Item 6E and 6F - SPIN Meeting ReportJUSOUTHLAKE
SPIN MEETING REPORT
SPIN Item Number: SPIN2021-34
City Case Number: ZA21-0087
Project Name: Granite Place Phase 2
SPIN Neighborhood: 7
Meeting Date: October 26, 2021
Meeting Location: 1400 Main Street, Southlake, TX
City Council Chambers
Total Attendance: 3
Host: Sherry Berman, Chair of the Southlake Community Engagement
Committee
Applicant Presenting: David Cunningham, phone: (972) 731-2300, email:
dcunningham@graniteprop.com
City Staff Present: Madeline Oujesky, Assistant to the Director
Town Hall Forums can be viewed in their entirety by visiting http://www.cityofsouthiake.com and clicking on "I Want to" and "View"
"Video on Demand" — forums are listed under SPIN by meeting date.
FORUM SUMMARY:
Property Situation:
The property is located at 550 Reserve St.
Development Details:
The applicant is proposing to develop an approximately 150,000 sq. ft. Class A
professional office building adjacent to Granite Place Phase 1. The building will be
designed as a multi -tenant 5-floor office building. Granite Place Phase 2 is 23% smaller
than the previously approved Phase 2 building in the Master Plan.
Project Improvements include:
• 142,000 RSF, 5 Story Class A Office
• 265 car parking garage addition
• 50 street parking spaces
• Approx. 50% open space including an outdoor conference center
Presentation:
PROJECT OVERVIEW
• In collaboration with Cooper & Company, Granite Properties is excited to present the second
phase of Granite Place at Southlake Town Square.
• Granite Place Phase 2 will be a Class A professional office building adjacent to Granite Place
Phase 1 on Block 16 of Southlake Town Square. The asset will be designed as a multi -tenant
5-floor office building.
• Granite Place Phase 2 is a new building as previously contemplated in the Block 16 Master
Plan.
It is important to note that Phase 2 is now 23% smaller than the Phase 2 Building that
has already been approved in the previous Master Plan.
• Project Improvements will include:
• 142,000 RSF, 5 Story Class A Office
• 265 Car Parking Garage Addition
• 50 Street Parking Spaces
• Approximately 50% open space including an outdoor conference center
GRANITE PLACE PHASE 2
Granite s
LANDSCAPE DESIGN APPROACH
• The Site is designed to allow for the proper circulation, storage and services related to the operational aspects
of the Garage and Office Building.
• Landscaping and Open space has been significantly increased from the prior approved Master Plan to reflect
Customer's desires for more outdoor space around their offices
• The open area intent is to create exterior usable open space that encourages interaction with the environment.
social interaction, passive recreation, outdoor meeting space, and physical activities.
• This open space will be generally open to the public.
• Enhanced pavers will be provided in the common areas between the Phase 2 Office and Garage addition.
• Pavers will be laid out in a way to enrich the building architecture and design aesthetic.
• Blending and feathering of the enhanced pavers into the surrounding concrete sidewalks will evoke
interest within the Courtyard and allow for unique planting opportunities.
• Whereas, the street infrastructure was completed with Phase 1, the construction of Phase 2 will include all of
the perimeter sidewalks, crosswalks, and streetscape which will fully integrate pedestrian traffic paths around
the entire development
• These improvements will connect Granite Place 1 and 2, McPherson Park, the Police and Fire Station
as well as the Carroll Pointe retail
LANDSCAPE SITE PLAN
it
4v
COURTYARD
4
2
0, .
M
r�r
Granites 5
WE DISTINGUISH OURSELVE
Passion to lead with integrity
Dedication to serve
Drive to create opportunities
Pursuit of improvement
Granite
A1LAN[A DALLAS DENVER HODSION SODIHERN CALIKORNIA
U R',
Questions and Concerns:
1. We have had drainage issues from Town Square to Gateway and to our properties. Will
this be drained through the same drainage way?
In the original design, there was a stormwater main in a stormwater drainage ditch that
was put in place. This storm main drains the water and brings it through the cistern, under
S.H. 114, and flows downstream through the pond system on the northside of S.H. 114.
2. 1 know this development will bring additional drainage. This area has been engineered all
the way up to Kirkwood Blvd. and the capacity for water retention is overwhelming. Beyond
that, it has not been engineered, it's all natural. The area is just eroding away, so I'm just
trying to get the attention we need to do something about this.
All the water for these sites is retained on -site and drained out at a controlled flow.
3. From our perspective it ends up being additional capacity. If its engineered, we don't have
any erosion up through Kirkwood Blvd. After that, there is additional flow that causes
erosion over time and with more volume.
4. For the restaurants, will they have outdoor seating?
Yes, they will.
5. The garage capacity, will that account for the restaurant concepts?
Yes, it will. This site is self -parked.
6. DIPS Headquarters is still clear on the sideline view from Division St. as an anchor on the
west -end. Is that correct?
Yes, we tried to camp the building back for provisions for that reason.
SPIN Meeting Reports are general observations of SPIN Meetings by City staff and SPIN Representatives. The report is neither verbatim nor official
meeting minutes; rather it serves to inform elected and appointed officials, City staff, and the public of the issues and questions raised by residents and
the general responses made. Responses as summarized in this report should not be taken as guarantees by the applicant. Interested parties are
strongly encouraged to follow the case through the Planning and Zoning Commission and final action by City Council.
Southlake Connect Results for the October 26, 2021 SPIN Town Hall Forum
IW29LI21. &22AM etreftdge -REpDqs
Evet6ridge SLIER City of Sonrhlake - ;... -- AM11 (OrparYmhon Admin)
Uashtaurd Unncnac N01rfiC.3l1 rr. Porrmcb Reports SdUngs AEDMS
Rvorls P hrWkd'kdboaYm Aunota� s MN Tarn Hall Fowm • OC40e Mth
Detailed Notification Analysis
SNNTawn Mall F&Lsrl-Off&& 261h
DETAILS I call Rasugs
Notlfic elan O 19467275!A274l54
€ate
■ IMA4 M-Q%}
Noltfi[etnm
Str.]rd
AdNrMd-M
Type
CaVYmed
Start Dale O0125,2D21
21135(165AMffWted
-Fbt D3nrrerftl
Start Tlme 13:5532 GOT
� 1613 [8a3%) FtM
Ccrr{rtl6a6cm Yea
Req uesled
0 435 ¢.16%1 Other
Call ThwWng Yea
Nrd[•Ecta l�
Dural, n 4hr�ij
GLI Result3lptr Del"prth;
Tidal
kor 70W
Message VaoefTert
1'oloernerl Meg Dn"
Prefcenoc s+7e
{smfirrrd
327
1.621E
-WM"Drdr Organlzmbo lldauh
arc 'a1 .0-- 1'c
6alhmT Mel-ro-tls
Ddhwad
9Ie
,.7111,
1. Pnru NIV:;
2 Eeca'c]r� J
L diremd - Tb Volcenai
91y22
I &MV.
3 PnrurvLmall
4, Pnr ry Moaie
Ncl Uclvcwd-No Ansvrt:i
22M
Itkw%
5. SecorcarK Emall
fi 5eca'eanr Modk
LIIHM tl - 13 Handset
U12
126 GAL
T. Hane Phone
RHa Fhorrei2
NEIUcl%wci-V31ccrrailHung
am
419%
A 9u�o Phone
L4
M TTY. TTMOeoloe
WotUcYvcwi-Haipicrr. Hurg
UP
1777
lk
Sant
Nit
14.661E
Atternplad - Not DXTKr .. ]
NEI U!Wti -Invalid Hurrbcr
Mi
1Aft
Nc1 Uclvcrcd-CutofS«vk*
1661
6.241c
Ncl Oclvcwd-Gairwbplmd
8
0.1041L
NU Uclvcwd -Ueen' bs mn
77
0.ag%
L�cmrrunica:i3n Error
Not os&mmd - Lire Busy
M
GA4%
NOT ATTEWT4Ti
NEI Aitemmed - "miim Pe•h
1:24
lk&A
Ncl Aibe :rled -Unsu3scr"
"i
MA
Ncl 130med-Unlacl Pa:h N31
G
1koft
Lkfincd
Net Uclvercd-UupincabePa-h
fil6
3.9Ift
Mtp V.1manager.ederbrldgenetTepDFWnoNcjIlDrOolew7194572F5.59276859
V`4UL:
0
16
Eaertrldge- Reports
{at Re Uftic*f cit1h m'y
P■ih;
Toi■I
%
of Tatar
971tt
Not oamwe i - C;Mnla[t
1��61c
i3d
1.1 h
Jllbieylc beer Tim a
eak
—
id
—
rt
H �tlt alai is
A16urp1 aNvtly Attempt
Alheln Pt Aticmpt Attcrnpt Alww
Ait w Atlelnpt Atitrnpt Atmpt Toils
11m• Mebiod 1
2
3
4
}
6
7
r
9
ad
21� Pd-n
2621
14M
SMS
De
OUT
MKO
ndery dD
"b
d
A
0
ti
II
n
a
11;2
M
Plim
ery S4
1221
in
U
0
u
II
a
a
"If*
Email
Pair
12
364
in
in
t7
U
II
:I
a
4115
Nladl
MKO
ride 2:
24
d
A
t7
6
II
:I
4
2,
E�
stm
ride S
■
1A
d
tY
4
6
6
d
a
1!2
Han
7M
12
in
U
4
D
6
in
4
7M
Han
P.n D
3
in
a
4
D
6
in
4
a
c $2
Basin
a'm 1e41
Phan
c
e
a
a
a
a
II
a
a
2IS+a';
rTV o
rM t}
C4xk
•
2
J
a
a
t}
II
n
a
2
Tend ,3,; 234a 1d61 769 01 216 42 9 2 18�
MOO, manager.L�rcrldgenetrepoles'nalMwUDrL-V .119d5F2T55PWoes9
WA
lW29f 1. LMAM
Eaert+ldge-Repxea
A1hen'pi Davvy Attempt Attempt Atlempt Attempt Altempl
A1LmW
AHampt AHernlrt Atb mp't Tow,
Time Mehod
2 3 4
5
d
7
9
9
601
2a
2091
14M 1318
D-0
2a116 J J
0
U
tl
J
0
1 %t
1
CDT
a
sub
Told
9
ad
" Phn
2021
11<iae e 0
a 4
0
U
u
J
0
U
�a
CDT
kcc
ndery U
u J J
0
U
u
J
0
U
SFAS
Prim
Dry 0
u pf J
0
0
u
J
0
W2
h�l
Piim
cry 0
Maul
c
u h3J 4-7J
0
0
u
J
0
'LM
Secc
ndeiy 0
u ljS , Ff
0
0
u
J
0
Ur
6n�1
Secc
ndo
Moll U
c
u M FJ
0
U
u
J
0
-24
Han
c
Phan u
c
u lil lh
0
u
u
:I
0
41
Han
c U
PMn
u J 2
0
U
D
U
0
4
c A2
BLmin
cm U
Phon
c
Ll 41
a
00
a
0
67
11Y:
T11} D
C�rdc
■
1 6 is
a
0
D
U
0
29
001
2a
2091
11<i0E
�12 0
D , ea, 7�bi
a
0
D
o
a
2920
cbT
Sub
Tald
i
ad
2ru Piim
2021
e u
14;10 SAS
u 0 J
a
u
u
a
0
u
}Q
cur
Talal gala
234a 1001 763
4al
216
42
9
2
11i
s T
7
Mtp "manager.e'oerbrl3gene4TepuWnalM(z1otrNew1194572TW9¢7D899
Sri
IGFMI. 8:22 r511
E-UkIge - Report
A—i Shci-r 13Y AV-iqd AAWrpl 7 Aiburpt Aitrmpi Atmmpt Atinmpt AiNrnPt
Talela
Tlm MWFod
y
A a 4
6
6
7
a
4
4CCc
adsry
I
7
0
nit
MIT
sly
U
II J J
7
4
D
Email
NIIT
sry
Mall
c
6
0 :I J
l'
II
:I
4
0
Saco
ndery
0
0 a 7
tiv
0
0
U
4
224
ErnW
Saco
ridery
Mcw
■
D
0 U U
7Sl
0
0
U
4
7S7
Han
aAlrrn
■
0
0 U U
70
0
0
U
0
77
Nan
F
0
0 U 0
2
0
0
0
0
2
a F2
BSI n
a
MW
■
D
D U a
74
D
D
U
0
14
my)
rM
Cfd4i
a
0
0 d d
20
0
0
d
0
2d
2081
14.'10
712
0
0
0
0
421
0
0
0
0
422
cM
Sub
Tills)
a
Od
'
4081
20
Ain
erlr
0
0
U
U
4
0
0
U
0
0
14.-1a
sas
A2
cm
Sim
nderyr
0
0
0
0
0
0
0
0
0
0
tx
NW
e rlr
0
0
0
0
0
0
0
0
0
0
E nd
PFkn
eryr
Fiohil
0
0
d
d
4
0
0
d
4
0
Ira) 1318 2y6. 1081 763 Mri 21d 42 4 2 I&W
s 7 7
P4wM enagererertrltlge. neUTepDrwnatlllnallon1uleK7194572755327MSS 4M
lflFml, 8= AM
E =_rt-lcge - R=_p-tU
Aatbvmt0liwy AMmptAtlempt AHompt Attempt A16rrptAitimpi
AHampi Aeirpj►/ k
VON
T1mr M*to3d
11
7 3 4
5
a
7
Sa[c
ndary
J
d
b
EMI
ndar)r
1.
a U
d
774
D
O
4
lid
mcbi1
Hpn
°
i'ilal
b
a d
d
tIR
14
d
4
93
Hdn
porn
■ F2
�In
'W=
■
d
D U U
4
72
79
O
d
as
rr-ry
rm
[�rda
■
d
0 U 4
0
9
9
O
4
72
001
2.
2021
ltio
7Q
1)
1)
0
0
d
276
42
O
d
260
cur
sob
ratai
11
ad
.2k
2021
AYn
a
d
0
a
o
d
0
G
o
d
0
l4kil
t
cur
ochry
d
0
a
a
d
0
G
o
0
0
AYn
°�
a
G
U
U
4
D
R
0
d
0
E,
Ain
■
MM
ndary
d
a
0
0
a
0
d
O
d
0
E�
nd°ry
F3bhil
d
D
U
U
4
D
d
O
d
0
c
Hem
1:Hal Ims 2mb. 16d1 RA 4:41 210. 42 9 2
s 7 7
1d4lmtanagerevertrldgE.nebaptxwnairn&AmruNen'119d=5927Da5A 5!5
10r MI.8:22 AM
E:=rGy.ge - R=p: U
*VmWM4§#iFIGrnpt Atbtmpt AHumpt Azwnprt Azvnpt A1Mnp1 Attempt AlUmpt AVArnpt Talel�
Tj Nod1od 1 2 3 4 0 a 7 8 9
Han
■ F2
ttiin
is
FIrn l
•
MY
rM
Dffdo
■
Od
2a
2021
l4kia
:91
D
D
0
0
0
o
u
Chi
sub
Tali
Tali
1315
14b1
■
1
234a
1d01
w
431
216
42
9
g
7
T ,. of or. I • 2W 4+ Inc.
81,2.1.144021.1&M-M30 FELOSn ed~7o9wf74s
PftW anagerererCrldge.nebTWmwnotMD rLl%llew,'l945 M5327M53
Err