Loading...
Item 7 - Narrative PROPOSAL SUMMARY INFORMATION DATE: 4/1/2025 APPLICANT: Electrify America c/o Brian Powers Black & Veatch 45 Eisenhower Drive Suite 210 Paramus, NJ 07652 Telephone: 201-977-1534 Email: powersbe@bv.com PROPERTY OWNER: Excel Southlake I, LP REQUEST: Electric Vehicle Charging Facility Permit LOCATION: Shopcore Park Village 1035 East Southlake Boulevard, Southlake TX 76092 ZONING: SP1- Commercial PROPOSAL DESCRIPTION Electrify America is establishing a comprehensive, technologically advanced, and customer-friendly charging network to drive Electric Vehicle (EV) adoption by reducing charging anxiety. Electrify America is establishing a network that includes non-proprietary electric vehicle charger stations (EVCS) at sites across the country. Community-based charging station sites such as the one proposed at Shopcore Park Village, are installed at workplaces, retail locations (shopping centers, restaurants, etc.), multifamily residential locations, municipal lots, and garages, and in high-speed community depots that will feature fast EV charging. A Shopcore property nestled in the Houston MSA. It is a 4-star Retail Community Center in an urban set up. Anchored by well-performing Kroger and Walgreens. Other tenants include Starbucks, Dental office, Chick Fil A, Restaurants, Café, Massage Heights, Mathnesium, etc. Energy Corridor tenants including BP, Shell, and ConocoPhillips office nearby. Access from Briar Forest Dr and Eldridge Pkwy. This property is well connected to Eldridge Pkwy, Briar Forest Dr, Parkway Plaza Dr, Westerloch Dr and Brimhurst Dr with high volume of traffic of 18229- Page 2 July 1, 2024 25716 vehicles (per the data of year 2022 in Co Star). It has 179 surface parking spaces and signalized intersection adding yet another safety aspect for the drivers. This location is attractive as it has a great tenant mix and serves a population of approximately118,837 (3 mi radius). Electrify America’s goal is to promote greater Zero-Emission Vehicle (ZEV) adoption by offering an ultrafast and convenient charging network. This will fuel today’s EVs, as well as the rapid growth in EV models expected from car companies between now and the late 2020s. Electrify America chargers are available to customers 24 hours a day, 7 days a week. The chargers do not require any attendants or employees and access to the charging stations is via existing roads. Electrify America has a 24-hour help line for troubleshooting and support. The charging station sites will have quarterly maintenance checks by Electrify America. For this project, Electrify America is looking to install this EVCS site on the northeast side of the existing parking lot. The proposed technology will not impact the footprint, parking, lighting, or landscaping of the site. The installation will not impact vehicle or pedestrian access, handicapped parking or truck loading and unloading facilities. The project will provide BTC Gen IV Dispensers and Signet Power Units on a new conduit platform. The attached site plan shows the proposed layout and equipment dimensions. The design of the EVCS will require the reduction of 1 parking space in the location of the EVCS. This loss of parking space will be mitigated by creation of another parking space on the property to maintain the current required (previously approved) number of parking spaces. Summary of Site Data Estimated Construction / Development Schedule +/- 6 weeks Zoning - Potential Change None Land Use - Potential Change None Proposed Impervious Coverage 535 sqft Impact to Open Space None Changes to Parking Replacement of 1 parking space Property Density None Page 3 July 1, 2024 Proposed Equipment Elevation: Plan for the proposed EV equipment: Page 4 July 1, 2024 Proposed Dispenser and Power Unit: Page 5 July 1, 2024