Loading...
SPIN2024-08 - TRA Kirkwood Lift StationQJ SOUTHLAKE SPIN MEETING REPORT SPIN Item Number: SPIN2024-08 City Case Number: ZA24-0019 Project Name: Trinity River Authority Kirkwood Lift Station SPIN Neighborhood: 1 Meeting Date: June 11, 2024 Meeting Location: 1400 Main Street, Southlake, TX City Council Chambers Total Attendance: 7 Hosts: Sanjay Veerabathina Applicant Presenting: Kelly Davis and Paul Banschbach City Staff Present: Madeline Prater, Business Manager FORUM SUMMARY: Property Situation: 3200 N. White Chapel Blvd. and 1350 W. Kirkwood Blvd. Development Details: • Kirkwood Lift Station collects flows from the City of Southlake and requires upgrades o Includes anew wet well and space for temporary emergency storage containers • Existing site — White Chapel Blvd. and a private drive (Sabre Dr.) • TRA has acquired additional land adjacent to the existing lift station for this expansion • Site improvements require a zoning change from NRPUD to SP1 Proposed Presentation: The Trinity River Authority of Texas tr provides regional wastewater treatment services in DFW. PwnM Rwr aulnwM a T�.n Denton Creek Regional Wastewater System SIM Service Area Trinity R:•;e' Basi, Denton Creek s.s' �.• Wastewater' ....' `? Transportation �- Y'•-. system Interceptor - Arg�rle `�Enrthlay.e er Mound I DCRWS Treatm nt Plant Texas Adt}t�! �1" Speedk�7y xa�r.:nAa Fort Watch s car-k TRA KirkwoodStation AN i l YVeSt aka Cluh DC w a Aitn.ort _ I� F- y t •.Y _ _ 1 _ Afl11 1 C0 _ ", � r3 enter, 79N _ $-i1 � ssclrle5�5'ern 1-1aSie; Yeller ry5ertri�.grka ,�ukhlak �y The Kirkwood Lift Station collects tr flows from the City of Southlake and requires upgrades. 8 'rc�br... ry, mocW club - x f •. _ _ FU,n it 11 Trophy Club �b1w• ' v.is WtlP r� gab Im TWM1E d0 �rsym W n" W as 11 ak• The existing site is located off White chapel Blvd. and a private drive (Sabre Dr.) TRA has acquired additional landr• adjacent to the existing lift station for this expansion. The site upgrades include a new wet well and space for temporary emergency storage containers. SECIIRiT„ SLICE G iE erg. e a unrcH �w �W 9• .. iM-VMYE YA T H NOJSCCt 'A0. STCWWE �"� ' w � ENPOFARx CM3fIE �ERpiExC SipRAai The existing decorative fencing will to be matched for the fence line extension. Tree impacts were mitigated and screening on Kirkwood Blvd. was maintained. These site improvements require a zoning change from NRPUD to SP1. PIiOPO5E0 PROPERTY ACOUIS�TION ZONING CHANGE FROM NRPUD TO SP1 ors. run ..c is :.N N..x IMO trgl Comments, Questions, and Concerns: Question: When will this project take place? Answer: This will most likely be advertised for construction in the fall — September/October timeframe. SPIN Meeting Reports are general observations of SPIN Meetings by City staff and SPIN Representatives. The report is neither verbatim nor official meeting minutes; rather it serves to inform elected and appointed officials, City staff, and the public of the issues and questions raised by residents and the general responses made. Responses as summarized in this report should not be taken as guarantees by the applicant. Interested parties are strongly encouraged to follow the case through the Planning and Zoning Commission and final action by City Council. Southlake Connect Results for the June 11, 2024 SPIN Town Hall Forum 8/14124, 2:23 PM Everbridges�ite Dashboard Universe Notifications ncidents Reports > Detailed Notification Analysis > SPIN Town Hall Forum - June 11th Detailed Notification Analysis SPIN Town Hall Forum - June 11 th DEWLS Call Results Everbridge - Reports City of Southiake - Citizen Alert (Organization Admin) Contacts Reports Settings Access Notification ID 1680948731052107 �It Notification Live Mode Notification Standard Type Start Date Jun4,2024 Start Time 14:13:53 CDT Confirmation Yes Hide Detalls Requested Call Throttling Yes Cell Results(per Delivery Path) Duration 5 hr(s) Message Voice/Text .... Format Voicemail Message Only Confirmed Preference DeliveryOrder Organization Default Aftempted• Not Confirmed Delivery Methods Organization Contacts 1.Primary SMS Delivered 2,Secondery SMS 3.Primary Email 4.Primary Mobile Delivered -To Voicemail 5.Secondery Email 6.Secondary Mobile 7.Home Phone Not Delivered - No Answer 8.Horn Phone #2 ".Business Phone 10.TTY / TTD Device Delivered -To Handset 11.Everbridge Mobile Ap Resident Connection 1.VOIP Not Delivered - Voicemail Hung 2,Landline Up Not Delivered - Recipient Hung Up Sent Atempted - Not Connected Not Delivered - Invalid Number Not Delivered - Out of Service Not Delivered -Carrier Expired Not Delivered - Downstream Communication Error https:ffmanage r.everbridge.nettreports/notificationtvlew/1680948731052107 ■ 247 (2.10%) Attempted - Confirmed 8723 (7424%) Attempted - Not Confimxrd 253 (2.15%) Attempted - Not Connected ■ 2410 (20-51 %) Not Attempted ■ fie (0.99%) Other Total 247 111 1610 144 2932 178 447 3301 64 94 17 72 Logout % of Total 2.10% 0.94% 13.70% 1.23% 24,96% 1.52% 3,80% 28.10% 0,54% 0.80% 0.14% 0.61 % 112 8114/24, 2:23 PM Everbridge - Reports Call Results(per Delivery Path) Total % of Total Not Delivered -Carrier Rejected 1 0.01 % Not Delivered -Line Busy 5 0.04% Naar A?V-mted Not Attempted -Inactive Path 259 2.20% Not Attempted -Unsubscribed 1326 11.29% Not Attempted -Throttling Time 1 Exceeded Not Delivered -Contact Path Not B 0.07% Defined Not Delivered -Duplicate Path 816 6.95% Not Delivered -Bounced Email 103 0.88% Not Delivered -Contact 13 0.11 % Unavailable Attempts Over Time 7.5k - Sk 2.Sk Qk ijvp. ryA. 3p. 3�. Show 0etells reve(bridge Privacy Policy Terms of use i 02024 Everbridge, Inc. 24.5.0.13-634de12-2024-07-24-21:00 FE-VERSION40 abs-manager-portaE77c965d68d-5ccwb https://manager.everbridge.net(reportslnotification/view/168OM7310521 O7 212