SPIN2022-02 - VerizonQJ SOUTHLAKE
SPIN MEETING REPORT
SPIN Item Number: SPIN2022-02
City Case Number: ZA22-0008
Project Name: Verizon Southlake Expansion
SPIN Neighborhood
Meeting Date: January 25, 2022
Meeting Location: 1400 Main Street, Southlake, TX
City Council Chambers
Total Attendance: 2
Hosts: Vandana Tanneru, member of the Southlake Community
Engagement Committee; Eric Wang, member of the Southlake
Community Engagement Committee
Applicant Presenting: Mason Griffin, phone: 214-420-1535, email:
mgriffin(agriffinharris.com
City Staff Present: Madeline Oujesky, Assistant to the Director
Town Hall Forums can be viewed in their entirety by visiting http://www.cityofsouthlake.com and clicking on "I Want to" and "View"
"Video on Demand" — forums are listed under SPIN by meeting date.
FORUM SUMMARY:
Property Situation:
The property is located at 747 W. SH 114
Development Details:
The applicant is proposing the development and construction of the approximately 210,700
square foot Verizon data center and operations center on 747 W. SH 114 (between W. Kirkwood
Blvd. and W. SH 114, north of the existing Verizon Wireless campus at 500 W. Dove Road,
Southlake). There will be 5 data center pods (buildings), one operations building, and an enclosed
access spine (between the data center pods) for the proposed complex. Only two pods and the
operation center will be constructed initially. The pods will be constructed perpendicular to W. SH
114 to reduce the site view impact of delivery trucks from the street. Employees for the data center
that will access the operations building from the W. Dove Road entrance (no access from W.
Kirkwood Blvd.) There will be 200 feet of existing undisturbed tree buffer and two existing ponds
that will between the data center complex and W. Kirkwood Blvd. to buffer the adjacent
neighborhood. The facility will be constructed in 2 phases- the 1 st phase will include the operations
center and 2 data center pods. The second phase will include the remaining 3 data center pods.
The goal of the development was to screen the facility from the neighborhood.
Presentation:
MASTERPLAN SITE PLAN
HKS '.,.,:..-"'
EXTERIOR MATERIALS: POD
ttts65 r /�
1
IIr UWIiv Fln[.E:Y.�EH o(Sx:4"�," �^e�ae�aie m...n.mwae�.
HKS
MASTEiPLAN: MASSING
ff
41101 ®�
l
M6
OVERALL:
Questions and Concerns:
1. What is the timetable for Phases 1 and 2? Phase 1 will be constructed as soon as possible
after City approval in the Spring 2022. There is no specified time for Phase 2 construction.
2. How long will the construction take for Phase 1? Will need to check on the construction
time for Phase 1.
SPIN Meeting Reports are general observations of SPIN Meetings by City staff and SPIN Representatives. The report is neither verbatim nor official
meeting minutes; rather it serves to inform elected and appointed officials, City staff, and the public of the issues and questions raised by residents and
the general responses made. Responses as summarized in this report should not be taken as guarantees by the applicant. Interested parties are
strongly encouraged to follow the case through the Planning and Zoning Commission and final action by City Council.
Southlake Connect Results for the January 25,
E�art�msasm:e
Detailed Notification Analysis
SPIN Hall fv,um-January—
NETARS can roeawa
mx[umapm
xw.fi<.xa„ib mmae�a,eswe � -�rc:.m�a� �
■�rr.n��ru-
s.�n� ossessrsr ■,�[raa®x)ra
uenpee
m�p.,.� Ye. •oF.m+61nM
u..� anmi
ana. rn..vima
.onva,ysws o�
Aimery [mmi 3 d d F
Rlmy M»b!
!
,arrrrrro o<aw n�+-�on�n�+.xw<arma u�,mn�+a�a ar«ms�uaan6 a�:..��u�earMa T.m.
nrwa.enw,aea..are,cnece..Eareron:��at�arl�
2022 SPIN Town Hall Forum
6ii�nIlir�mE.ump� Ilnarv'. Ac�npi Cu.�nly A�rcrp� abenipi a,reman
Tr�me��4'Me0„od 1' Sa�. 3 A 5 fi ) g 9 iaula
Jm� a Is o o a o 0 0 0 T6
�` a se o 0 a tl 0 tl 0 a,
n�
.
Z J fi tl tl tl tl tl tl tl tl
na, 0 a a o a o o 0 o T
BbrIQ
2S
2tl22
i b'b' T195 21Y1 tl tl tl b tl b tl 9]89
CST
T e1a
ibm9 �`� a o 0 tl 0 a tl a tl 0
CST
Jm� a o o tl o a tl a tl n
cim
y a o ago 0 o a 0 a 0 676
[maT
Rlmw
y tl 0 4i3 LT1 � b tl b tl ,bBS
AMbTe
Jm� tl 0 96 1P b 0 b tl 2b0
E y tl tl 0 tl 0 lab
EAobTe
��` tl 0 fil BO tl tl 0 tl tl i50
Everhribe- Reports
An r, 0.11w.r�Jy Anmtlt Anem9t fnem j Anaryt Anemps Yum 5 Anempr hemp Anern9r ioul�
inene tl 0 5 ] � a 0 a a 4
n
a,.ina
tl tl 2I S} � d 0 d tl 61
mi
deem a tl 6 T1 0 9 0 9 0 34
Jen
2s
29zz
�S
014 Y a tl o tl o a o tl o
Everhndge - Reports
Ananpt DNl�er� Anengr, Anempr, —', A.—, --e Anemia --e A[—p Attcrnp[ To[ele
Time M ffi i 1 2 3 4 5 6 ] 3 9
T i
T a 0 a 0 16 a 0 a 0 16
NO.
Jm
21
2M
1MU a 0 0 0 455 a 0 a 0 A59
06
CST
sW
T M
21
2S
2M 0 0 a 0 a 0 0 0 0 a
a19, ' WS
06
CST
de,r
d.,
a
d
d
d
d
a
d
a
d d
seas
R mm
a
d
d
d
d
a
d
a
a d
E m4d
P lmm
y
eaanae
a
d
d
d
d
a
d
a
d d
d&y
de,r
a
d
d
d
d
a
d
a
a d
Em4d
Scan
derr
Abbk
a
0
a
0
a
161
0
d
d 162
Phan[
Phen[
a
0
a
0
a
36
41
a
0 79
tiara[
pant[
a
d
d
d
d
s
4
a
d 7
n
a dine
a1,nt[
a
d
d
d
d
1s
17
a
d 3d
YI
TTo
oewo[
a
d
o
d
o
9
2
a
d 11
T M V95 24ai ims ev 455 m W 16 3 8326
E-t,k pe - Reports
nnamq �ell� �Y Anm�p' Mmp� Ae[nn 9 Ana�p[ Anmp� I¢an 6 Anmp' Anem e M�mp ioula
2S
2S
y19�6 a a o a u a o a a o
No Text