Loading...
Item 4C - Attachment B- Carroll Ave Mobility Improvements Review LetterPage 1 kimley-horn.com 225 E. John W. Carpenter Freeway, Suite 1100, Irving, TX, 75062 214 420 5600 April 8, 2025 Josué A. Hernandez, P.E. Project Manager City of Southlake RE:Bid for Carroll Avenue Mobility Improvements KH# 061237047 Mr. Hernandez, On March 28, 2025, the City of Southlake received bids for the Carroll Avenue Mobility Improvements project. The bid received is listed below. Bidder Total Bid Tejas Cutters, LLC $847,886.97* * Note: Calculation errors were discovered for bid items 37, 48, 49, 50, 60, and 80. Calculation and written errors were discovered for bid items 35, 69, and 78. The contractor’s written unit price was the price utilized for the total bid tabulation. The total cost listed above represents the corrected tabulated cost based on the items noted. Kimley-Horn and Associates, Inc. (Kimley-Horn) has reviewed the bid and contacted references for the bidder. Tejas Cutters, LLC Brandon Gibbs with TxDOT confirmed Tejas Cutters worked on the Navarro Bridge Reconstruction project for TxDOT. The project consisted of bridge reconstruction where Tejas performed drainage and dirt work with extensive rip-rap installation amounting to $1,063,570.31. The project is ongoing and is estimated to be completed on time and within budget. Tejas was a sub-contractor for this project and did not use any subsequent sub-contractors for their scope of work. Mr. Gibbs stated that there have not been any issues with Tejas, and the only change order was due to TxDOT changing their scope of work. Tejas performed work in the associated creek to remove and re-install existing rip-rap with no issues. Mr. Gibbs stated he would work with Tejas again. Enclosed is a copy of the bid tabulation for your reference. Sincerely, KIMLEY-HORN AND ASSOCIATES, INC John Ryan, P.E. Received by : KIMLEY-HORN AND ASSOCIATES, INC. Owner: Job No.: Project: Date: Item No.Specification Item Description Bid Plans Quantity Unit Unit Price Item Cost Unit Price Item Cost 1 TXDOT 100 PREPARING ROW 1 LS $35,000.00 $35,000.00 $40,000.00 $40,000.00 2 TXDOT 500 MOBILIZATION 1 LS $45,000.00 $45,000.00 $50,000.00 $50,000.00 3 NCTCOG 107.21 PROJECT SIGN 2 EA $650.00 $1,300.00 $2,500.00 $5,000.00 4 TXDOT 503 PORTABLE CHANGEABLE MESSAGE SIGN 1 LS $20,000.00 $20,000.00 $25,000.00 $25,000.00 5 TXDOT 110 EXCAV (ROADWAY)415 CY $30.00 $12,450.00 $40.00 $16,600.00 6 TXDOT 162 BLOCK SODDING 125 SY $15.00 $1,875.00 $20.00 $2,500.00 7 TXDOT 160 FURNISH AND PLACE TOPSOIL (4")125 SY $20.00 $2,500.00 $10.00 $1,250.00 8 TXDOT 247 FL BS (CMP INPLC)(TY A GR 1-2)(6" FLEXIBLE BASE)779 SY $24.91 $19,404.89 $80.00 $62,320.00 9 TXDOT 247 FL BS (CMP INPLC)(TY A GR 1-2)(8" FLEXIBLE BASE)266 SY $33.83 $8,998.78 $90.00 $23,940.00 10 TXDOT 341 2" D-GR HMA TY-D PG64-22 127 SY $31.87 $4,047.49 $50.00 $6,350.00 11 TXDOT 341 4" D-GR HMA TY-B PG64-22 127 SY $42.02 $5,336.54 $65.00 $8,255.00 12 TXDOT 341 5" D-GR HMA TY-B PG64-22 266 SY $51.62 $13,730.92 $75.00 $19,950.00 13 TXDOT 360 CONC PVMT (CONT REINF - CRCP) (8")636 SY $105.00 $66,780.00 $160.00 $101,760.00 14 TXDOT 528 LANDSCAPE PAVERS 201 SY $25.00 $5,025.00 $120.00 $24,120.00 15 TXDOT 528 COLORED TEXTURED CONC (8")(INTEGRAL COLORED)41 SY $155.00 $6,355.00 $250.00 $10,250.00 16 TXDOT 529 CONC CURB (MONO) (6")799 LF $2.00 $1,598.00 $45.00 $35,955.00 17 TXDOT 529 CONCRETE CURB AND GUTTER (TY II)412 LF $35.00 $14,420.00 $20.00 $8,240.00 18 TXDOT 532 CURB RAMPS (TY 7)2 EA $2,400.00 $4,800.00 $5,000.00 $10,000.00 19 TXDOT 531 CONCRETE SIDEWALK (4")27 SY $105.00 $2,835.00 $125.00 $3,375.00 20 NCTCOG 201,203,204 TREE REMOVAL 5 EA $500.00 $2,500.00 $2,500.00 $12,500.00 21 NCTCOG 702 GRATE INLET 1 EA $3,500.00 $3,500.00 $8,000.00 $8,000.00 22 NCTCOG 502 RELOCATE EXISTING WATER METER 1 EA $2,500.00 $2,500.00 $1,500.00 $1,500.00 23 NCTCOG 502 ADJUST EXISTING WATER VALVE TO PROP GRADE 2 EA $250.00 $500.00 $1,000.00 $2,000.00 24 NCTCOG 502 ADJUST EXISTING STORM MANHOLE TO PROP GRADE 1 EA $550.00 $550.00 $4,000.00 $4,000.00 25 TXDOT 192 HARDWOOD MULCH (3" DEPTH)(MATCH EXISTING COLOR)43 SY $30.00 $1,290.00 $10.00 $430.00 26 TXDOT 506 EROSION AND SEDIMENTATION CONTROL (SWPPP)1 LS $2,000.00 $2,000.00 $10,000.00 $10,000.00 27 TXDOT 502 BARRICADES, SIGNS, AND TRAFFIC HANDLING 1 LS $8,000.00 $8,000.00 $50,000.00 $50,000.00 28 TXDOT 666 PAVEMENT MARKINGS 1 LS $9,790.00 $9,790.00 $25,000.00 $25,000.00 29 TXDOT 644 7001 IN SM RD SN SUP&AM TY10BWG(1)SA(P)7 EA $841.00 $5,887.00 $900.00 $6,300.00 30 TXDOT 644 7004 IN SM RD SN SUP&AM TYS80(1)SA(T)1 EA $975.00 $975.00 $1,000.00 $1,000.00 31 TXDOT 644 7065 RELOCATE SM RD SN SUP&AM TY 10BWG 2 EA $907.00 $1,814.00 $750.00 $1,500.00 32 TXDOT 644 7072 RELOCATE SM RD SN SUP&AM(SIGN ONLY)2 EA $90.75 $181.50 $250.00 $500.00 33 SC LANDSCAPING RESTORATION 1 LS $7,250.00 $7,250.00 $5,000.00 $5,000.00 34 SC IRRIGATION RESTORATION 1 LS $20,000.00 $20,000.00 $5,000.00 $5,000.00 Carroll Ave Mobility Improvements 4/8/2025 (Bid Opening on 3/28/2025) BID TABULATION BIDDER 1 City of Southlake 061237047 Designer James Proulx Tejas Cutters, LLC 1562 R 4127 Kimley-Horn and Associates Inc. Opinion of Probable Construction Cost Decatur, TX 76234 (817) 304-4309 Sheet 1 of 3 Received by : KIMLEY-HORN AND ASSOCIATES, INC. Owner: Job No.: Project: Date: Item No.Specification Item Description Bid Plans Quantity Unit Unit Price Item Cost Unit Price Item Cost Carroll Ave Mobility Improvements 4/8/2025 (Bid Opening on 3/28/2025) BID TABULATION BIDDER 1 City of Southlake 061237047 Designer James Proulx Tejas Cutters, LLC 1562 R 4127 Kimley-Horn and Associates Inc. Opinion of Probable Construction Cost Decatur, TX 76234 (817) 304-4309 35 TXDOT 0416 6034 DRILL SHAFT (TRF SIG POLE) (48 IN)22 LF $1,051.80 $23,139.60 $789.00 $17,358.00 36 TXDOT 0618 6029 CONDT (PVC) (SCH 40) (3")15 LF $38.50 $577.50 $45.00 $675.00 37 TXDOT 0618 6046 CONDT (PVC) (SCH 80) (2")30 LF $36.50 $1,095.00 $40.00 $1,200.00 38 TXDOT 0618 6058 CONDT (PVC) (SCH 80) (4")30 LF $40.70 $1,221.00 $60.00 $1,800.00 39 TXDOT 0620 6009 ELEC CONDR (NO.6) BARE 75 LF $4.73 $354.75 $4.15 $311.25 40 TXDOT 0620 6010 ELEC CONDR (NO.6) INSULATED 460 LF $4.73 $2,175.80 $5.00 $2,300.00 41 TXDOT 0621 6002 TRAY CABLE (3 CONDR) (12 AWG)1170 LF $5.72 $6,692.40 $5.75 $6,727.50 42 TXDOT 0624 6010 GROUND BOX TY D (162922)W/APRON 2 EA $2,933.70 $5,867.40 $2,900.00 $5,800.00 43 TXDOT 0680 9991 INSTALL HWY TRF SIG (SH 114)1 EA $10,600.70 $10,600.70 $15,000.00 $15,000.00 44 TXDOT 0680 9992 INSTALL HWY TRF SIG (FIRESTATION)1 EA $62,998.10 $62,998.10 $40,000.00 $40,000.00 45 TXDOT 0680 6004 REMOVING TRAFFIC SIGNALS (FIRESTATION)1 EA $9,359.90 $9,359.90 $5,000.00 $5,000.00 46 TXDOT 0682 6001 VEH SIG SEC (12")LED(GRN)3 EA $522.50 $1,567.50 $625.00 $1,875.00 47 TXDOT 0682 6002 VEH SIG SEC (12")LED(GRN ARW)5 EA $522.50 $2,612.50 $625.00 $3,125.00 48 TXDOT 0682 6003 VEH SIG SEC (12")LED(YEL)5 EA $522.50 $2,612.50 $625.00 $3,125.00 49 TXDOT 0682 6004 VEH SIG SEC (12")LED(YEL ARW)3 EA $522.50 $1,567.50 $625.00 $1,875.00 50 TXDOT 0682 6005 VEH SIG SEC (12")LED(RED)5 EA $522.50 $2,612.50 $625.00 $3,125.00 51 TXDOT 0682 6006 VEH SIG SEC (12")LED(RED ARW)3 EA $522.50 $1,567.50 $625.00 $1,875.00 52 TXDOT 0682 6018 PED SIG SEC (LED)(COUNTDOWN)1 EA $1,141.80 $1,141.80 $2,560.00 $2,560.00 53 TXDOT 0682 6019 PED SIG SEC (LED)(CNTDWN)(MODULE ONLY)11 EA $518.10 $5,699.10 $1,500.00 $16,500.00 54 TXDOT 0682 6054 BACKPLATE W/REF BRDR(3 SEC)(VENT)ALUM 15 EA $292.60 $4,389.00 $400.00 $6,000.00 55 TXDOT 0682 6055 BACKPLATE W/REF BRDR(4 SEC)(VENT)ALUM 2 EA $407.00 $814.00 $500.00 $1,000.00 56 TXDOT 0682 6056 BACKPLATE W/REF BRDR(5 SEC)(VENT)ALUM 1 EA $418.00 $418.00 $600.00 $600.00 57 TXDOT 0684 6033 TRF SIG CBL (TY A)(14 AWG)(7 CONDR)285 LF $4.07 $1,159.95 $6.00 $1,710.00 58 TXDOT 0684 6042 TRF SIG CBL (TY A)(14 AWG)(16 CONDR)755 LF $8.25 $6,228.75 $8.75 $6,606.25 59 TXDOT 0686 9999 INS TRF SIG PL AM(S)1 ARM(60')LUM&ILSN (CITY STANDARD)1 EA $121,141.90 $121,141.90 $58,000.00 $58,000.00 60 TXDOT 0690 6006 REMOVAL OF GROUND BOXES 2 EA $622.60 $1,245.20 $1,800.00 $3,600.00 61 TXDOT 0690 6009 REMOVAL OF CABLES 2 LS $3,287.90 $6,575.80 $5,000.00 $10,000.00 62 TXDOT 0690 6030 REMOVAL OF PEDESTRIAN PUSH BUTTONS 6 EA $176.00 $1,056.00 $100.00 $600.00 63 TXDOT 0690 6033 REMOVAL OF TRAFFIC SIGNAL POLE FND 1 EA $2,112.00 $2,112.00 $3,000.00 $3,000.00 64 TXDOT 0690 6051 REMOVAL OF SIGNAL POLE ASSM 1 EA $7,670.30 $7,670.30 $5,000.00 $5,000.00 65 TXDOT 0690 9992 FURN & INSTALL OF SIGNAL RELATED SIGN 11 EA $691.90 $7,610.90 $500.00 $5,500.00 66 TXDOT 0690 9993 REMOVAL OF PEDESTRIAN SIGNAL (MODULE ONLY)11 EA $116.60 $1,282.60 $300.00 $3,300.00 67 TXDOT 5191 6001 WHEEL STOPS 12 EA $200.00 $2,400.00 $3,000.00 $36,000.00 68 TXDOT 6027 6003 CONDUIT (PREPARE)1900 LF $26.40 $50,160.00 $6.00 $11,400.00 Sheet 2 of 3 Received by : KIMLEY-HORN AND ASSOCIATES, INC. Owner: Job No.: Project: Date: Item No.Specification Item Description Bid Plans Quantity Unit Unit Price Item Cost Unit Price Item Cost Carroll Ave Mobility Improvements 4/8/2025 (Bid Opening on 3/28/2025) BID TABULATION BIDDER 1 City of Southlake 061237047 Designer James Proulx Tejas Cutters, LLC 1562 R 4127 Kimley-Horn and Associates Inc. Opinion of Probable Construction Cost Decatur, TX 76234 (817) 304-4309 69 TXDOT 6027 6008 GROUND BOX (PREPARE)12 EA $1,413.15 $16,957.80 $1,800.00 $21,600.00 70 TXDOT 6090 9990 REMOVE EXISTING ILSN 6 EA $468.60 $2,811.60 $600.00 $3,600.00 71 TXDOT 6090 9996 ILSN (LED) (6 S)4 EA $6,068.70 $24,274.80 $4,500.00 $18,000.00 72 TXDOT 6090 9998 ILSN (LED) (8 S)2 EA $7,141.20 $14,282.40 $5,500.00 $11,000.00 73 TXDOT 6156 9991 LED RDWY LUMINAIRE (.25KW EQ)2 EA $844.80 $1,689.60 $3,000.00 $6,000.00 74 TXDOT 999 9991 DETECTABLE WARNING SURFACE FOR SH 114 BRIDGE 1 EA $4,500.00 $4,500.00 $1,000.00 $1,000.00 75 TXDOT 999 9992 PRE-EMPTION CABLE 300 LF $4.73 $1,419.00 $4.00 $1,200.00 76 TXDOT 999 9993 PRE-EMPTION CAMERA ASSEMBLY 4 EA $2,951.30 $11,805.20 $4,000.00 $16,000.00 77 TXDOT 0682 9001 VEH SIG SEC (12")LED(GRN) (INSTALL ONLY)2 EA $170.50 $341.00 $200.00 $400.00 78 TXDOT 0682 9002 VEH SIG SEC (12")LED(GRN ARW) (INSTALL ONLY)4 EA $170.30 $681.20 $200.00 $800.00 79 TXDOT 0682 9003 VEH SIG SEC (12")LED(YEL) (INSTALL ONLY)2 EA $170.50 $341.00 $200.00 $400.00 80 TXDOT 0682 9004 VEH SIG SEC (12")LED(YEL ARW) (INSTALL ONLY)1 EA $170.50 $170.50 $200.00 $200.00 81 TXDOT 0682 9005 VEH SIG SEC (12")LED(RED) (INSTALL ONLY)2 EA $170.50 $341.00 $200.00 $400.00 82 TXDOT 0682 9006 VEH SIG SEC (12")LED(RED ARW) (INSTALL ONLY)1 EA $170.50 $170.50 $200.00 $200.00 83 TXDOT 6045 6001 INSTALL OF (RADD) VEHICLE DETECTORS 4 EA $1,741.30 $6,965.20 $2,000.00 $8,000.00 84 TXDOT 6046 6001 INSTALL OF (RPD) VEHICLE DETECTORS 6 EA $1,622.50 $9,735.00 $2,000.00 $12,000.00 85 TXDOT 6119 6002 INSTALL OF SIGNAL RELATED SIGNS 1 EA $862.40 $862.40 $300.00 $300.00 86 TXDOT 6058 6001 BBU SYSTEM (EXTERNAL BATT CABINET)(RELOCATE)1 EA $3,426.50 $3,426.50 $2,000.00 $2,000.00 87 TXDOT 6292 6001 RVDS (PRESENCE DETECTION ONLY)3 EA $16,734.30 $50,202.90 $14,000.00 $42,000.00 88 TXDOT 999 9994 PTZ CAMERA SYSTEM 1 EA $987.80 $987.80 $10,000.00 $10,000.00 $847,886.97 $1,025,243.00 NOTES: Calculation errors were discovered for bid items 37, 48, 49, 50, 60, and 80 Calcuation and written errors were discovered for bid items 35, 69 and 78 The written price was utilized for the total bid tabulation. Carroll Ave Mobility Improvements Sheet 3 of 3