SPIN2022-03QJ SOUTHLAKE
SPIN MEETING REPORT
SPIN Item Number: SPIN2022-03
City Case Number: ZA22-0011
Project Name: Verizon Southlake Expansion
SPIN Neighborhood
Meeting Date: February 8, 2022
Meeting Location: 1400 Main Street, Southlake, TX
City Council Chambers
Total Attendance: 10
Hosts: Eric Wang, member of the Southlake Community Engagement
Committee
Applicant Presenting: James Cox, Hawkins-Welwood Homes, phone: 817-691-8036
email: jamesc(o-)-hwhomes.com, Rich DeOtte
City Staff Present: Madeline Oujesky, Assistant to the Director
Town Hall Forums can be viewed in their entirety by visiting http://www.cityofsouthlake.com and clicking on "I Want to" and "View"
"Video on Demand" — forums are listed under SPIN by meeting date.
FORUM SUMMARY:
Property Situation:
The property is located at 4078 N. White Chapel Blvd., Southlake
Development Details:
The applicant is proposing the development of 4 1-acre residential lot development at the
southwest corner of N. White Chapel Blvd. and W. Bob Jones Road. The property has some trees
on the property. The property drains from east to west to N. White Chapel Blvd. Water and sewer
are accessible to the property. The proposed street will be a 30-feet wide concrete pavement for
the street. The fencing has not been decided yet. The development may have an entry feature. A
gated entrance is still undecided. The power lines may or may not be lowered, a decision has
not been made to date. The estimated price line for the homes will be approximately $3 million.
Presentation:
Questions and Concerns:
1. Who will build the homes? Hawkins-Welwood Homes will be the builder.
2. What is the price point of the homes? Approximately $3 million.
3. What will the size of the homes be? Yes. We are still deciding on the size of the homes.
4. Will there be any lighting guidelines? There will be some streetlights.
5. Do you plan to leave any trees? Yes, we plan to leave as many trees as possible and
will not regrade Lot 4 until there is a client.
6. What will be going on with the corner lot? The lot currently land use is low density
residential.
7. Are you planning any dedicated open space? It is not required; we will be going for
straight zoning.
8. What type of fencing are you proposing? We will go above and beyond what the city
requires. It could be a combination of stone and maybe pipe rail.
9. Whatever fence goes in, would it be the property owner's or the developer's? It may be a
development wall on the perimeter and the property owners' fence between the
properties.
10. Would livestock be allowed on each lot? I don't believe so. It would be allowed, but not
suitable for these lots.
11. Would this be a gated development? We are open to it, but City Council may not allow it.
12. With access on W. Bob Jones, do you anticipate any traffic concerns? Not with the
number of lots that will not generate a lot of traffic.
13. Any ideas for the materials for homes? We will have strict ARC guidelines to ensure a
quality development- maybe a hill country style.
14. Any plans for a detention/retention pond? There is not a water amenity plan with the 1
acre lots unless it is required. The water flows to Bob Jones Park.
15. Is the setback is determined by you or the city? The setbacks are determined by the
zoning.
16. Will the perimeter fences be consistent with the development? We will write specific
regulations to ensure consistency for the fencing and retaining walls.
17. Would the houses be addressed on Bob Jones or their own street? The houses will be
addressed on their own street.
18. Comment: I hope this development will continue to encourage wildlife in this area.
19. On the tress, we are not planning to remove trees except for the road construction and
will try to design homes to preserve as may as possible.
20. Will there be sidewalks in the development and along W. Bob Jones and N. White
Chapel Blvd.? We will build sidewalks as required by the city.
21. Is there a storm water drainage plan for the development? We will be working on a
drainage plan and study to determine how to design it.
22. Will the telecom and phone lines be underground? We will investigate it- has not be
determined at this time.
23. What is the number of cars/garages? It may be a 3 car minimum if not 4 depending on
the property owner.
24. Will there be any entrance wall to the development? We will be working on a design to
ensure privacy for the homes adjacent to the street and have not designed anything yet.
25. Will this development be gated? Maybe. The city may not prefer the development to be
gated.
26. How will you develop the lots- one at a time or all together? It depends on the market,
but we try to develop all at once.
2MM. 5:03 PM
Mail - Madeline Ouimicy - Outlook
Online Form Submittal: SPIN Town Hall Forum Question / Comment Form
noreply@civicplus.com <noreplyQcivicpluscom>
Tue 218f2022 5:03 PM
To: Madeline Oujesky Imo jeskyOci.wuthlake.musY
SPIN Town Hall Forum Question / Comment Form
Can't make if to a SPIN Town Half Forum but shli have a question or comment on
an item being presented? Use this form)
Those who wish to ask a question or make a comment on an item being presented
at a SPIN Town Pfaff Forum may do so by efectronicatly subrrifting this form. The
meeting host wrfl make an effort to get to each question and/or comment submitted
However, please be aware that it is possible not aff questions and/or comments
submitted wolf be read during the SPIN Town Nall Forum. Cduesbons and/or
comments submitted before 6 00 p m on the meeting date will be included in the
meeting report far that specific item.
SPIN Meeting Date 2022-02-0S
SPIN Rem par Item
SPIN2022-03
Description
Fir t Name
Jillianrte
La tRame
Ajayi
Email
Addre
4505 Saddleback Vane
City
Southlake
State
T
Cue tion or Comment
1 Will there be idewalk out ide of the development that will
run along both W. nob Jones Road, as well as N. White Chapel
Blvd?
2 Will there be a 1 acre lot minimum?
3. Is there a drainage plan for storm water?
4. Will the electric power lines be buried?
5 Will the treet in the development be concrete?
6. Is there a plan for tree preservation+mitigation requirements?
7. Will the front building line be set back at a minimum of 30
feet or greater+
8. What are the telecom fiber plans?
9. What is the number of cars forthe size of the homes?
10 What are the planned price paint ?
11. What will the fencing type be?
219r22, 5:03 PM Mail - Madeline Cluiesky - Oudook
12. Will there be an entrance wall to the development?
13. Will the development be gated?
Zip 76092
Email not displaying correc*? View it in vour hM2LUr.
SPIN Meeting Reports are general observations of SPIN Meetings by City staff and SPIN Representatives. The report is neither verbatim nor official
meeting minutes; rather it serves to inform elected and appointed officials, City staff, and the public of the issues and questions raised by residents and
the general responses made. Responses as summarized in this report should not be taken as guarantees by the applicant. Interested parties are
strongly encouraged to follow the case through the Planning and Zoning Commission and final action by City Council.
Southlake Connect Results for the February 8, 2022 SPIN Town Hall Forum
Detailed Notification Analysis
SPIN Tarn Hall Faium-F nqW
DUAL s can roewlN
x�6rFme,� ID awa9nns1seocosas■a�^zm1<yAaen9n'-9-
mma,a
•,'r„'�nn,,,�[P1�4-
s,.rnn< 1<6rvo9 csr ■ 1 bra
�� wwNrra
A.r.�.�... xx —cmy
oxw.�'rwe�.d. •� .<iee eer..n
*fir eysws
�yn
AyNA6ne
5. SevmdaryEmail
Secud.ry Nobik
aa9n�t9 o9.r rin,a
E
n+arpeGMllw�rylmnM:+vW.Avnnp:.4®nM:+]nV:Ammp6:'AverWeAnmP:M«.NMemmo To[el]
Feb
�� SMS 3199 0 6 4 0 a 9 0 0 9 1199
Senn:
TaWf 18i1 RAS] 155B 839 161 S�Q 68 2tl 1 1 6651
B
EverWi�e-Nepons
nvrnpl �A9unpenenv:Anena U.amnplmn�p:Awmtl:Anemp:Anciu'. e..eni9]Aeumo Toule
EverWi�e - Repdrls
Ane[p!gellrcryFe�anplAn mp[AnempUnernplAnmp[Anemp�Attmp�Anmp[Ie�eniAna To[els
Time Me1M1od i 2 3 4 5 6 ] 8 9 9 10 10
H—
a 0 fi3 Ba a a o a a 0 150
H—
PFan 0 0 5 8 0 d d 0 0 d 4
e f2
aa:n
PFI�n 0 0 20 38 0 0 0 0 0 0 60
MI
T� 0 0 6 21 0 0 0 0 0 0 29
onk
Feb
a],
2022
15A8' a a 15% 839 a a 0 a a a ASS
18
T.
TaM
Feb
a], RImA
2°u ry 0 0 0 0 a 0 0 0 0 a 0
1 St3 SMS
8
CST
Sewn
dory a a o a a a 0 0 0 a 0
SMS
RImA
7 a a o a a a o 0 o a a
Cmwll
Rlien
7 a a o a a a a 0 0 a a
MNrll
sewn
d.7 a a o a 22z a o a a a MEmell
sewn
dell a a o a 1d a o a a a 149
MNrl
Hans
Pr 0 0 0 0 d6 0 0 0 0 0 e]
EvwbriKige - Reports
Ame t[ llve k[ plAnm
tAttempU. plAnm tAn p[Arm
Aneegek[ piA pi Totals
Time Melhod 1
2 3 d 5 6
]
8 9 10
Nome
Run a
0 0 a 2 a
0
0 0 a 3
e R2
ausw
eas a
0 0 a 27 a
o
0 0 a 28
Rpn
TTY I
TT0 0d
a 0 a 16 a,
0
a a 0d 16
0e.<
Feb
07'
2022
1511 a 0 0 a 461 a 0 a a d Ms
18
csr
T
T els
Feb
2 RImA
2a22 0 0 0 a 0 0 0 0 0 d 0
518 ms
18
CST
Sewn
dan a a o a a a o a a d o
SMS
Rlmn
ry a a 0 a a a o a a d 0
Cmell
RImA
7 a a 0 a 0 a o a a a o
M&H
Sewn
dan a a o a a a o a a a o
Smell
sewn
III a 0 0 a 0 169 0 0 0 a 169
e
Hame
R— 0 0 0 a 0 38 39 0 0 0 79
Wm
Run 0 0 0 a 0 3 d 0 0 0 ]
en
Txels MI 15% 839 461 230 63 2a A 1 M" I T els Mi 2� ism 839 461 M 63 2a A 1 B456
Euerhndpe - Reports
Amm tCeIlwiy AnanplAncwtAttranpLAx plAnm tAn ,plprtmplALl p! A —pi Attesnpi Tolxls
'hiss Method 1 2 a A 5 6 7 6 9 ' 0
bus
a 0 a a 0 15 16 0 0 a 32
Pteon
rTVJ
TT➢ a a a a a 6 2 0 0 a 6
owc
Fair
m,
2022
15.1 IL a a a a a 2233 63 0 0 a 296
16
AT
aW
Taeh
Fab
07. prlufe
2 F02ry 0 0 a 0 0 0 a 0 0 0 0
523 SMS
1
CST
Semis
der, a a o a a a a a 0 a 0
SMS
RLae
ry a a a a a a a a 0 a 0
Emell
P'l—
ly a 0 a a a a a a 0 a 0
MM
semis
fiery a a a a a a o 0 0 a 0
E—il
scorn
dory a 0 a a 0 a a 0 0 a 0
Mdlll
wake
plan a a a a a a a a 0 a 0
H—
Pl— a a a a a a a 7 0 a 7
e02
Buse
% 0 0 a 0 0 0 0 12 2 0 14
Taeh 2941 2437 1559 939 461 23a, 63 2a 4 1 8454
Everbndge - Reports
An"'E)ellrery Aw plAn"tAu"FiLA[ plALI pkAn plArmwiAnanp[I.naimpl Ae pl Tmle
71ma Whod 1 2 7 4 5 6 7 S 9 10
Fab
07,
20 a2
1525 a 0 0 a a a p a 0 1 1
26
CST
SW
Ta[eds
Taia 1s 2941 2427 1556 939 461 270 62 20 4 1 8A54
Eved.Wge - Reports
Aneop!Llellwry A[lanptAlvnptAt'tenpU[lem plAnenp[AaeinplAttempl0.nengr A[lmnAner Toeale
Tlme Meth9 10od 1 2 3 4 3 6 7 8 9 10
m;
TT➢ a a 0 a 0 a 0 1 2 a 8
Fab
07.
2a22
152I a 0 a a 0 a 0 20 4 a 24
16
I
&A
Tote is
Fab
07. Wl-
2022 a a a a 0 a a 0 0 a a
7
26 SMS
CST
Semis
dory a a a a a a a a a a a
SMS
R Ime
ry a 0 a a 0 a 0 a a a o
Grlell
Pr lme
ry I a a a a a a a a a a a
S—
dery a 0 a a 0 a 0 0 0 a a
III
d°7 a 0 0 a 0 a 0 0 0 a a
Mo
Nome
Plan 0 0 0 0 0 a 0 0 0 0 a
Nome
plan 0 0 a 0 0 a 0 0 0 0 a
e rz
cruse
Z, a a o a o a 6 0 o a o
m;
TT➢ a 0 a a 0 a a a a 1 1
a—k
llM 2&11 3A87 is% 8a9 461 Zaa 6a 2a A 1 B454