2012-11-12 Meeting Report (FY2013 Project Priority Lists - Sidewalks and Wayfinding Signage)SPIN MEETING REPORT
CASE NO. N/A
PROJECT NAME: FY2013 Project Priority Lists for 1) Sidewalk Construction and
2) Wayfinding Signage Installation
SPIN DISTRICT: Citywide
MEETING DATE: November 12, 2012: 6:00 PM
MEETING LOCATION: 1400 MAIN STREET, SOUTHLAKE, TEXAS
CITY COUNCIL CHAMBERS
TOTAL ATTENDANCE: Sixteen (16)
SPIN REPRESENTATIVE(S) PRESENT: Jeff Medici (# 3) and Vic Awtry (# 7)
STAFF PRESENTING: Lorrie Fletcher, Planner I; Matthew Jones, Planner I
STAFF PRESENT: Steve Anderson, Civil Engineer
STAFF CONTACT: Lorrie Fletcher, (817)748-8069; lfletcher@ci.southlake.tx.us
EXECUTIVE SUMMARY
Details ofSidewalk Presentation:
City staff presented and requested feedback on the priority list for FY13 citywide sidewalk
construction projects. These projects will utilize general funds budgeted for sidewalk
construction. This year, staff recommended eight possible locations for sidewalk
construction with an approved budget of $400,000:
Est. CostLocationConsiderationsEst. Linear Feet
East side of North Carroll Ave1 ROW; topography 1,010 $68,000fromSH114toHighland
East side of North Carroll Ave
2 from Federal north to DPS 650 $44,000
headquarters
North side of Johnson Road,
filling in twogaps (segments 92 575 + 623 = 3 93) that will create connectivity Trees; ROW $80,0001,198fromRoyalLane, east toFM
1938.
West or east side ofShady Oaks ROW; location of
Drive at point of existing sidewalk being4 460 $31,000sidewalkoneastsideatPark, evaluated due to
north toLove Henry Ct. visibility at park
Plan 3foot walk
connection to
Look atrevision possibility for existing onFM
5 SW corner of FM1709 atCentral 1709 and a 160 $8,000
Avenue retaining wall;
crosswalk on south
side of FM1709
West side ofCarroll Ave from La Future road
6 Paloma south toconnect to construction on 1,020 $68,000
existing sidewalk at OldUnion Carroll; ROW
North side ofContinental from PedestrianexistingsidewalkatSouth7easement; Channel 2,368 $166,000HollowDreasttoCrookedLnCrossingsegment203)
West side of Ridgecrest from ROW; topography;
north terminus of North Park to drainage issues; 8 2,527 $200,000approx. 200 feet north of Oak park trail connection
Pointe Ln w/pedestrian bridge
665,000 + TOTAL 9,393 ROW costs
The total estimated cost of the FY2013 priority list is greater than the $400,000 in funds
budgeted by the City Council. There are several noted considerations such as right of way
acquisitions, which are an unknown cost variable. Sidewalk construction projects can also
result in lower than estimated costs which can lend flexibility. The recommendations you see
listed in the table above will continue to be reviewed by city staff and a final list will be
presented to City Council at their December 4, 2012 work session.
QUESTIONS / COMMENTS (Sidewalks)
There is a gap along Carroll, north of Estes Park. Have you talked to them about
putting sidewalk there?
Yes, it has been discussed. The city is working on options in that location. Î
Johnson Elementary has no sidewalk except where the doors open up. It can be a
safety issue to someone passing by jogging or biking.
Would the city consider putting in a temporary walkway along the undeveloped
property at the southeast corner of Carroll and SH 114?
Permanent sidewalk is required with development of that property. IamÎ
unsure if the city has ever considered temporary walkways on private
property.
We are in favor of a sidewalk along Ridgecrest. It is heavily used; it would be good
for North Park; it should extend all the way to Dove; and, double check your
After double checking the distance, the 2,527 is the measurement from Dove. Î
The measurement from the park is a little over 1,400 linear feet.
Iam in favor of a sidewalk along Ridgecrest. Would like to see it go all the way to
Dove or allow access through the park.
We are concerned about accidents along Ridgecrest.
We are in favor of sidewalk along North Carroll. Someone fenced their property all
the way to the street so you have to walk in the street to get around it.
I am on the Parks Board and a working on the 2030 Mobility Plan.. the neighbors
fought to keep the gate locked at the park because they were concerned too many
parents would use it as a drop off point for their kids playing lacrosse. Iam glad to
see the priorities that get kids to schools.
I am delighted to see the piece on Carroll connecting to DPS. You said that 1709 will
be completed from one end to the other. There is a gap remaining at Foxborough
after the decel lane was done. Will that be completed?
looked at this year?
Yes. They currently in design and pending construction. We are looking atÎ
new segments for the next fiscal year budget.
We live in Loch Meadow Estates. The Ridgecrest sidewalk would be great and
beneficial.
Im happy to see Carroll on the priority list. Connecting to Town Square makes
sense.
Details ofWayfinding Signage Presentation:
Staff presented some background regarding the Wayfinding Signage Installation Program
which was adopted by City Council April 2011. The plan provides for locations and
messages for 60-plus signs throughout the city as well as a priority list for sign funding and
installation. A list of 15 signs/locations was presented:
Location Description
Eastbound FM1709 at N. Peytoneville Ave intersection; SWC
Eastbound FM 1709 at White Chapel Blvd; SWC
South/Westbound Gateway Dr. at FM1709 intersection; NWC
Westbound FM 1709 at Kimball Ave intersection; NEC
Westbound FM 1709 at White Chapel Blvd intersection; NEC
Westbound FM 1709 at N. Peytonville Ave intersection; NEC
Eastbound frontage road SH 114 at N. Carroll Ave; SWC
Eastbound frontage road SH 114 between N. Carroll Ave &
Reserve St.
Eastbound frontage road SH 114 at N. Kimball Ave; SWC
Southbound N. Kimball Ave at FM1709 intersection; NWC
Northbound Brumlow Ave at E. Continental Blvd; SEC
Northbound N. Carroll Ave at FM1709 intersection; SEC
Westbound E. Dove Rd at N. Carroll Ave, NEC
Eastbound E. Continental Blvd at Carroll/Brumlow; SWC
QUESTIONS / COMMENTS (Wayfinding)
We would like to see mile marker signs for runners like they have in Keller.
Mile markers are a part of the Southlake 2030 plan. Î
Ilike the wayfinding signs but why are they all city-
we want to use these for private entities?
The hotel signs not only serve our residents but also serve visitors. The hotelÎ
occupancy tax helps fund the wayfinding signs which in turn enhance tourism
for the city.
SPIN Meeting Reports aregeneral observations of SPINMeetings byCity staffand SPINRepresentatives. The
report is neither verbatim norofficialmeeting minutes; rather itservesto inform elected and appointed officials,
City staff, and thepublic of theissues andquestions raisedby residents and the general responses made.
Responses assummarized inthisreportshould notbetakenasguarantees bytheapplicant. Interested parties
are strongly encouraged tofollowthecasethrough thePlanning and Zoning Commission and finalactionbyCity
Council.