Item 4H - MemoCITY OF
SOUTH LAKE
MEMORANDUM
July 30, 2024
To:
Alison Ortowski, City Manager
From:
David Miller, Director of Community Services
Subject:
Approve an agreement with Kimley-Horn and Associates for
professional engineering and design services related to Phase 2 of the
Green Ribbon project along the State Highway 114 corridor in an
amount not to exceed $76,000
Action
Requested:
Approve an agreement with Kimley-Horn and Associates for
professional engineering and design services related to Phase 2 of the
Green Ribbon project along the State Highway 114 corridor in an
amount not to exceed $76,000.
Background
Information:
The purpose of this item is to approve an agreement with Kimley-Horn
and Associates, Inc. for professional engineering and design services
related to Phase 2 of the Green Ribbon project along the State
Highway 114 corridor in an amount not to exceed $76,000. The Green
Ribbon program is a TXDOT-reimbursable grant program designed to
improve the visual character of highway corridors and minimize the
negative impacts of air pollution by planting trees and shrubs. The City
Council directed staff to begin implementation of the State Highway
114 Green Ribbon Master Plan at the 2023 summer workshop. Phase
1 is well underway and in coordination with Kimley Horn, the city
applied for Green Ribbon funding for phase 2 of the project in the
spring of 2024 and received the maximum $400,000 award amount.
The services included in this agreement will help accomplish phase 2
of the master plan and will focus on continued improvements at the
intersection of Dove Road and State Highway 114.
The scope of work included in this agreement includes the
following:
Task 1 — Project Meetings and Design Coordination — This effort
includes tasks related to project meetings and design coordination for
construction plans.
Task 2 — Survey — This effort includes the preparation of a
topographic survey for the purpose of preparing landscape plans.
City of Southlake Values. -
Integrity ♦ Innovation ♦ Accountability ♦ Commitment to Excellence ♦ Teamwork
Alison Ortowski, City Manager
Meeting Date —August 6, 2024
Page 2 of 3
Task 3 — Construction Documents — This effort will include the
preparation of landscape construction plans, in general accordance
with the approved schematic design.
Task 4 — ISA Report — This effort will include all efforts to determine
the environmental submittal requirements for this project.
Task 5 — Bidding — This effort will include bidding assistance to
include assistance in opening bids, bid tabulations and letters of
recommendation, and the preparation of construction contract
documents for City review and execution.
Task 6 — Construction Contract Administration — This effort will
include reviewing shop drawings, attending the pre -construction
meeting, RFI response, 2 site visits, and a final walk-through.
Based on their solid reputation, proven experience, and prior
satisfactory work with the City, staff recommends that the City enter
into a professional services agreement with Kimley-Horn to perform
these engineering and design services.
Financial
Considerations: Funding is available within the existing General Fund CIP Intersection
Improvements on State Highway 114.
Strategic Link: This item is linked to the City's Strategy Map related to the focus area
of Quality Development and Infrastructure and meets the corporate
objective to Invest to provide and maintain high -quality public assets
and collaborate with select partners to implement services solutions.
Citizen Input/
Board Review: City Council consideration August 6, 2024
Legal Review: The proposed professional services agreement with Kimley-Horn is a
standard contract that has been previously reviewed by the City
Attorney.
Alternatives: 1) Approval of the proposed agreement as presented
2) Approval with modifications to the proposed agreement
3) Denial of the proposed agreement
Supporting
Documents:
City of Southlake Values. -
Integrity ♦ Innovation ♦ Accountability ♦ Commitment to Excellence ♦ Teamwork
Alison Ortowski, City Manager
Meeting Date —August 6, 2024
Page 3 of 3
• Copy of proposed contract and agreement
• Copy of Green Ribbon Implementation Plan
Staff
Recommendation: Approve an agreement with Kimley-Horn and Associates, Inc. for
professional engineering and design services related to Phase 2 of the
Green Ribbon project along the State Highway 114 corridor in an
amount not to exceed $76,000.
City of Southlake Values. -
Integrity ♦ Innovation ♦ Accountability ♦ Commitment to Excellence ♦ Teamwork
City Agreement
AGREEMENT FOR ENGINEERING SERVICES
THIS AGREEMENT is made this day of , 2024, by and
between the City of Southlake, Texas (hereinafter referred to as "CITY"), and KIMLEY-
HORN AND ASSOCIATES, INC. (hereinafter referred to as "ENGINEER").
WHEREAS, CITY contemplates the need execute phase II of the State Highway
114 Green Ribbon Master Plan Implementation project located at State Highway 114
and West Dove road. This project is to be known as the SH114 Green Ribbon Phase II
project and hereinafter referred to as the "Project".
WHEREAS, ENGINEER is qualified, able and desirous to perform the necessary
engineering and design work upon which the Project is based and is willing and able to
work with CITY staff to organize and coordinate the professional services necessary to
complete the Project.
NOW, THEREFORE, CITY engages ENGINEER to perform, and ENGINEER
agrees to perform, the engineering and design work for the Project, as more fully
described herein below, and CITY agrees to pay as compensation, and ENGINEER
agrees to accept as compensation, the payments on the dates and in the amounts
herein specified, all in accordance with the terms more fully set out below and as
provided in Attachment A ("Scope of Work"), which is attached hereto and incorporated
by reference as if fully set forth herein.
I. ARTICLE
PROFESSIONAL SERVICES
A. Scope of Work
ENGINEER will provide the supervision, direction, personnel and equipment to
perform the consulting Services outlined in Attachment A in accordance with the terms
set forth in this Agreement and in Attachment A.
B. Definitions
"Services" refer to the professional services performed by ENGINEER pursuant
to this Agreement.
C. Changes
CITY, without invalidating the Agreement, may order changes within the general
scope of the work, as described in Attachment A, required by the Agreement by altering,
adding to and/or deducting from the work to be performed. If any change causes an
increase or decrease in ENGINEER's cost of, or the time required for, the performance
of any part of the Services under the Agreement, an equitable adjustment will be made
by mutual agreement and this Agreement shall be modified in writing accordingly.
D. Coordination with Owner
The CITY shall make available to ENGINEER for use in performing Services
hereunder all existing plans, maps, field notes, statistics computations and other data in
the CITY's possession relative to existing facilities and to the Project.
E. Site and Local Conditions
ENGINEER has the right to examine the site in order to become acquainted with
local conditions and accepts conditions at the site unless otherwise noted in writing to
the CITY. Any coordination or scheduling of work by CITY shall not relieve ENGINEER
from its responsibilities specified hereunder. Necessary arrangement for access to any
site by ENGINEER's employees will be made with CITY.
F. Assignment and Subcontractors/Third Party Rights
The rights and obligations covered herein are personal to each party hereto and
not to any third party and for this reason neither this Agreement nor any contract
hereunder shall be assigned by either party in whole or in part; nor shall ENGINEER
subcontract any of its obligations under this Agreement without the prior written consent
of CITY.
G. Independent Contractor
ENGINEER covenants and agrees that it will perform the work hereunder as an
independent contractor, and not as an officer, agent, servant, or employee of CITY; that
ENGINEER shall have exclusive control of and exclusive right to control the details of
the work performed hereunder, and all persons performing same, and shall be solely
responsible for the acts and omissions of its officers, agents, employees, contractors,
subcontractors, and consultants; that the doctrine of respondent superior shall not apply
as between CITY and ENGINEER, its officers, agents, employees, contractors,
subcontractors, and consultants, and nothing herein shall be construed as creating a
partnership or joint enterprise between CITY and ENGINEER.
H. Disclosure
By signature of this contract, ENGINEER warrants to CITY that it has made full
disclosure in writing of any existing conflicts of interest or potential conflicts of interest,
including personal financial interests, direct or indirect, in property abutting the proposed
Project and business relations with abutting property owners. ENGINEER further
warrants that it will make disclosure in writing of any conflicts of interest that develop
subsequent to the signing of this contract and prior to final payment under the contract.
Finally, ENGINEER warrants that it has submitted to the City a completed Conflicts of
Interest Questionnaire as required by Chapter 176 of the Texas Local Government
Code.
I. Approval by CITY
Approval by CITY of this Agreement shall not constitute or be deemed to be a
release of the responsibility and liability of ENGINEER, its officers, agents, employees,
and subcontractors for the accuracy and competency of the Services performed under
this Agreement, including but not limited to surveys, designs, working drawings and
specifications and other engineering documents.
Such approval shall not be deemed to be a waiver or an assumption of such
responsibility and liability by CITY for any negligent act, error, or omission in the
performance of ENGINEER's professional Services or in the conduct or preparation of
the subsurface investigations, surveys, designs, working drawings and specifications or
other consulting documents by ENGINEER, its officers, agents, employees and
subcontractors, it being the intent of the parties that approval by CITY signifies the
CITY's approval of only the general design concept of the improvements to be
constructed.
J. Indemnification
ENGINEER SHALL AND DOES HEREBY AGREE TO INDEMNIFY AND HOLD
HARMLESS CITY, ITS OFFICERS, AGENTS, AND EMPLOYEES FROM ANY AND
ALL DAMAGES, LOSS OR LIABILITY OF ANY KIND WHATSOEVER, BY REASON
OF DEATH OR INJURY TO PROPERTY OR PERSON CAUSED BY ANY OMISSION
OR NEGLIGENT ACT OF ENGINEER, ITS OFFICERS, AGENTS, EMPLOYEES,
INVITEES, OR OTHER PERSONS FOR WHOM IT IS LEGALLY LIABLE, WITH
REGARD TO THE PERFORMANCE OF THIS CONTRACT, AND ENGINEER WILL,
AT ITS COST AND EXPENSE, DEFEND, PAY ON BEHALF OF, AND PROTECT
CITY AND ITS OFFICERS, AGENTS, AND EMPLOYEES AGAINST ANY AND ALL
SUCH CLAIMS AND DEMANDS. THE PROVISIONS OF THIS SECTION ARE
SUBJECT TO THE LIMITATIONS OF TEXAS LOCAL GOVERNMENT CODE
SECTION 271.904 AND SHALL BE CONSTRUED TO THAT EFFECT.
K. No Third Party Beneficiary
For purposes of this Agreement, including its intended operation and effect, the
parties specifically agree and contract that: (1) this Agreement only affects
matters/disputes between the parties to this Agreement, and is in no way intended by
the parties to benefit or otherwise affect any third person or entity (except the
indemnitees identified or described in Article I, Section J., above), notwithstanding the
fact that such third person or entities may be in a contractual relationship with CITY and
ENGINEER, or both; and (2) the terms of this Agreement are not intended to release,
either by contract or operation of law, any third person or entity from obligations they
owe to either CITY or ENGINEER.
L. Successors and Assigns
CITY and ENGINEER each bind themselves and their successors, executors,
administrators and assigns to the other party to this Agreement and to the successors,
executors, administrators and assigns of such other party with respect to all covenants
of this Agreement. Neither CITY nor ENGINEER shall assign or transfer its interest in
this Agreement without prior written consent of the other.
II. ARTICLE
CITY'S RESPONSIBILITIES
CITY will:
1. Provide full information as to CITY's requirements for the Project;
2. Assist ENGINEER by placing at ENGINEER's disposal all information in
CITY's control or knowledge which is pertinent to the Project, including
executed right-of-way easements and final field survey data;
3. Examine all work presented by ENGINEER and respond within
reasonable time and in writing to the material submitted by ENGINEER;
4. Pay all costs incident to advertising for obtaining bids or proposals from
Contractors;
5. Give prompt written notice to ENGINEER whenever CITY observes or
otherwise becomes aware of any defect in ENGINEER's work or in
Contractor's work;
6. Designate in writing a person to act as its representative with respect to
this Agreement, such person having complete authority to transmit
instructions, receive information, and make or interpret the CITY's
decisions;
7. Provide all information and criteria as to the CITY's requirements,
objectives, and expectations for the Project including all numerical criteria
that are to be met and all standards of development, design, or
construction;
8. Provide to the ENGINEER all previous studies, plans, or other documents
pertaining to the Project and all new data reasonably necessary in the
ENGINEER's opinion, such as site survey and engineering data,
environmental impact assessments or statements, zoning or other land
use regulations, etc., upon all of which the ENGINEER may rely; and
9. Arrange for access to the site and other private or public property as
required for the ENGINEER to provide its Services; and
10. Provide any other information or assistance as outlined in Attachment A
hereto.
III. ARTICLE
COMPENSATION FOR PROFESSIONAL SERVICES
The CITY shall compensate ENGINEER for Services rendered under this
Agreement, in accordance with the following:
For the completion of the work contemplated in Article I, the ENGINEER shall be
paid on a lump sum basis in the amount of $76,000 for Basic Services and on an hourly
basis plus expenses in an amount not to exceed $0.00 (as outlined in Attachment A)
with a total not to exceed cost ceiling of $76,000 as billed monthly by ENGINEER.
IV. ARTICLE
TIMES OF BILLING AND PAYMENT
The ENGINEER shall bill CITY monthly for any Services and expenses incurred
in accordance with the work performed subject to the limits set out in Article III.
Payment shall be due within thirty (30) days of receipt by CITY of a properly prepared
and correct invoice from ENGINEER. ENGINEER's invoices shall be accompanied by
such records or other written proof as CITY deems necessary to verify the billings.
Invoices shall be made to Citv Finance Department's office at 1400 Main Street._
Suite 440, Southlake, Texas 76092.
If CITY fails to make payment due ENGINEER within thirty (30) days of the day
when payment for Services and expenses is due under the terms of this Agreement,
ENGINEER shall be entitled to interest on such unpaid sums at the rate provided in
Chapter 2251 of the Texas Government Code.
V. ARTICLE
ADDITIONAL ENGINEERING SERVICES
In addition to performing its professional Services set out in this Agreement,
ENGINEER agrees to perform additional Services as requested by CITY from time to
time and CITY agrees to compensate ENGINEER for such additional Services in
accordance with ENGINEER's standard hourly fee and expenses as outlined in
Attachment B, for actual time expended and actual out-of-pocket sums expended, such
additional Services may be one or more of the following:
1. Make or prepare detailed description of sites, maps, or drawings related
thereto and outside the scope of the Project;
2. Appearances before courts or boards on matters of litigation or hearings
related to the Project;
3. Preparation of environmental impact assessments or statements for any
governmental agency;
4. Miscellaneous engineering work for CITY not related to the Project;
5. To provide resident project construction inspection, unless such inspection
is not required, in writing, by the CITY;
6. Other additional Services agreed to by the parties in writing and
incorporated herein.
VI. ARTICLE
STANDARD OF CARE
In performing its professional Services, the ENGINEER will use that degree of
care and skill ordinarily exercised, under similar circumstances, by reputable members
of its profession in the same locality at the time the Services are provided and in
accordance with any applicable governmental laws, regulations and ordinances.
VII. ARTICLE
PERIOD OF SERVICE
This Agreement shall be effective upon execution by CITY and ENGINEER, and
shall remain in force until work is completed on the Project or until terminated under the
provisions hereinafter provided in Article VIII.
VIII. ARTICLE
TERMINATION
The CITY may terminate this Agreement at any time for convenience, with or
without cause by giving written notice to the ENGINEER. Such termination may be
made effective on such future date as agreed by the parties, but absent such
agreement shall be immediate. Upon receipt of such notice the ENGINEER shall
immediately discontinue all Services and work and the placing of all orders or the
entering into contracts for supplies, assistance, facilities, and materials in connection
with the performance of this Agreement and shall proceed to cancel promptly all existing
contracts insofar as they are chargeable to this Agreement.
The ENGINEER, upon termination, shall be paid for all Services rendered
through the date of termination together with any additional reimbursable expense then
due and allowable under this Agreement.
IX. ARTICLE
OWNERSHIP OF DOCUMENTS
1. All completed or partially completed reports prepared under this
Agreement, including the original drawings in both paper and electronic
formats, shall become the property of CITY if this Agreement is
terminated. Upon completion and payment of this Agreement, any final
documents in both paper and electronic formats shall be owned by CITY.
2. Reuse, change or alteration by CITY or others acting by or on behalf of
CITY of such documents without the permission of ENGINEER shall be at
CITY's sole risk.
X. ARTICLE
INSURANCE
ENGINEER shall carry and maintain at all times relevant hereto, at ENGINEER's
expense, insurance of the type and of minimum coverage limits as follows:
1. Workers Compensation - Statutory Employer's Liability - Limits as required
by the State of Texas.
2. Comprehensive General Liability, Bodily Injury and Property Damage
including contractual liability in a combined single limit - $500,000 per
occurrence.
3. Comprehensive Automotive Liability, Bodily Injury and Property Damage
in a combined single limit - $1,000,000 per accident.
Certificates of insurance for the above coverage in a form acceptable to CITY,
evidencing the coverage required above, shall be provided to CITY within ten (10)
business days after execution of this Agreement and prior to issuing Notice to Proceed.
Such certificates shall provide that the insurer will give CITY not less than ten (10) days
notice of any material changes in or cancellation of coverage. In the event any
subcontractor of ENGINEER, with or without CITY's consent, provides or renders
Services under this Agreement, ENGINEER shall ensure that the subcontractor's
Services are covered by the same insurance limits as set forth above.
ENGINEER shall not commence work under this Agreement until it has obtained
Professional Liability (Errors and Omissions) Insurance as required hereunder and such
insurance coverage has been approved by CITY. Such insurance shall be in the
minimum amount of $1,000,000 and shall include coverage of Contractually Assumed
Liability. The insurance coverage prescribed herein shall be maintained until three (3)
years after CITY's acceptance of the construction project and shall not be canceled
without prior written notice to CITY. In this connection, upon the signing and return of
this Agreement by ENGINEER, a Certificate of Insurance shall be furnished to CITY as
evidence that the insurance coverage required herein has been obtained by
ENGINEER, and such certificate shall contain the provision that such insurance shall
not be cancelled or modified without thirty (30) days prior written notice to CITY.
ENGINEER shall notify CITY within ten (10) days of any modification or alteration in
such Professional Liability (Errors and Omissions) Insurance.
XI. ARTICLE
AUTHORIZATION, PROGRESS AND COMPLETION
CITY and ENGINEER agree that the project is planned to be completed as
expeditiously as possible by on the timeline set forth by TXDOT for completion of the
project. ENGINEER shall employ manpower and other resources, and use professional
skill and diligence in a manner consistent with that degree of care and skill ordinarily
exercised by members of the same profession currently practicing under similar
circumstances at the same time and in the same or similar locality, to meet the
schedule; however, ENGINEER shall not be responsible for schedule delays resulting
from conditions beyond its control. By mutual agreement, CITY and ENGINEER may
modify the Project schedule during the course of the Project and if such modifications
affect ENGINEER's compensation, it shall be modified accordingly, subject to CITY's
approval.
For additional ENGINEER Services, the authorization by CITY shall be in writing
and shall include the definition of the additional Services to be provided, the schedule
for commencing and completing the additional Services, and the basis for compensation
as agreed upon by CITY and ENGINEER.
XII. ARTICLE
NOTICE
Any notice required under this Agreement will be in writing and given either
personally, by registered or certified mail, return receipt requested, or by a nationally
recognized overnight courier service, addressed to the parties as follows:
If to CITY: Alison Ortowski
City Manager
City of Southlake
1400 Main Street, Suite 460
Southlake, Texas 76092
Phone: 817-748-8400
Fax: 817-748-8010
If to ENGINEER: Laura Presley, PLA
Project Manager
Kimley-Horn and Associates, Inc.
801 Cherry Street, Suite 1300
Fort Worth, 76102
Phone: 817-349-6821
All notice shall be effective upon the date of receipt.
XIII. ARTICLE
SEVERABILITY
In the event that any provision of this Agreement shall be found to be void or
unenforceable, such finding shall not be construed to render any other provisions of this
Agreement either void or unenforceable. All provisions, which are void or
unenforceable, shall not substantially affect the rights or obligations granted to or
undertaken by either party.
XIV. ARTICLE
VENUE -LAW
Venue of any suit or cause of action under this Agreement shall lie exclusively in
Tarrant County, Texas. This Agreement shall be construed in accordance with the laws
of the State of Texas, without regard for conflict of laws principles.
IN WITNESS WHEREOF the parties have caused this Agreement to be executed
in two equal originals on the date and year first above mentioned.
CITY OF SOUTHLAKE:
By:
Shawn McCaskill, Mayor
ATTEST:
By:
City Secretary
ENGINEER: Kimlev-Horn and Associates, Inc.
By: /5-�4. 1-el�l
Bradley J. Hill,GRegional Contract Lead
THE STATE OF TEXAS §
COUNTY OF TARRANT §
Before me on this day personally appeared Bradlev J. Hill known to me [or
proved to me on the oath of or through
(description of identity card or other document)] to be the person whose name is
subscribed to the foregoing instrument and that he/she is the duly authorized Regional
Contract Lead of Kimlev-Horn and Associates, Inc., and acknowledged to me that
he/she executed the same for the purposes and consideration therein expressed.
Given under my hand and seal of office this �6 day of JU I L'j
A. D.2024.
�N IRO
(SEAL) Public. State of Texas
9T c. v► QU me. rU
F i0 3 F' Tars Name Printed
Kimley»>Horn
July 18, 2024
David Miller
Director of Community Services, City of Southlake
285 Shady Oak Drive
Southlake, Texas 76092
Re: Professional Services Agreement
SH114 Green Ribbon Phase II
Southlake, Texas
Dear Mr. Miller:
Page 1
Kimley-Horn and Associates, Inc. ("Consultant' or "Kimley-Horn") is pleased to submit this letter
agreement (the "Agreement') to the City of Southlake ("City" or "Client') for providing professional
services for the above referenced project. The Consultant will perform the services outlined below for
the site located in Southlake, Texas.
Project Understanding
The City has requested the Consultant provide professional services for the construction documents
and construction phase services for the Beautification Project at the intersection of West Dove Road
and State Highway 114 within the right-of-way (ROW) consisting of landscape and irrigation design as
shown on the attached "Exhibit A".
The scope of work is within the existing median and ROW. The Consultant understands that project
construction cost will be federally funded and will be programmed by the Texas Department of
Transportation (TXDOT). The Client understands the project will follow the TXDOT Design Review
Process and follow Local Government Project Procedures (LGPP).
Scope of Services
The tasks outlined below are the professional services to be provided by the Consultant. The scope
of services described for the tasks will be completed for the lump sum fee indicated.
Task 1 Project Meetings and Design Coordination $9,000 (LS)
The effort included in this task relates to project meetings and design coordination for the Construction
Plans:
■ Meet with City and TXDOT to review schedule, design guidelines and requirements, and
general design criteria and preferences for the landscaped medians — one (1) meeting.
■ TXDOT coordination including correspondence with TXDOT District, Submittal (60%,
90%) and TXDOT review response letters.
■ Prepare for and attend City plan review meetings — (60%, 90%) — two (2) meetings total.
■ Project communication, correspondence, and coordination with the City and with TXDOT.
Kimley>>> Horn Page 2
■ Prepare and email monthly progress reports and project correspondence to project team
(City of Southlake staff and Consultant team).
■ Prepare monthly invoices and invoice summary.
■ Prepare project schedule and update throughout design for TXDOT and the City.
Task 2 Survey $5,500 (LS)
The Consultant will prepare a topographic survey for the subject project, as indicated on the attached
"Exhibit A" for the purpose of preparing landscape plans. The Consultant will survey existing limits
along the areas designated in the attached exhibit, and will consist of guardrails, fencing, traffic poles,
signs, and other observed above ground physical features.
The Consultant will prepare an electronic map showing existing contour lines at 1' intervals based on
a nominal 50' grid system, along with major grade breaks.
Visible evidence of utilities, including water valves, storm inlets, sewer cleanouts, electrical lines,
telephone lines and gas lines will be located. This task does not include subsurface utility locations.
The Consultant will set on -site temporary benchmarks in close proximity to each median.
Horizontal and vertical datum will be provided, or the Consultant will use Texas State Plane Coordinate
system.
Task 3 Construction Documents $37,500 (LS)
The Consultant will prepare the landscape construction plans, in general accordance with the approved
schematic design concept, attached "Exhibit A". The construction plans will provide locations of
landscape improvements, planting details, irrigation plans and details, and specifications. This task
consists of plan sets and submittals as follows:
60% Submittal:
■ Develop Landscape Plans and Details for the medians showing new plant material
locations as they relate to the medians. Included in these sheets will be a planting schedule
specifying recommended plant species and details illustrating recommended installation
methods and requirements.
■ Develop Irrigation Plans and Details for the proposed landscape improvements showing
head layout, pipe sizing and Controller/Valve locations and standard details. These plans
will not show sufficient detail for construction and will be prepared to conform to published
City and TXDOT requirements.
■ Compile applicable City standard details and TXDOT standard details necessary for
design. Modify standard details as needed.
■ Revise project schedule based on TXDOT review schedule.
■ Develop opinion of probable construction costs (OPCC). The Consultant has no control
over the cost of labor, materials, equipment, or over the Contractor's methods of
Kimley»>Horn
Page 3
determining prices or over competitive bidding or market conditions. Opinions of probable
costs provided herein are based on the information known to Consultant at this time and
represent only the Consultant's judgment as a design professional familiar with the
construction industry. The Consultant cannot and does not guarantee that proposals, bids,
or actual construction costs will not vary from its opinions of probable costs.
■ Submit one (1) digital 11" x 17" .pdf to the City for review and comment.
■ Address City comments and re -submit one (1) digital 11" x 17" .pdf to the TXDOT District
Office for review and comment.
■ Conduct 60% PS&E comment review meeting with TXDOT District Office to solicit review
comments and discuss the approach to addressing comments.
■ Address 60% PS&E comments and prepare TXDOT response letter.
The 60% Submittal will consist of:
■ TXDOT Standard Cover/Index
■ Project Control
■ Quantity Summary Sheets
■ Project Layout
■ Landscape
■ Irrigation
■ Miscellaneous Details
■ TXDOT Standard Detail Sheets
■ OPCC
■ General Notes
90% Submittal:
■ Submit one (1) digital 11" x 17" Construction Documents .pdf and one (1) digital 8.5" x 11"
Contract Documents .pdf to the City for review and comment.
■ Address City comments, prepare comment response letter, and re -submit one (1) digital
11" x 17" Construction Documents .pdf and one (1) digital 8.5" x 11" Contract Documents
.pdf to the TXDOT District Office review and comment.
■ Conduct 90% PS&E comment review meeting with TXDOT District Office to solicit review
comments and discuss the approach to addressing comments.
■ Address TXDOT Area Office comments and resubmit one (1) digital 11" x 17" Construction
Documents .pdf and one (1) digital 8.5" x 11" Contract Documents .pdf for review and
comment.
The 90% Submittal will consist of:
■ TXDOT Standard Cover/Index
■ Project Control
■ Quantity Summary Sheets
Kimley»>Horn
■ Project Layout
■ Landscape
■ Irrigation
■ Miscellaneous Details
■ TXDOT Standard Detail Sheets
■ OPCC
■ General Notes
■ Prepare final project manual, consisting of:
■ City standard construction contract forms
■ Notice to bidders
■ Special instructions to bidders
■ Bid form
■ Standard construction contract
■ Performance Bond
■ Payment Bond
■ Maintenance Bond
■ Certificate of insurance
■ General conditions
■ Special provisions
■ Technical specifications
■ LGPP required forms
Final Submittal:
Page 4
■ Submit one (1) digital 11" x 17" Construction Documents .pdf to the City and TXDOT District
Office
■ Submit one (1) digital 8.5" x 11" Contract Documents .pdf to the City and TXDOT District
Office
The Final Submittal will consist of:
■ Incorporate the final design submittal review comments and prepare comment response
letter.
■ Prepare final project manual, consisting of:
■ City standard construction contract forms
■ Notice to bidders
■ Special instructions to bidders
■ Bid form
■ Standard construction contract
■ Performance Bond
■ Payment Bond
■ Maintenance Bond
■ Certificate of insurance
Kimley>>> Horn Page 5
■ General conditions
■ Special provisions
■ Technical specifications
■ LGPP required forms
■ Submit five (5) sets of plans and specifications to the City.
■ Submit final OPCC.
Subsequent modifications resulting from material site plan changes directed by the City or their
representatives will be billed to the City as additional services.
Task 4 ISA Report
$7,000 (LS)
This effort includes preparation and submittal of the published TXDOT ISA Report Form, June 2016
(510.01.DS). As part of this effort, Consultant will review historic aerial images and mapping, and the
results of a regulatory records review (database search). The Consultant will submit a Preliminary
Scoping Form to the TXDOT Fort Worth District, in an effort to determine the environmental submittal
requirements for the project. One project site visit will be conducted to make observations and take
photographs of the existing observable conditions related to the environmental concerns outlined in the
ISA Report. Interviews with local residents, TXDOT staff, or City personnel are not included in this
task.
Any additional effort, or additional TXDOT requirements, including responding to comments or requests
for additional information will be considered an Additional Service.
Task 5 Bidding $10,000 (LS)
The Consultant will assist the City during the bidding phase. Consultant will:
■ Provide one (1) set of .pdf file final plans and specifications to the City. Submittal shall
consist of the following: final plans, final contract documents, and final OPCC.
■ Print up to thirty (30) 11" x 17" sets and specifications for potential bidders upon
authorization by the City.
■ Furnishing additional copies of review documents and/or bid documents in excess of the
number of the same identified above will be considered as Additional Services.
■ Prepare the advertisement for bids and bid documents upon letter of authorization from
TXDOT.
■ Issue addenda in response to bidder's requests for information.
■ Assist the City in opening bids.
■ Provide bid tabulations and Letter of Recommendation. (A summary of the bid analysis will
be provided to the City for use in selection and award of the construction contract.) TXDOT
will need to approve the bid opening and tabulation prior to the award of the construction
contract.
0 Prepare Construction Contract Documents for City review and execution.
Kimley>>> Horn Page 6
Task 6 Construction Contract Administration $7,000 (LS)
The Consultant will assist the City during the construction phase. Consultant will:
■ Review shop drawings. Consultant will review and approve or take other appropriate action
in respect to Shop Drawings and Samples and other data which Contractor is required to
submit, but only for conformance with the information given in the Contract Documents.
Such review and approvals or other action will not extend to means, methods, techniques,
equipment choice and usage, sequences, schedules, or procedures of construction or to
related safety precautions and programs.
■ Attend one (1) pre -construction meeting. Consultant will attend a Pre -Construction
Conference prior to commencement of Work at the Site.
■ Respond to contractor RFI's. Consultant will respond to reasonable and appropriate
Contractor requests for information and issue necessary clarifications and interpretations
of the Contract Documents to City as appropriate to the orderly completion of Contractor's
work. Any orders authorizing variations from the Contract Documents will be made by City.
■ Site visits as requested by the City — two (2) total. Consultant will make visits at intervals
as directed by City in order to observe the progress of the Work. Such visits and
observations by Consultant are not intended to be exhaustive or to extend to every aspect
of Contractor's work in progress. Observations are to be limited to spot checking, selective
measurement, and similar methods of general observation of the Work based on
Consultant's exercise of professional judgment. Based on information obtained during
such visits and such observations, Consultant will evaluate whether Contractor's work is
generally proceeding in accordance with the Contract Documents, and Consultant will keep
City informed of the general progress of the Work. Consultant shall not, during such visits
or as a result of such observations of Contractor's work in progress, supervise, direct, or
have control over Contractor's work, nor shall Consultant have authority over or
responsibility for the means, methods, techniques, equipment choice and usage,
sequences, schedules, or procedures of construction selected by Contractor, for safety
precautions and programs incident to Contractor's work, nor for any failure of Contractor to
comply with laws and regulations applicable to Contractor's furnishing and performing the
Work. Accordingly, Consultant neither guarantees the performance of any Contractor nor
assumes responsibility for any Contractor's failure to furnish and perform its work in
accordance with the Contract Documents.
■ Final walk-through. Consultant will conduct a final site visit to determine if the completed
Work of Contractor is generally in accordance with the Contract Documents to the best of
Consultant's knowledge, information, and belief based on the extent of its services and
based upon information provided to Consultant upon which it is entitled to rely.
Services Not Included
Any other services, including but not limited to the following, are not included in this Agreement:
0 Performing a geotechnical study or analysis.
Kimley»>Horn
Page 7
■ Providing presentations.
■ Providing additional platting, or other surveying services not identified in the above scope
of services.
■ Providing additional printing for bidding document distribution.
■ Providing additional renderings.
■ Any services not listed in the Scope of Services.
Additional Services
Any services not specifically provided for in the above scope will be billed as additional services and
performed at our then current hourly rates. Additional services we can provide include, but are not
limited to, the following:
■ Attending City of Southlake parks board meetings.
■ Attending City of Southlake city council meetings.
■ Presenting at City of Southlake parks board meetings and city council meetings.
Schedule
Consultant will provide our services as expeditiously as practicable to meet a mutually agreed upon
schedule.
Fee and Expenses
Consultant will perform the services in Tasks 1 - 6 for the total lump sum fee below. Individual task
amounts are informational only. All permitting, application, and similar project fees will be paid directly
by the City.
Task 1
Project Meetings and Design Coordination
$
9,000
Task 2
Survey
$
5,500
Task 3
Construction Documents
$
37,500
Task 4
ISA Report
$
7,000
Task 5
Bidding
$
10,000
Task 6
Construction Contract Administration
$
7,000
Total Lump Sum Fee
$
76,000
Lump sum fees will be invoiced monthly based upon the overall percentage of services performed.
Payment will be due within 25 days of your receipt of the invoice and should include the invoice number
and Consultant project number.
Closure
In addition to the matters set forth herein, our Agreement shall include and be subject to, and only to,
the attached Standard Provisions, which are incorporated by reference. As used in the Standard
Provisions, "Kimley-Horn" shall refer to Kimley-Horn and Associates, Inc., and "Client" shall refer to
City of Southlake, Texas.
Kimley»>Horn
Page £
Kimley-Horn, in an effort to expedite invoices and reduce paper waste, submits invoices via email in an
Adobe PDF format. We can also provide a paper copy via regular mail if requested. Please include
the invoice number and Kimley-Horn project number with all payments. Please provide the following
information:
Please email all invoices to
Please copy
If you want us to proceed with the services, please have an authorized person sign this Agreement
below and return to us. We will commence services only after we have received a fully executed
agreement. Fees and times stated in this Agreement are valid for sixty (60) days after the date of this
letter.
We appreciate the opportunity to provide these services to you. Please contact me if you have any
questions.
Sincerely,
KIMLEY-HORN AND ASSOCIATES, INC.
Signed:
Printed Name: Laura Presley, PLA
Title: Project Manager
Attachment — Exhibit A
Bradley J. Hill
Regional Contract Lead
Kimley»>Horn
EXHIBIT A
rl1r, - � -, 1�1
V"
s
Page 9
Kimley»>Horn
Kimley-Horn and Associates, Inc.
Hourly Labor Rate Schedule
Classification Rate
Analyst I
Analyst II
Professional
Senior Professional I
Senior Professional II
Senior Technical Support
Technical Support
Support Staff
Effective through June 30, 2025
Subject to annual adjustment thereafter
$140 - $180
$185 - $230
$230 - $260
$270 - $335
$360 - $425
$125 - $305
$110 - $180
$95 - $155
Internal Reimbursable Expenses will be charged at 5% of Labor Billings
External Reimbursable Expenses will be charged at 15% mark-up, or per the Contract
Sub -Consultants will be billed per the Contract
BROOPUPRF.A.001
Implementation Plan
Kimley»>Horn
State Highway 114 Green Ribbon Implementation Plan
To: David Miller, Director of Community Services
City of Southlake, Texas
From: Laura Presley, PLA
Kimley-Horn and Associates, Inc.
Report Date: October 18, 2023
Mr. Miller,
Page 1
The following document identifies proposed intersection improvements along State Highway 114 in Southlake,
Texas with respective preliminary opinions of probable construction costs as funded by the TXDOT Green Ribbon
Grant. Funding from the TXDOT Green Ribbon Grant can be applied to construction costs for tree and shrub
planting, groundcover for plant beds (mulch, decomposed granite, river rock, etc.) concrete mow strips, and
irrigation systems (excluding overhead spray irrigation). The funding cannot be applied to hardscape
improvements (such as sidewalks), sod, or overhead irrigation systems.
The improvements are organized from west to east along State Highway 114 with the intention of phasing over
multiple years to beautify the corridor as a whole. Each intersection's improvements include native and adaptive
vegetation, canopy trees, hardwood mulch, concrete mow strips, and underground irrigation systems for the new
plantings. Projects have been divided into phases and they will be implemented over multiple years. The TXDOT
Green Ribbon funding may provide up to $400,000 per year. As costs continue to rise, the award amount, or the
anticipated number of phases for completion, may vary from what is listed in this document.
The proposed phasing order is as follows:
West Dove Road and State Highway 114
o West Dove Road enhancements are projected to be completed within three (3) Green Ribbon
phases and consist of twelve (12) planting beds and associated improvements.
2. North White Chapel Boulevard and State Highway 114
o North White Chapel Boulevard enhancements are projected to be completed in three (3) Green
Ribbon phases and consist of four (4) planting beds and associated improvements.
3. North Carroll Avenue and State Highway 114
o North Carroll Avenue enhancements are projected to be completed within four (4) Green Ribbon
phases and consist of sixteen (16) planting beds and associated improvements.
Kimley»>Horn
Page 2
Kimball Avenue and State Highway 114
o Kimball Avenue enhancements are projected to be completed in three (3) Green Ribbon phases
and consist of four (4) planting beds and associated improvements.
The following implementation plan includes opinions of probable construction cost (OPCC) for the intersection
improvements. These OPCCs are intended to inform, budget, and prioritize phasing of the intersection
improvements per Green Ribbon funding for the City. Kimley-Horn and Associates, Inc. has no control over the
cost of labor, materials, equipment, or over the contractor's methods of determining prices or over competitive
bidding or market conditions. Estimates are based on the information known to Kimley-Horn and Associates, Inc.
atthe time and represent only Kimley-Horn and Associates, Inc.'s judgement as a design professional firm familiar
with the construction industry. Kimley-Horn and Associates, Inc. cannot guarantee that proposals, bids, or actual
construction costs will not vary from its opinion.
If you have additional questions or inquiries about this document, feel free to reach out to me at
Iaura.oreslev(@kimlev-horn.com.
Sincerely,
Laura Presley, PLA
Kimley-Horn and Associates, Inc.
00W D ve Rd
3
2
1<
0
a,
671 ft
m
Q
v
W Highland St
Bicentennial
Park
Boulder Dr
Northwest
Enclave Park
IFS
rd
F Srdre tP y�9h
hi yd
9h�dy y
77
A
E Highland St
O
�0, 687ft
el?,
Blvd
E Dove Rd
Lake Park
or,
W Southlake Blvd 1709 E Southlake Blvd
0
J
E Highland St
F Kirkwood gi,,,
a
9
h�
Oi�
Oil
S/off
S r
in
Ln
a
Southlake
v
Q
N
Q
E
Y
z
z
x
3
0-
D
ro
GREEN RIBBON PHASING
10 -13 total phases to complete Green Ribbon Improvements.
—Can be completed in 1 less phase depending on pricing and fees in year completed.
0 W. DOVE ROAD
3 Green Ribbon Phases
Landscape improvements to be installed at the intersection of West
Dove Road and West State Highway 114. Enhancements include
curvilinear beds incorporating various native vegetation, concrete
mow strips, and mulch. Canopy trees will also be added in the seeded
areas for a full vegetative appearance. These improvements will take
approximately 3 Green Ribbon phases to complete.
0 N. WHITE CHAPEL BLVD.
3 Green Ribbon Phases"
Landscape improvements to be installed at the intersection of
North White Chapel Boulevard and West State Highway 114. The
enhancements will include plant beds with native vegetation, concrete
mow strips, hardwood mulch, and canopy trees. This intersection
will be completed in 3 years and 3 Green Ribbon Phases. Depending
on the time frame and associated inflation costs this intersection will
approximately take 2 Green Ribbon phases to complete.
N. CARROLL AVENUE
4 Green Ribbon Phases**
Landscape improvements to be installed at the intersection of North
Carroll Avenue and West State Highway 114. Enhancements include
various plant beds that contain native vegtetation, hardwood mulch,
v, and concrete mow strips. Canopy trees will additionally be placed to
a provide a full vegetated look. This intersection will be completed in 4
CL
years and 4 Green Ribbon Phases. Depending on the time frame and
associated inflation costs this intersection will take approximately 3
Green Ribbon phases to complete.
N. KIMBALL AVENUE
E 3 Green Ribbon Phases**
Landscape improvements to be installed at the intersection of Kimball
Avenue and West State Highway 114. Enhancements include four plant
beds that include concrete mow strips, native vegetation, hardwood
mulch, and canopy trees. These improvements will take approximately
3 years and 3 Green Ribbon
E Southlake ng on the
d time frame and associated inflationflsc costs thto is intersection l will take
approximately 2 Green Ribbon phases to complete.
SOUTHLAI<E Kimley>>> Horn
9 OCTOBER 2023
ORNAMENTAL GRASSES IMAGERY
c
7.
- l 46 yew' Sr, a rT �u � '.,� f t�AY3 �,f:F ,` �""�L • � �En A
r
.t E
�q 4 ,,T +w9M"•-_ - � f ��
v
e
7 m�
"•\...R�
I i II � • � I�
9\
w I r
y��r : - �,�. ll! yk� g.;, � : , � i:;' ��, e�_71 ,.�\ , q � ...,;^,�t, h r�.' Y _
��.:iit.�i'li��` I��'3a''.'�4di.� .i � f, �,'-i:��'�.+ �%ry.'; .f !,•� ir�€�:) '��\� ��'M '� ~> '�-.. � I 1 •v,�... . "�: -a., ra«.a�:V s. .., - . 7777
....
BLUE GRAMA GRASS FOUNTAIN GRASS MUHLY GRASS SIDE OATS 'BLONDE AMBITION' INDIAN GRASS
ACCENT SHRUBS DESERT SHRUBS
,
1 lam°'
n
KALEIDOSCOPE ABELIA SAVLIA TEXAS SAGE COLORGAURD YUCCA SOFT LEAF YUCCA
EVERGREEN SHRUBS
~ 1
TIM
,I��'"�"'`,s.".•��-.r �'+.. +'" ._.s-a �.}� ; �w`� .. �.� ? �� ,RRI � i Ss�ti � � '�'�� fir' 1' (� �,�� 5�'�� ��r 'A' ..
� 5'kC.. } 2 a�'�� r ...r J_ �S � �z�.•.�4 k �'� � e`� �}' r�' 'i ��� yt 1X '� -
DWARF HOLLY LOROPETALUM LIGUSTRUM BOXWOOD WHEELERS DWARF PITTOSPORUM
ORNAMENTAL TREES q� CANOPY TREES _
o
r
VITEX TREE MOUNTAIN LAUREL CRYPE MYRTLE CEDAR ELM TEXAS RED OAK
SOUTHLAKE Kimley>>> Horn
® JUNE2023
6
PERSPECTIVE VIEWPOINT
r
SEED (TYP.)
0
0 0
-f Oft
W. STATE HWY 114 Ab
!�
( ) (�r)
�
SEED TYP.
LEGEND:
SEED
0 HARDWOOD MULCH
- EVERGREEN SHRUBS
ACCENT SHRUBS
U ACCENT SHRUBS
ORNAMENTAL GRASSES
Ll ORNAMENTAL GRASSES
DESERT SHRUBS
0 EXISTING TREES
(i CANOPY TREES
v
ACCENT SHRUB (TYP.)
ORNAMENTAL GRASS (TYP.)
•• 11
EXISTING PAVERS TO REMAIN
EXISTING CONCRETE EMBANKMENT TO REL......
v
h
s4f
SEED (TYP)
IF -Bosom -Aft
ACCENT SHRUB (TYP.)
ORNAMENTAL GRASS (TYP) W. STATE HWY 114
EVERGREEN SHRUB (TYP)
s
SEED (TYP)
EXISTING CONCRETE EMBANKMENT TO REMAIN y'
EXISTING PAVERS TO REMAIN
� O
0
O
CANOPY TREE (TYP)
1' CONCRETE MOW STRIP (TYP)
HARDWOOD MULCH (TYP.)
EXISTING TREE (TYP.)
DESERT SHRUB (TYP.)
N 0 F T H
0 5' 15' 30' 60'
SCALE.
44ft,w
CITY Of
SOUTHLAKE Kimley>>Horn
® JUNE 2023
7
H
rr
Mack
�WIT
M16
-
t
Ir
_ �j •� •`-TiWy -r
3. � -•ram
' r
DOVE ROADCURRENT CONDITIONS
•
SOUTHLAKE, TEXAS CONCEPTUAL DESIGN THIS INFORMATIOAPHIC IS N ON THE
BEST INFONMATION AVAILABLE AND IS SUBJECT TO CHANGE WITHOUT NOTICE.
AVAILABLE THEINFORMATIONSHOWN I WITHOUT
l{y) I
&a
--- --- ---------
Nw ,
Aw
ow
00,
71 097
Alt
4
."o
■
1
DOVE ROAD GREEN RIBBON
THIS GRAPHIC 19 CONCEPTUAL. THE INFORMATION SHOWN IS BASED ON THE
SOUTHLAKE, TEXAS CONCEPTUAL DESIGN BEST INFORMATION AVAILABLE AND IS SUBJECT TO CHANGE WITHOUT NOTICE.
West Dove Road Imurovements - Green Ribbon
Southlake, Texas
Opinion of Probable Costs
SOUTHLAKE
0
6/14/2023
Green Ribbon Applicable Items
Unit
Quantity
Cost
Item Cost
1006002 PREPARING ROW
STA
20.5
$3,500.00
$71,750.00
1646008 BROADCAST SEED (PERM) (RURAL) (CLAY)
AC
1.8
$2,000.00
$3,600.00
1666001 FERTILIZER
AC
1.8
$2,500.00
$4,500.00
1686001 VEGETATIVE WATERING
MG
122.2
$130.00
$15,886.00
1706001 IRRIGATION SYSTEM (DRIP & BUBBLERS)
LS
1
$130,000.00
$130,000.00
1926003 PLANT MATERIAL (3-GAL)
EA
8,700
$25.00
$217,500.00
192 613 MULCH
SY
5,200
$2.50
$13,000.00
1926025 PLANT MATERIAL (45 GAL) (TREE)
EA
30
$800.00
$24,000.00
1926016 PLANT BED PREP
SY
5,200
$10.00
$52,000.00
1936001 PLANT MAINTENANCE
MO
12
$2,200.00
$26,400.00
1936007 IRRIGATION SYSTEM OP AND MAINT
MO
12
$950.00
$11,400.00
5006001 MOBILIZATION
LS
1
$35,000.00
$35,000.00
5026001 BARRICADES, SIGNS, AND TRAFFIC HANDLING
MO
6
$5,500.00
$33,000.00
5066040 INSTALL EROSION CONTROL LOGS
LF
2,500
$6.00
$15,000.00
5066043 REMOVE EROSION CONTROL LOGS
LF
2,500
$3.00
$7,500.00
4326001 RIP RAP (CONC)(12"Wx4"D)
CY
52
$1,000.00
$52,000.00
6206007 ELEC CONDR (NO. 8) BARE
LF
430
$2.50
$1,075.00
1004 6001 TREE PROTECTION
EA
44
$325.00
$14,300.00
Green Ribbon Construction Subtotal
$727,911.00
Green Ribbon Contingency (t20%)
$148,009.00
Green Ribbon Indirect Costs - 5-10 Year Phasing (t35%)
$254,080.00
Green Ribbon Design Fees - Landscape Architecture, Engineering, Survey (t15)%
$110,000.00
Green Ribbon Total Estimated Project Cost
$1,240,000.00
The Engineer has no control over the cost of labor, materials, equipment, or over the Contractor's methods of determining prices or over competitive bidding or
market conditions. Opinions of probable costs provided herein are based on the information known to Engineer at this time and represent only the Engineer's
judgment as a design professional familiar with the construction industry. The Engineer cannot and does not guarantee that proposals, bids. or actual costs will not
vary from its opinions of probable costs.
ol
SEED (TYP.)
,c)
SEED (TYP)
PERSPECTIVE VIEWPOINT
i
LEGEND:
SEED
HARDWOOD MULCH
EVERGREEN SHRUBS
0 ACCENT SHRUBS
0 ACCENT SHRUBS
0 ORNAMENTAL GRASSES
0 ORNAMENTAL GRASSES
a DESERT SHRUBS
EXISTING TREES
CANOPY TREES
1 �
EXISTING PAVERS TO REMAIN
-EXISTING TREE (TYP)
CANOPY TREE (TYP)
HARDWOOD MULCH (TYP)
ORNAMENTAL GRASS (TYP.)
Y
ORNAMENTAL GRASS (TYP)
ACCENT SHRUB (TYP.)
EXISTING CONCRETE EMBANKMENT TO REMAIN
-414
IM?Fo
i
iP $ �i
W. STATE HWY 114
EXISTING CONCRETE EMBANKMENT TO REMAIN '
etf
IN
SEED
�1
t�
SEED (TYP)
i
ON
5�
NORiN
GRAPHIC SCALE IN FEET
0 15 30 60
CITY OF
soUTHLAKE Kimley»)Horn
® JUNE2023
11
e�
,--"
_ F
='f y
- -� -- ��
--J
Mal
N . WHITE CHAPEL BLVDCURRENT CONDITIONS
SOUTHLAKE, TEXAS CONCEPTUAL DESIGN
V5
Ciro Of
SOUTHLAKE
Kimley>))Horn
THIS GRAPHIC 19 CONCEPTUAL. THE INFORMATION SHOWN IS BASED ON THE
1
11
® JUNE 2023
1
BEST INFORMATION AVAILABLE AND IS SUBJECT TO CHANGE WITHOUT NOTICE.
12
N. WHITE CHAPEL BLVDGREEN RIBBON
SOUTHLAKE, TEXAS
0'
CONCEPTUAL DESIGN
THIS GRAPHIC IS C
BEST INFBRMATI I
'x• �Y'''e �.,. ty ft�
mj
.. .. r
J- u—
IMP
CITY OF
SOUTHLAKE
rNCEPTUAL. THE INFORMATION SHOWN IS BASED ON THE
Kimley»> Horn
IgJUNE 2023
13
North White Chanel Boulevard Improvements - Green Ribbon
Southlake, Texas
Opinion of Probable Costs
SOUTHLAKE
0
6/14/2023
Green Ribbon Applicable Items
Unit
Quantity
Cost
Item Cost
1006002 PREPARING ROW
STA
10.5
$3,500.00
$36,750.00
1646008 BROADCAST SEED (PERM) (RURAL) (CLAY)
AC
1
$2,000.00
$2,000.00
1666001 FERTILIZER
AC
1
$2,500.00
$2,500.00
1686001 VEGETATIVE WATERING
MG
82
$130.00
$10,660.00
1706001 IRRIGATION SYSTEM (DRIP & BUBBLERS)
LS
1
$115,000.00
$115,000.00
1926003 PLANT MATERIAL (3-GAL)
EA
7,200
$25.00
$180,000.00
192 613 MULCH
SY
4,270
$2.50
$10,675.00
1926025 PLANT MATERIAL (45 GAL) (TREE)
EA
35
$800.00
$28,000.00
1926016 PLANT BED PREP
SY
4,270
$10.00
$42,700.00
1936001 PLANT MAINTENANCE
MO
12
$2,200.00
$26,400.00
1936007 IRRIGATION SYSTEM OP AND MAINT
MO
12
$950.00
$11,400.00
5006001 MOBILIZATION
LS
1
$30,000.00
$30,000.00
5026001 BARRICADES, SIGNS, AND TRAFFIC HANDLING
MO
6
$5,500.00
$33,000.00
5066040 INSTALL EROSION CONTROL LOGS
LF
1,700
$6.00
$10,200.00
5066043 REMOVE EROSION CONTROL LOGS
LF
1,700
$3.00
$5,100.00
4326001 RIP RAP (CONC)(12"Wx4"D)
CY
21
$1,000.00
$21,000.00
6206007 ELEC CONDR (NO. 8) BARE
LF
585
$2.50
$1,462.50
1004 6001 TREE PROTECTION
EA
20
$325.00
$6,500.00
Green Ribbon Construction Subtotal
$573,347.50
Green Ribbon Contingency (t20%)
$114,652.50
Green Ribbon Indirect Costs - 5-10 Year Phasing (t35%)
$202,000.00
Green Ribbon Design Fees - Landscape Architecture, Engineering, Survey (f15)%
$90,000.00
Green Ribbon Total Estimated Project Cost
$980,000.00
The Engineer has no control over the cost of labor, materials, equipment, or over the Contractor's methods of determining prices or over competitive bidding or
market conditions. Opinions of probable costs provided herein are based on the information known to Engineer at this time and represent only the Engineer's
judgment as a design professional familiar with the construction industry. The Engineer cannot and does not guarantee that proposals, bids. or actual costs will not
vary from its opinions of probable costs.
�`. 4 14�
EXISTING PAVERS TO REMAIN
,,-ACCENT SHRUB (TYP.) F
PE ISPECTIVE
VIEWPOINT
EXISTING CONCRETE EMBANKMENT TO REMAIN
W. STATE HWY 114
SEED (TYP)
EVERGREEN SHRUB (TYP)
EXISTING TREE (TYP)
DESERT SHRUB (TYP.)
C
LEGEND:
SEED
0 HARDWOOD MULCH
- EVERGREEN SHRUBS
ACCENT SHRUBS
0 ACCENT SHRUBS
ORNAMENTAL GRASS (TYP.)
4
1' CONCRETE MOW STRIP (TYP.)
EXISTING TREE (TYP.)
CANOPY TREE (TYP)
s �DESERT SHRUB (TYP.)
F\/FRrRFFN RHRIIR (TYP)
0
SEED (TYP.)
114
EXISTING CONCRETE EMBANKMENT TO REMAIN -_- ---� �, - Ma-
-
/ 111JI11W AUUtIV 16HKUb (I YF..)
EXISTING CONCRETE EMBANKMENT TO REMAIN
ORNAMENTAL GRASSES
0 ORNAMENTAL GRASSES •• ,•�
DESERT SHRUBS
0 EXISTING TREES
i r 11�
CANOPY TREES � � ♦ �
art
r : �
•' 0 5' 1530' fill
SCALE -30
NCPT11'
C- Or
SOUTHLAKE Kimley»)Horn
® JUNE2023
15
710 6.
blik
lit
z' zf7,
P� LL
_ � �� _ � _ � ,ems-' .-.r' � � - '� .I.� • .���jtt"F"}�i� '� � ' �,
qh�
4L
Y���•'�I j
ti
N . CAR R 0 LL AVENUE CURRENT CONDITIONS
THIS GRAPHIC IS CONCEPTUAL. THE INFORMATION SHOWN IS BASED ON THE
SOUTHLAKE, TEXAS CONCEPTUAL DESIGN BEST INFORMATION AVAILABLE AND IS SUBJECT TO CHANGE WITHOUT NOTICE.
still ! .r
l.
y
F -
AC
Al
o'
.r.•-
oi�i� °.t'vf''4T1�2�;',;�+ � �� •yy� 4�.:��+A,'wS/;,�. � �� �,l' . �`�'/ .. /
N. CARROL
SOUTHLAKE, TEXAS
L AVENUEGREEN RIBBON
I�I ,
ON THE
CONCEPTUAL DESIGN THIS INFORMATION IS INFORMATION SHOWN IS WITHOUT
BEST INFORMATION AVAILABLE AND IS SUBJECT TO CHANGE WITHOUT NOTICE.
AVAILABLE AND
{y) t
North Carroll Avenue Improvements - Green Ribbon
Southlake. Texas
Opinion of Probable Costs
SOUTHLAKE
0
6/14/2023
Green Ribbon Applicable Items
Unit
Quantity
Cost
Item Cost
1006002 PREPARING ROW
STA
23.0
$3,500.00
$80,500.00
1646008 BROADCAST SEED (PERM) (RURAL) (CLAY)
AC
3.9
$2,000.00
$7,800.00
1666001 FERTILIZER
AC
3.9
$2,500.00
$9,750.00
1686001 VEGETATIVE WATERING
MG
210
$130.00
$27,300.00
1706001 IRRIGATION SYSTEM (DRIP & BUBBLERS)
LS
1
$115,000.00
$115,000.00
1926003 PLANT MATERIAL (3-GAL)
EA
7,500
$25.00
$187,500.00
192 613 MULCH
SY
4,426
$2.50
$11,065.00
1926025 PLANT MATERIAL (45 GAL) (TREE)
EA
30
$800.00
$24,000.00
1926016 PLANT BED PREP
SY
4,426
$10.00
$44,260.00
1936001 PLANT MAINTENANCE
MO
12
$2,200.00
$26,400.00
1936007 IRRIGATION SYSTEM OP AND MAINT
MO
12
$950.00
$11,400.00
5006001 MOBILIZATION
LS
1
$40,000.00
$40,000.00
5026001 BARRICADES, SIGNS, AND TRAFFIC HANDLING
MO
6
$5,500.00
$33,000.00
5066040 INSTALL EROSION CONTROL LOGS
LF
4,550
$6.00
$27,300.00
5066043 REMOVE EROSION CONTROL LOGS
LF
4,550
$3.00
$13,650.00
4326001 RIP RAP (CONC)(12"Wx4"D)
CY
100
$1,000.00
$100,000.00
6206007 ELEC CONDR (NO. 8) BARE
LF
600
$2.50
$1,500.00
1004 6001 TREE PROTECTION
EA
61
$325.00
$19,825.00
Green Ribbon Construction Subtotal
$780,250.00
Green Ribbon Contingency (t20%)
$155,750.00
Green Ribbon Indirect Costs - 5-10 Year Phasing (t35%)
$274,000.00
Green Ribbon Design Fees - Landscape Architecture, Engineering, Survey (t15)%
$120,000.00
Green Ribbon Total Estimated Project Cost
$1,330,000.00
The Engineer has no control over the cost of labor, materials, equipment, or over the Contractor's methods of determining prices or over competitive bidding or
market conditions. Opinions of probable costs provided herein are based on the information known to Engineer at this time and represent only the Engineer's
judgment as a design professional familiar with the construction industry. The Engineer cannot and does not guarantee that proposals, bids. or actual costs will not
vary from its opinions of probable costs.
- W. STATE HWY 114
Gam....- us&
VINI
LEGEND
0
SEED
0
HARDWOOD MULCH
EVERGREEN SHRUBS
ACCENT SHRUBS
0
ACCENT SHRUBS
SEED (TYP)
mb i r imob. .�
ORNAMENTAL GRASSES
0 ORNAMENTAL GRASSES
DESERT SHRUBS
0 EXISTING TREES
�4-4 CANOPY TREES
ORNAMENTAL GRAS
1' CONCRETE MOW
HARDWOOD MULCH
CANOPY TREE (TYP.)
ACCENT SHRUB (TY[
ORNAMENTAL GRAS
EXISTING CONCRETE EMBANKMENT TO REMAIN
ri
I
EXISTING CONCRETE EMBANKMENT TO REMAIN —/
W. STATE HWY 114
SOUT LAKE
v
Kimley»)Horn
JUNE 2023
19
WFIN - -._ ..
-- : a I '
+} .r 00 —
}
If
�•f
-r
AL
fi
i
OF
b.
o
IF
KIMBALL AVENUECURRENT CONDITIONS
SOUTHLAKE,TEXAS
CONCEPTUAL DESIGN
THIS GRAPHIC IS CONCEPTUAL. THE INFORMATION SHOWN IS BASED ON THE
BEST INFORMATION AVAILABLE AND IS SUBJECT TO CHANGE WITHOUT NOTICE.
■
H
y Ji7:r.
ILIX
h „ I ..i
t I�.�?•".'
KIMBALL AVENUEGREEN RIBBON
ON THE
BEST INFORMATION AVAILABLE AND IS SUBJECT TO CHANGE WITHOUT NOTICE.
ION AVAILABLE THE INFORMATION SHOWN I WITHOUT
SOUTHLAKE, TEXAS CONCEPTUAL DESIGN THIS INFORMATION
I�I
{y)
Kimball Avenue Improvements - Green Ribbon
Southlake, Texas
Opinion of Probable Costs
SOUTHLAKE
0
6/14/2023
Green Ribbon Applicable Items
Unit
Quantity
Cost
Item Cost
1006002 PREPARING ROW
STA
11
$3,500.00
$38,500.00
1646008 BROADCAST SEED (PERM) (RURAL) (CLAY)
AC
0.6
$2,000.00
$1,200.00
1666001 FERTILIZER
AC
0.6
$2,500.00
$1,500.00
1686001 VEGETATIVE WATERING
MG
66
$130.00
$8,580.00
1706001 IRRIGATION SYSTEM (DRIP & BUBBLERS)
LS
1
$115,000.00
$115,000.00
1926003 PLANT MATERIAL (3-GAL)
EA
7,500
$25.00
$187,500.00
192 613 MULCH
SY
4,280
$2.50
$10,700.00
1926025 PLANT MATERIAL (45 GAL) (TREE)
EA
30
$800.00
$24,000.00
1926016 PLANT BED PREP
SY
4,280
$10.00
$42,800.00
1936001 PLANT MAINTENANCE
MO
12
$2,200.00
$26,400.00
1936007 IRRIGATION SYSTEM OP AND MAINT
MO
12
$950.00
$11,400.00
5006001 MOBILIZATION
LS
1
$30,000.00
$30,000.00
5026001 BARRICADES, SIGNS, AND TRAFFIC HANDLING
MO
6
$5,500.00
$33,000.00
5066040 INSTALL EROSION CONTROL LOGS
LF
1,700
$6.00
$10,200.00
5066043 REMOVE EROSION CONTROL LOGS
LF
1,700
$3.00
$5,100.00
4326001 RIP RAP (CONC)(12"Wx4"D)
CY
23
$1,000.00
$23,000.00
6206007 ELEC CONDR (NO. 8) BARE
LF
400
$2.50
$1,000.00
Green Ribbon Construction Subtotal
$569,880.00
Green Ribbon Contingency (t20%)
$115,000.00
Green Ribbon Indirect Costs - 5-10 Year Phasing (t35%)
$200,120.00
Green Ribbon Design Fees - Landscape Architecture, Engineering, Survey (T15)%
$90,000.00
Green Ribbon Total Estimated Project Cost
$975,000.00
The Engineer has no control over the cost of labor, materials, equipment, or over the Contractor's methods of determining prices or over competitive bidding or
market conditions. Opinions of probable costs provided herein are based on the information known to Engineer at this time and represent only the Engineer's
judgment as a design professional familiar with the construction industry. The Engineer cannot and does not guarantee that proposals, bids. or actual costs will not
vary from its opinions of probable costs.