At the Southlake City Council meeting on Tuesday 9/3, TRA received comments from Council
members regarding the desire for TRA to provide a "masonry wall" parallel to Sabre Drive to block
visibility into the expanded Kirkwood Lift Station site, as part of its construction contract. TRA and
Garver pointed to an existing Oncor easement that crosses through the property. It was discussed
and generally agreed that Oncor would likely not approve a permanent structure such as a masonry
wall across its easement, as that would block access, and that TRA would reach out to Oncor for
confirmation.
Following the City Council meeting, TRA and Garver reached out to Oncor to confirm what Oncor
might allow across its 150 ft easement. In response, Oncor has stated that a masonry wall across
its easement would very likely not be approved. However, a "panel fence", no taller than 8 feet high,
with a 16-ft minimum gate might be approved. A utility encroachment permit application would
need to be sent from TRA to Oncor to begin their review.
In order to comply with Southlake City Council's desire for reduced visibility into the Kirkwood Lift
Station site, as well as to get Oncor's approval to construct across its easement, TRA proposes the
8 foot tall "panel fence" instead of a masonry wall, along Sabre Drive, shown in red on the attached
exhibit. The exhibit shows where the panel fence would be placed, as well as gates required for TRA
or Oncor access. It is not likely that an official decision would be provided by Oncor in time for the
next Council meeting on 9/17. Worst case, this 150-ft segment would need to remain open and
unchanged.
In order to access its parking area and maintain the reduced visibility, TRA would require gates
Located across the driveway. Two 30-ft long electric cantilever slide gates are proposed to provide
the access needed and provided reduced visibility from Kirkwood Blvd. The gates would remain
closed and locked, unless there is an emergency lift station shutdown.
Also attached are some photos of the type of panel fence proposed. This fence is a "semi-
permanent" feature; individual panels can be removed if ever needed but the fence is intended to
remain after construction is completed to block visibility. These photos are taken from another TRA
Lift station expansion construction project that is currently underway.
The attached exhibits and photos are provided for Southlake's review. TRA respectfully requests
that these be reviewed and considered for approval and any additional comments and preferences
in relation to this visibility concern be provided to TRA prior to the next Council meeting so we can
be adequately prepared to discuss, if needed. A high-level estimate is that these features would
add approximately $200- $300K to the project.
Please let me know if there are any questions or anything I can clarify on behalf of the Authority to
facilitate Southlake's review.
Thankyou!
Blayne Johnson, PE
Assistant Manager, Engineering Services, Pipeline
Planning, Design & Construction Administration
Trinity River Authority of Texas
Office Direct: 817.493.5173
t r
Page is too large to OCR.
Page is too large to OCR.
No Text
r
s
�
r
r ��
e. .
�S
------------
if
--------------
A
if
-Lin
e - yR \
f I
.. ._ .. _ .. .. '` . a'.e H'�„*��d.'�� �"�➢�`•67. - 'mac
Y,�