Item 6B - PresentationCITY OF
SOUTHLAK
nWAIFR-
APPLICANT:
-{ REQUEST:
PURPOSE:
PS LPT Properties Investors
Ryan Soule
Brookfield Properties is requesting approval of a site plan for Lot 1, Block 1,
Mustang Business Park
The purpose of this request is to seek approval of a Site Plan to build a new
approximately 2,970 square foot fenced storage area on the existing site.
Consolidated Electrical Distributors is looking to move its Euless operation to
a new building in Southlake at 1825 Mustang Court. They are seeking
approval for fenced outside storage at the property. 1111A,r t "L i.t\;v\t x NIA x
'. ' y A,
LOCATION: Lot 1, Block 1, Mustang Business Park
\� CITY OF
" SOUTHLAKE
I
7
Aerial
Lana use Designailon
Future Land Use Industrial and
1825 Mustang Ct. MO -Year Flood Plain
Future Land Use
100-Year Flood Plain
- corps of Engineers Property
- Public Park/Open Space
- Public/Semi-Public
Low Density Residential
- Medium Density Residential
Office Commercial
- Retail Commercial
-Yc.. Flood P
- Mixed Use
T - Town Center
6 Regional Retail
ti
S? MUSTANG OR Industrial
0 175 350 700
F6,
r. S+
� � r
Current Zoning
Current zoning:
1825 Mustang
Ct.
"I-1"Light Industrial
Zoning Districts:
AG C1
® RE G2
f
U SF1A C3
��
- '
0 SF1B C4
,.•��
//
- ® SF2 NR-FUD
f °
�✓'
J SF30 HC
SF20A o 61
SF20B B2
R-PUS f1
MF1
.,-�
MF2 U SP1
MH SP2
0 02 0 EGZ
�1 �
0 225 450 900
oFee(
i
�jFt.
I
07 eta
a �r pp1�
24' emergency access easement
for possible future access
60' private street easement for future access
GENERALSITE DATA
LOT AREA (SQUARE FEET AND ACRES)
1,143,014SF/ 26.24 AC
EXISTI N G ZO N ING
11( J GHT I N DV5TR IAL
PROPOSEDZONING
11(LIGHT INDUSTRIAL
Elf LAND USE
VACANT
LAND USE DESIGNATION
IN D USTRI A L AND 100-YEAR FLOOD PLAIN
PROP LAND USE
SPECULATIVEDISTRIBLMON WAREHOUSE
8U I LDI NG H El GHT (4STORI ES)
35'-00" I 1 STORY
MAX BUILDING HEIGHT
35 FT
BUI LOING AREA
340,1805F
BUILDING AREA BY USE:
OFFICE (7%)
23,8135F
WAREHOUSE (93%)
316,357 5 F
BUILDING COVERAGE AREA
29, 80%
I M PE RV 10 US COV ER AGE
70.94%
IMPERVIOUSAREA
810,8545F
PE RC ENTAGE 0 P EN SPA CE
29.06%
AREA OPENSPACE
3321605F
PARENG
TOTAL SPACES REO,UI RED"
396 SPACES
TOTAL SPACES PROVIDED
STANDARD
388SPACES
HANDICAP
10 SPACES (9 REQUIRED)
TOTAL
3985PACE5
"1 SPACE PER 1,0fIDSFOF WAREHOUSE
"15PAC E PER 300SF OF OFFICE
REQUIRED LOADING SPACES
BUILDING 1:9• BUILDING 2:6; BUILDING 3:6
PROVIDED LOADING SPACES (10X50')
BUILDING 1:38; BUILDING 2:19, BUILDING 3:24
AREA OF O UTSI DE STORAGE
a S F
PERCENTAGE OF 0LR'SIDE STORAGE
0%
ANTICIPATED SCHEDULE OF DEVELOPMENT
CONSTRUCTION START DATE:
Jan-22
CONSTRUCTION END DATE;
Jun-23
�L
07 SUE PLAN
OVERALL KEY SRE PLAN
m
Outside storage for
factory bundled 10' — 209
long PVC and metal
electrical conduit
20'-0" WIDE X V-0" H16H GALVANIZED
CHAIN LINK 5LIDN6 GATE W/ BLACK
VINYL COATED SLATS 4 (4) 45" HI&H
STEEL BOLLARDS FILLED N/WNC.
6'-01..N GALVANIZED CHAIN
LINK FENCE M 6LAGK VINYL
COATED SLAT5
Interior warehouse space will be used e
,1 for other electrical materials such as /
lighting fixtures, wiring, wiring /
accessories, circuit breakers, electrical
Appearance
-3�-
Z71-A.
yaw
111 10
10
�M-illl &W
YY v mil_ y -�� ��'�,.' .d_ _/ a°"�.�
its
. . . . . ... ...
1219 1595 15 ] I601 1611 1611
1603 AN 1.
1603
Las t3] 11]3
•. .36s iwi
—7
Ifi06 —
For:
Opposed:
1951
Undecided: — --
1535
L537
L636
—,. — legs
1630
1635
^ L6751575 16J
1222 1223 ]222 1223
1225 1229 1225
1226
1227 I225 12D
_ _ W
1228 � 1229 z 1u9
h 1226 J
1
2
4
5
1233'
_
]90
31
�
Iz
MS u
8
10235
9 I
6
/
18 1236 �
123] 15
3236 14
_
J
L7
-!fi
7
}7lL
i
I855
]�
19
low
1800
I
IIL
�
20
1810
21 -
2990
S�.
�C
1fl50
y�
n
1750
23
—`/
2350
5
Planning & Zoning Commission Action
CITY VF
SOUTHL,4
Questions?