Loading...
SPIN2022-03QJ SOUTHLAKE SPIN MEETING REPORT SPIN Item Number: SPIN2022-03 City Case Number: ZA22-0011 Project Name: Verizon Southlake Expansion SPIN Neighborhood Meeting Date: February 8, 2022 Meeting Location: 1400 Main Street, Southlake, TX City Council Chambers Total Attendance: 10 Hosts: Eric Wang, member of the Southlake Community Engagement Committee Applicant Presenting: James Cox, Hawkins-Welwood Homes, phone: 817-691-8036 email: jamesc(o-)-hwhomes.com, Rich DeOtte City Staff Present: Madeline Oujesky, Assistant to the Director Town Hall Forums can be viewed in their entirety by visiting http://www.cityofsouthlake.com and clicking on "I Want to" and "View" "Video on Demand" — forums are listed under SPIN by meeting date. FORUM SUMMARY: Property Situation: The property is located at 4078 N. White Chapel Blvd., Southlake Development Details: The applicant is proposing the development of 4 1-acre residential lot development at the southwest corner of N. White Chapel Blvd. and W. Bob Jones Road. The property has some trees on the property. The property drains from east to west to N. White Chapel Blvd. Water and sewer are accessible to the property. The proposed street will be a 30-feet wide concrete pavement for the street. The fencing has not been decided yet. The development may have an entry feature. A gated entrance is still undecided. The power lines may or may not be lowered, a decision has not been made to date. The estimated price line for the homes will be approximately $3 million. Presentation: Questions and Concerns: 1. Who will build the homes? Hawkins-Welwood Homes will be the builder. 2. What is the price point of the homes? Approximately $3 million. 3. What will the size of the homes be? Yes. We are still deciding on the size of the homes. 4. Will there be any lighting guidelines? There will be some streetlights. 5. Do you plan to leave any trees? Yes, we plan to leave as many trees as possible and will not regrade Lot 4 until there is a client. 6. What will be going on with the corner lot? The lot currently land use is low density residential. 7. Are you planning any dedicated open space? It is not required; we will be going for straight zoning. 8. What type of fencing are you proposing? We will go above and beyond what the city requires. It could be a combination of stone and maybe pipe rail. 9. Whatever fence goes in, would it be the property owner's or the developer's? It may be a development wall on the perimeter and the property owners' fence between the properties. 10. Would livestock be allowed on each lot? I don't believe so. It would be allowed, but not suitable for these lots. 11. Would this be a gated development? We are open to it, but City Council may not allow it. 12. With access on W. Bob Jones, do you anticipate any traffic concerns? Not with the number of lots that will not generate a lot of traffic. 13. Any ideas for the materials for homes? We will have strict ARC guidelines to ensure a quality development- maybe a hill country style. 14. Any plans for a detention/retention pond? There is not a water amenity plan with the 1 acre lots unless it is required. The water flows to Bob Jones Park. 15. Is the setback is determined by you or the city? The setbacks are determined by the zoning. 16. Will the perimeter fences be consistent with the development? We will write specific regulations to ensure consistency for the fencing and retaining walls. 17. Would the houses be addressed on Bob Jones or their own street? The houses will be addressed on their own street. 18. Comment: I hope this development will continue to encourage wildlife in this area. 19. On the tress, we are not planning to remove trees except for the road construction and will try to design homes to preserve as may as possible. 20. Will there be sidewalks in the development and along W. Bob Jones and N. White Chapel Blvd.? We will build sidewalks as required by the city. 21. Is there a storm water drainage plan for the development? We will be working on a drainage plan and study to determine how to design it. 22. Will the telecom and phone lines be underground? We will investigate it- has not be determined at this time. 23. What is the number of cars/garages? It may be a 3 car minimum if not 4 depending on the property owner. 24. Will there be any entrance wall to the development? We will be working on a design to ensure privacy for the homes adjacent to the street and have not designed anything yet. 25. Will this development be gated? Maybe. The city may not prefer the development to be gated. 26. How will you develop the lots- one at a time or all together? It depends on the market, but we try to develop all at once. 2MM. 5:03 PM Mail - Madeline Ouimicy - Outlook Online Form Submittal: SPIN Town Hall Forum Question / Comment Form noreply@civicplus.com <noreplyQcivicpluscom> Tue 218f2022 5:03 PM To: Madeline Oujesky Imo jeskyOci.wuthlake.musY SPIN Town Hall Forum Question / Comment Form Can't make if to a SPIN Town Half Forum but shli have a question or comment on an item being presented? Use this form) Those who wish to ask a question or make a comment on an item being presented at a SPIN Town Pfaff Forum may do so by efectronicatly subrrifting this form. The meeting host wrfl make an effort to get to each question and/or comment submitted However, please be aware that it is possible not aff questions and/or comments submitted wolf be read during the SPIN Town Nall Forum. Cduesbons and/or comments submitted before 6 00 p m on the meeting date will be included in the meeting report far that specific item. SPIN Meeting Date 2022-02-0S SPIN Rem par Item SPIN2022-03 Description Fir t Name Jillianrte La tRame Ajayi Email Addre 4505 Saddleback Vane City Southlake State T Cue tion or Comment 1 Will there be idewalk out ide of the development that will run along both W. nob Jones Road, as well as N. White Chapel Blvd? 2 Will there be a 1 acre lot minimum? 3. Is there a drainage plan for storm water? 4. Will the electric power lines be buried? 5 Will the treet in the development be concrete? 6. Is there a plan for tree preservation+mitigation requirements? 7. Will the front building line be set back at a minimum of 30 feet or greater+ 8. What are the telecom fiber plans? 9. What is the number of cars forthe size of the homes? 10 What are the planned price paint ? 11. What will the fencing type be? 219r22, 5:03 PM Mail - Madeline Cluiesky - Oudook 12. Will there be an entrance wall to the development? 13. Will the development be gated? Zip 76092 Email not displaying correc*? View it in vour hM2LUr. SPIN Meeting Reports are general observations of SPIN Meetings by City staff and SPIN Representatives. The report is neither verbatim nor official meeting minutes; rather it serves to inform elected and appointed officials, City staff, and the public of the issues and questions raised by residents and the general responses made. Responses as summarized in this report should not be taken as guarantees by the applicant. Interested parties are strongly encouraged to follow the case through the Planning and Zoning Commission and final action by City Council. Southlake Connect Results for the February 8, 2022 SPIN Town Hall Forum Detailed Notification Analysis SPIN Tarn Hall Faium-F nqW DUAL s can roewlN x�6rFme,� ID awa9nns1seocosas■a�^zm1<yAaen9n'-9- mma,a •,'r„'�nn,,,�[P1�4- s,.rnn< 1<6rvo9 csr ■ 1 bra �� wwNrra A.r.�.�... xx —cmy oxw.�'rwe�.d. •� .<iee eer..n *fir eysws �yn AyNA6ne 5. SevmdaryEmail Secud.ry Nobik aa9n�t9 o9.r rin,a E n+arpeGMllw�rylmnM:+vW.Avnnp:.4®nM:+]nV:Ammp6:'AverWeAnmP:M«.NMemmo To[el] Feb �� SMS 3199 0 6 4 0 a 9 0 0 9 1199 Senn: TaWf 18i1 RAS] 155B 839 161 S�Q 68 2tl 1 1 6651 B EverWi�e-Nepons nvrnpl �A9unpenenv:Anena U.amnplmn�p:Awmtl:Anemp:Anciu'. e..eni9]Aeumo Toule EverWi�e - Repdrls Ane[p!gellrcryFe�anplAn mp[AnempUnernplAnmp[Anemp�Attmp�Anmp[Ie�eniAna To[els Time Me1M1od i 2 3 4 5 6 ] 8 9 9 10 10 H— a 0 fi3 Ba a a o a a 0 150 H— PFan 0 0 5 8 0 d d 0 0 d 4 e f2 aa:n PFI�n 0 0 20 38 0 0 0 0 0 0 60 MI T� 0 0 6 21 0 0 0 0 0 0 29 onk Feb a], 2022 15A8' a a 15% 839 a a 0 a a a ASS 18 T. TaM Feb a], RImA 2°u ry 0 0 0 0 a 0 0 0 0 a 0 1 St3 SMS 8 CST Sewn dory a a o a a a 0 0 0 a 0 SMS RImA 7 a a o a a a o 0 o a a Cmwll Rlien 7 a a o a a a a 0 0 a a MNrll sewn d.7 a a o a 22z a o a a a MEmell sewn dell a a o a 1d a o a a a 149 MNrl Hans Pr 0 0 0 0 d6 0 0 0 0 0 e] EvwbriKige - Reports Ame t[ llve k[ plAnm tAttempU. plAnm tAn p[Arm Aneegek[ piA pi Totals Time Melhod 1 2 3 d 5 6 ] 8 9 10 Nome Run a 0 0 a 2 a 0 0 0 a 3 e R2 ausw eas a 0 0 a 27 a o 0 0 a 28 Rpn TTY I TT0 0d a 0 a 16 a, 0 a a 0d 16 0e.< Feb 07' 2022 1511 a 0 0 a 461 a 0 a a d Ms 18 csr T T els Feb 2 RImA 2a22 0 0 0 a 0 0 0 0 0 d 0 518 ms 18 CST Sewn dan a a o a a a o a a d o SMS Rlmn ry a a 0 a a a o a a d 0 Cmell RImA 7 a a 0 a 0 a o a a a o M&H Sewn dan a a o a a a o a a a o Smell sewn III a 0 0 a 0 169 0 0 0 a 169 e Hame R— 0 0 0 a 0 38 39 0 0 0 79 Wm Run 0 0 0 a 0 3 d 0 0 0 ] en Txels MI 15% 839 461 230 63 2a A 1 M" I T els Mi 2� ism 839 461 M 63 2a A 1 B456 Euerhndpe - Reports Amm tCeIlwiy AnanplAncwtAttranpLAx plAnm tAn ,plprtmplALl p! A —pi Attesnpi Tolxls 'hiss Method 1 2 a A 5 6 7 6 9 ' 0 bus a 0 a a 0 15 16 0 0 a 32 Pteon rTVJ TT➢ a a a a a 6 2 0 0 a 6 owc Fair m, 2022 15.1 IL a a a a a 2233 63 0 0 a 296 16 AT aW Taeh Fab 07. prlufe 2 F02ry 0 0 a 0 0 0 a 0 0 0 0 523 SMS 1 CST Semis der, a a o a a a a a 0 a 0 SMS RLae ry a a a a a a a a 0 a 0 Emell P'l— ly a 0 a a a a a a 0 a 0 MM semis fiery a a a a a a o 0 0 a 0 E—il scorn dory a 0 a a 0 a a 0 0 a 0 Mdlll wake plan a a a a a a a a 0 a 0 H— Pl— a a a a a a a 7 0 a 7 e02 Buse % 0 0 a 0 0 0 0 12 2 0 14 Taeh 2941 2437 1559 939 461 23a, 63 2a 4 1 8454 Everbndge - Reports An"'E)ellrery Aw plAn"tAu"FiLA[ plALI pkAn plArmwiAnanp[I.naimpl Ae pl Tmle 71ma Whod 1 2 7 4 5 6 7 S 9 10 Fab 07, 20 a2 1525 a 0 0 a a a p a 0 1 1 26 CST SW Ta[eds Taia 1s 2941 2427 1556 939 461 270 62 20 4 1 8A54 Eved.Wge - Reports Aneop!Llellwry A[lanptAlvnptAt'tenpU[lem plAnenp[AaeinplAttempl0.nengr A[lmnAner Toeale Tlme Meth9 10od 1 2 3 4 3 6 7 8 9 10 m; TT➢ a a 0 a 0 a 0 1 2 a 8 Fab 07. 2a22 152I a 0 a a 0 a 0 20 4 a 24 16 I &A Tote is Fab 07. Wl- 2022 a a a a 0 a a 0 0 a a 7 26 SMS CST Semis dory a a a a a a a a a a a SMS R Ime ry a 0 a a 0 a 0 a a a o Grlell Pr lme ry I a a a a a a a a a a a S— dery a 0 a a 0 a 0 0 0 a a III d°7 a 0 0 a 0 a 0 0 0 a a Mo Nome Plan 0 0 0 0 0 a 0 0 0 0 a Nome plan 0 0 a 0 0 a 0 0 0 0 a e rz cruse Z, a a o a o a 6 0 o a o m; TT➢ a 0 a a 0 a a a a 1 1 a—k llM 2&11 3A87 is% 8a9 461 Zaa 6a 2a A 1 B454