resistance rating • Performance, payment and maintenance bonds for the project installation and warranty as it relates to NSA provided labor and materials Admin Building: $46,045.00 Admin Panic: 994.00 Bonds: 4,500.00 Tower Building: $30,090.00 Service Building: $33,590.00 $115,219.00 Add Alt. 1: Admin PT Intercom: $6,200.00 No Sales Tax Included>> *Each pricing sub item includes the labor necessary for that item. EXCLUSIONS OR QUALIFICATIONS NOTIFICATION SYSTEMS OF AMERICA, Inc License B-09589 ACR 1745 PO Box 1385, Grapevine, Texas 76099 (817) 442-5442 jonellis@nsainc.pro Page 2 of 3 Work to be performed by NSA Inc. 1. Provide low voltage wiring terminations and mounting of the equipment for the proposed systems as shown only in the contract documents and/or specifications. 2. Provide all equipment or equals of equipment as shown on the bid documents. Any work or equipment not included in the above-mentioned bid documents will require a change order to perform. 3. Provide certificate of installation, O&M Manual(s) and as built drawings as specified. 4. All work is based on work being performed during NSA, Inc.’s normal business hours. Work to be performed by an Electrical Contractor. 1. Any 120vac for equipment power, backup power (UPS) and conduits required for installation . Items provided by other Contractors or the Owner. 1. All door hardware (Electrified and Non-Electric) and any door hardware power supplies as listed in the contract documents are provided and installed by others. The current hardware schedule indicates that the planned electric hardware also has integrated Reader, REX and DPS. 2. Network cables, switches, ports and patch panels are provided, installed and tested by others. What is not included… 1. Price does not include any required tax. 2. Price does not include any required patching or painting. <<<None Expected>>> 3. Changes in scope of work or design from the proposed project plan that increases the amount of labor or material will require a change order. Pricing of Proposed System NSA shall provide the material and labor necessary for the complete installation of the proposed system including the specified warranty for the sum of $115,219.00 If approved for purchase, please complete the following information and email this document back to NSA for processing. Thank you! Payment Terms - Our price is subject to the understanding that we shall be entitled to prompt monthly payment for the value of material delivered and work installed, that our payments shall be conditioned on owner payment only to the extent of monies withheld by the owner due to some deficiency on our part, that our retainage shall not exceed 10% nor the percentage of retainage currently being held by the owner with respect to our work and that our final payment shall be due upon acceptance of our work. This proposal pricing is valid for at least Thirty (30) days. Should the approval and or funding require more than 30 days, the pricing may be extended by NSA in most cases. Approval: Acceptance of Signature Date Print Name Title/Position Purchase Order (If applicable) NOTIFICATION SYSTEMS OF AMERICA, Inc License B-09589 ACR 1745 PO Box 1385, Grapevine, Texas 76099 (817) 442-5442 jonellis@nsainc.pro Page 3 of 3 Card Reader and Intercom System Device Sheet Admin Building Qty. Type Item Description 1 Access PW7K1ICE ProWatch controller w/ single reader port 8 Access PW7K1R2 ProWatch 2 door board 4 Access 40KTKS-00-000000 Keypad Reader 2 Access Trove2Hw2 Access control enclosure 1 Access AL400ULXB2 Access power supply 2 Access ACM8 Power controller board 4 Intercom IX-EA Weather Resistant IP Video Door Station 1 Intercom IX-MV7 IP Video Master Station 7" Touchscreen 2 Intercom PD114B w/ PCH196 Dual height pedestal and housing 2 Surge TBD Surge Protection 1 Switch ESULS4-L1-B Industrial POE Switch for Intercoms 3 Wire 32965002 Plenum Composite Access Cable 500' 1 Wire 41575008 18/4 stranded direct burial cable 500' 1 Wire 51105008 Cat6 direct burial cable 500' Add Alternate #1 3 PTI SC-100 Pass through Intercom, Level 3, w/ window ring Tower Building Qty. Type Item Description 1 Access PW7K1ICE ProWatch controller w/ single reader port 7 Access PW7K1R2 ProWatch 2 door board 2 Access Trove2Hw2 Access control enclosure 2 Access AL400ULXB2 Access power supply 2 Access ACM8 Power controller board 2 Wire 32965002 Plenum Composite Access Cable 500' Service Building Qty. Type Item Description 1 Access PW7K1ICE ProWatch controller w/ single reader port 8 Access PW7K1R2 ProWatch 2 door board 2 Access Trove2Hw2 Access control enclosure 2 Access AL400ULXB2 Access power supply 2 Access ACM8 Power controller board 4 Wire 32965002 Plenum Composite Access Cable 500' 1. Door hardware, electric locks, card readers and Special lock power supplies provided and installed by others ( Div. 8) 2. Control equipment, control wire, programming and associated labor by NSA 3. 120vac, conduit and back boxes by others