Loading...
Item 6D - SPIN ReportUSOUTHLAKE SPIN MEETING REPORT SPIN Item Number: SPIN2024-08 City Case Number: ZA24-0019 Project Name: Trinity River Authority Kirkwood Lift Station SPIN Neighborhood: 1 Meeting Date: June 11, 2024 Meeting Location: 1400 Main Street, Southlake, TX City Council Chambers Total Attendance: 7 Hosts: Sanjay Veerabathina Applicant Presenting: Kelly Davis and Paul Banschbach City Staff Present: Madeline Prater, Business Manager FORUM SUMMARY: Property Situation: 3200 N. White Chapel Blvd. and 1350 W. Kirkwood Blvd. Development Details: • Kirkwood Lift Station collects flows from the City of Southlake and requires upgrades o Includes a new wet well and space for temporary emergency storage containers • Existing site — White Chapel Blvd. and a private drive (Sabre Dr.) • TRA has acquired additional land adjacent to the existing lift station for this expansion • Site improvements require a zoning change from NRPUD to SP1 Proposed Presentation: The Trinity River Authority of Texas tr provides regional wastewater W049 treatment services in DFW. MMI Denton Creek Regional Wastewater System UP Ama TrZ,7Rwff Wastewater % syslBm Interceptor Argyle us orthla e er Mound ........... DCRWS Texas tif0f Treatm nt Plant 14 Fort Wo C—k TRA Kirkwood Lift Station RG e . .. .. ...... ANanC% -SY clu b tie Airport J= Wastlak DCRWS c� Hasle oiler S Aria k W 7 The Kirkwood Lift Station collects flows from the City of Southlake and requires upgrades. DA. , E Ce io rci 1=4 Trophy Club e - - - - - - - - - - - -Lek. DLNlON DINIO N A T�WA I 13— The existing site is located off White Chapel Blvd. and a private drive (Sabre Dr.) TRA has acquired additional land adjacent to the existing lift station tr for this expansion. ,..�._.,,.... The site upgrades include a new wet well and space for temporary emergency storage containers. -_ �O MATCHF%iS1iHG w cw `E� 1 -.F�k',µ,; f �=.1M=•4aT.iiC-�... �.;:-, LL .uw. rx I ^ i � :%.L::-F.+';�4�i�'r�•-.: if'..�' r+Ki 1 ® 1rMNUe { s•a[� r' '� ' �I TWELL wAA wA T MADE&TEE< �'�� v-• �� gOIUcC E RYIXJ5 E P( oY57 ppApE i The existing decorative fencing will be matched for the fence line extension. tr rmm a•.« A.Mw.�n a r.,,. try Tree impacts were mitigated and screening on Kirkwood Blvd. was maintained. These site improvements require a tr zoning change from NRPUD to SP'I. L I _... PROPOSE❑PROF ERYY ACO17151i1ON ZONING CHANGE FROM NRPIID TO SP1 ""' �xnrynlfll77" Comments, Questions, and Concerns: Question: When will this project take place? Answer: This will most likely be advertised for construction in the fall — September/October timeframe. SPIN Meeting Reports are general observations of SPIN Meetings by City staff and SPIN Representatives. The report is neither verbatim nor official meeting minutes; rather it serves to inform elected and appointed officials, City staff, and the public of the issues and questions raised by residents and the general responses made. Responses as summarized in this report should not be taken as guarantees by the applicant. Interested parties are strongly encouraged to follow the case through the Planning and Zoning Commission and final action by City Council. Southlake Connect Results for the June 11, 2024 SPIN Town Hall Forum 8114124, 2:23 PM / �Verbridge suite CAI Dashboard Universe Notifications Incidents Reports > Detailed Notification Analysis > SPIN Town Hall Forum - June 11 th Detailed Notification Analysis SPIN Town Hall Forum - June 11th DETAILS Everbridge - Reports City of Southlake - Citizen Alert (Orgonastion Admin) Contacts Reports Settings Access Notification ID 1680948731052107 ��� Notification Live Mode Notification Standard Type Start Date Jun4,2024 Start Time 14:13:53 CDT Confirmation Yes Hlde Desslls. Requested Call Throttling Yes Call Results(per Delivery Path) Duration 5 hr(s) Message Voice/Text Attempted - Confirmed Format Voicemail Message Only Confirmed Preference DeliveryOrder Organaation Default Attempted - Not Confirmed Delivery Methods Organization Contacts 1.PrimarySMS Delivered 2.Seoondary SMS 3.Primary Em ail 4.Primary Mobile Delivered - To Voicemail 5.Seoondary Email 6.Secondary Mobile 7,Home Phone Not Delivered - NO Answer 8.Home Phone #2 9.Business Phone 10.TTY / TTD Device Delivered -To Handset 11.Everbridge Mobile Ap Resident Connection 1,VOIP Not Delivered - Voicemail Hung 2.1-andline Up Not Delivered - Recipient Hung Up Sent 'attempted - Not Connected Not Delivered - Invalid Number Not Delivered - Out of Service Not Delivered - Carrier Expired Not Delivered - Downstream Communication Error https:lfmanage r.everbridge.nettreporL%/notificabon/view/16BO948731052107 ■ 247 (2.10%) Attempted - Confimred ■ 8723 (74.24%)Attempted - Not CorErmed ■ 253 (2.15%) Attempted - Not Connected ■ 2410 (20.51 %) Not Attempted ■ 118 (0.99%) Other Total 247 111 1610 144 2932 178 447 3301 64 94 17 72 —0ut C % of Total 2.10%, 0.94%, 13.70% 1.23% 24.96% 1.52% 3.80% 28.10% 0.54% 0.80% 0.14% 0.61 % 112 8/14/24, 2:23 PM Everbridge - Reports Call Results(per Delivery Path) Total %of Total Not Delivered - Carrier Rejected 1 0.01 % Not Delivered - Line Busy 5 0.04% Not Attempted - Inactive Path 259 2.20% Not Attempted - Unsubscribed 1326 11,29% Not Attempted -Throttling Time 1 0,01 % Exceeded Not Delivered - Contact Path Not 96 Defined 8 0.07 Not Delivered - Duplicate Path 816 6.95% Other Not Delivered - Bounced Email 103 0.88% Not Delivered - Contact 13 0.1196 Unavailable Attempts Over Time 7.Sk Sk Z.Sk 9k - o"' oA ry9. ,0 Show Details 'blevefbridger Privacy Pollcv Terms of Use ® 2024 Everbridge, Inc. 24.5.0.13-834de12-2024-07-24-21:00 FE-VERSION e ebs-manager-portat77c985d68d-5oowb https://monager.everbridge.net/reports/notificationtview/1680948731052107 2/2