Loading...
Item 4F-4I - A133-2019 Exhibit A-06.05.25 with exhibitsAIA Document A131- 2019 Exhibit A Guaranteed Maximum Price Amendment This Amendment dated the 17th day of June in the year 2025, is incorporated into the accompanying AIA Document A133T"4--2019 Standard Form of Agreement Between Owner and Construction Manager as ADDITIONS AND DELETIONS: Constructor where the basis of payment is the Cost of the Work Plus a Fee The author of this document may with a Guaranteed Maximum Price dated the 19th day of May in the year have revised the text of the original 2025 (the "Agreement") AIA standard form. An Additions (In words, indicate day, month, and year.) and Deletions Report that notes revisions to the standard form text for the following PROJECT: is available from the author and (Name and address or location) should be reviewed. A vertical line in the left margin of this document City of Southlake ty indicates where the author has Municipal Service Center & Public Training Tower Project added to or deleted from the Southlake, Texas original AIA text. THE OWNER: This document has important legal (Name, legal status, and address) consequences. Consultation with an attorney is encouraged with City of Southlake respect to its completion or 1400 Main Street, Suite 270 modification. Southlake, Texas 76092 AIA Document A201 TM-2017, General Conditions of the Contract THE CONSTRUCTION MANAGER: for Construction, is adopted in this (Name, legal status, and address) document by reference. Do not use with other general conditions Thos. S. Byrne, Inc. unless this document is modified. 551 Berry Street Fort Worth, Texas 76110 TABLE OF ARTICLES A.1 GUARANTEED MAXIMUM PRICE A.2 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION A.3 INFORMATION UPON WHICH AMENDMENT IS BASED A.4 CONSTRUCTION MANAGER'S CONSULTANTS, CONTRACTORS, DESIGN PROFESSIONALS, AND SUPPLIERS ARTICLE A.1 GUARANTEED MAXIMUM PRICE § A.1.1 Guaranteed Maximum Price Pursuant to Section 3.2.6 of the Agreement, the Owner and Construction Manager hereby amend the Agreement to establish a Guaranteed Maximum Price. As agreed by the Owner and Construction Manager, the Guaranteed Maximum Price is an amount that the Contract Sum shall not exceed. The Contract Sum consists of the Construction Manager's Fee plus the Cost of the Work, as that term is defined in Article 6 of the Agreement. AIA Document A133 — 2019 Exhibit A. Copyright @ 1991, 2003, 2009, and 2019. All rights reserved. 'The American Institute of Architects," "American Institute of Architects," "AIA," the AIA Logo, and "AIA Contract Documents" are trademarks of The American Institute of Architects. This document was produced at 10:53:37 CDT on 06/05/2025 under Subscription No.20250129724 which expires on 05/21/2026, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com. User Notes: (6841bce805351aee7a4d702a) § A.1.1.1 The Contract Sum is guaranteed by the Construction Manager not to exceed Twenty -Six Million, One Hundred Forty -Five Thousand, Eighty Two Dollars and Zero Cents ($ 26,145,082.00), subject to additions and deductions by Change Order as provided in the Contract Documents. § A.1.1.2 Itemized Statement of the Guaranteed Maximum Price. Provided below is an itemized statement of the Guaranteed Maximum Price organized by trade categories, including allowances; the Construction Manager's contingency; alternates; the Construction Manager's Fee; and other items that comprise the Guaranteed Maximum Price as defined in Section 3.2.1 of the Agreement. (Provide itemized statement below or reference an attachment.) See attached Exhibit A.1. § A.1.1.3 The Construction Manager's Fee is set forth in Section 6.1.2 of the Agreement. § A.1.1.4 The method of adjustment of the Construction Manager's Fee for changes in the Work is set forth in Section 6.1.3 of the Agreement. § A.1.1.5 Alternates § A.1.1.5.1 Alternates, if any, included in the Guaranteed Maximum Price: Item Price See attached Exhibit A.2. § A.1.1.5.2 Subject to the conditions noted below, the following alternates may be accepted by the Owner following execution of this Exhibit A. Upon acceptance, the Owner shall issue a Modification to the Agreement. (Insert below each alternate and the conditions that must be met for the Owner to accept the alternate) Item Price Conditions for Acceptance § A.1.1.6 Unit prices, if any: (Identify the item and state the unitprice and quantity limitations, if any, to which the unitprice will be applicable) Item Units and Limitations Price per Unit ($0.00) Not Applicable. ARTICLE A.2 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION § A.2.1 The date of commencement of the Work shall be: (Check one of the following boxes) [ ] The date of execution of this Amendment. [ X] Established as follows: (Insert a date or a means to determine the date of commencement of the Work.) The date of commencement shall be either when a Notice to Proceed with Construction is issued or when a valid permit is issued; whichever occurs later. If a date of commencement of the Work is not selected, then the date of commencement shall be the date of execution of this Amendment. § A.2.2 Unless otherwise provided, the Contract Time is the period of time, including authorized adjustments, allotted in the Contract Documents for Substantial Completion of the Work. The Contract Time shall be measured from the date of commencement of the Work. § A.2.3 Substantial Completion AIA Document A133 — 2019 Exhibit A. Copyright @ 1991, 2003, 2009, and 2019. All rights reserved. 'The American Institute of Architects," "American Institute of Architects," "AIA," the AIA Logo, and "AIA Contract Documents" are trademarks of The American Institute of Architects. This document was produced at 10:53:37 2 CDT on 06/05/2025 under Subscription No.20250129724 which expires on 05/21/2026, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com. User Notes: (6841bce805351aee7a4d702a) § A.2.3.1 Subject to adjustments of the Contract Time as provided in the Contract Documents, the Construction Manager shall achieve Substantial Completion of the entire Work: (Check one of the following boxes and complete the necessary information) [ ] Not later than ( ) calendar days from the date of commencement of the Work. [ X ] By the following date: Substantial Completion — 455 Calendar days after Date of Commencement / Final Completion — 485 Calendar days after Date of Commencement as shown in attached Exhibit A.3 § A.2.3.2 Subject to adjustments of the Contract Time as provided in the Contract Documents, if portions of the Work are to be completed prior to Substantial Completion of the entire Work, the Construction Manager shall achieve Substantial Completion of such portions by the following dates: Portion of Work Substantial Completion Date § A.2.3.3 If the Construction Manager fails to achieve Substantial Completion as provided in this Section A.2.3, liquidated damages, if any, shall be assessed as set forth in Section 6.1.6 of the Agreement. ARTICLE A.3 INFORMATION UPON WHICH AMENDMENT IS BASED § A.3.1 The Guaranteed Maximum Price and Contract Time set forth in this Amendment are based on the Contract Documents and the following: § A.3.1.1 The following Supplementary and other Conditions of the Contract: Document Title Date Pages Not Applicable § A.3.1.2 The following Specifications: (Either list the Specifications here, or refer to an exhibit attached to this Amendment.) See attached Exhibit A.4. § A.3.1.3 The following Drawings: (Either list the Drawings here, or refer to an exhibit attached to this Amendment.) See attached Exhibit A.4. § A.3.1.4 The Sustainability Plan, if any: (If the Owner identified a Sustainable Objective in the Owner's Criteria, identify the document or documents that comprise the Sustainability Plan by title, date and number of pages, and include other identifying information. The Sustainability Plan identifies and describes the Sustainable Objective; the targeted Sustainable Measures; implementation strategies selected to achieve the Sustainable Measures; the Owner's and Construction Manager's roles and responsibilities associated with achieving the Sustainable Measures; the specific details about design reviews, testing or metrics to verify achievement of each Sustainable Measure; and the Sustainability Documentation required for the Project, as those terms are defined in Exhibit C to the Agreement.) Title Date Pages Not Applicable Other identifying information: AIA Document A133 — 2019 Exhibit A. Copyright @ 1991, 2003, 2009, and 2019. All rights reserved. "The American Institute of Architects," "American Institute of Architects," "AIA," the AIA Logo, and "AIA Contract Documents" are trademarks of The American Institute of Architects. This document was produced at 10:53:37 3 CDT on 06/05/2025 under Subscription No.20250129724 which expires on 05/21/2026, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com. User Notes: (6841bce805351aee7a4d702a) § A.3.1.5 Allowances, if any, included in the Guaranteed Maximum Price: (Identify each allowance) Item Price See attached Exhibit A.5. § A.3.1.6 Assumptions and clarifications, if any, upon which the Guaranteed Maximum Price is based: (Identify each assumption and clarification) See attached Exhibit A.6. § A.3.1.7 The Guaranteed Maximum Price is based upon the following other documents and information: (List any other documents or information here, or refer to an exhibit attached to this Amendment.) Not Applicable ARTICLE A.4 CONSTRUCTION MANAGER'S CONSULTANTS, CONTRACTORS, DESIGN PROFESSIONALS, AN D SUPPLIERS § A.4.1 The Construction Manager shall retain the consultants, contractors, design professionals, and suppliers, identified below: (List name, discipline, address, and other information) Not Applicable This Amendment to the Agreement entered into as of the day and year first written above. OWNER (Signature) BY: Shawn McCaskill - Mayor (Printed name and title) CONSTRUCTION MANAGER (Signature) BY: Paul Avila - Chief Financial Officer (Printed name and title) AIA Document A133 — 2019 Exhibit A. Copyright @ 1991, 2003, 2009, and 2019. All rights reserved. 'The American Institute of Architects," "American Institute of Architects," "AIA," the AIA Logo, and "AIA Contract Documents" are trademarks of The American Institute of Architects. This document was produced at 10:53:37 4 CDT on 06/05/2025 under Subscription No.20250129724 which expires on 05/21/2026, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com. User Notes: (6841bce805351aee7a4d702a) Additions and Deletions Report for AIA® Document A 13Y — 2019 Exhibit A This Additions and Deletions Report, as defined on page 1 of the associated document, reproduces below all text the author has added to the standard form AIA document in order to complete it, as well as any text the author may have added to or deleted from the original AIA text. Added text is shown underlined. Deleted text is indicated with a horizontal line through the original AIA text. Note: This Additions and Deletions Report is provided for information purposes only and is not incorporated into or constitute any part of the associated AIA document. This Additions and Deletions Report and its associated document were generated simultaneously by AIA software at 10:53:37 CDT on 06/05/2025. Changes to original AIA text PAGE 2 § A.1.1.1 The Contract Sum is guaranteed by the Construction Manager not to exceed Twenty -Six Million, One Hundred Forty -Five Thousand, Eighty Two Dollars and Zero Cents ($ 26,145,082.00), subject to additions and deductions by Change Order as provided in the Contract Documents. [- X ] Established as follows: PAGE 3 [ X ] By the following date: Substantial Completion — 455 Calendar days after Date of Commencement / Final Completion — 485 Calendar days after Date of Commencement as shown in attached Exhibit A.3 SeetiGn title Sate Rages der Witte Sate Variable Information PAGE 1 This Amendment dated the 17th day of June in the year 2025, is incorporated into the accompanying AIA Document A133T' —2019, Standard Form of Agreement Between Owner and Construction Manager as Constructor where the basis of payment is the Cost of the Work Plus a Fee with a Guaranteed Maximum Price dated the 19th day of May in the year 2025 (the "Agreement") City of Southlake Municipal Service Center & Public Training Tower Project Southlake, Texas City of Southlake 1400 Main Street, Suite 270 Additions and Deletions Report for AIA Document A133 — 2019 Exhibit A. Copyright @ 1991, 2003, 2009, and 2019. All rights reserved. 'The American Institute of Architects," "American Institute of Architects," "AIA," the AIA Logo, and "AIA Contract Documents" are trademarks of The American Institute of Architects. This document was produced at 10:53:37 CDT on 06/05/2025 under Subscription No.20250129724 which expires on 05/21/2026, is not for resale, is licensed for one- time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com. User Notes: (6841bce805351aee7a4d702a) Southlake, Texas 76092 Thos. S. Byrne, Inc. 551 Berry Street Fort Worth, Texas 76110 PAGE 2 See attached Exhibit A.1. Item See attached Exhibit A.2. Item Not Applicable. [ - X ] Established as follows: PAGE 3 Price Units and Limitations Price per Unit ($0.00) The date of commencement shall be either when a Notice to Proceed with Construction is issued or when a valid permit is issued: whichever occurs later. [ X ] By the following date: Substantial Completion — 455 Calendar days after Date of Commencement / Final Completion — 485 Calendar days after Date of Commencement as shown in attached Exhibit A.3 Document Title Date Pages Not Applicable See attached Exhibit A.4. See attached Exhibit A.4. Title Date Pages Not Applicable PAGE 4 Item Price See attached Exhibit A.5. See attached Exhibit A.6. Not Applicable Not Applicable Additions and Deletions Report for AIA Document A133 — 2019 Exhibit A. Copyright @ 1991, 2003, 2009, and 2019. All rights reserved. 'The American Institute of Architects," "American Institute of Architects," "AIA," the AIA Logo, and "AIA Contract Documents" are trademarks of The American Institute of Architects. This 2 document was produced at 10:53:37 CDT on 06/05/2025 under Subscription No.20250129724 which expires on 05/21/2026, is not for resale, is licensed for one- time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com. User Notes: (6841bce805351aee7a4d702a) Certification of Document's Authenticity AIA° Document D401 TM - 2003 I, , hereby certify, to the best of my knowledge, information and belief, that I created the attached final document simultaneously with its associated Additions and Deletions Report and this certification at 10:53:37 CDT on 06/05/2025 under Order No. 20250129724 from AIA Contract Documents software and that in preparing the attached final document I made no changes to the original text of AIA® Document A133TM - 2019 Exhibit A, Guaranteed Maximum Price Amendment, other than those additions and deletions shown in the associated Additions and (Title) Design Group, Inc. -Principal June 5, 2025 (Dated) AIA Document D401 — 2003. Copyright ©1992 and 2003. All rights reserved. "The American Institute of Architects," "American Institute of Architects," "AIA," the AIA Logo, and "AIA Contract Documents" are trademarks of The American Institute of Architects. This document was produced at 10:53:37 CDT on 06/05/2025 under Order No.20250129724 which expires on 05/21/2026, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, a -mail docinfo@aiacontracts.com. User Notes: (6841bce805351aee7a4d702a) Byrne Construction Services Southlake Municipal Service Center & Public Safety Training Tower Exhibit "A.1" Cost Summary See attached Cost Summary dated May 19, 2025. CONSTRUCTION SERVICES A CENTURY YEARS OF EXCELLENCE 551 E. Berry Street Fort Worth, Texas 76110 (817)335-3394 Fax (817) 877-5507 Cost Estimate Summary Sheet Southlake Municipal Service Center & Public Safety Training Tower 100% Construction Document - Guaranteed Maximum Price (GMP) Date: May 19, 2025 33,148 sqft Bid Bid Package Description Package # GIVIP Cost/SF Notes 77 010020 Temporary Construction $ 299,416 $ 9.03 000010 Fire Training Props $ 778,855 $ 23.50 033000 Concrete Structure & Paving $ 3,595,816 $ 108.48 033536 Concrete Floor Finish $ 88,537 $ 2.67 048100 Masonry $ 1,019,560 $ 30.76 051000 Structural & Miscellaneous Steel $ 1,367,673 $ 41.26 057000 Ornamental Railings & Guardrails w/ BP-051000 $ - 061000 Rough Carpentry $ 87,810 $ 2.65 064000 Architectural Woodwork $ 133,936 $ 4.04 071000 Waterproofing & Sealants $ 317,853 $ 9.59 072129 Spray Foam Insulation $ 85,617 $ 2.58 074000 Metal Panels $ - 075000 Roofing Systems $ 308,453 $ 9.31 081000 Doors, Doorframes, Hardware $ 544,355 $ 16.42 083616 Vertical Opening Doors $ 411,092 $ 12.40 084000 Glass & Glazing Systems $ 189,307 $ 5.71 092000 Drywall & Acoustical Systems $ 507,837 $ 15.32 092400 Plaster/EIFS $ - $ - 093000 Tile $ 90,931 $ 2.74 096500 Flooring & Wall Base $ 20,148 $ 0.61 096600 Terrazzo $ - $ - 099000 Paint & Wall Coverings $ 359,820 $ 10.85 101000 Toilet Accessories & Misc. Specialties $ 187,261 $ 5.65 104000 Signage & Graphics $ 51,570 $ 1.56 107300 Prefab Alum. Canopies $ - $ - w/ BP-133418 PEMB 110000 Equipment - Hoist / Trolley Crane $ - $ - 114000 Appliances $ 82,037 $ 2.47 115300 Laboratory Equipment w/ BP-114000 $ - 122400 Window Treatments $ 22,098 $ 0.67 129313 Bike Racks $ - $ - 133418 Pre -Engineered Metal Building $ 1,172,881 $ 35.38 141000 Elevators $ 112,000 $ 3.38 210500 Fire Sprinkler Systems $ 245,027 $ 7.39 210500 Fire Pump Upgrade at Service Bay Bldg ALLOW $ 42,500 $ 1.28 220500 Plumbing Systems $ 1,068,522 $ 32.23 230000 HVAC Systems $ 1,192,588 $ 35.98 235000 Testing Adjusting & Balancing $ 19,010 $ 0.57 260000 Electrical Systems $ 2,272,905 $ 68.57 260000 Uninterruptible Power Supply System ALLOW $ 100,000 $ 3.02 270500 Communications Systems By Owner 270500 Audio / Video Systems By Owner 280500 Security Systems By Owner 310000 Earthwork $ 2,014,341 $ 60.77 Page 1 of 2 Cost Summary - GMP CONSTRUCTION SERVICES A CENTURY YEARS OF EXCELLENCE 551 E. Berry Street Fort Worth, Texas 76110 (817)335-3394 Fax (817) 877-5507 Cost Estimate Summary Sheet Southlake Municipal Service Center & Public Safety Training Tower 100% Construction Document - Guaranteed Maximum Price (GMP) Date: May 19, 2025 33,148 sqft PackageBid Bid Package Description 310050 Site Enabling GIVIP $ 94,375 Cost/SF $ 2.85 Notes 313130 Termite Treatment $ - $ - 320110 Asphalt Paving $ - $ - 321410 Unit Pavers $ - $ - 321720 Pavement Markings $ 18,100 $ 0.55 323000 Retaining Walls $ - w/ Concrete & Masonry 323113 Fencing and Gates $ 551,450 $ 16.64 329223 Landscaping & Irrigation $ 473,537 $ 14.29 331000 Site Utilities $ 1,599,914 $ 48.27 Cost of Work Subtotal $ 21,527,132 $ 649.42 Design Completion Factor 0.00% $ - $ - Market Volatility Contingency 1.00% $ 215,271 $ 6.49 Contractor Contingency 3.00% $ 645,814 I $ 19.48 Owner Contingency 6.00% $ 1,291,628 $ 38.97 Building Permit By Owner $ - Subtotal $ 23,679,845 $ 714.37 CGL & Umbrella Insurancel 1 $ 251,254 $ 7.58 Builder's Riski Is 43,619 $ 1.32 Payment & Performance Bond $ 191,831 $ 5.79 Subtotal $ 24,166,549 1 $ 729.05 General Conditionsi 1,368,4651 $ 41.28 1 Subtotal $ 25,535,014 $ 770.33 Preconstruction Fee $ 35,530 $ 1.07 Fee 2.25% $ 574,538 $ 17.33 Project Total $ 26,145,082 $ 788.74 GMP I Page 2 of 2 Cost Summary - GMP Byrne Construction Services Southlake Municipal Service Center & Public Safety Training Tower Exhibit "A.2" Alternates Below are the alternates which have not been included in the GMP. Alt # Description Add Cost Concrete Paving (5' Thick) in lieu of Flex 1 Base Paving at Dashed Hatching per Paving $209,259 Plan C1.38 Concrete Paving (5' Thick) in lieu of Flex 2 Base Paving at Diamond Hatching per Paving $412,427 Plan C1.38 CONSTRUCTION SERVICES A CENTURY YEARS OF EXCELLENCE 551 E. Berry Street Fort Worth, Texas 76110 (817)335-3394 Fax (817) 877-5507 Cost Estimate Summary Sheet Southlake Municipal Service Center & Public Safety Training Tower 100% Construction Document - Guaranteed Maximum Price (GMP) ALTERNATE #1: Concrete Paving (5" Thick) In Lieu of Flex Base Paving (at Dashed Hatching per Civil Paving Plan C1.38) Date: May 19, 2025 35,264 sqft PackageBid _. Package Description ALTERNATE#1 Cost/SF Notes IL 033000 Concrete Structure & Paving $ 220,722 $ 6.26 310000 Earthwork $ (40,700) $ (1.15) Cost of Work Subtotal $ 180,022 $ 5.10 Design Completion Factor 0.00% $ - $ - Market Volatility Contingency 1.00% $ 1,800 $ 0.05 Contractor Contingency 3.00% $ 5,401 $ 0.15 Owner Contingency 6.00% $ 10,801 $ 0.31 Building Permit By Owner $ - Subtotal $ 198,024 ---F- $ 5.62 CGL & Umbrella Insurancel 1 $ 2,011 1 $ 0.06 Builder's Risk $ 349 1 $ 0.01 Payment & Performance Bondi $ 4,270 $ 0.12 Subtotal $ 204,654 $ 5.80 General Conditionsi 1 $ - 1 $ - Subtotal $ 204,654 $ 5.80 Preconstruction Fee w/ GMP 1 $ - Fee 2.25% $ 4,605 $ 0.13 Project Total $ 209,259 $ 5.93 ALTERNATE #1 Page 1 of 1 ALT 1 CONSTRUCTION SERVICES A CENTURY YEARS OF EXCELLENCE 551 E. Berry Street Fort Worth, Texas 76110 (817)335-3394 Fax (817) 877-5507 Cost Estimate Summary Sheet Southlake Municipal Service Center & Public Safety Training Tower 100% Construction Document - Guaranteed Maximum Price (GMP) ALTERNATE #2: Concrete Paving (5" Thick) In Lieu of Flex Base Paving (at Diamond Hatching per Civil Paving Plan C1.38) Date: May 19, 2025 55,945 sqft PackageBid _. Package Description ALTERNATE#2 Cost/SF Notes IL 033000 Concrete Structure & Paving $ 432,909 $ 7.74 310000 Earthwork $ (77,193) $ (1.38) Cost of Work Subtotal $ 355,716 $ 6.36 Design Completion Factor 0.00% $ - $ - Market Volatility Contingency 1.00% $ 3,557 $ 0.06 Contractor Contingency 3.00% $ 10,671 $ 0.19 Owner Contingency 6.00% $ 21,343 $ 0.38 Building Permitl By Owner $ - Subtotal $ 391,287 $ 6.99 CGL & Umbrella Insurancel 1 $ 3,963 1 $ 0.07 Builder's Risk $ 688 1 $ 0.01 Payment & Performance Bondi $ 7,414 $ 0.13 Subtotal $ 403,352 $ 7.21 General Conditionsi 1 $ - $ - Subtotal $ 403,352 $ 7.21 Preconstruction Fee w/ GMP $ - Feel 2.25% $ 9,075 $ 0.16 Project Total $ 412,427 $ 7.37 ALTERNATE #2 Page 1 of 1 ALT 2 Byrne Construction Services Southlake Municipal Service Center & Public Safety Training Tower Exhibit "A.3" Project Schedule See attached Project Schedule dated May 19, 2025. 100% Concept / Schematic Design 40% SD Drawings Issued for Pricing SD Estimate VE & Presentation to Council Design Development Approval of SD Estimate to Move to DD 100% DD Drawings Issued for Pricing DD Estimate Approval to Move Forward with CD's CD Drawing Development Issue 100% Contract Documents Permit Dwg Review by CoSL (@Wks) For Construction Dwgs Issued for Bidding Review CDs & Finalize Bid Packages Public Advertisement #01 100% CDs & Bid Packages out for Bid Pubic Advertisement #02 PreBid Meeting / Site Walk Final RFI's from Subcontractors Final Addendum Issued Bid Day Byrne Bid Review & Evaluation Team Budget Preparation & Review Issue GMP forApproval CityApproval of GMP Ground Breaking Ceremony Notice to Proceed for Construction Mobilization and Buyout Issue LOI's / Sub Buyout & Purchasing BMW CONSTRUCTION SERVICES iing Facility 0 19-Jan-22 A 30-May-23 A 0 08-Jun-23A 0 09- Jun-23 A 30-Jun-23 A 0 06-Jul-23 A 19-Jan-24 A 0 19-Jan-24 A 16-Apr-24 A 0 19-Jan-24 A 0 16 Apr-24 A 0 17 Apr-24 A 14-May-24 A 0 23-Oct-24 A '8 0 24-Oct-24A 28-Mar-25A 0 28-Mar-25A 00%Contract Documents 10 31-Mar--25A 02,Jun-25 Permit Qwg Review by CoSLI(6Wks) 0 31-Mar--25A onstruction Dwgs Issued for8iddin§ 0 31-Mar--25A 04-Apr-25A 0 06-Apr-25A li AdverGisemgnt#01 0 07Apr-25 A 29-Apr-25 A 0 13-Apr-25A IcAdve4isement#,02 0 16-Apr-25 A 16-Apr-25 A 0 21 Apr-AprA 21 Apr-AprA 0 25-Apr-25A Fi gIAd&ndujn Issued 0 29-Apr-25 A id: Day 0 30-Apr-25 A 14-May-25 A 1 15-May-25A 19-May-25 'Team Budget Preparation '& Review, 0 19-May-25 :Issue GMP forApproVal 20 20-May-25 17-Jun-25 00 CityApprowal of,GMP, 1 18-Jun-25 18-Jun-25 I iGrouhd Breaking Ceremony 0 23tilun-25 ♦ Notice to Proceed for Construction 25 23,Jun-25 28'Ju1-25 Issue LOI's/ Sub Buyout'& Puirchasing File ID = SMSC - GMP Southlake MSC and Fire Training Facility Data Date as of 19-May-25 CITY OF CMAR's GMP Project Schedule Page 1 of 8 SOUTH LAKE Project Kickoff & Safety Meeting 1 1 24-Jun-25 24-Jun-25 PreConstruction Mtg with CoSL Bldg Inspection 1 25-Jun-25 25-Jun-25 Temporary Site Fencing 3 25-Jun-25 27-Jun-25 SWPPP - Erosion Control 3 26-Jun-25 30-Jun-25 Site Survey & Dimensional Control sa Submit Eng. Trench Plan to CoSL 2 30-Jun-25 01-Jul-25 1 25,Jun-25 25,Jun-25 Structural Steel Shop Drawing Generation 20 26,Jun-25 24,Jul-25 Site Utility Submittals -A/E Review 10 30,Jun-25 14,Jul-25 Structural Steel Shop Drawing ReviewA/E 10 25,Jul-25 07-Aug-25 Structural Steel Fabrication 25 08 Aug-25 12Sep-25 Site Work Demolition ,& Excavation Tree Protection Instalation 2 01-Jul-25 02-Jul-25 Construction Entrances 5 01-Jul-25 08-Jul-25 Site Strip - Cut / Fill 15 03-Jul-25 24-Jul-25 Building Pads 10 22-Jul-25 04-Aug-25 TV/Camera Document Existing Utilities (If Req'd) 2 26-Jun-25 27-Jun-25 Water Line Loop 25 22-Jul-25 25-Aug-25 Sanitary Sewer 20 26-Aug-25 23Sep-25 Gas 5 10Sep-25 16Sep-25 UG Site Conduit - Secondary Pwr Distribuiton All Bldgs 15 15-Sep-25 03-Oct-25 Stone Drain 20 17Sep-25 14-Oct-25 Permanent Power to Site 0 03-Oct-25 Concrete Storage Bins - Foundation 10 1 09-Oct-25 22-Oct-25 Site Light Pole Bases 10 23-Oct-25 05-Nov-25 Concrete Storage Bin - Wall Construction 15 23-Oct-25 12-Nov-25 Lime Stabilization 25 15-Dec-25 21 plan-26 Set Light Poles 5 22,Jan-26 28,Jan-26 Site Paving 40 22,Jan-26 18-Mar--26 Pervious Paving 15 19-Mar-26 08Apr-26 Retaining Wall at Administration Building 15 1 23-Mar-26 I 10-Apr-26 1: Project Kic koff',& Safety Meeting PreConstruction Mtg with: CoSL Bldg Inspection 1: Temporary SRO Fencing M SWPPP:- Erosion (ontrpl Site Survey & Dimensional Cbntrol Submit Eng. TrenchlPlanito CoSL 0 Structural' Steel Shop Drawing Generation ❑ Site UkilitySubmittals;A/E Review [] Structural Steel Shop Drawir-6 RgviewA/E Structural Steel Fabricbtio6 Tree Protection In stallat io n ■ CbnstNctiori Entrances Site ;Strip Cut;/ Fill Building Padfi I: TV/Camera Document Existing Utilities (If Req'd) WaterUrie Lobp Sanitary $ewer; 0 Gas EM UG Site Conduit -Secondary PwrDistdbuiton All Bldgs Storm:Drain Permanent Powerio Site O Concrete Storage Bins - Foundation. ❑ Site Light Pole Bases 0 Concrete Storage Bin:- Wall Construction 0 ;Lime Stabilizatibn 0: Set Lighk Polgs 0 :Site Pavino ❑ Pervious Paving O Retaining Wall atlAdministrdtion Building File ID = SMSC - GMP BMW Southlake MSC and Fire Training Facility Data Date as of 19-May-25 CITY OF CMAR's GMP Project Schedule Page 2 of 8 SOUTH LAKE CONSTRUCTION SERVICES Hardscapes &Amenities Perimeter Fencing Irrigation Landscaping Plantings, Sod & Hydromulch Administration Building (Two Levels) - Foundation Layout Foundations Form, Rein, Pour Grade Beams Underground MEP Termite Treatment Form, Rein, Pour Slab Cure Foundations / SOV Delivery of Structural Steel FRP TiR-Wall Panels Erection of Tilt Wall Panels, Structural Steel & Decking 2nd Floor Rough -In 2nd Floor Form, Rein, Pour Elevated Slab 2nd Floor Cure Building Facade & Roofing Hollow Metal Door Frame Delivery (E)t & Int) Exterior Paint, Masonry & Cast Stone Roofing Exterior Storefront & Windows OH Door Installation Building Dried -In Exterior Building Signage Interior Wa II La you t Overhead MEP Roughin Frame Interior Walls In Wall MEP Rough -in One Side Interior Partition Walls In -Wall Inspection Insulation at ExteriorWals Close Walls 15 13-Apr-26 01-May-26 ❑ Hardscalpes $Amenities O Perimeter'Fenang ;❑ ;Irrigation E�11111111', Landscaping F Iantings, Sod &', I Fdundation LayorJt M; Foundations �' Form, Rein, Pour Grade 13eanis Underground;MEP I Termite YreatMent j M Fomh, Rein, Pour Slab 1 Coe Foundations'/ SOV ♦ Delivery;of Structural Steel FRP Tilt -Wall Parcels 0 Erectioh of kilt Wall Pastels, $truct�ral $teel Decking ❑: 2nd FlodrRoOgh-In N 2nd Floor Form, Rein,', Pour, Elevated Slab ■ 2nd:Floor:Cure: j ♦ Hollo,y Metal Dopr Frame Qelivery (E> & Irjt) ❑' Exterior Paint, :Masbnry & Cast Storle � :Roofing ❑ Exterior Storefront & Windows 0 ;OH Door Installation ♦ ;Building Dried-Ist 11 Exterior Building Signage :1 I hterior Wa II La yk�u t �I Overhead MEP Rouugh-in * Frpme InterigrWals ■ 16 Wall MEP Rough-lnl ■ pne Side Interior Partition Walls; I In -Wall Inspection M Insulation, atExteriortWalt Clgse V�alls 30 13-Apr-26 22-May-26 15 04-May-26 22-May-26 25 25-May-26 26-Jun-26 2 05 Aug-25 06-Aug-25 15 07Aug-25 27-Aug-25 25 21Aug-25 25-Sep-25 15 12-Sep-25 02-Oct-25 1 03 Oct-25 03 Oct-25 15 06-Oct-25 24-Oct-25 5 27-Oct-25 31-Oct-25 0 31-Oct-25 25 03-Nov-25 09-Deo25 40 10-Deo-25 06-Feb-26 10 15,Jan-26 28,Jan-26 10 29tilan-26 11-Feb-26 7 12-Feb-26 20-Feb-26 0 11-Feb-26 10 12-Feb-26 25feb-26 25 12-Feb-26 18aVlar-Mar 12 26-Feb-26 13aVlar-26 5 16-Mar-26 20-Mar--26 0 20-Mar--26 2 24-Jul-26 27-Jul-26 777 7 02-Mar-26 10-Mar--26 7 06-Mar-26 16-Mar--26 1 17-Mar-26 17-Mar--26 4 18-Mar-26 23-Mar--26 10 20-Mar-26 02Apr-26 File ID = SMSC - GMP BY Southlake MSC and Fire Training Facility Data Date as of 19-May-25 CITY OF MCMAR's GMP Project Schedule Page 3 of 8 SOUTH LAKE CONSTRUCTION SERVICES Hard Ceilings & Interior Soffits 8 03-Apr-26 14-Apr-26 ;❑ Ward Ceilings & Interior Soffits 0 Tape, Bred, Float and Paint Walls (First Co I Permanent Power Established 0 It / Data OH Wiry Pul((By Omer) 0 HVAGStartrUp /:Functional:Testing ❑ Ceiling Grin ❑ Ceramic Tile C❑ Elevator Installation, ♦ OondiionecAir I Overhead Ceilino Inspectiohs I Toilet Accessories & Misc. Speclaltiesl 0 'Drop Ceiling Tile ❑ Millwork) & Countertops ❑ Painting - Final Coat ❑ MEP Trimout ;❑ Flooring & Base U Doors and:Hardware' I (Interior Signage Security $ysterns Urn Out & Fun I Window Blinds / Treatments 0 'Interior Wall Layout Overhead MEP (Rough -in ■j Frarne Interior,Wal§ I6 WaII:MEP Rouc0h-In ■ One Side Interior Partition Walls I In -Wall Inspection 1 Insulation) Exterior Walls 10 Clpse Walls ❑ Hard Ceilings & Interibr Soffits Eli Tape, Bed, Float and Paint Walls (Fir 0 IT / Data OH Wire Pull, (By Owner) 0 HVACI StartFUp /;Functional Testing ■ Ceiling Grid ■ Ceramic Tile Tape, Bed, Float and Paint Walls (First Coat) 15 15-Apr-26 05-May-26 Permanent Power Established 1 06-May-26 06-May-26 IT/ Data OH Wire Pull (By Owner) 5 06-May-26 12-May-26 HVAC Start -Up / Functional Testing 5 06-May-26 12-May-26 Ceiling Grid 7 06-May-26 14-May-26 Ceramic Tile 8 06-May-26 15-May-26 Elevator Installation 15 07-May-26 27-May-26 Conditioned Air 0 12-May-26 Overhead Ceiling Inspections 1 15-May-26 15-May-26 Toilet Accessories & Misc. Specialties 2 18-May-26 19-May-26 Drop Ceiling Tile 5 18-May-26 22-May-26 Millwork & Countertops 8 25-May-26 03,Jun-26 Painting - Final Coat 8 25-May-26 03,Jun-26 MEP Tdmout 10 25-May-26 05,Jun-26 Flooring &Base 7 04tilun-26 12,1un-26 Doors and Hardware 3 15,Jun-26 17,Jun-26 Interior Signage 1 18,Jun-26 18,Jun-26 Security Systems Trim Out & Functional Testing 5 18,Jun-26 24,Jun-26 Window Blinds / Treatments Level 2lnterior Interior Wall Layout 2 09,Jul-26 10,Jul-26 3 12-Feb-26 16-Feb-26 Overhead MEP RoughAn 12 02-Mar-26 17 Mar-26 Frame Interior Walls 8 18-Mar-26 27-Mar-26 In Wall MEP Rough -In 7 30-Mar-26 07 Apr--26 One Side Interior Partition Walls 7 08-Apr-26 16-Apr-26 In -Wall Inspection 1 17-Apr-26 17 Apr-26 Insulation Exterior Walls 4 20-Apr-26 23-Apr-26 Close Walls 10 22-Apr-26 05-May-26 Hard Ceilings & Interior Soffits 8 06-May-26 15-May-26 Tape, Bed, Float and Paint Walls (First Coat) 15 18-May-26 05,1un-26 IT / Data OH Wire Pull (By Owner) 5 08-Jun-26 12-Jun-26 HVAC Start -Up / Functional Testing 5 08-Jun-26 12-Jun-26 Ceiling Grid Ceramic Tile 7 08-Jun-26 16-Jun-26 8 08-Jun-26 17-Jun-26 File ID = SMSC - GMP MIMN Southlake MSC and Fire Training Facility Data Date as of 19-May-25 CITY OF CMAR's GMP Project Schedule Page 4 of 8 13 SOUT'H LA KE CONSTRUCTION SERVICES Conditioned Air Overhead Ceiling Inspections Toilet Accessories & Misc. Specialties Drop Ceiling Tile MEP Trimout Painting - Final Coat Millwork and Countertops Flooring & Base Doors and Hardware Interior Signage Security Systems Trim Out & Functional Testing Window Blinds / Treatments Public Safety Training Tower (4-Story) Level 1 Foundations Layout Foundations Form, Rein, Pour Grade Beams Underground MEP Form, Rein, Pour Slab (One Pour) CIP Columns Ud 1-2 Cure Foundations / Slab CMU Walls LV 1-2 Delivery of Structural Steel & Stair Tower Erection of Structural Steel & Stair Tower 0 1 2 5 7 10 10 7 3 1 5 2 2 10 12 5 5 1 5 1 0 10 17-Jun-26 18-Jun-26 18-Jun-26 25-Jun-26 25-Jun-26 25-Jun-26 09-Jul-26 20-Jul-26 23-Jul-26 23,Jul-26 30,Jul-26 05 Aug-25 28Aug-25 05Sep-25 19Sep-25 26Sep-25 03-Oct-25 03-Oct-25 06-Oct-25 17-Feb-26 12-Jun-26 17-Jun-26 19-Jun-26 24-Jun-26 03-Jul-26 08-Jul-26 08-Jul-26 17-Jul-26 22-Jul-26 23-Jul-26 29,Jul-26 31 ,Jul-26 06-Aug-25 11 Sep-25 23Sep-25 25Sep-25 02-Oct-25 03-Oct-25 09-Oct-25 06-Oct-25 17-Feb-26 02-Mar--26 Overhead MEP 10 05-Jun-26 I 18-Jun-26 Wall Framing & Rough -In 10 19-Jun-26 02-Jul-26 In Wall Inspection 1 03-Jul-26 03-Jul-26 Insulation 5 06-Jul-26 10-Jul-26 Close Walls 10 13-Jul-26 24-Jul-26 Tape, Bed, Float and Paint Complete 5 27-Jul-26 31-Jul-26 Flooring 5 03-Aug-26 07-Aug-26 10 07-Oct-25 20-Oct-25 FRP Level 2 Elevated Deck CIP Columns LvI 2-3 5 21-Oct-25 27-Oct-25 ♦ Conditioned Air Overhead Ceiling Inspections :ToiletAccdssori2s & Misc. Specialti Drop Ceiling Tie ■ MEP THMout IJ Painting - Final Coat Millwork and: Countertops ■ Flooring & Basel 1 Doors anc Hardvarp I Interlor Sionag& 1', Security Systems Tdm Out F Window:Blinds / Treatment: j I Fqundations, Layout ❑ Foundlationfi ❑ Form, Rein, Pour Grade Beams p' Underground MEP 0 Form, Rein, Pour Slab (One Pour); 11 CIO Coiumnj LA 1-2 0 C'ure Fbundations / Slab CMU Walls 4)A 1 'Delivery of StructuralSteel & Stair Tower ■ Erectior! of Structural Steel &StairTowet ;❑ IOverhead MEP; 0 Wall Fra wring & Roug h-In In Wall tnspeetion 0 Insulation ❑ Close Walls d Tape, Bed, Float and Paint G Flooring ❑ FRP;Levei2 Elevated Deck & CIP Columns Lvl 2,3 File ID = SMSC - GMP MIMN Southlake MSC and Fire Training Facility Data Date as of 19-May-25 CITY OF CMAR's GMP Project Schedule Page 5 of 8 13 SOUTH LAKE CONSTRUCTION SERVICES Slab Cure (75%) 5 1 21-Oct-25 27-Oct-25 Wreck Formwork and Shore Elevated Deck 5 28-Oct-25 03-Nov-25 CMU Wals L,,123 10 28-Oct-25 10-Nov-25 Reshore Install 5 04-Nov-25 10-Nov-25 Reshore Removal 3 06-Jan-26 08-Jan-26 Misc. Light Finishes 5 09-Jan-26 15-Jan-26 FRP Level 3 Elevated Deck 10 1 11-Nov-25 24-Nov-25 CIP Columns Lvl 3-4 5 25-Nov-25 03-Dec-25 Slab Cure (75%) 5 25-Nov-25 03-Dec-25 Wreck Formwork and Shore Elevated Deck 5 04-Deo-25 10-Deo-25 CMU Wals Lei 34 10 04-Deo-25 17-Deo-25 Reshore Install 5 11-Dec25 17-Deo-25 Reshore Removal 3 10-Feb-26 12-Feb-26 Misc. Light Finishes 5 13-Feb-26 19-Feb-26 FRP Level 4 Elevated Deck 10 18-Deo-25 05,Jan-26 CIP Columns Lvl 4-Roof 5 06,Jan-26 12,Jan-26 Slab Cure (75%) 5 06,Jan-26 12,Jan-26 Wreck Formwork and Shore Elevated Deck 5 13,Jan-26 19,Jan-26 CMU Wals Lei 4-Roof 10 13,Jan-26 26,Jan-26 Reshore Install 5 20,Jan-26 26,Jan-26 Reshore Removal 3 10-Feb-26 12-Feb-26 Misc. Light Finishes 5 13-Feb-26 19-Feb-26 FRP Level Roof Elevated Deck 10 27-Jan-26 09-Feb-26 Slab Cure (75%) 5 10-Feb-26 16Feb-26 Wreck Formwork and Shore Elevated Deck 5 17-Feb-26 23-Feb-26 Building Facade & Roof Ext Studs / Sheathing / Rigid Insulation &Air Barrier 30 27-Feb-26 09-Apr-26 Exterior Masonry -All Levels 40 07-Apr-26 01-Jun-26 Hollow Metal Door Frame Delivery (E)t & Int) 0 09-Apr-26 Roofing 10 10-Apr-26 23-Apr-26 Exterior Storefront & Windows 5 29-May-26 04-Jun-26 Building Dried -In 0 04-Jun-26 0', Slab Cure (75%) ❑ Wreck 5ormwork and Shore Elevated Deck ❑ CMU Wals L).i 2 3 0 Reshore Install 0 Reshore Removel O Misc.', Light Finishes ❑ ; FRP Level 3 Elevated Dock CIS Columns Lvl $4 0 SIJb Cure (75%) ;0 *eck Fomiwork;and Shore; Elevated Deck ❑ CMU:Wals Lu 34 0 Reshbre Install 0 keshgre Rgmovpl 0 Misd Light Finishes M FRP Level 4:Elevated deck' 0 CIP Columns Lvl 4-Roof 0 $lab Cure (75%) 0 Wreck Fonnwor9k and Shore Elevated Dedk ❑ ; CMIU Wals Lv14-RQof 0 Reshore:Install 0 Reshore Removal 0 Misc; Lighj Finishes p FRP Level Roof Elevated Deck 0 'Slab Cure;(75%) 0 Wre;ck Formwo* and Shore Elevated Deck 0 Ekt Studs / Sheathing / Rigid Insulation &Air Exterior Masonry -All Levels ♦ Hollow:Metal Door Frame Delivery' (Ext & Int) ❑ Roofing Q Exterior, Storgfront; & Winndows �► Building Dried -In File ID = SMSC - GMP MIMN Southlake MSC and Fire Training Facility Data Date as of 19-May-25 CITY OF CMAR's GMP Project Schedule Page 6 of 8 13 SOUTH LAKE CONSTRUCTION SERVICES Outdoor Covered Storage, Pole Barn & Wash Bay Foundations Layout Foundations Underground MEP Form, Rein, Pour Pier Caps Lime Treated Subgrade & Paving Cure Paving Delivery of Structural Steel Erection of Structural Steel, Metal Panels & Roof Overhead MEP Rough -in Overhead MEP Inspection Paint Metal Building Components & OH MEP Chainlink Fencing Install Washbay Components Complete Fuel Station Island &Wno Foundations Layout Foundations Underground MEP Form, Rein, Pour Pier Caps Lime Treated Subgrade & Paving Cure Paving Delivery of Structural Steel & Canopy Erection of Struct Steel & Canopy Painting of Metal Building Components & MEP Foundations Layout Drill Piers Underground MEP Form, Rein, Pour Pier Caps Delivery of Structural Steel & Coverings Erection of Structural Steel & Coverings Paint Exposed Metal Big. Components & MEP MEP Trim Out Project Closeout State Elevator Inspection I; Foundations layout ■' Foundations I Un'dergrbund;MEP ■ Form, Rein,:PourjPier Caps; =1 Lime Treated Subgrade:& Paving 0 Cure Paving; ♦ Delivery' of Structural Steel EYectioh of Structural Steel,:Metal Panels &;Roof; j I Qverhoad MEP koug6-in I Overh&ad MEP Inspection 0 ;Paint; Metal Building Components & OH MEP O Chainlink Fencing D ;Install WashbayCorhpononts Complete I: Foundations Layou{ 0 Foundations ❑ Underground MEP 0 Forr-A, Rein, Pour Pier Caps ❑ Lune ieated Subgrad2 & Paving: ■ Cure;Pavirl9 ♦ :Delivery of Structural: Steel & Canopy ■ Erection of Struct Steel &;Canopy 0 Painting of Metal 8uildirig Components& M5P I Foundations Layout ❑ grill Piers D Underground MEPI 0 Form, Rein, Pour Pier Caps Delivery of Stnictural Steel &: Coverings ;Erection of Structural Steel &Coverings E� Paint Pxposgd Metal Big. Component] & MEP 0 MEP Trim Out 2 28-Aug-25 29-Aug-25 10 12Sep-25 25Sep-25 3 29Sep-25 01-Oct-25 5 02 Oct-25 08 Oct-25 15 09-Oct-25 29-Oct-25 7 30-Oct-25 07-Nov-25 0 07-Nov-25 20 10-Nov-25 09-Deo-25 2 10-Deo-25 11-Deo-25 1 12-Deo-25 12-Deo-25 5 15-Deo-25 19-Deo-25 7 22-Deo-25 02,Jan-26 20 22-Deo-25 21,1an-26 1 28-Aug-25 28-Aug-25 5 26Sep-25 02-Oct-25 10 06 Oct-25 17-Oct-25 5 20-Oct-25 24-Oct-25 10 27 Oct-25 07-Nov-25 7 10-Nov-25 18-Nov-25 0 18-Nov-25 10 10-Dec-25 23-Dec-25 5 26-Dec-25 02-Jan-26 1 03-Oct-25 03-Oct-25 10 06-Oct-25 17-Oct-25 5 21-Oct-25 27-Oct-25 5 28-Oct-25 03-Nov-25 0 03-Nov-25 20 26-Deo-25 23�1an-26 10 26,Jan-26 06-Feb-26 5 09-Feb-26 13-Feb-26 1 1 28-May-26 I 28-May-26 I I I l; State Elevator. Inspection File ID = SMSC - GMP BY Southlake MSC and Fire Training Facility Data Date as of 19-May-25 CITY OF MCMAR's GMP Project Schedule Page 7 of 8 SOUTH LAKE CONSTRUCTION SERVICES No Text Byrne Construction Services Southlake Municipal Service Center & Public Safety Training Tower Exhibit "A.4" Contract Documents See attached Contract Documents List dated May 19, 2025. CENTURY OF EXCELLENCE CUNS'i Rlit_.PO SE.f3V i.f=c Contract Documents List City of Southlake Municipal Service Center and Public Safety Training Tower Southlake, TX 100% Construction Document - Guaranteed Maximum Price (GMP) Date: 5/19/2025 551 E Berry St. Fort Worth, TX 76110 817/335/3394 FAX 817/877-5507 Sheet Original Date 11 Sheet Name SPECIFICATIONS 000101 03/28/25 Project Title Page 000107 03/28/25 Project Team 000110 03/28/25 Table of Contents 011000 03/28/25 Summary of Work 012000 03/28/25 Price and Payment Procedures 012200 03/28/25 Unit Prices 012300 03/28/25 Alternates 013000 03/28/25 Administrative Requirements 014000 03/28/25 Quality Requirements 014100 03/28/25 Testing Laboratory Services 015000 03/28/25 Temporary Facilities and Controls 015100 03/28/25 Temporary Utilities 015719 03/28/25 Temporary Environmental Controls 015723 03/28/25 Temporary Storm Water Pollution Control 015813 03/28/25 Temporary Project Signage 016000 03/28/25 Product Requirements 016116 03/28/25 Volatile Organic Compound (VOC) Content Restrictions 017000 03/28/25 Execution and Closeout Requirements 017800 03/28/25 Closeout Submittals 017900 03/28/25 Demonstration and Training 019113 03/28/25 General Commissioning Requirements 019114 03/28/25 Commissioning Authority Responsibilities 023200 03/28/25 Geotechnical Investigations 031000 03/28/25 Concrete Forming and Accessories 031010 03/28/25 Tilt -Up Concrete Panel Accessories 032000 03/28/25 Concrete Reinforcing 033000 03/28/25 Cast -In -Place Concrete 034713 03/28/25 Tilt -Up Concrete 040513 03/28/25 Masonry Mortar Grout 042001 03/28/25 Brick Masonry Veneer 042200 03/28/25 Concrete Unit Masonry 044301 03/28/25 Stone Masonry Veneer 047200 03/28/25 Cast Stone Masonry 051200 03/28/25 Structural Steel Framing 052100 03/28/25 Steel Joist Framing 053100 03/28/25 Steel Decking 054000 03/28/25 Cold Formed Metal Framing 055000 03/28/25 Metal Fabrications 055213 03/28/25 Pipe and Tube Railings 061000 03/28/25 Rough Carpentry 062000 03/28/25 Finish Carpentry 064100 03/28/25 Architectural Wood Casework 071300 03/28/25 Sheet Waterproofing 071900 03/28/25 Water Repellents 072100 03/28/25 Thermal Insulation 072119 03/28/25 Sprayed Foam Insulation 072500 03/28/25 Weather Barriers 072600 03/28/25 Under -Slab Vapor Barrier/Retarder 072726 03/28/25 Fluid Applied Membrane Air Barrier 073113 03/28/25 Asphalt Shingles 074113 03/28/25 Metal Roof Panels 074133 03/28/25 Polycarbonate Roof Panels 074213 03/28/25 Metal Wall Panels 074625 03/28/25 Cement Board Soffit 0754001 03/28/25 ITPO Membrane Roofing 076200 1 03/28/25 ISheet Metal Flashing and Trim 077200 1 03/28/25 1 Roof Accessories Page 1 of 1 Contract Documents List CENTURY OF EXCELLENCE CUNS'i Rlit_.PO SE.f3V i.f=c Contract Documents List City of Southlake Municipal Service Center and Public Safety Training Tower Southlake, TX 100% Construction Document - Guaranteed Maximum Price (GMP) Date: 5/19/2025 551 E Berry St. Fort Worth, TX 76110 817/335/3394 FAX 817/877-5507 Sheet Original Sheet Name 078220 03/28/25 Thermal Lining Systems 078400 03/28/25 Firestopping 079005 03/28/25 Joint Sealers 081113 03/28/25 Hollow Metal Doors and Frames 081416 03/28/25 Flush Wood Doors 083100 03/28/25 Access Doors and Panels 083323 03/28/25 Overhead Coiling Doors 084313 03/28/25 Aluminum -Framed Storefronts 085113 03/28/25 Aluminum Windows 085669 03/28/25 Bullet Resistant Transaction Windows 087100 03/28/25 Door Hardware 088000 03/28/25 Glazing 088300 03/28/25 Mirrors 089100 03/28/25 Louvers 092116 03/28/25 Gypsum Board Assemblies 093000 03/28/25 Tiling 095100 03/28/25 Acoustical Ceilings 096500 03/28/25 Resilient Flooring 096813 03/28/25 Tile Carpeting 098413 03/28/25 Fixed Sound -Absorptive Panels 099113 03/28/25 Exterior Painting 099123 03/28/25 Interior Painting 099725 03/28/25 Concrete Floor Sealer 101400 03/28/25 Signage 102113 03/28/25 Metal Toilet Compartments 102225 03/28/25 In -Wall Payment Drop Boxes 102601 03/28/25 Wall and Corner Guards 102641 03/28/25 Bullet Resistant Fiberglass Panels 102800 03/28/25 Toilet, Bath and Utility Accessories 104116 03/28/25 Emergency Key Box 104300 03/28/25 Emergency Aid Specialties 104400 03/28/25 Fire Protection Specialties 105100 03/28/25 Lockers 105613 03/28/25 Metal Storage Shelving 107316 03/28/25 Premanufactured Aluminum Canopies 107500 03/28/25 Flagpoles 113100 03/28/25 Residential -Laboratory Equipment 122113 03/28/25 Horizontal Louver Blinds 123600 03/28/25 Countertops 133419 03/28/25 Metal Building Systems 142400 03/28/25 Holeless Hydraulic Elevators 215000 03/28/25 Common Work Results for Fire Suppression. 211313 03/28/25 Wet -Pipe Sprinkler Systems 211316 03/28/25 Dry -Pipe Sprinkler Systems 220500 03/28/25 Common Work Results for Plumbing 220513 03/28/25 Common Motor Requirements for Plumbing Equipment 220516 03/28/25 Expansion Fittings and Loops for Plumbing Piping 220519 03/28/25 Meters and Gauges for Plumbing Piping 220523 03/28/25 General -Duty Valves for Plumbing Piping 220529 03/28/25 Hangers and Supports for Plumbing Piping and Equipment 220533 03/28/25 Heat Tracing for Plumbing Piping 220548 03/28/25 Vibration Controls for Plumbing Piping and Equipment 220553 03/28/25 Identification for Plumbing Piping and Equipment 220700 03/28/25 Plumbing Insulation 221116 03/28/25 Domestic Water Piping 221119 03/28/25 Domestic Water Piping Specialties 221120 03/28/25 Facility Natural Gas Piping 221316 03/28/25 Sanitary Waste and Vent Piping 221319 03/28/25 Sanitary Waste Piping Specialties Page 2 of 2 Contract Documents List CENTURY OF EXCELLENCE CUNS'i Rl,J1_..P0 SE.f3V•.i..f=c Contract Documents List City of Southlake Municipal Service Center and Public Safety Training Tower Southlake, TX 100% Construction Document - Guaranteed Maximum Price (GMP) Date: 5/19/2025 551 E Berry St. Fort Worth, TX 76110 817/335/3394 FAX 817/877-5507 Sheet Original Sheet Name 221413 03/28/25 Facility Storm Drainage Piping 221423 03/28/25 Storm Drainage Piping Specialties 221429 03/28/25 Sump Pumps 221513 03/28/25 General Service Compressed Air Piping 221519 03/28/25 General Service Packaged Air Compressors and Receivers 223300 03/28/25 Electric, Domestic — Water Heaters 223400 03/28/25 Fuel -Fired Domestic Water Heaters 224000 03/28/25 Plumbing Fixtures 224500 03/28/25 Emergency Plumbing Fixtures 230513 03/28/25 Common Motor Requirements for HVAC Equipment 230529 03/28/25 Hangers and Supports for HVAC Piping and Equipment 230553 03/28/25 Identification for HVAC 230593 03/28/25 Testing, Adjusting, and Balancing for HVAC 230713 03/28/25 Duct Insulation 230923 03/28/25 Direct Digital Control Systems (DDC) System for HVAC 230923.43 03/28/25 Weather Stations 230993 03/28/25 Sequence of Operations for HVAC Controls 233113 03/28/25 Metal Ducts 233300 03/28/25 Air Duct Accessories 233346 03/28/25 Flexible Ducts 233423 03/28/25 HVAC Power Ventilators 233439 03/28/25 High -Volume, Low -Speed Fans 233600 03/28/25 Air Terminal Units 233713 03/28/25 Air Diffusers, Registers, and Grills 233723 03/28/25 HVAC Gravity Ventilators 234100 03/28/25 Particulate Air Filtration 235523 03/28/25 Low -Intensity, Gas -Fired Radiant Heaters 237416 03/28/25 Packaged Rooftop Air -Conditioning Units 238126 03/28/25 Split -System Air -Conditioners 238129 03/28/25 Variable -Refrigerant -Flow HVAC Systems 238239 03/28/25 Unit Heaters 260500 03/28/25 Common Work Results for Electrical 260519 03/28/25 Low -Voltage Electrical Power Conductors and Cables 260526 03/28/25 Grounding and Bonding for Electrical Systems 260529 03/28/25 Hangers and Supports for Electrical Systems 260533 03/28/25 Raceway and Boxes for Electrical Systems 260553 03/28/25 Identifications for Electrical System 260573.13 03/28/25 Short -Circuit Studies 260573.16 03/28/25 Coordination Studies 260573.19 03/28/25 Arc -Flash Hazard Analysis 260923 03/28/25 Lighting Control Devices 262213 03/28/25 Low -Voltage Distribution Transformers 262416 03/28/25 Panelboards 262726 03/28/25 Wiring Devices 262816 03/28/25 Enclosed Switches and Circuit Breakers 263213 03/28/25 Engine Generators 263323.11 03/28/25 Central Battery Equipment for Emergency Lighting 263353 03/28/25 Static Uninterruptible Power Supply 263600 03/28/25 Automatic Transfer Switches 264100 03/28/25 Lightning Protection Systems 265100 03/28/25 Interior Lighting 265600 03/28/25 Exterior Lighting 270000 03/28/25 Communications Basic Requirements 270526 03/28/25 Communications Grounding and Bonding 270528 03/28/25 Communications Building Pathways 270811 03/28/25 Communications Twisted Pair Testing 270821 03/28/25 Communications Fiber Optic Testing 271100 03/28/25 Communications Equipment Room 271313 03/28/25 Communications Twisted Pair Cabling Page 3 of 3 Contract Documents List CENTURY OF EXCELLENCE CUNS'i Rlit_.PO SE.f3V i.f=c Contract Documents List City of Southlake Municipal Service Center and Public Safety Training Tower Southlake, TX 100% Construction Document - Guaranteed Maximum Price (GMP) Date: 5/19/2025 551 E Berry St. Fort Worth, TX 76110 817/335/3394 FAX 817/877-5507 Sheet Original Sheet Name 271323 03/28/25 Communications Fiber Optic Cabling 280000 03/28/25 Security Basic Requirements 284621.11 03/28/25 Fire Alarm System 310000 03/28/25 Earthwork 311000 03/28/25 Site Clearing 312333 03/28/25 Trenching and Backfilling 313200 03/28/25 Soil Stabilization 321313 03/28/25 Concrete Paving 321723 03/28/25 Pavement Markings 321735 03/28/25 Concrete Bin Blocks 321900 03/28/25 Walk Road & Parking Appurtenances 323113 03/28/25 Chain Link Fences and Gates 323119 03/28/25 Decorative Metal Fences and Gate 328400 03/28/25 Planting Irrigation 329200 03/28/25 Turf & Grasses 329300 03/28/25 Planting 331000 03/28/25 Water Utilities 333000 1 03/28/25 ISanitary Sewerage Utilities 334000 1 03/28/25 iStorm Drainage Utilities Drawings C1.01 03/28/25 EXISTING TOPOGRAPHY PLAN C1.03 03/28/25 DEMOLITION PLAN C1.04 03/28/25 OVERALL SITE PLAN C1.05 03/28/25 SITE PLAN - SECTION A C1.06 03/28/25 SITE PLAN - SECTION B C1.07 03/28/25 SITE PLAN - SECTION C C1.08 03/28/25 OVERALL DIMENSIONAL CONTROL PLAN C1.09 03/28/25 DIMENSIONAL CONTROL PLAN - SECTION A C1.10 03/28/25 DIMENSIONAL CONTROL PLAN - SECTION B C1.11 03/28/25 DIMENSIONAL CONTROL PLAN - SECTION C C1.12 03/28/25 OVERALL GRADING PLAN C1.13 03/28/25 GRADING PLAN - SECTION A C1.14 03/28/25 GRADING PLAN - SECTION B C1.15 03/28/25 GRADING PLAN - SECTION C C1.16 03/28/25 EXISTING DRAINAGE AREA C1.17 03/28/25 DRAINAGE AREA MAP C1.18 04/21/25 OVERALL STORM DRAIN PLAN (Addendum #1) C1.19 04/21/25 STORM DRAIN PLAN - SECTION A (Addendum #1) C1.20 04/21/25 STORM DRAIN PLAN - SECTION B (Addendum #1) C1.21 04/21/25 STORM DRAIN PLAN - SECTION C (Addendum #1) C1.22 04/21/25 STORM DRAIN PROFILE (1 OF 7) (Addendum #1) C1.23 04/21/25 STORM DRAIN PROFILE (2 OF 7) (Addendum #1) C1.24 04/21/25 STORM DRAIN PROFILE (3 OF 7) (Addendum #1) C1.25 04/21/25 STORM DRAIN PROFILE (4 OF 7) (Addendum #1) C1.26 04/21/25 STORM DRAIN PROFILE (5 OF 7) (Addendum #1) C1.27 04/21/25 STORM DRAIN PROFILE (6 OF 7) (Addendum #1) C1.28 04/21/25 STORM DRAIN PROFILE (7 OF 7) (Addendum #1) C1.29 04/21/25 STORM DRAIN CALCULATIONS (Addendum #1) C1.30 04/21/25 ENERGY GRADE COMPUTATIONS (Addendum #1) C1.31 04/21/25 OVERALL WATER & SANITARY SEWER PLAN (Addendum #1) C1.32 04/21/25 WATER & SANITARY SEWER PLAN - SECTION A (Addendum #1) C1.33 04/21/25 WATER & SANITARY SEWER PLAN - SECTION B (Addendum #1) C1.34 04/21/25 WATER & SANITARY SEWER PLAN - SECTION C (Addendum #1) C1.35 04/21/25 SANITARY SEWER PROFILES (1 OF 3) (Addendum #1) C1.36 04/21/25 SANITARY SEWER PROFILES (2 OF 3) (Addendum #1) C1.37 04/21/25 SANITARY SEWER PROFILES (3 OF 3) (Addendum #1) C1.38 1 04/21/25 JOVERALL PAVING PLAN (Addendum #1) C1.39 1 04/21/25 IPAVING PLAN - SECTION A (Addendum #1) C1.40 1 04/21/25 IPAVING PLAN - SECTION B (Addendum #1) Page 4 of 4 Contract Documents List CENTURY OF EXCELLENCE CUNS'i Rlit_.PO SE.f3V i.f=c Contract Documents List City of Southlake Municipal Service Center and Public Safety Training Tower Southlake, TX 100% Construction Document - Guaranteed Maximum Price (GMP) Date: 5/19/2025 551 E Berry St. Fort Worth, TX 76110 817/335/3394 FAX 817/877-5507 Sheet Original Sheet Name C1.41 04/21/25 PAVING PLAN - SECTION C (Addendum #1) C1.42 04/21/25 OVERALL EROSION CONTROL PLAN (Addendum #1) C1.43 04/21/25 EROSION CONTROL PLAN - SECTION A (Addendum #1) C1.44 04/21/25 EROSION CONTROL PLAN - SECTION B (Addendum #1) C1.45 04/21/25 EROSION CONTROL PLAN - SECTION C (Addendum #1) C1.46 04/21/25 SITE DETAILS (Addendum #1) C1.47 04/21/25 PAVING DETAILS (Addendum #1) C1.48 04/21/25 DRAINAGE DETAILS (Addendum #1) SD-1 04/21/25 WATER DETAIL (Addendum #1) SD-2 04/21/25 SANITARY SEWER DETAILS (Addendum #1) SD-3 04/21/25 CONCRETE PAVING DETAILS (Addendum #1) SD-4 04/21/25 HMAC PAVING DETAILS (Addendum #1) SD-5 04/21/25 MISCELLANEOUS PAVING DETAILS (Addendum #1) SD-6 04/21/25 STORM DRAIN DETAILS (Addendum #1) SD-7 04/21/25 STORM DRAIN DETAILS (Addendum #1) SD-8 04/21/25 STORM DRAIN DETAILS (Addendum #1) SD-9 04/21/25 EMBEDMENT DETAILS (Addendum #1) SD-10 04/21/25 TREE PROTECTION DETAILS (Addendum #1) L-0 03/28/25 OVERALL LANDSCAPE PLAN L-1 03/28/25 LANDSCAPE PLAN L-2 03/28/25 PLANTING PLAN L-3 03/28/25 PLANTING PLAN L-4 03/28/25 PLANTING DETAILS L-5 03/28/25 PLANTING DETAILS TC-1 03/28/25 TREE CONSERVATION PLAN TC-2 03/28/25 TREE CONSERVATION PLAN TC-3 03/28/25 TREE CONSERVATION PLAN IR-1 03/28/25 IRRIGATION PLAN IR-2 03/28/25 IRRIGATION PLAN IR-3 03/28/25 IRRIGATION PLAN IR-4 03/28/25 IRRIGATION DETAILS A-1.00 03/28/25 GENERAL NOTES A-1.01 03/28/25 SITE PLAN A-1.02 03/28/25 SITE DETAILS A-1.03 03/28/25 SITE DETAILS A-1.04 03/28/25 SITE DETAILS A-1.05 03/28/25 SITE DETAILS A-1.06 03/28/25 SITE DETAILS A-1.07 03/28/25 SITE ELEVATIONS A-1.08 03/28/25 SITE ELEVATIONS A-1.09 03/28/25 SITE ELEVATIONS A-1.10 03/28/25 SITE DETAILS A-1.11 03/28/25 SITE DETAILS A-1.12 03/28/25 SITE DETAILS A-1.13 03/28/25 SITE DETAILS A-1.14 03/28/25 SITE DETAILS A-A-2.00 03/28/25 ADMIN. BLDG. LIFE SAFETY PLANS A-A-2.01 03/28/25 ADMIN. BLDG. MAIN LEVEL FLOOR PLAN A-A-2.02 03/28/25 ADMIN. BLDG. REFLECTED CEILING PLAN A-A-2.03 03/28/25 ADMIN. BLDG. FINISH FLOOR PLAN A-A-2.04 03/28/25 ADMIN. BLDG. ROOF PLAN A-A-2.05 03/28/25 ADMIN. BLDG. FF&E FLOOR PLANS A-A-2.06 03/28/25 ADMIN. BLDG. ENLARGED PLANS A-A-2.07 03/28/25 ADMIN. BLDG. ENLARGED STAIRS PLANS A-A-3.01 03/28/25 ADMIN. BLDG. FINISH/DOOR SCHEDULE A-A-3.02 03/28/25 ADMIN. BLDG. WINDOW SCHEDULE A-A-4.01 03/28/25 ADMIN. BLDG. EXTERIOR ELEVATIONS A-A-5.01 03/28/25 ADMIN. BLDG. BUILDING SECTIONS A-A-5.02 03/28/25 ADMIN. BLDG. WALL SECTIONS Page 5 of 5 Contract Documents List CENTURY OF EXCELLENCE CUNS'i Rlit_.PO SE.f3V i.f=c Contract Documents List City of Southlake Municipal Service Center and Public Safety Training Tower Southlake, TX 100% Construction Document - Guaranteed Maximum Price (GMP) Date: 5/19/2025 551 E Berry St. Fort Worth, TX 76110 817/335/3394 FAX 817/877-5507 Sheet Original Sheet Name A-A-5.03 03/28/25 ADMIN. BLDG. WALL SECTIONS A-A-5.04 03/28/25 ADMIN. BLDG. WALL SECTIONS A-A-5.05 03/28/25 ADMIN. BLDG. STAIRS SECTIONS A-A-5.06 03/28/25 ADMIN. BLDG. STAIRS AND ELEVATOR SECTIONS A-A-6.01 03/28/25 ADMIN. BLDG. MAIN LEVEL INTERIOR ELEVATIONS A-A-6.02 03/28/25 ADMIN. BLDG. MAIN LEVEL INTERIOR ELEVATIONS A-A-6.03 03/28/25 ADMIN. BLDG. MAIN LEVEL INTERIOR ELEVATIONS A-A-6.04 03/28/25 ADMIN. BLDG. MAIN LEVEL INTERIOR ELEVATIONS A-A-6.05 03/28/25 ADMIN. BLDG. MAIN LEVEL INTERIOR ELEVATIONS A-A-6.06 03/28/25 ADMIN. BLDG. MAIN LEVEL INTERIOR ELEVATIONS A-A-6.07 03/28/25 ADMIN. BLDG. MAIN LEVEL INTERIOR ELEVATIONS A-A-6.08 03/28/25 ADMIN. BLDG. LOWER LEVEL INTERIOR ELEVATIONS A-A-6.09 03/28/25 ADMIN. BLDG. LOWER LEVEL INTERIOR ELEVATIONS A-A-6.10 03/28/25 ADMIN. BLDG. LOWER LEVEL INTERIOR ELEVATIONS A-A-7.01 03/28/25 ADMIN. BLDG. PARTITION TYPES A-A-7.02 03/28/25 ADMIN. BLDG. MILLWORK A-A-7.03 03/28/25 ADMIN. BLDG. WINDOW & DOOR DETAILS A-A-7.04 03/28/25 ADMIN. BLDG. ROOF DETAILS A-A-7.05 03/28/25 ADMIN. BLDG. BUILDING DETAILS A-A-7.06 03/28/25 ADMIN. BLDG. BUILDING PLAQUE A-A-7.07 03/28/25 ADMIN. BLDG. BUILDING DETAILS A-A-7.08 04/21/25 ADMIN. BLDG. TILT -UP WALL PANELS DETAILS (Addendum #1) S-0.01 03/28/25 GENERAL NOTES S-0.01 03/28/25 SPECIAL INSPECTIONS STRL ABBREVIATIONS S-1.01 03/28/25 CONCRETE SECTIONS S-1.02 03/28/25 CONCRETE PANEL REINF'G & SECTIONS S-1.03 03/28/25 CONCRETE SECTIONS S-1.04 03/28/25 CONCRETE SECTIONS CONCRETE BEAM SCHEDULE S-1.05 03/28/25 CONCRETE SECTIONS S-1.06 03/28/25 CONCRETE SECTIONS S-1.07 03/28/25 CONCRETE SECTIONS S-1.08 03/28/25 CONCRETE SECTIONS S-3.01 03/28/25 STEEL SECTIONS S-3.02 03/28/25 STEEL SECTIONS S-3.03 03/28/25 STEEL SECTIONS S-3.04 03/28/25 STEEL ELEVATIONS AND SECTIONS S-3.05 03/28/25 STEEL SECTIONS S-4.01 03/28/25 CANPOY SECTIONS S-4.02 03/28/25 SECTION THRU CANOPY AND FOUNDATIONS S-4.03 03/28/25 SITE RETAINING WALL PLAN S-A-2.01 03/28/25 FOUNDATION PLAN S-A-2.02 03/28/25 2ND FLOOR FRAMING PLAN S-A-2.03 03/28/25 ROOF FRAMING PLAN M-A-0.01 03/28/25 MECHANICAL GENERAL NOTES & LEGEND M-A-1.01 03/28/25 ADMIN. BLDG. LOWER LEVEL MECHANICAL PLAN M-A-1.02 03/28/25 ADMIN. BLDG. MAIN LEVEL MECHANICAL PLAN M-A-1.03 03/28/25 ADMIN. BLDG. ROOF LEVEL MECHANICAL PLAN M-A-5.01 03/28/25 ADMIN. BLDG. MECHANICAL DETAILS M-A-6.01 03/28/25 ADMIN. BLDG. MECHANICAL SCHEDULES F-A-0.01 03/28/25 FIRE SUPPRESSION GENERAL NOTES & LEGEND F-A-1.01 03/28/25 ADMIN. BLDG. MAIN LEVEL FIRE SUPPRESSION PLAN F-A-1.02 03/28/25 ADMIN. BLDG. LOWER LEVEL FIRE SUPPRESSION PLAN P-A-0.01 03/28/25 PLUMBING GENERAL NOTES & LEGEND P-A-1.00 03/28/25 ADMIN. BLDG. SITE PLUMBING PLAN P-A-2.00 03/28/25 ADMIN. BLDG. ROOF LEVEL PLUMBING PLAN P-A-2.01 03/28/25 ADMIN. BLDG. LOWER LEVEL PLUMBING UNDERSLAB PLAN P-A-2.02 03/28/25 ADMIN. BLDG. MAIN LEVEL PLUMBING UNDERSLAB PLAN P-A-2.03 03/28/25 ADMIN. BLDG. LOWER LEVEL PLUMBING SANITARY WASTE & VENT PLAN P-A-2.04 03/28/25 ADMIN. BLDG. MAIN LEVEL PLUMBING SANITARY WASTE & VENT PLAN Page 6 of 6 Contract Documents List CENTURY OF EXCELLENCE (-ONS Rlit:.7!ON SE.RV•.(.f=c Contract Documents List City of Southlake Municipal Service Center and Public Safety Training Tower Southlake, TX 100% Construction Document - Guaranteed Maximum Price (GMP) Date: 5/19/2025 551 E Berry St. Fort Worth, TX 76110 817/335/3394 FAX 817/877-5507 Sheet Original Sheet Name P-A-2.05 03/28/25 ADMIN. BLDG. LOWER LEVEL PLUMBING DOMESTIC WATER PLAN P-A-2.06 03/28/25 ADMIN. BLDG. MAIN LEVEL PLUMBING DOMESTIC WATER PLAN P-A-5.01 03/28/25 PLUMBING DETAILS P-A-5.02 03/28/25 PLUMBING DETAILS P-A-5.03 03/28/25 PLUMBING DETAILS P-A-6.01 03/28/25 PLUMBING SCHEDULES P-A-7.01 03/28/25 ADMIN. BLDG. PLUMBING RISER DIAGRAMS P-A-7.02 03/28/25 ADMIN. BLDG. PLUMBING RISER DIAGRAMS E-A-0.01 03/28/25 ELECTRICAL GENERAL NOTES AND LEGEND E-A-5.01 03/28/25 ELECTRICAL DETAILS E-A-6.01 03/28/25 ELECTRICAL SCHEDULES E-A-6.02 03/28/25 ELECTRICAL SCHEDULES E-A-7.01 03/28/25 ELECTRICAL DIAGRAMS EL-A-1.01 03/28/25 ADMIN. BLDG. MAIN LEVEL ELECTRICAL LIGHTING PLAN EL-A-1.02 03/28/25 ADMIN. BLDG. LOWER LEVEL ELECTRICAL LIGHTING PLAN EP-A-1.01 03/28/25 ADMIN. BLDG. MAIN LEVEL ELECTRICAL POWER PLAN EP-A-1.02 03/28/25 ADMIN. BLDG. LOWER LEVEL ELECTRICAL POWER PLAN EP-A-1.03 03/28/25 ADMIN. BLDG. ROOF LEVEL ELECTRICAL PLAN EP-A-4.01 03/28/25 ADMIN. BLDG. ENLARGED PLANS ES-A-1.00 03/28/25 ELECTRICAL POWER SITE PLAN ES-A-1.01 03/28/25 ELECTRICAL SITE LIGHTING PLAN ES-A-1.02 04/21/25 ELECTRICAL SITE LIGHTING PHOTOMETRICS (Addendum #1) TN-A-0.01 03/28/25 TECHNOLOGY GENERAL NOTES AND LEGEND TN-A-1.01 03/28/25 ADMIN. BLDG. MAIN LEVEL TECHNOLOGY PLAN TN-A-1.02 03/28/25 ADMIN. BLDG. LOWER LEVEL TECHNOLOGY PLAN TN-A-2.01 03/28/25 ADMIN. BLDG. MAIN LEVEL TECHNOLOGY CEILING PLAN TN-A-2.02 03/28/25 ADMIN. BLDG. LOWER LEVEL TECHNOLOGY CEILING PLAN TN-A-4.01 03/28/25 TECHNOLOGY ENLARGED PLAN TN-A-4.02 03/28/25 TECHNOLOGY ENLARGED PLAN TNZ-A-1.02 03/28/25 TECHNOLOGY DETAILS TY-A-0.01 03/28/25 SECURITY GENERAL NOTES AND LEGEND TY-A-1.01 03/28/25 ADMIN. BLDG. MAIN LEVEL SECURITY PLAN TY-A-1.02 03/28/25 ADMIN. BLDG. LOWER LEVEL SECURITY PLAN TYZ-A-1.01 03/28/25 SECURITY DETAILS A-B-2.00 03/28/25 SERVICE BAY BLDG. LIFE SAFETY PLAN A-B-2.01 03/28/25 SERVICE BAY BLDG. FLOOR PLAN A-B-2.02 03/28/25 SERVICE BAY BLDG. ROOF PLAN A-B-2.03 03/28/25 SERVICE BAY BLDG. REFLECTED CEILING PLAN A-B-2.04 03/28/25 SERVICE BAY BLDG. FINISH FLOOR PLAN A-B-2.05 03/28/25 SERVICE BAY BLDG. ENLARGED PLANS A-B-2.06 03/28/25 SERVICE BAY BLDG. ENLARGED PLANS A-B-3.01 03/28/25 SERVICE BAY BLDG. SCHEDULES A-B-4.01 03/28/25 SERVICE BAY BLDG. EXTERIOR ELEVATIONS A-B-4.02 03/28/25 SERVICE BAY BLDG. EXTERIOR ELEVATIONS A-B-5.01 03/28/25 SERVICE BAY BLDG. BUILDING SECTIONS A-B-5.02 03/28/25 SERVICE BAY BLDG. WALL SECTIONS A-B-5.03 03/28/25 SERVICE BAY BLDG. WALL SECTIONS A-B-6.01 03/28/25 SERVICE BAY BLDG. INTERIOR ELEVATIONS A-B-6.02 03/28/25 SERVICE BAY BLDG. INTERIOR ELEVATIONS A-B-6.03 03/28/25 SERVICE BAY BLDG. INTERIOR ELEVATIONS A-B-6.04 03/28/25 SERVICE BAY BLDG. INTERIOR ELEVATIONS A-B-6.05 03/28/25 SERVICE BAY BLDG. INTERIOR ELEVATIONS A-B-6.06 03/28/25 SERVICE BAY BLDG. INTERIOR ELEVATIONS A-B-6.07 03/28/25 SERVICE BAY BLDG. INTERIOR ELEVATIONS A-B-6.08 03/28/25 SERVICE BAY BLDG. INTERIOR ELEVATIONS A-B-6.09 03/28/25 SERVICE BAY BLDG. INTERIOR ELEVATIONS A-B-6.10 03/28/25 SERVICE BAY BLDG. INTERIOR ELEVATIONS A-B-6.11 03/28/25 SERVICE BAY BLDG. INTERIOR ELEVATIONS A-B-6.12 03/28/25 SERVICE BAY BLDG. INTERIOR ELEVATIONS Page 7 of 7 Contract Documents List CENTURY OF EXCELLENCE CUNS'i Rlit:.PO SE.f3V i.f=c Contract Documents List City of Southlake Municipal Service Center and Public Safety Training Tower Southlake, TX 100% Construction Document - Guaranteed Maximum Price (GMP) Date: 5/19/2025 551 E Berry St. Fort Worth, TX 76110 817/335/3394 FAX 817/877-5507 Sheet Original Sheet Name A-B-6.13 03/28/25 SERVICE BAY BLDG. INTERIOR ELEVATIONS A-B-6.14 03/28/25 SERVICE BAY BLDG. INTERIOR ELEVATIONS A-B-7.01 03/28/25 SERVICE BAY BLDG. WINDOW & DOOR DETAILS A-B-7.02 03/28/25 SERVICE BAY BLDG. DETAILS A-B-7.03 03/28/25 SERVICE BAY BLDG. DETAILS A-B-7.04 03/28/25 SERVICE BAY BLDG. MILLWORK DETAILS A-B-7.05 03/28/25 SERVICE BAY BLDG. ROOF AND WALL DETAILS A-B-7.06 03/28/25 SERVICE BAY BLDG. PARTITION TYPES S-0.01 03/28/25 GENERAL NOTES S-0.02 03/28/25 SPECIAL INSPECTIONS STRL ABBREVIATAOINS S-1.01 03/28/25 CONCRETE SECTIONS S-1.02 03/28/25 CONCRETE SECTIONS S-B-2.01 03/28/25 FOUNDATION PLAN M-B-0.01 03/28/25 MECHANICAL GENERAL NOTES AND LEGENDS M-B-1.01 03/28/25 SERVICE BAY BLDG. FLOOR LEVEL MECHANICAL PLAN MH-B-1.01 04/21/25 SERVICE BAY BLDG. FLOOR LEVEL MECHANICAL HVAC PLAN (Addendum #1) M-B-1.02 03/28/25 SERVICE BAY BLDG. ROOF LEVEL MECHANICAL PLAN M-B-5.01 03/28/25 MECHANICAL DETAILS M-B-6.01 04/21/25 MECHANICAL SCHEDULES (Addendum #1) M-B-8.01 03/28/25 MECHANICAL CONTROLS MP-B-1.01 04/21/25 SERVICE BAY BLDG- FLOOR LEVEL MECHANICAL PIPING PLAN (Addendum #1) P-B-0.01 03/28/25 PLUMBING GENERAL NOTES AND LEGEND P-B-1.00 03/28/25 SERVICE BAY BLDG. SITE PLUMBING PLAN P-B-2.01 03/28/25 SERVICE BAY BLDG. PLUMBING UNDERSLAB PLANS P-B-2.02 03/28/25 SERVICE BAY BLDG. PLUMBING WASTE & VENT PLANS P-B-2.03 03/28/25 SERVICE BAY BLDG. PLUMBING SUPPLY PLANS P-B-5.01 03/28/25 PLUMBING DETAILS P-B-5.02 03/28/25 PLUMBING DETAILS P-B-6.01 03/28/25 PLUMBING SCHEDULES P-B-6.02 03/28/25 PLUMBING SCHEDULES P-B-7.01 03/28/25 PLUMBING RISER DIAGRAMS E-B-0.01 03/28/25 ELECTRICAL GENERAL NOTES AND LEGEND E-B-5.01 03/28/25 ELECTRICAL DETAILS E-B-6.01 03/28/25 ELECTRICAL SCHEDULES E-B-6.02 03/28/25 ELECTRICAL SCHEDULES E-B-7.01 03/28/25 ELECTRICAL DIAGRAMS EL-B-1.01 03/28/25 SERVICE BAY BLDG. ELECTRICAL LIGHTING PLAN EP-B-1.01 03/28/25 SERVICE BAY BLDG. ELECTRICAL POWER PLAN ES-B-1.00 03/28/25 SERVICE BAY SITE PLAN SB-B-1.01 03/28/25 SERVICE BAY SITE LIGHTING SB-B-1.02 04/21/25 ELECTRICAL SITE LIGHTING PHOTOMETRICS (Addendum #1) FP-B-0.01 03/28/25 FIRE PROTECTION GENERAL NOTES AND LEGEND FP-B-2.01 03/28/25 SERVICE BAY BLDG. FIRE PROTECTION PLAN TN-B-0.01 03/28/25 TECHNOLOGY GENERAL NOTES AND LEGEND TN-B-1.01 03/28/25 SERVICE BAY BLDG. TECHNOLOGY PLAN TNZ-B-1.01 03/28/25 TECHNOLOGY DETAILS TY-B-0.01 03/28/25 SECURITY GENERAL NOTES AND LEGEND TY-B-1.01 03/28/25 SERVICE BAY BLDG. SECURITY PLAN TYZ-B-1.01 03/28/25 SECURITY DETAILS A-C-0 03/28/25 COVER AND BUILDING INFORMATION A-C-1.00 03/28/25 PUBLIC SAFETY TRAINING TOWER - ACCESSIBILITY & SIGNAGE A-C-1.01 03/28/25 SITE PLAN A-C-2.00 03/28/25 PUBLIC SAFETY TRAINING TOWER - LIFE SAFETY PLAN A-C-2.01 03/28/25 PUBLIC SAFETY TRAINING TOWER - FIRST FLOOR PLAN A-C-2.02 03/28/25 PUBLIC SAFETY TRAINING TOWER - SECOND FLOOR PLAN A-C-2.03 03/28/25 PUBLIC SAFETY TRAINING TOWER - THIRD FLOOR PLAN A-C-2.04 03/28/25 PUBLIC SAFETY TRAINING TOWER - FOURTH FLOOR PLAN A-C-2.05 03/28/25 PUBLIC SAFETY TRAINING TOWER - ROOF PLAN Page 8 of 8 Contract Documents List CENTURY OF EXCELLENCE C-ONS Rlit:.7!ON SE.RV•.t.f=c Contract Documents List City of Southlake Municipal Service Center and Public Safety Training Tower Southlake, TX 100% Construction Document - Guaranteed Maximum Price (GMP) Date: 5/19/2025 551 E Berry St. Fort Worth, TX 76110 817/335/3394 FAX 817/877-5507 Sheet Original Sheet Name A-C-2.06 03/28/25 PUBLIC SAFETY TRAINING TOWER - REFLECTED CEILING PLANS A-C-2.07 03/28/25 PUBLIC SAFETY TRAINING TOWER - REFLECTED CEILING PLANS A-C-2.08 03/28/25 PUBLIC SAFETY TRAINING TOWER - FINISH FLOOR PLAN A-C-3.01 03/28/25 PUBLIC SAFETY TRAINING TOWER - SCHEDULES A-C-4.01 03/28/25 PUBLIC SAFETY TRAINING TOWER - EXTERIOR ELEVATIONS A-C-4.02 03/28/25 PUBLIC SAFETY TRAINING TOWER - EXTERIOR ELEVATIONS A-C-4.03 03/28/25 PUBLIC SAFETY TRAINING TOWER - EXTERIOR ELEVATIONS A-C-4.04 03/28/25 PUBLIC SAFETY TRAINING TOWER - EXTERIOR ELEVATIONS A-C-5.01 03/28/25 PUBLIC SAFETY TRAINING TOWER - BULDING SECTIONS A-C-5.02 03/28/25 PUBLIC SAFETY TRAINING TOWER - BULDING SECTIONS A-C-5.03 03/28/25 PUBLIC SAFETY TRAINING TOWER - BULDING SECTIONS A-C-5.04 03/28/25 PUBLIC SAFETY TRAINING TOWER - BULDING SECTIONS A-C-5.05 03/28/25 PUBLIC SAFETY TRAINING TOWER - BULDING SECTIONS A-C-5.06 03/28/25 PUBLIC SAFETY TRAINING TOWER - BULDING SECTIONS A-C-5.07 03/28/25 PUBLIC SAFETY TRAINING TOWER - WALL SECTIONS A-C-5.08 03/28/25 PUBLIC SAFETY TRAINING TOWER - WALL SECTIONS A-C-5.09 03/28/25 PUBLIC SAFETY TRAINING TOWER - ENLARGED STAIR #1 SECTION & DETAILS A-C-5.10 03/28/25 PUBLIC SAFETY TRAINING TOWER - ENLARGED STAIR #2 SECTION & DETAILS A-C-5.11 03/28/25 PUBLIC SAFETY TRAINING TOWER - ENLARGED MANHOLE TUNNEL PLAN & SECTION A-C-5.12 03/28/25 PUBLIC SAFETY TRAINING TOWER - ENLARGED EXHAUST ENCLOSURE WALL A-C-6.01 03/28/25 PUBLIC SAFETY TRAINING TOWER - INTERIOR ELEVATIONS A-C-6.02 03/28/25 PUBLIC SAFETY TRAINING TOWER - INTERIOR ELEVATIONS A-C-6.03 03/28/25 PUBLIC SAFETY TRAINING TOWER - INTERIOR ELEVATIONS A-C-6.04 03/28/25 PUBLIC SAFETY TRAINING TOWER - INTERIOR ELEVATIONS A-C-6.05 03/28/25 PUBLIC SAFETY TRAINING TOWER - INTERIOR ELEVATIONS A-C-6.06 03/28/25 PUBLIC SAFETY TRAINING TOWER - INTERIOR ELEVATIONS A-C-7.01 03/28/25 PUBLIC SAFETY TRAINING TOWER - WINDOW & DOOR DETAILS A-C-7.02 03/28/25 PUBLIC SAFETY TRAINING TOWER - BUILDING DETAILS A-C-7.03 03/28/25 PUBLIC SAFETY TRAINING TOWER - BUILDING DETAILS A-C-7.04 03/28/25 PUBLIC SAFETY TRAINING TOWER - PARTITION TYPES A-C-9.01 03/28/25 PUBLIC SAFETY TRAINING TOWER - KFT A-C-9.02 03/28/25 PUBLIC SAFETY TRAINING TOWER - KFT A-C-9.03 03/28/25 PUBLIC SAFETY TRAINING TOWER - KFT A-C-9.04 03/28/25 PUBLIC SAFETY TRAINING TOWER - KFT A-C-9.05 03/28/25 PUBLIC SAFETY TRAINING TOWER - KFT A-C-9.06 03/28/25 PUBLIC SAFETY TRAINING TOWER - KFT A-C-9.07 03/28/25 PUBLIC SAFETY TRAINING TOWER - KFT A-C-9.08 03/28/25 PUBLIC SAFETY TRAINING TOWER - KFT A-C-9.09 03/28/25 PUBLIC SAFETY TRAINING TOWER - KFT A-C-9.10 03/28/25 PUBLIC SAFETY TRAINING TOWER - KFT A-C-9.11 03/28/25 PUBLIC SAFETY TRAINING TOWER - KFT S-C-0.01 03/28/25 GENERAL NOTES S-C-0.02 03/28/25 SPECIAL INSPECTIONS STRL ABBREVIATIONS S-C-1.01 03/28/25 CONCRETE SECTIONS S-C-1.02 03/28/25 CONCRETE SECTIONS S-C-1.03 03/28/25 CONCRETE SECTIONS S-C-2.01 03/28/25 FOUNDATION PLAN S-C-2.02 03/28/25 2ND FLOOR FRAMING PLAN S-C-2.03 03/28/25 3RD FLOOR FRAMING PLAN S-C-2.04 03/28/25 4TH FLOOR FRAMING PLAN S-C-2.05 03/28/25 ROOF FRAMING PLAN S-C-3.01 03/28/25 STEEL SECTIONS S-C-3.02 03/28/25 STEEL ELEVATIONS & SECTIONS M-C-0.01 03/28/25 PUBLIC SAFETY TRAINING TOWER MECHANICAL GENERAL NOTES & M-C-1.01 03/28/25 PUBLIC SAFETY TRAINING TOWER MECHANICAL PLANS Page 9 of 9 Contract Documents List CENTURY OF EXCELLENCE CUNS'i RU1-..P0 SE.f3V•.i..f=c Contract Documents List City of Southlake Municipal Service Center and Public Safety Training Tower Southlake, TX 100% Construction Document - Guaranteed Maximum Price (GMP) Date: 5/19/2025 551 E Berry St. Fort Worth, TX 76110 817/335/3394 FAX 817/877-5507 Sheet Original Sheet Name M-C-5.01 03/28/25 PUBLIC SAFETY TRAINING TOWER MECHANICAL DETAILS M-C-6.01 03/28/25 PUBLIC SAFETY TRAINING TOWER MECHANICAL SCHEDULES M-C-8.01 03/28/25 PUBLIC SAFETY TRAINING TOWER MECHANICAL CONTROLS MH-C-1.01 04/21/25 PUBLIC SAFETY TRAINING TOWER MECHANICAL HVAC PLANS (Addendum #1) MP-C-1.01 04/21/25 PUBLIC SAFETY TRAINING TOWER MECHANICAL PIPING PLANS (Addendum #1) FX-C-0.01 03/28/25 FIRE PROTECTION GENERAL NOTES AND LEGEND FX-C-1.01 03/28/25 FIRE TRAINING TOWER FIRE PROTECTION PLAN P-C-0.01 03/28/25 PLUMBING GENERAL NOTES AND LEGEND P-C-1.00 03/28/25 FIRE TRAINING TOWER SITE PLUMBING PLAN P-C-2.00 03/28/25 FIRE TRAINING TOWER PLUMBING UNDERSLAB PLAN P-C-2.01 03/28/25 FIRE TRAINING TOWER PLUMBING WASTE & VENT PLAN P-C-2.02 03/28/25 FIRE TRAINING TOWER PLUMBING SUPPLY PLANS P-C-3.01 03/28/25 PLUMBING DETAILS P-C-4.01 03/28/25 PLUMBING SCHEDULES P-C-5.01 03/28/25 PLUMBING DIAGRAMS E-C-0.01 03/28/25 ELECTRICAL GENERAL NOTES AND LEGEND TN-C-0.01 03/28/25 TECHNOLOGY GENERAL NOTES AND LEGEND TN-C-1.01 03/28/25 PUBLIC SAFETY TRAINING TOWER TECHNOLOGY PLAN TNZ-C-1.01 03/28/25 TECHNOLOGY DETAILS TY-C-0.01 03/28/25 SECURITY GENERAL NOTES AND LEGEND TY-C-1.01 03/28/25 PUBLIC SAFETY TRAINING TOWER SECURITY PLAN TYZ-C-1.01 03/28/25 SECURITY DETAILS EL-C-1.01 03/28/25 PUBLIC SAFETY TRAINING TOWER ELECTRICAL LIGHTING PLAN ES-C-1.00 03/28/25 PUBLIC SAFETY TRAINING TOWER SITE PLAN ES-C-1.01 03/28/25 PUBLIC SAFETY TRAINING TOWER SITE LIGHTING PLAN E-C-5.01 03/28/25 ELECTRICAL DETAILS E-C-6.01 03/28/25 ELECTRICAL SCHEDULES E-C-7.01 03/28/25 ELECTRICAL DIAGRAMS EP-C-1.01 03/28/25 PUBLIC SAFETY TRAINING TOWER ELECTRICAL POWER PLAN EP-C-1.03 03/28/25 PUBLIC SAFETY TRAINING TOWER ROOF LEVEL POWER PLAN EP-C-1.02 03/28/25 PUBLIC SAFETY TRAINING TOWER ELECTRICAL POWER PLAN ES-C-1.02 04/21/25 ELECTRICAL SITE LIGHTING PHOTOMETRICS (Addendum #1) EP-C-1.02 03/28/25 PUBLIC SAFETY TRAINING TOWER ROOF LEVEL POWER PLAN EP-C-1.03 03/28/25 Addenda Addendum #1 04/21/25 Addendum #1 Page 10 of 10 Contract Documents List Byrne Construction Services Southlake Municipal Service Center & Public Safety Training Tower Exhibit "A.5" Allowances The allowances indicated below are included in this GMP. 1. Standard 50hp Fire Pump at Service Bay Building $42,500 2. Static Uninterruptible Power Supply $100,000 CONSTRUCTION SERVICES Allowances NINE DECADES OF EXCELLENCE 551 E. Berry Street Fort Worth, Texas 76110 (817)335-3394 Fax (817) 877-5507 Southlake Municipal Service Center & Public Safety Training Tower 100% Construction Document - Guaranteed Maximum Price (GMP) Date: May 19, 2025 Allowances by Byrne Construction for work requiring clarifcation 1 Standard 50hp Fire Pump at Service Bay Building $ 42,500 Pending design information 2 Static Uninterruptible Power Supply $ 100,000 Pending design information Page 1 of 1 Allowances Byrne Construction Services Southlake Municipal Service Center & Public Safety Training Tower Exhibit "A.6" Qualifications & Clarifications See attached Qualifications & Clarifications dated May 19, 2025. BYRN CONSTRUCTION SERVICES CENTURY OF EXCELLENCE 551 E. Berry Street Fort Worth, Texas 76110 (817)335-3394 Fax (817) 877-5507 Qualifications & Clarifications - (REVISED) Southlake Municipal Service Center & Public Safety Training Tower 100% Construction Document - Guaranteed Maximum Price (GMP) Date: May 21, 2025 General Conditions: 1 A Contractor's Construction Contingency of 3% is included in this GMP, and is intended for construction use only. This is calculated as 3% of the Cost of Work Subtotal. 2 A Market Volatility Contingency of 1 % is included in this GMP, and is intended for construction use only. This is calculated as 1 % of the Cost of Work Subtotal. 3 An Owner Contingency of 6% is included in this GMP. This is calculated as 6% of the Cost of Work Subtotal. 4 A construction fee of 2.25% is included on the cost summary, and is based upon the total construction cost. This is calculated on the subtotal prior to fees. 5 Builders Risk Insurance is included, and based upon the total cost. 6 CGL & Umbrella Insurance is included, and based upon the total cost. 7 Payment and Performance bonds for Byrne have been included on the cost summary, and are based upon the total cost. 8 The CM re -construction services fee is included in this GMP. 9 All costs associated with approvals, easements, assessments, fees, deposits, charges, permits, studies, impact fees, tap fees, services fees, or similar, required by any governing agency to include County, City, State, or Federal entities, in addition to any and all utility entities are specifically excluded. 10 Building permit cost is excluded. 11 Testing Lab services for materials, mock-ups, or delegated engineering components are to be provided by the Owner, and are excluded. 12 Testing of building components for water or air intrusion is not included and is to be provided by the Owner. 13 Commissioning Agent and Services are to be provided by the Owner. 14 The General Conditions included in this estimate are based upon approximately 15 months to substantial completion. 15 Design Fees or services are not included. Where required in the specifications, the Construction Manager will provide design calculations and information provided by the Trade Contractors to the Architect and Engineer for approval and acceptance of the design. 10 Commissioning Agent and Services are to be provided by the Owner. 11 The CM does not warrant of guarantee functionality of the design with the Owner's requirements. The CM relies upon the designers to provide and implement the Owner's requirements into the design documents. 12 Includes trucks, fuel, tolls, and maintenance related to the Byrne personnel assigned to this project. Truck / Auto Allowance is inclusive of vehicle costs, insurance, fuel and maintenance. 13 All costs for mobile phones is inclusive of mobile data management. 14 All electrical and natural gas utility costs associated with construction are excluded. Owner shall pay for utility costs associated with construction. 15 All water costs associated with construction is excluded. Owner shall pay for utility costs associated with construction. 16 All initial and final survey's and plats required by the City are by the Owner. 17 This GMP is to be reviewed as a whole; not as individual line items. Temporary 1 JAII costs associated with temporary fencing and gates is included. General Comment: 1 Sales taxis excluded. 2 This GMP is based upon electronic design document files and models being available to all subcontractors at no additional cost. 3 All furnishings, fixtures, and equipment are excluded from this GMP. Page 1 of 4 Qualifications & Clarifications HYRINE CONSTRUCTION SERVICES CENTURY OF EXCELLENCE 551 E. Berry Street Fort Worth, Texas 76110 (817) 335-3394 Fax (817) 877-5507 Qualifications & Clarifications - (REVISED) Southlake Municipal Service Center & Public Safety Training Tower 100% Construction Document - Guaranteed Maximum Price (GMP) Date: May 21, 2025 4 LEED management of onsite waste and documentation of LEED compliances is excluded. 5 All hazardous or contaminated material and soil testing, remediation, investigation, and abatement is excluded. 6 The Fuel Island and associated Canopy system are excluded from this GMP and assumed to be by Owner. Byrne shall provide rough grades and conduit stub -ups, only. Everything above the subgrade shall be by Owner. 7 1 Site is assumed to be free of any contaminates, unencumbered, and ready to begin excavation work. Division 3 - Concrete: 1 Concrete is included as indicated. 2 Suspended concrete slabs, concrete columns, and concrete beams are included as indicated at the Public Safety Training Tower. (REVISED 5/21/2025) 3 Concrete paving is included as indicated. GMP excludes concrete paving systems associated with Alternates #1 & #2. Reference Alternate Cost Summary Sheets to review pricing associated with site paving Alternates #1 & #2. Alternate pricing is only valid for 30 days. Pricing is subject to change after June 19, 2025. Division 4 - Masonry: 11 Masonry (brick, stone, CMU, or cast stone) is included as indicated. 21 Masonry fence/columns are excluded none indicated). Division 5 - Metals: 1 Structural steel framing and miscellaneous metals are included as indicated. 2 Steel framed canopy structures with standard metal roof decking are included at the covered parking structures, material storage bins, pole barn, and Owner -provided storage container area. 3 Erection of concrete tilt wall panels and structural steel are included. 4 Excludes architecturally exposed structural steel AESS services. Wood, Plastics and Composites: 11 Rough carpentry (in -wall blocking) is included as indicated. 21 Finish carpentry systems base cabinets wall cabinets countertops, window sills etc. are included as indicated. Division 7 - Thermal and Moisture Protection: 1 Roofing systems and associated roof blocking are included as indicated. 2 TPO membrane roofing is excluded at the high roof of the Public Safety Training Tower (none indicated). Plans indicate an exposed concrete roof system at the high roof of the Public Safety Training Tower. 3 Metal roofing is excluded at the steel framed canopy structures indicated at the covered parking structures, material storage bins, pole barn, and Owner -provided storage container area. Includes a standard metal roof deck without additional metal roofing systems none indicated). 4 Waterproofing systems and interior/exterior sealants are included as indicated. 5 Spray -applied and intumescent fireproofing is excluded. 6 Includes metal soffit panels and wall panels as indicated. 7 Spray -applied insulation is included as indicated. 8 Below grade waterproofing is included as indicated. •. 1 Doors, frames, and hardware are included as indicated. 2 Overhead doors are included as indicated. 3 Interior and exterior Glass/glazing systems are included as indicated. Page 2 of 4 Qualifications & Clarifications BYRINE CONSTRUCTION SERVICES CENTURY OF EXCELLENCE 551 E. Berry Street Fort Worth, Texas 76110 (817) 335-3394 Fax (817) 877-5507 Qualifications & Clarifications - (REVISED) Southlake Municipal Service Center & Public Safety Training Tower 100% Construction Document - Guaranteed Maximum Price (GMP) Date: May 21, 2025 Finis'NW- 11 Drywall framing systems are included as indicated. 2 Tile is included as indicated. 3 Resilient flooring systems are included as indicated. 4 Carpet flooring is included as indicated. (REVISED 5/21/2025) 5 Includes cement board soffits stems as indicated. 6 Includes substitute acoustic wall panels (basis -of -design: Acousti-Tack ATF Wall Panels) in lieu of the "as specified" Acoufelt "Filter Wall Panel" system Owner approved cost value option). 71 Interior and exterior paint systems are included as indicated. Division i - Specialties: 1 Toilet accessories and miscellaneous specialties are included as indicated. 2 Interior and exterior signage systems are included as indicated. 3 Prefabricated aluminum canopies are included as indicated. Division 11 -Equipment: 1 Hoist/Trolley cranes are excluded (none indicated). 2 Includes laboratory equipment at the Environmental Laboratory (Administration Building) as indicated. 3 Fire training props are included in this estimate for the Public Safety Training Tower as indicated. 4 Residential appliances are included as indicated. Division 12 - Furnishings: 11 Manual horizontal louver blind window treatments are included as indicated. 21 Excludes motor -operated window treatments. Division 13 - Special Construction: 1 Pre-engineered metal building (PEMB) structures are included as indicated. 2 Includes PEMB scope for 12' curb mounted skylights in lieu of translucent polycarbonate roof panels at the Service Bay Building roofing system as approved by Owner. 3 PEMB scope is based on a standard Kynar finish in lieu of a 3-coat Kynar Finish (Owner approved cost value .option). 4 Includes PEMB scope for rod -hung canopy systems (BOD: Metallic Products, Personnel Door Canopies) in lieu of the prefabricated specified Mapes Canopy systems at the Service Bay Building 11 EA). 5 PEMB scope is based on an exposed fastener corrugated (PBR) metal panel system (MBCI or similar) in lieu of a concealed fastener metal wall panel system as specified (Specified BOD: Berridge FW 12). This is an Owner a roved cost value option. Division 14 - Conveying Equipment: 11 Elevator is included as indicated. Suppression:Division 21 - Fire 11 Fire sprinkler systems are included as indicated. 2 An allowance of $42,500 is includes for a standard 50hp fire pump at the Service Bay Building. Division 22 - Plumbing: 11 Plumbing systems are included as indicated. 21 Includes two (2) 1,000 gallon propane tanks and associated piping as indicated. Division 23 - Heating, Ventilating and Air Conditioning: 11 HVAC systems are included as indicated. 2 Testing, adjusting, and balancing services are included as indicated. Page 3 of 4 Qualifications & Clarifications HYRINE CONSTRUCTION SERVICES CENTURY OF EXCELLENCE 551 E. Berry Street Fort Worth, Texas 76110 (817) 335-3394 Fax (817) 877-5507 Qualifications & Clarifications - (REVISED) Southlake Municipal Service Center & Public Safety Training Tower 100% Construction Document - Guaranteed Maximum Price (GMP) Date: May 21, 2025 1 Electrical and lighting systems are included as indicated. 2 Lightning protection systems are included as indicated. 3 An allowance of $100,000 is included for the proposed Static Uninterruptible Power Supply system as outlined in specification 263353 - Static Uninterruptible Power Supply due to a lack of information provided on the plans. 4 Generator enclosures are excluded. Division 27 - Communications & Audio Visual: 1 lCommunications systems are excluded as Owner-Furnished/Owner-Installed. 2 Audio/Visuals stems are excluded as Owner-Furnished/Owner-Installed. Division 28 - Electronic Safety and Security: 1 ISecurity and Access Control systems are excluded as Owner-Furnished/Owner-Installed. Division 31 - Earthwork: 1 Earthwork is included as indicated. 2 Includes 8" of lime stabilization treatments beneath all vehicular paving systems and flexbase paving systems. 3 Excludes filter fabric beneath flexbase paving systems none indicated). Division 32 - Exterior Improvements: 1 Concrete bin blocks are included as indicated. 2 Pavement markings are included as indicated. 3 Fences, gates, and gate operators are included. Includes chain link fencing systems with privacy slats and 3- strand barbed wire as indicated. 4 Due to warranty and constructability concerns associated with the specified basis -of -design decorative fencing system (BOD: Ameristar Montage II modified to include cedar privacy slats), the GMP is based upon a Fence Trac fencing system with wood -look PVC privacy slats (BOD: UltraBlend) at the decorative metal fencing systems. This is an Owner approved cost value option. 5,Landscaping and irrigation is included as indicated. Division 33 - Utilities: 11 1 ISite Utilities are included as indicated. Page 4 of 4 Qualifications & Clarifications