Item 4E - TW King PS and GST Tech Memo by KHA
INFRASTRUCTURE PLANNING PROJECT SELECTION TW KING PUMP STATION AND GROUND STORAGE TANK CITY OF SOUTH AKE Prepared by: Kimley-Horn and Associates, Inc. 801 Cherry Street, Unit 1 1, Suite 1 300 Fort Worth, TX 76102 Phone 817 335 651 1 TBPE Firm Registration Number: F-928 Project Number: 061 237061 © Kimley-Horn and Associates, Inc. �Q�(E°°°°°°°Tt��-���! oo ° o*®®� ®° 000°°°°°°°°°°°°°°°°°o o i JOSH KERCHO 0000.� o �1 13002 0 40— 2023-01-30 Kimley»>Horn TABLE OF CONTENTS CITY OF SOUTHLAKE 0 Introduction.............................................................................................................................................. 1 II City of Southlake ARPA Disbursement.....................................................................................................2 III Criteria for ARPA Eligible Project Selection..............................................................................................3 IV Recommended TW King PS & GST Improvements....................................................................................5 Appendix............................................................................................................................................................... 8 Infrastructure Planning Project Selection TW King Pump Station and Ground Storage Tank ii January 2023 City of Southlake, Texas SOUTHLAIZE Kimley>>> Horn 0 I INTRODUCTION The City of Southlake has received State and Local Fiscal Recovery Funds (SLFRF) as part of the American Rescue Plan Act (ARPA) disbursement and has requested assistance in determining eligible projects that best allocate federal funds. Kimley-Horn was requested to assist the City in evaluating potential project eligibility and prioritization based upon various criteria. This technical report includes the discussion of the following items: • City of Southlake ARPA Disbursement • Criteria for ARPA eligible project selection • Recommended TW King PS & GST improvements Infrastructure Planning Project Selection 1 January 2023 TW King Pump Station and Ground Storage Tank City of Southlake, Texas SOUTHLAIZE Kimley>>> Horn 0 II CITY OF SOUTHLAKE ARPA DISBURSEMENT On March 11, 2021 the American Rescue Plan Act (ARPA) was signed into law and intended to provide $350 billion of fiscal recovery funds to support State, territorial, local, and Tribal governments in their response to the economic and public health impacts of COVID-1 9 and in their efforts to contain impacts on their communities, residents, and businesses. Through ARPA, the Coronavirus State and Local Fiscal Recovery Funds (SLFRF) program was established. On May 17, 2021 the U.S. Department of Treasury (Treasury) published an Interim Final Rule (IFR) to implement the SLFRF program. Under the IFR, the City of Southlake (City) was classified as a nonentitlement unit of government — a local government with a population below 50,000 — with a committed distribution of approximately $8.03 million. As a recipient of funds, the City is required to obligate funds by December 31, 2024 and expend the obligated funds by December 31, 2026 or otherwise return any unused funds to the Treasury. In addition, recipients are to comply with the SLFRF statute, the SLFRF Award Terms and Conditions, the IFR, and reporting requirements as applicable. In Fall 2021, the City Manager's Office retained the services of Kimley-Horn to begin the ARPA Infrastructure Planning Project with the following scope to identify and prioritize infrastructure projects that: • Meet the City customer needs for the safety, security, and quality of the water system infrastructure. • Qualify to receive financial assistance through the Environmental Protection Agency's (EPA) Clean Water State Revolving Fund (CWSRF) or Drinking Water State Revolving Fund (DWSRF) as outlined in the ARPA's SLFRF program. • Are programmable within the IFR's five year obligation and expenditure timeframe to ensure the procurement of professional services, engineering design, permitting, right-of-way acquisition, bidding, and construction. Following the publication of the IFR, the Treasury received feedback from recipients and stakeholders and on January 6, 2022 the Treasury adopted a final rule that delivered broader flexibility and simplicity to the SLFRF program for recipients. Following the broadened final rule, the City of Southlake reassessed the utilization of the ARPA fiscal recovery funds. The City found that it could use the funds to restore and bolster their public sector capacity that supported the City's ability to deliver critical COVID-1 9 services through the period of performance. In Spring 2022, the City allocated the ARPA fiscal recovery funds to cover operating costs for public safety personnel that met the objective of the final rule therefore creating an operating cost offset in the City's General Fund. During this time, the City re-examined the prioritized ARPA eligible infrastructure projects identified by Kimley-Horn and requested an ultimate buildout of the T.W. King Pump Station and Ground Storage Tank (TW King PS & GST) site. As a result, the City can now apply the offset General Funds to the Capital Budget - accelerating the TW King PS & GST ultimate build out through the City's standard procurement of engineering, design, and construction services rather than the federal administration requirements outlined in the SLFRF statute. Infrastructure Planning Project Selection 2 January 2023 TW King Pump Station and Ground Storage Tank City of Southlake, Texas SOUTHLAI<E Kimley»>Horn III CRITERIA FOR ARPA ELIGIBLE PROJECT SELECTION ARPA Eligibility Evaluation Kimley-Horn reviewed existing and forthcoming planning documents with City staff to identify planned water distribution system projects which would potentially qualify under the ARPA SLFRF program and meet EPA CWSRF and DWSRF criteria. The following planning documents were evaluated: • Adopted and Current Water Master Plan Draft • America's Water Infrastructure Act (AWIA) Risk and Resiliency Assessment (RRA) • AWIA Emergency Response Plan (ERP) • Senate Bill 3 (SB 3) from the 87th Regular Legislative Session Notice filing to the Public Utility Commission (PUC) • SB 3 Emergency Preparedness Plan (EPP) • Water Quality Evaluation ARPA Infrastructure Project Priority List Development Funding eligible projects were then prioritized to determine the best allocation of ARPA funding. The following criteria was utilized as part of this evaluation: • Short, intermediate, and long-term water system needs identified in the Water Master Plan. • Projected future conditions of the water system where not captured by the Water Master Plan. • Emergency preparedness projects identified during review of the AWIA RRA, AWIA ERP, and the SB 3 EPP. • Existing performance of the water system, system deficiencies, and operations challenges. • Regulatory compliance. • Anticipated capital costs.* *Costs were determined from previous Southlake infrastructure project bid tabulations provided by the City, as well as average market prices from July 2022. Prices assumed during evaluation are not reflective of actual construction costs at the eventual time of bidding. Project Selection The City of Southlake receives potable water from the City of Fort Worth at the Pearson Lane and TW King pump stations. Pearson Lane pump station serves both the upper and lower pressure planes, and TW King serves the lower pressure plane. 21 million gallons (MG) of water storage is currently available at both pump stations and elevated storage tanks (ESTs) within the distribution system. However, the storage and supply available at TW King cannot be counted under Senate Bill 3 in the event of loss of power due to lack of backup power generation. In order to provide necessary redundancy to better serve the citizens of Southlake, improvements to ground storage, pumping Infrastructure Planning Project Selection 3 January 2023 TW King Pump Station and Ground Storage Tank City of Southlake, Texas Kimley»>Horn SOUTHLAKE 0 capacity, and backup power generation are recommended at the TW King pump station. These improvements are further detailed in Section IV. ARPA Funding Reallocation ARPA funding encompasses strict requirements pertaining to solicitation, reporting, payroll review, personnel interviews, permitting timing, speed of design, construction timing, construction phasing, etc. City staff has determined that the additional administrative burden required to expend ARPA funding on a proposed infrastructure project is not feasible with current staff availability. However, ARPA funds may also be utilized for employee compensation, with minimal administrative requirements. As a result of this determination, ARPA funding will be reallocated to fund employee compensation thus off -setting City funds which can be made available for the TW King PS improvements project. Infrastructure Planning Project Selection 4 January 2023 TW King Pump Station and Ground Storage Tank City of Southlake, Texas SOUTHLAI<E Kimley»>Horn IV RECOMMENDED TW KING PS & GST IMPROVEMENTS The TW King Pump Station has one 5MG Ground Storage Tank, unenclosed pumps and motors which provide pumping capacity to the Lower Pressure Plane. The pump station is only connected to the City's SCADA system by radio, and the station does not have backup power generation. The following upgrades to the TW King PS and GST are recommended: • Supplementing SCADA connectivity through the City's fiber network; • Expansion of pumping capacity; • Addition of standby generator(s) and fuel storage; and • Expansion of water storage capacity. The proposed improvements have been divided into a three phase approach (see Appendix I for exhibits) summarized below with Engineer's Opinion of Probable Construction Cost (OPCC). Detailed breakdowns for cost can be found in Appendix II. Note that the individual components for each phase may change or be moved to different phases upon completion of more detailed design/analysis, as dictated by modeling updates, or by City staff. • Phase I — OPCC: $8,812,00 o Water model update and analysis o Standby generator installation o Residual control system o Septic to sewer conversion of the site o Surveillance system installation o Supervisory Control and Data Acquisition (SCADA) system upgrades o Extension of a fiber optic cable for SCADA and remote security surveillance • Phase II — OPCC: $4,1 31,000 o Building improvements to enclose pumps and motors o Lower pressure plane (LPP) pumping capacity improvements o Drainage improvements for ultimate buildout conditions o Yard piping and valving improvements for ultimate buildout connection • Phase III — OPCC: $18,51 1,000 o Construction of new 5 MG Ground Storage Tank o Upper pressure plane (UPP) pumping capacity improvements o Tank Coating Improvements for existing 5 MG Ground Storage Tank o Site Fencing Improvements Infrastructure Planning Project Selection 5 January 2023 TW King Pump Station and Ground Storage Tank City of Southlake, Texas SOUTHLAIZE Kimley>>> Horn 0 Phase I (Exhibits A and B) This phase will improve the existing electrical system to allow for additional (and remote) operational control, as well as increased water quality, site security, and regulatory compliance. • Update City Water Model (last updated in 201 2) to existing conditions and for ultimate build -out. Analyze and make recommendations regarding regulatory, pumping capacity, storage capacity, and water age residual control system requirements for TW King PS and GST. Modeling results will be utilized to further refine scope of work for all phases. • Install approximately 1 1,500 LF of fiber optic cable to the TW King site and tie to a new network switch and various instrumentation improvements to permit SCADA integration to the City's fiber network. Fiber provides additional bandwidth which will permit security cameras and automatic gates to be installed. • Install an automatic gate along the south entrance to permit ease of access to perform regular maintenance on the proposed standby generators • Install standby generators, necessary switchgear upgrades, and 24-hours of fuel storage to permit pump station operation during power outages. • Install chlorine residual control system and integrate with SCADA system to conduct remote monitoring and maintenance of chlorine residuals in the existing and proposed ground tanks. • Install a wastewater grinder station, approximately 950 LF of 2" force main, and remove the existing septic system. Phase II (Exhibit C) Phase II focuses on the expansion of pumping capacity to the lower pressure plane and to prepare the site for ultimate buildout. • Install enclosure structure over 3 existing pumps and remaining empty slots to protect pumps and motors from inclement weather. • Install 2 lower pressure plane pumps (pending model results) • Improve site grading and drainage to accommodate draining of the existing 5MG tank, and to prepare site for new 5MG tank installation in Phase III. • Install necessary yard piping and valving for Phase II and Phase III improvements. Infrastructure Planning Project Selection b January 2023 TW King Pump Station and Ground Storage Tank City of Southlake, Texas Kimley»>Horn Phase III (Exhibit D) SOUTHLAKE 0 Phase III focuses on the addition of a new 5MG GST, addition of pumps to allow for pumping into the upper pressure plane, and rehab of the existing GST. • Install new 5 MG GST to increase storage capacity. • Install 2 upper pressure plane pumps (pending model results) to provide backup pumping capacity for the Pearson Pump Station • Remove and replace interior lining and exterior coating of existing 5 MG GST. • Install fencing improvements to visually tie the site to the surrounding neighborhood. Infrastructure Planning Project Selection 7 January 2023 TW King Pump Station and Ground Storage Tank City of Southlake, Texas Kimley»>Horn APPENDIX Appendix I - Exhibits SOUTHLAKE 0 Appendix II — Engineer's Opinion of Probable Construction Cost (OPCC) Infrastructure Planning Project Selection 8 January 2023 TW King Pump Station and Ground Storage Tank City of Southlake, Texas Kimley»>Horn Appendix I - Exhibits Infrastructure Planning Project Selection TW King Pump Station and Ground Storage Tank City of Southlake, Texas SOUTHLAKE 0 January 2023 I I ru UVI I - /A N 91M CONCEPTUAL FIBER OPTIC ALIGNMENT (11,420 LF) o 41 1116, 401 CONCEPTUAL FIBER OPTIC ALIGNMENT B (11,480 LF) 11 9 RD ran R � Lir lb 11 @ra IBM • el— @1M 2;9 ra rag @1M 91m ra Y'V& mw� \1k 9 M'� fl Aw* Legend 19� CITY OF Existing Water Line: 12'and Smaller SOUTHLAKE Existing Elevated Storage Tank A, Existing Water Line: Greater than 12" r ?� ' . -M Existing Sanitary o Sewer Existing Ground Storage Tank Existing Force Main 0 75 150 300 450 600 Feet ALINGMENTA City Limits IS — ALIGNMENT B DATE: JANUARY 2023 ARPA INFRASTRUCTURE 'kIIII, 2023-01-30 EXHIBIT DESIGN: JCK FIBER OPTIC CABLE Kimley)))Horn DRAWN: ARE CONCEPTUAL ALIGNMENT TO PLANNING PROJECT �u*.-.'� .............. :*-.*.�'� JOSH KERCHO W Revision By Date . ........................ I . A CHECKED: JRA T.W. KING PS & GST SITE CITY OF SOUTHLAKE KHA NO.: 061237061 PHASE I TARRANT COUNTY, TEXAS Akiaw M J z,- w- z<•• r.- w <• w—,... w ,.. w w z. w — w EXISTING EXISTING � -- DISCHARGE LINE DISCHARGE LINE # EXISTING-7 P.ROP.OSED SUPPLY'LINE r=•:•, SITE EXPANSION V� OR RESISD�A.�L`MCONTROL Flu PROPOSED — GRINDER PUMP STATION; I 0 T, 'Dot Z T.—as w— oaw� o5-�w oa ca Y X I i4 PROPOSED FIBER OPTIC CABLE EXTENSION TO SITE EXISTING • I SUPPLY LINE/ w •. 'aiI Y' _9j4 # � I ► Z. t k 7 PROPOSED I—c AUTOMATIC � GATE J _ I r �PROPOSED 2—INCH SANITARY SEWER FORCE MAIN PROPOSED STEEL FENCE REMOVAL OF EXISTING FENCE XISTING 4—INCH TANK OVERFLOW LINE GRAPHIC SCALE IN FEET 0 15 30 60 FOR 11X17 PLOT, SCALE: 1••=60, NOTE: IMPROVEMENTS THIS PHASE ANNOTATED IN RED. :E � � r ;1 5—L , • 1 � I II C • � a � soj V o N• � � U z H z o 0 a• i .'S�. � � I m w o PROPOSED SANITARY SEWER '�,• MANHOLE10. z O w a L OX ow oMLL o w. o�w o z C., C., NN❑ Mw FrF � zmrn w Now y xa w � x m 0l13012023 Y w Q OU Q K x N Y z N N m m a w fO w � w x Y ao ❑� N ❑ ❑ o w 0. 5 U U) U) Y w 0 _ } U d > Z o 0 LL O z zQ� H � a F- Q U) Z w Lu Y > w O U) w U) EXHIBIT B ww �m DISCF I.. PROPOSED 24-INCH DISCHARGE LINE F PROPOSED GRINDER PUMP STATION I PROPOSED - FIBER OPTIC CABLE EXTENSION TO SITE EXISTING SUPPLY LINEE,� >3 t I 1 ;a 1 �I �I it �I �Iit 1, k r ❑ a o -0 :. " w N w- 2e w b1 w g \ `EXISTING LING ��\ DISCHARGE LINE LINE & = EXISTING) + cV CI IPPI Y ING PROPOSED SITE EXPANSION FOR RESIDUAL CONTROL SYSTEM PROPOSED LOWER PRESSURE PLANE PUMPS (PENDING MODEL RESULTS) wort 4At _ �Mk A. l vwoid) w PROPOSED J PUMP STATION ENCLOSURE 0 IMPROVEMENTS Y 48-INCH SUCTION LINE EXISTING 5MG GROUND STORAGE TANK PROPOSED 2—INCH SANITARY SEWER FORCE MAIN EXISTING 24-INCH TANK OVERFLOW LINE x� 24-INCH TANK SUPPLY LINE PROPOSED REMOVE AND REPLACE OF EXISTING FENCE \-- PROPOSED SITE DETENTION AREA — GRAPHIC SCALE IN FEET 0 15 30 60 FOR 11X17 PLOT, SCALE: 1"=60' NOTE: IMPROVEMENTS THIS PHASE ANNOTATED IN RED PROPOSED ^!- SANITARY SEWER - MANHOLE L 0 3m� �Wz 2\ o rc z a� C� �w � zm� Now w 0113012023 EXHIBIT C U a 0 z z z K O x w 0 g 'k s z$ i' z. ` SS �r 1�— ❑ o- ❑ EF— b _ w - .z.wz,-w-2.^w z.^w -- wz✓wza-w--zvwz,-w--za-w z,-wn•w�\�EX i z- " - I I EXISTING � � DISCHARCHAR GE LINE DISCHARGE LINE EXISTIN� + N I PROPOSED SUPPLY LINE —� ,. SITE EXPANSION FOR RESIDUAL CONTROL \ a SYSTEM jI�I PROPOSED RECOATING- PROPOSED 24-I14CH OF EXISTING GROUND STORAGE DISCHARGE LINE I, X AGE TANK V PROPOSED / UPPER PRESSURE o PLANE PUMPS u') 1s (PENDING I PROPOSED - X MODEL RESULTS) GRINDER PUMP STATION _ EXISTING 5MG GROUND STORAGE TANK 40 t..l \.. �48oNCHD ' 11124 INCYFLDTA K SUCTION LINEINE 0 Q O 0 Z 1' 3 F PROPOSED FIBER OPTIC CABLE EXTENSION TO SITE EXISTING SUPPLY LINE�,� I I F1 � 1 1 I �I it �I A �I 11 i 12 rr w� D ) EXISTING 24-INCH TANK OVERFLOW LINE PROPOSED � PUMP STATION = 4\� X ENCLOSURE / IMPROVEMENTS PROPOSED 48-INCH SUCTION LINE } PROPOSED /J( SITE S' EXPANSION FOR EIACKUP PROPOSED REMOVAL PROPOSED GENERATORS OF EXISTING \ COI+CRETE MATH SOUND COMPOSITE FENCE / DRIVEWAY ATTENIN ON EXTENSION PROPOSED \ .111%� SALVAGE OF STEEL FENCE \ E (PHASE I INTERIM) 0/-PROPOSED 24-INCH SUPPLY \ LINE CONNECTION .i PROPOSED 5MG GROUND STORAGE TANK 105' -PROPOSED �. 30-INCH TANK, OVERFLOW LINE \ ;.C' PROPOSE' ` 4=.F0OT 'MOW STRIP — \ PROPOSED vSI� , \ GRADING TIE-IN\ PROPOSE[? - _ � x SITE DETENTIOFJr AREA—� PROPOSED STEEL FENCE o PROPOSED -2-INCH SANITARY SEWER FORCE MAIN \ h _ `PROPOSED - PROPOSED - COMPOSITE FENCE STEEL FENCE Y ID w — — a w- 0 Of GRAPHIC SCALE IN FEET 0 15 30 60 FOR 11X17 PLOT, SCALE: 1"=60' z IMPROVEMENTS THIS PHASE ANNOTATED IN RED 21 .• O8-1 oLL 3mLL o. z raw nw b � M . ` J w yzrc ` + • I 0113012023 to zcl.6 I-,11 0 i ........KERC....::.�j JOSH .7i�KERCHO.... f 113002 � � Q O I m m b W o Q m 0 a w z zQ Y I Cl tea' QZ U N K � ❑ Q m O O U b 0 i W U QQ + w w ULLI Y LU bZ �p g~ PROPOSED Z COMPOSITE FENCE , m 0 Q p O �Z � Z LL ? z z b aQ b b w Z W - H Y>LuQ � o < d = J ' b W PROPOSED ^! I SANITARY SEWER MANHOLE b II EXHIBIT D z a O z z Z K 0 x w 0 Kimley»>Horn Appendix II — Engineer's Opinion of Probable Construction Cost (OPCC) CITY Or SOUTHLAKE 0 Infrastructure Planning Project Selection January 2023 TW King Pump Station and Ground Storage Tank City of Southlake, Texas Kimley-Horn & Associates, Inc. Opinion of Probable Construction Cost Client: City of Southlake Date: 7/22/2022 Project: ARPA Infrastructure Planning Project Prepared By: ARE KHA No.: 061237061 Checked By: JRA No.— Item DescriptionItem AOO A Fiber Optic Line Extension and On -Site Security (Alignment A) 1 E,8 0 6, (t ImprovementsExhibit T.W. King Site Power B and Sewer Connection Phase I - Total iii ImprovementsC T.W. King Site .. oW Phase 11 - Total iii ARPA Phase III T.W. King 5 MG Ground Storage Tank and Pump Station #2; D Recoating.. iii TotalPhase III - ii, ■ D- The Engineer has no control over the cost of labor, materials, equipment, or over the Contractor's methods of determining over competitive bidding or market conditions. Opinions of probable costs provided herein are based on the information prices or known to Engineer at The Engineer probable costs. this time and represent only the Engineer's judgment as a design professional familiar cannot and does not guarantee that proposals, bids, or actual construction costs will with the construction not vary from its opinions industry. of K:\FTW Utilities\061237061-Southlake-ARPA-IP\WKS\SLK-ARPA-1PP Water OPCC.xlsx Kimley-Horn & Associates, Inc. Client: City of Southlake Project: ARPA Infrastructure Planning Project KHA No.: 061237061 Phase I: Fiber Optic Line Extension and On -Site Security (Alignment A) Item No. Item Description Basis for Cost Projection: Opinion of Probable Construction Cost Quantity Unit Date: 7/22/2022 Prepared By: ARE Checked By: JRA Unit Price Item Cost The Engineer has no control over the cost of labor, materials, equipment, or over the Contractor's methods of determining prices or over competitive bidding or market conditions. Opinions of probable costs provided herein are based on the information known to Engineer at this time and represent only the Engineer's judgment as a design professional familiar with the construction industry. The Engineer cannot and does not guarantee that proposals, bids, or actual construction costs will not vary from its opinions of probable costs. Kimley-Horn & Associates, Inc. Client: City of Southlake Project: ARPA Infrastructure Planning Project KHA No.: 061237061 T.W. King Site Improvements - Power Generator, Residual Control System, Phase I: and Sewer Connection Item No. Item Description Basis for Cost Projection: Opinion of Probable Construction Cost Quantity Unit Date: 7/22/2022 Prepared By: ARE Checked By: JRA Unit Price Item Cost *All materials shall use domestically manufactures products that are composed predominatelyof steel and/or iron to incorporate into the permanent installation of the utility facility - in compliance with the Buy America provisions of 23 CFR 635.410 as amended. The Engineer has no control over the cost of labor, materials, equipment, or over the Contractor's methods of determining prices or over competitive bidding or market conditions. Opinions of probable costs provided herein are based on the information known to Engineer at this time and represent only the Engineer's judgment as a design professional familiar with the construction industry. The Engineer cannot and does not guarantee that proposals, bids, or actual construction costs will not vary from its opinions of probable costs. Kimley-Horn Client: Project: KHA No.: Phase Item No. 0 II: & Associates, Inc. City of Southlake ARPA Infrastructure Planning Project 061237061 T.W. King Site Improvements - LPP Pump Expansion and Item Description Mobilization0 Control0 • Pump Station Building Quantity Opinion Enclosure Unit of Probable Construction Date: Prepared By: Checked By: Unit Price :1 111 Cost 7/22/2022 ARE JRA Item Cost :1 111 ©Erosion 111MENFUNI11 ©. 1 111 0Discharge®1 .1 111 © ' Discharge Line® 11 111 0' ••ie11 • 111 Outlet Piping to Suction Line*® .11 111 0 Connection to Existing © 111 : 111 0 � � • © '111 '111 Trench Safety for All Yard Piping 6" Gate Valve* 0 11 111 ® ' Gate Valve*© 1 111 1 111 ® • Box* © 111 1 111 • 0 11 111 3,500 GPM Pump and Motor - 400HP*© 11 111 111 111 Remove Existing Composite Fence Composite Fence OF Me Temporary Fence0 1 111 1 111 - .• • - • • • •• • • • •. • 0 '1 1 1 1 '� 1 1 1 1 0 '11 111 '11 111 0 :11 111 '�:11 111 MJMW Basis for Cost Projection: I• • . . 1 111 •11 p o Design Completed. DesignPrelimi' Final Se 0•• .All materials permanent The Engineer competitive and represent guarantee shall use domestically manufactures products that are composed installation of the utility facility - in compliance with the Buy America has no control over the cost of labor, materials, equipment, or bidding or market conditions. Opinions of probable costs provided only the Engineer's judgment as a design professional familiar that proposals, bids, or actual construction costs will not vary from predominatelyof steel and/or provisions of 23 CFR 635.410 over the Contractor's methods herein are based on the information with the construction industry. its opinions of probable costs. iron to incorporate into as amended. of determining prices or known to Engineer The Engineer cannot and the over at this time does not K:\FTW Utilities\061237061-Southlake-ARPA-IP\WKS\SLK-ARPA-1PP Water OPCC.xlsx Kimley-Horn Client: Project: KHA No.: Phase III: Item No. 0 & Associates, Inc. City of Southlake ARPA Infrastructure Planning Project 061237061 T.W. King 5 MG Ground Storage Tank and Pump Station Item Description Mobilization #2; Recoating of Existing Quantity Opinion of 5MG GST Unit Probable Construction Date: Prepared By: Checked By: #1 (Ultimate Buildout) Unit Price Cost 7/22/2022 ARE JRA Item Cost • 111 ©Erosion Control0 ' Two 11 T: 111 © • • • .•- • • •. • 0 . 111 111 . 111 111 0Grou5 MG nd Storage Tank Subgrade0 w 1 111 1 111 ©12" Discharge®1 .1 111 0'Tank Supply'� 11 1 111 0 1 ®1 11 1 111 0 Connection to Existing 0 111 111 Connection to Existing 0 111 111 ®': 0 11 111 11 111 ® Upper• & Motor*© 11 111 111 111 Salvage Existi• Steel Fence*® 1 1 1 1 ®Remove Existing Composite Fence1 • 111 1 111 Composite Fence* Temporary Fence0 Site Grading Phase0 •Interior/Exterior• • • Storage Tank 1 111 1 111 1 111 1 111 ®-•. 1 1 1 1 1 1 1 1 1 1 Basis for Cost Projection: Subtotal:111 0 ■ '" • . 1 •11 • • M.•1 *All materials permanent installation The Engineer has competitive bidding and represent guarantee that shall use domestically manufactures products that are composed of the utility facility - in compliance with the Buy no control over the cost of labor, materials, equipment, or market conditions. Opinions of probable costs only the Engineer's judgment as a design professional familiar proposals, bids, or actual construction costs will not vary predominatelyof steel and/or iron America provisions of the CFR as amended. or over the Contractor's methods of provided herein are based on the information with the construction industry. The from its opinions of probable costs. to incorporate into determining prices or known to Engineer Engineer cannot and the over at this time does not K:\FTW Utilities\061237061-Southlake-ARPA-IP\WKS\SLK-ARPA-1PP Water OPCC.xlsx