Item 6B - Site Plan, Elevations, and ExhibitsPage is too large to OCR.
Page is too large to OCR.
Page is too large to OCR.
Page is too large to OCR.
Page is too large to OCR.
Page is too large to OCR.
Page is too large to OCR.
Page is too large to OCR.
Page is too large to OCR.
0
0
0
5/8/25
POINT BY POINT CALCULATIONS
Address
PROJECT
DESIGNED
RC
CHECKED
EX
��—\//Project
Pralec[-specific repuirements [o ensure compliance, Pertormance. antl efficiency. The solution is
M
A
tailored to meet functional and technical nestle while optimizing ........ iformhy, and energy efficiency.
PRO. OFFICE BUILDING
w
DATE
SCALE
ThistlocumentisintentledforinternalreviewantlealuationAnymodifications,reproduc[ion,ore#ernal
1420 Kirkwood Blvd
5/7/2025
NTS
N
N
Marathon Lighting
LED LIGHTING UPGRADE
w
Y
dietributionrequiteprforapprovalfromMarathonLightmg.Theli9htin9tlesi9nantlassociatedtlocumentatian
Southlake, Texas 76092
REVISION
PAGE
remain confid—mlantl to mthe tantl are—icted to h, mlwdeda li-ion.
proprie ry projec pp
CONCEPT REV 1
Page 1 of 5
y
POINT BY POINT CALCULATIONS
This lighting design i, de loped in ..... d,,,, With md-b- p,,,t,,w, IESNA M,,d,,d,, and
project -specific repuirements t. .—m ...pli.m., p.d.—m., wd efficiency. Th. ..I.m i.
tailored,tailoredto meet functional "d 1-h"illl 111d, Will optimizing 111—i ........ 11-1y, "d energyefficiency.
Thi, d Marathon
Thi, d...... I i, ml-�df,, i� ... I lWim Ild �1-i— My ,difl—i ...... p,,d-ti-, , --1
lllzo�Lighting
distribution
.... h, prior approval from Marathon Lighting. , lighting d-ig" Ild dl,lllllltil" i, conftlenti,l antl pmpd—e to the p,,j,,l antl a ,, —il" to its ml-d" application.
Project Address
1420 Kirkwood Blvd
Southlake,Texas 76092
PROJECT
PRO. OFFICE BUILDING
LED LIGHTING UPGRADE
RC
5/7/2025
CONCEPT REV 1
5/8/25
NTS
N
Page 2 of 6
w
RENDER -- FALSE COLOR
5/8/25
•
I Marathon Lighting
This lighting design i, developed in accordance With industry b- p,,,t,,w, IESNA M,,d,,d,, and
P,.j-t-.:ific to ensure compliance, p..., d efficiency. The solution is
tailoredi - functional and —W-1 111d, Mill optimizing illuminance, -lf—hy, and energy efficiency.
This d,,,,,M i, intended f,, internal hwim and evaluation. Any modifications,reproduction, or — ... I
distribution
require prior approval from Marathon Lighting. The lighting design and I—lil d-11"Iti,
i, ,,fd,,Ii,l antl pmpdlt,ry to the p,,j,,l antl are —illd to its intended application.
RENDER -- RGB
Project Address
1420 Kirkwood Blvd
Southlake, Texas 76092
PROJECT
PRO. OFFICE BUILDING
LED LIGHTING UPGRADE
RC
5/7/2025
EX
NTS
CONCEPT REV 1
Page 3 of 6
RENDER -- FALSE COLOR
5/8/25
Am"81-r1allbou Lighting
This lighting design is developed in ....,d—. with industry b- practices, lESNA—d.,d.d
project -specific t, performance,.. defficiency. The dwim i,
tailoredt - functional and —W-1 111d, Mill optimizing illuminance, -lf—hy, and energy efficiency.
This d,,,,,M i, intended f,, internal 1wim and evaluation. Any modifications,reproduction, or — ... I
distribution
.... i,, prior approval from Marathon Lighting. The lighting design and I—lil d-11"Iti,
i, ,,fd,,Ii,l antl pmpdlt,ry to the p,,j,,l antl are —illd to its intended application.
RENDER -- RGB
Project Address
1420 Kirkwood Blvd
Southlake,Texas 76092
PROJECT
PRO. OFFICE BUILDING
LED LIGHTING UPGRADE
RC
5/7/2025
Ex
NTS
CONCEPT REV 1
Page 4 of 6
Page is too large to OCR.