Item 8 - Narrative & Variance RequestBrumlow East Preliminary Plat The Blumlow East development is a floodplain reclamation project consisting of a residential and a commercial component. The reclamation process consists of dirt work to adjust the existing grades and remove a portion of the property from the floodplain. Once the dirt work has been completed the reclamation portion of the property will be surveyed per the requirements of the Corps of Engineers to apply for a Letter Of Map Revision. The application process through the Corps of Engineers to obtain the Letter Of Map Revision is quite lengthy. The timeline can be anywhere from 9 months to 18 months. There is also the possibility that the Corps of Engineers will have comments to our application which will need to be addressed by our engineers and a re-submittal back to the Corps for our Letter Of Map Revision request. The second review should be much shorter, but could still take another 6 to 9 months. Because of the uncertainty of time the Corps of Engineers may take to approve the Letter Of Map Revision, we respectfully request that the preliminary plat and any subsequently approved final plat be valid for a period of 4 years.