Item 6A - Narrative and Exhibits
PROPOSAL SUMMARY INFORMATION
DATE: 5/5/2025
PROPERTY OWNER: Excel Southlake I, LP
REQUEST: Electric Vehicle Charging Facility Permit
LOCATION: Shopcore Park Village
1035 East Southlake Boulevard, Southlake TX 76092
ZONING: SP1- Commercial
PROPOSAL DESCRIPTION
Electrify America is establishing a comprehensive, technologically advanced, and
customer-friendly charging network to drive Electric Vehicle (EV) adoption by reducing
charging anxiety.
Electrify America is establishing a network that includes non-proprietary electric vehicle
charger stations (EVCS) at sites across the country.
Electrify America’s goal is to promote greater Zero-Emission Vehicle (ZEV) adoption by
offering an ultrafast and convenient charging network. This will fuel today’s EVs, as well
as the rapid growth in EV models expected from car companies between now and the
late 2020s.
Electrify America chargers are available to customers 24 hours a day, 7 days a week.
The chargers do not require any attendants or employees and access to the charging
stations is via existing roads. Electrify America has a 24-hour help line for
troubleshooting and support. The charging station sites will have quarterly maintenance
checks by Electrify America.
For this project, Electrify America is looking to install this EVCS site on the southeast
side of the existing parking lot. The proposed technology will not impact the footprint,
parking, lighting, or landscaping of the site. The installation will not impact vehicle or
pedestrian access, handicapped parking or truck loading and unloading facilities. The
project will provide (4) BTC 350Kw Gen IV Dispensers and (2) BTC 360kW Power Units
on a new conduit platform. This will also require a utility owned 480/277V Transformer
with a utility meter and a 1200A 277/480V switchboard.
This project will require a retaining wall, with a max height of 4 ft, in the southeast
corner of the proposed site. This is required due to the excessive slope in the area
where the proposed transformer, power units, and switchboard are to be placed.
There are (5) trees and (10) bushes that will be removed to make room for the new
equipment and retaining wall. Please reference sheet C-2 for details on which
trees/bushes are to be removed. The trees are to be replaced with (3) River Birch trees
and (2) Red Maple Trees. The bushes are to be replaced with 11 Wintergreen Boxwood
Shrubs. Please reference sheet LS-1 for landscaping details.
Summary of Site Data
Estimated Construction /
Development Schedule +/- 6 weeks
Zoning - Potential Change None
Land Use - Potential Change None
Proposed Impervious Coverage 420 sqft
Existing Percent Impervious Cover 72.30%
Proposed Percent Impervious Cover 72.36%
Impact to Open Space None
Changes to Parking
The charging facility will
replace 5 stalls with 4
stalls and another stall
will be created in the
northeast section of the
property to maintain the
current number of stalls.
Property Density None
Page is too large to OCR.
Page is too large to OCR.
Page is too large to OCR.
Page is too large to OCR.
Page is too large to OCR.
Page is too large to OCR.
Page is too large to OCR.
Page is too large to OCR.
Page is too large to OCR.
Page is too large to OCR.
Page is too large to OCR.
Page is too large to OCR.
Page is too large to OCR.
Page is too large to OCR.
Page is too large to OCR.
Page is too large to OCR.
Page is too large to OCR.
Page is too large to OCR.
Page is too large to OCR.
Page is too large to OCR.
Page is too large to OCR.
Page is too large to OCR.
Page is too large to OCR.
Page is too large to OCR.
Page is too large to OCR.
AIR
40
fm
�v EV EV EV Ho �
AGING CHARGING CHARGING CHARGING
Cr CNL Y ONLY ONLY P ARGIN
AIR
40
fm
�v EV EV EV Ho �
AGING CHARGING CHARGING CHARGING
Cr CNL Y ONLY ONLY P ARGIN
r
,
AI - fir/ Y G
Xy }
, Y
• f
r
r
•
• ' , . . ' ,td
m
airs � ' , �,,2 ..•., ..
f ` -
�i!�� InIAIInIAST
y�
Y i
Y _
_
L s
-1`
i
z
s l
w
-
"�_„
r
,
AI - fir/ Y G
Xy }
, Y
• f
r
r
•
• ' , . . ' ,td
m
airs � ' , �,,2 ..•., ..
f ` -
�i!�� InIAIInIAST
y�
Y i
Y _
_
L s
-1`
i
z
s l
w
-
"�_„