2012-01-23 Meeting Report (Bicentennial Park)SPIN MEETING REPORT
CASE NO. N/A
PROJECT NAME: Bicentennial Park new playground
SPIN DISTRICT: Citywide
MEETING DATE: January 23, 2012; 6:00 PM
MEETING LOCATION: 1400 Main Street, Southlake, TX
Training Rooms 3A 3B
TOTAL ATTENDANCE: Nineteen (19)
SPIN REPRESENTATIVE(S) PRESENT: Ron Evans (# 10); Vic Awtry (# 7)
CONSULTANT(S) PRESENTING: Susan Goltsman, MIG; et al SRA (3)
STAFF PRESENT: Chris Tribble, Director of Community Services; Candice Edmondson,
Assistant to the Director of Community Services; Peter Kao, Construction Manager for
Community Services; and Lorrie Fletcher, Planner I
STAFF CONTACT: Chris Tribble, Director of Community Services (817)748-8021;
ctribble@ci.southlake.tx.us
EXECUTIVE SUMMARY
Property Situation
The property is located at Bicentennial Park - 300 W. Southlake Boulevard.
Development Details
The City of Southlake is proposing to replace the existing ½ acre playground area with a
1 ½ acre playground. The play area concept plan includes a sand & water play plaza,
dragon climbing area, toddler play area and picnic area.
The following plans were presented at SPIN:
QUESTIONS / CONCERNS
Does most of the shade come from the trees in the play areas?
YesÎ
If the trees are going to be planted duri-20 years to
grow?
Yes, we will plan to put in some temporary shade areas; also, there are someÎ
existing mature trees that will stay.
Will the slides be plastic or concrete?
Concrete is preferred because of the heat. Î
Do they slide well?
Yes, when polishedÎ
What age group can use that slide?
If you can get up there, you can slideÎ
Will there be any age restriction signage?
No, the equipment is all sized proportionate to the intended age that will use it; itÎ
is tested and safe.
Will this new playground area cause a need to increase city staff?
NoÎ
What about the old play structures?
They will be replaced; they are 16 ½ years oldÎ
What is the timing for this project?
At least a year; possibly sooner if the existing equipment becomes a safety issue. Î
Are concrete slides new?
No, we have been using concrete slides for yearsÎ
Is there a filter system for the water features
YesÎ
Is the water clean?
Yes, the water comes in clean then will eventually flow to the pond and be usedÎ
for irrigation.
Is the roller rink staying?
Yes, for nowÎ
Are there going to be swings?
Yes, all different kindsÎ
Why arent there any see saws or merry-go-rounds anymore?
Safety issuesÎ
What about a zip line?
We dont currently have one but could possible work it into the plan; we wouldÎ
like to work in some of the existing elements
What is the cost?
It is budgeted at $1 million / $9.8 million for Phase 2Î
SPIN Meeting Reports are general observations of SPIN Meetings by City staff andSPIN Representatives. The report is neither
verbatim nor official meeting minutes; rather it serves toinform elected and appointed officials, Citystaff, and thepublic oftheissues
and questions raised by residents and thegeneral responses made. Responses as summarized in thisreport should not be taken