Item 9A - Contract Change Orders 01-06DocuSign Envelope ID: 6ADF9029-A335-48FF-8E78-98187C4BF3AC
_ CITY OFSDUTHLAKE
~�l�� TIPS CVntnatt#o: 230203,23020102.
�~��� o x m�.��u`�m� �
23020101 �3O1O402 23O1O401
PLJBLl��WOR�B ' '
x/
CITY-S0UTHLAKE
PUBLIC WORKS DEPARTMENT
CONTRACT CHANGE 'ORDER NOs.W1-84 rev0
TIPS CONTRACT NOs.: 230203,23020102,23020101,23010402,23010401
DESCRIPTION: , Renovations tzthe Bicentennial Park Baseball Field; Bicentennial Par
' Site Amenities; Bob Jones Park Soccer Fields; Bob Jones Park Site
-Amenities; Bob Jones Park Softball Field; and Including Bob Jones Park
' & Bicentennial Park -AddAKornmtem
TO: ' _ ^ GeoSurfaoaa'|no.
You are hereby
'-instructed mcomply with the following changes from the Vendor/Member .
SUMMARY
OF CHANGES
Description
Changein
Additional Work
Additional Work
(Detailed Explanation Attached)
Contract Price'
Days Requested
Days Approved
by Contractor
by Ci y
Fencing
Park
Net Change in Contract Price and Work
$182,578.00
33
0
' Deduction cvdecrease mUontrampnuemuenoteumpumnmoses.
'Net Change inWork Days shall hethe sum ofthe Change inWork Days Approved byCity.
'
The
-' following
--chmr ela'ereby made '-'---a'prt 'ofthe
'`-' Vendor/Member Agreement
- and ^-shall�b
e performed
under the same hynne and conditions as required by the original Vendor/Member Agreement. Except as
modified herein, the original Vendor/Member Agreement and all prior amendments shall remain in full force
and effect and all of the terms of the Vendor/N1embmrAgveemant are hereby incorporated in this Change
Order.
SUMMARY OFALL CHANGE ORDERS
ORIGINAL CONTRACT AM0UNT-.... ...... ......... --^$11.2o723110
'
CCDO1.......................... ........................ ...................... ....
-$41.861.00
CCDO2.......... -........ ............. ................................... -......
$14.84&00
CCD03_...................... ....... ......... ......................................
$126,069.00
CCO04......... ... ........................ -................... -.....................
'$Um
SUMMARY OF WORKING DAYS
FIRST DAY OF VVORK:..... ....... -
CDNTRACTWORKING D/8S:-....
TIME EXTENSION: CC0O1-04....
NEW TOTAL WORKING DAYS: .... '
.... --- ... '18O
-------0
-----'180
.05/18/2024
000 signsnvomnem:sxorenzn,Aaas4opF-eE7aee1nrC4oFnxC
CITY OFSOUTHLAKE
SOUTHLAKE TIPS Contract #a: 230203,23020102.
PUBLIC WORKS 23020101.23010402'23010401
Change Order No
TIPS CONTRACT NOo.: 230203,23020102,23020101,23010402,23010401
DESCRIPTION: Renovations hothe Bicentennial Park Baseball Field; Bicentennial
Park Site Amenities; Bob Jones Park Soccer Fields; Bob Jones
Park Site Amenities; Bob Jones Park Softball Field; and Including
Bob Jones Park & Bicentennial Park — Add Alternates
The changes nrinterpretations described and noted herein are hereby authorized. The signed
original of this order is on file in the Department of Public Works. Shown as separate paragraphs:
(A) Reason for Change; (B) Description of Change; /C\ Change in Contract Costs; and /D>
Change inCompletion Date.
Contract Change Order No. R1:Chain|inkTemporary Fencing
A. Chain|inktemporary fencing was not included inthe Scope ofWork
for the original Vendor/Member Agreement. The City required temporary ohain|ink
temporary fencing, during the preconstruction meeting, to secure the work area.
B. Provide ohein|inktemporary fencing 8odirected bvthe City.
C.
Description
Cost
Unit
Subtotal'
Bob Jones Park
$27,295.00
EA
$27,295.00
Bicentennial Park
$14,366.00
EA
$14,366.00
TOTAL
$41,661.00
Deduction ordecrease inContract Price isdenoted inparentheses.
Change in Contract Cost:
Add $41,661.00
Change in Completion Date:
Contractor requested that U working days be added to the Contract Time.
Add 0 Working Days
DocuSign Envelope ID: 6ADF9029-A335-48FF-8E78-98187C4BF3AC
CITY OF8OUTHLAKE
��U'�k�'�� TIPS {�ontnaot#o:23O2O3.'23O2O102'
� - 23020101 23U1O4O2 23O1O4O1
PUBQC WORKS ' '
Change Order No.: 2
TIPS CONTRACT N{}8.: 230203,23020102,23020101,23010402,23010401
DESCRIPTION: ' Renovations hothe Bicentennial Park Baseball Field; Bicentennial
Park Site Amenities; Bob Jones Park Sooner Fields; Bob Jones
-Park Site Amenities; Bob Jones Park 8ORbaU Field; and Including
Bob Jones Park & Bicentennial Park —Add AbonnotaS
The changes
orinterpretations
' descrbmdand -nhtedherein are hereby authorized. The —signed
original of this order is on file in the Department of Public Works. Shown as separate paragraphs:
(A) Reason for Change; (B) Oeaohodon of Change; (C) Change in Contract Costs; and ([})
Change inCompletion Date.
Contract Change Order No. {2: SWPPP Material & Labor
A. 'Reason for Change: Material and labor relative to S;WPPPi[np|enlentad0l was not
_ included in the Scope of Work for the original Vendor/MennberAoreement. The City
required aSVVPPP as part of the project.
B. Provide labor and material tVimplement and maintain the
_ SVVPPPfor the project.
ED
Description
Cost
Unit
Subtotal'
Labor
$2,600.00
EA
$2,600.00
Straw Wattles
$4,596.00
EA
$4,596.00
Orange Construction Fencing & T Posts
$2,600.00
EA
$2,600.00
Cable Ties
$130.00
EA
$130.00
Stone for Rock Dams
$4,142.00
EA
4,142.00
Wooden Stakes
$780.00
EA
$780.00
TOTAL
$14,848.00
'Deduction or decrease in Contract Price is denoted in parentheses.
'
Change in Contract Cost:
Add $14.848.00
Change in Completion Date:
<Contractor requested that O working days beadded tnthe Contract Time. '
'
. .Add OWorking Days
ouo oignenvempom:xAoFeoon-Aoas-4upF-oern-9a1arc4aFaAC
��� ���
��^�"�� u u uu�v sxn^��
PUBLIC WORKS
Change Order No.: 3
CITY DFSOUTHLAKE
TIPS Contract #a:23O2O3.23O2O1O2'
23020101.23010402.23010401
TIPS CONTRACT NC>n.: 230203,23020102,23020101,23010402,23010401
DESCRIPTION: Renovations to the Bicentennial Park Baseball Field; Bicentennial
Park Site Amenities; Bob Jones Park Soccer Fields; Bob Jones
Park Site Amenities; Bob Jones Park Softball Field; and Including
Bob Jones Park & Bicentennial Park — Add Alternates
The changes orinterpretations deScrbedond noted herein are hereby authorized. The signed
original of this order is on file in the Department of Public Works. Shown as separate paragraphs:
(A) Reason for Change; (B) Description of Change; (C) Change in Contract Costs; and ([))
Change inCompletion Date.
Contract Change Order No. 03:G"Mow Strip &kFencing Around Bob Jones Soccer Fields
A. 1\Concrete edging around the turfed soccer field was not included
inthe Scope ofWork for the original Vendor/Member Agreement. Toprotect the new turf
during mowing, the City requested for the installation of a concrete nnovv strip/curbing
around the perimeter of the soccer fields at Bob Junes. 2\ Fencing around the the Bob
Jones Soccer Fields was not included in the Scope of Work for the original
Vendor/K4mmbmrAonaement. To discourage trespassing onto the soccer fields after the
turf renovations, the City requested for the installation fencing around the perimeter of the
soccer field.
C
NJ
,Description of Change:
i\ 0^Mow Strip. Install 2.00+/- of 6" wide by 4" thick concrete mow stric/curbingamumd
the perimeterofthe soccer fields niBob Jones Park.
ii> Perimeter Fencing.
(1) Install 2,100 LF of 4' black vinyl fencing from the roadside fence, across the front
of the parking |ot, down the side of the easternmost soccer field and back to the
roadside fence along the tree line.
(2) Install includes three (3) 12' by 4' bi-parting gates.
Change in Contract Cost:
Descri2tion
Cost
Unit
Subtotal'
Perimeter Fencing — Bob Jones Soccer
Fields
$81,900.00
EA
$81,900.00
TOTAL
$126,069.00
.Change in Completion Date:
Contractor requested that 28working days be added to the Contract Time. Because this
oocusignEnvelope ID: 187C4BF3Ao
'
SOUTHLA]KE-
PUBUC VNIORKS
CITY OFSOUTHLAKE
TIPS Contract #e:2302U3'23O20102'
23020101.23010402'23010401
(Jrd�rNo��' -4
Change -
TIPS CONTRACT NOs.: ' 23O2O3.2302O1O2.25O20101.23O1O4O2.�23O1O4O1
~-
DESCRIPTION: Renovations to the Bicentennial Park Baseball Field; Bicentennial
Park Site Amenities; Bob Jones Park Soccer Fields; Bob Jones
Park Site /\n`mnM0ea; Bob Jones Park Softball Field; and Including
Bob Jones Park & Bicentennial Pork —Add Alternates
'
The changes ' or interpretations
' described and noted
herein are hereby authorized.
`^- signed
original of this order is on file in the Department of Public Works. Shown as separate paragraphs:
A\ Reason for Change; (B) Description of Change; (C) Change in Contract Costs; and (0)
Change in Connok*Uon Date. -
Contract' - Change Order
No. '04: Capstone for Bicentennial Park Backstops
-
A. ' match the existing masonry style ofBicentennial Park
GeoSurhaces proposed to install o cast stone capstone on the backstops. The City
accepted that proposal.
B. Change:Install +/- 360 feet of cast stone 18"wide X 4" overall height
xv custom coping on backstops adBicentennial Perk. '
-
C. Change in Contract Cost:
Add $0.00
O. ' _
Contractorsted that 0 working' — — | added to 'i E9ec�uS� d�
' requested U�yS D8 Time, s
work was not on the critical pa(h, the request was denied.
' -
'Add A Working Days
SIGNATURE PAGE TO FOLLOW:
ouo aigvsn,*mpew:exopuozy-A3xo-4upF-8ero-9u1orn4apaAo
CITY {}F8{)UTHLAKE
DUTHLAKE TIPS Contract #a: 230203`23020102.
A\,\
PUBUCWORKS
The original Contract Price was $11.207.231.00. Contract Change [)nden No. 1 increased the
Contract Price byS41.0O1.UO. Contract Change Order No. 2 increased the Contract Price by
$14.848.00. Contract Change Order No. 3 increased the Contract Price by $126,069.00. Contract
Change Order No. 4 increased the Contract Price by$O.0O. The new Contract Price will be
$11.388,809.00. resulting in on increase of approximately 1.63% to the original Contract.
The original Contract Time of 180VVorking Days was extended by 0 Working Days per Change
Order Nos. 1-4. The last contract Working Day iaO5/18/2O24.
Ordered: Date: 12/28/2023
Project Manager
Acceptance by the Contractor:
This Change Order is in full compromise and settlement of all adjustments to Contract Time and
Contract Phoe, and compensation for any and all dm|ay, extended or additional field and home
office owarhood, disruption, acceleration, inefficiencies, lost labor or equipment productivity,
differing site CondiUnns, construction interferences and other extraordinary or consequential
damages (hereinafter called "Impacts"), including any ripple or cumulative effect of these Impacts
on the overall Work under the Contract arising directly or indirectly from the performance of Work
described inthis Change Order. Byexecution ofthis Change Order, the Contractor agrees that
this Change [)njer constitutes a complete accord and satisfaction with respect to all o|airno for
schedule extension, |nnpooto, or any costs of any natuna, character or kind arising out of or
incidental tuthis Change Order.
DocuSigneoby:
Name: Date: ' I/2/2024 | lI'4Z nn CST
pro]ect manager
SOU� o ��| mLA«n~E
CITY C)FSUUTHLAKE
TIPS ContraCt#s: 230203.23020102'
23020101,23010402,23010401
CITY OF ._SOUTHILAKE
PUBLIC WORKS DEPARTMENT
- ' - CONTRACT CHANGE ORDER NO. 5
TIPS CONTRACT NOs.: 23U2O1 ~23O2O1O1.2301O40223U1O401
DESCRIPTION: -Renovations to the Bicentennial Park Baseball Field; Bicentennial Pork
�-Site Bob Jones Park Soccer Fields; Bob Jones Park She
~ Amenities; Bob Jones Perk Softball Field; and Including Bob Jones Park
.& Bicentennial Padx-Add Alternates
TO: ', . � ' � �� �GeoSurhaoea, |m1
You are hereby instructed tocomply with the following changes from the Vendor/Member Agreement:
SUMMARY
OF CHANGES
Description
Changein
Additional Work
Additional Work
(Detailed Explanation Attached)
Contract Price'
Days Requested
Days Approved
by Contractor
by City
FAdditional
I
Fencing at Bob Jones Park,
$6,74988
0
0
-
per Change Request #5 (attached).
Net Change in Contract Price and Work
$6,749.88
0
0
'ueouctmo000 nor�onsaum/nuonpn �m oonoo.
'NetnVY Change U Dayosh�bndmoumofzheChangeJnVVor Days Appnnedby{]ry.
The following change is hereby made a part of the Vendor/Member Agreement and shall be performed
under the same terms and conditions as required by the original Vendor/Member Agreement. Except as
modified herein, the original Vendor/Member Agreement and all prior amendments shall remain in full force
and effect and all of the terms of the Vendor/Member Agreement are hereby incorporated in this Change
SUMMARY OFALL CHANGE ORDERS
ORIGINAL CONTRACT AMOUNT ...................... ...... ..... $f1,207,231.00
CCOO1........ .--...................... ........................ ......... $41.661.00
CCOO2_.... -----.......... ........... —.... ............ .......... -]C14,848.0O
CCOU3---... ----...... ............... ... -......... ......... -_$126,06S.OD
CCD04-... -......... ...... ......... ...................... ........ ....... ........ _$D.DO
CCQO5......... ....... ................................ ............................. 8674888
FIRST DAY oFWORK: ... ---------'............. -.... .... �11/2m/202o
CONTRACT WORKING DAYS: .... ............................... ......... .............. 18O
TIME EXTENSION: 'CCO01-O5.......... -....................................... .... O
NEW TOTAL WORKING DAYS: ................................... ....... ........... .18O
-z�
',SOUTHLAKE
Change Order No.: 5
CITY OF SOUTHLAKE
TIPS Contract #s: 230203, 23020102,
23020101, 23010402, 23010401
M M F-11 k1FCj4MVK4A94flM
TIPS CONTRACT NOs.: 230203, 23020102, 23020101, 23010402, 23010401
DESCRIPTION: Renovations to the Bicentennial Park Baseball Field; Bicentennial
Park Site Amenities; Bob Jones Park Soccer Fields; Bob Jones
Park Site Amenities; Bob Jones Park Softball Field; and Including
Bob Jones Park & Bicentennial Park — Add Alternates
The changes or interpretations described and noted herein are hereby authorized. The signed
original of this order is on file in the Department of Public Works. Shown as separate paragraphs:
(A) Reason for Change; (B) Description of Change; (C) Change in Contract Costs; and (D)
Change in Completion Date.
Contract Change Order No. 05: Fencing Additions for Bob Jones Soccer Field
A. Reason for Change: After review by City staff and the Carroll High School cross country
coaching staff, the original fencing plan around the soccer fields at Bob Jones Park was
found to not be sufficient to support cross country's racing and practice route. To rectify
this, City staff and coaching staff walked the fence line and designated where additional
gates would be needed and where currently planned gates could be removed. A plan was
drawn noting these alterations and submitted to the Contractor on 12/20/2023 (attached).
B. Description of Change: The installation of (1) 4'x 6'swing gate, (1) 30'x 4'bi-parting swing
gate, (3) 20' x 4' bi-parting swing gates, and the removal of (3) 12' x 4' bi-parting gates,
per the 12.20.23 revised fencing plan (attached).
CChange in Contract CoM
Add $6,749.88 1
D. Change in Completion I.
Add 0 Working Days
P ,-3 Fill " F-34 1-111,454
r\I//" CITY OF SOUTHLAKE
SOUTHLAKE TIPS Contract #s: 230203, 23020102,
23020101, 23010402, 23010401
The original Contract Price was $11,207,231.00. Contract Change Order No. 1 increased the
Contract Price by $41,661.00. Contract Change Order No. 2 increased the Contract Price by
$14,848.00. Contract Change Order No. 3 increased the Contract Price by $126,069.00. Contract
Change Order No. 4 increased the Contract Price by $0.00. Contract Change Order No. 5
increased the Contract Price by $6,749.88. The new Contract Price will be $11,396,558.88,
resulting in an increase of approximately 1.69% to the original Contract.
The original Contract Time of 180 Working Days was extended by 0 Working Days per Change
Order Nos. 1 5 The last contract Working Day is 05/18/2024,
PC
Ordered: Date: /16/2024
Project Manager
Acceptance by the Contractor:
This Change Order is in full compromise and settlement of all adjustments to Contract Time and
Contract Price, and compensation for any and all delay, extended or additional field and home
office overhead, disruption, acceleration, inefficiencies, lost labor or equipment productivity,
differing site conditions, construction interferences and other extraordinary or consequential
damages (hereinafter called "Impacts"), including any ripple or cumulative effect of these Impacts
on the overall Work under the Contract arising directly or indirectly from the performance of Work
described in this Change Order. By execution of this Change Order, the Contractor agrees that
this Change Order constitutes a complete accord and satisfaction with respect to all claims for
schedule extension, Impacts, ,or any costs of any nature, character or kind arising out of or
incidental to this Change Order.
fv7t
Name: Date:
Title: Pro,, e"
S
W K,
SURFACES4
I E N
Project Reference: City of Southlake - Bob Jones & Bicentennial Park Renovations
GeoSurfaces, Inc. will make the following changes/adjustments to our Base Bid scope of work for the
above referenced project:
m
r
-'encing Additions ............................................................................
1. Install one 4' by 6' swing gate.
2. Install one 30' by 4' bi-parting swing gates.
3. Install three 20' by 4' bi-parting swing gates,
4. Remove three 12' by 4' bi-parfing gates (No longer needed)
Change Order No. 5 Total .......................................................................... 00"
TERMS /EXCLUSIONS:
• The cost of permits, city engineering fees, water management fees or other fees, if applicable,
will be provided by owner,
• Testing for strength of concrete cylinders and proctor testing is included,
• No concrete adjustment or repair of parking lot or grass areas used for entrance is included in
this proposal. Back dragging of rutted areas is included.
• Proposed cost is applicable for one mobilization: any additional mobilizations will be charged at
a cost of $4,500.00 each.
• Clear site access is to be provided by Owner.
• No grading or sitework outside of the newly installed field areas is included,
• Installation will commence upon receipt of Purchaser's written notice and as soon as
GeoSurfaces' schedule allows.
• Completion will be within the agreed upon good weather working days,
• Utility, water, or other lines that are not marked are the responsibility of the Owner,
• Installation shall not be interrupted or delayed by Purchaser for any reason without prior written
approval from GeoSurfaces.
7080 St. Gabriel Ave. —Suite A, St. Gabriel, LA 70776 * 877.663.5968 Phone # 225.208.0243 Fax * W AtqLn
Acceptance of Offer to Sell: This offer to sell (Change Request #5) is valid for acceptance by Purchaser
by the execution of the Acceptance of Proposal below and return of an original to GeoSurfaces.- If the
Acceptance of Proposal is not received by GeoSurfaces on or before the Proposal expiration date, this
offer to sell shall be deemed automatically cancelled and withdrawn.
Proposal tendered this 8th day of February 2024. Proposal expires the 1 bth day of February 2024.
For: GeoSurfaces, In For: City of Southlake Parks & Recreation
By:: By:
7080 St. Gabriel Ave. suite A, St. Gabriel, LA 70776 a 877.663.5968 Phone r 225,208.0243 Fax s s .
CITY OF SOUTHLAKE
SOUTHLAKE
TIPS Contract#s: 230203, 23020102,
23020101, 23010402, 23010401
CITY OF SOUTHLAKE
PUBLIC WORKS DEPARTMENT
TIPS CONTRACT NOs.: 230203, 23020102, 23020101, 23010402, 23010401
DESCRIPTION: Renovations to the Bicentennial lark Baseball Field; Bicentennial Park
Site Amenities; Bob Jones Park Soccer Fields; Bob Jones Park Site
Amenities; Bob Jones Park Softball Field, and Including Bob Jones Park
& Bicentennial Park - Add Alternates
TO: GeoSurfaces, Inc,
You are hereby instructed to comply with the following changes from the Vendor/Member Agreement:
SUMMARY OF CHANGES
Description
Change in
Additional work
Additional Work
(Detailed Explanation Attached)
Contract Price'
Days Requested
by Contractor
Days Approved
by City
Revised Scope of Work to Repair Sink
Holes Below Field #6 at Bicentennnial
$4,340.00
0
0
Park, per ;Contract Change Request
#07 (attached).
Net Change in Contract Price and Work
$4,340.00
0
0
Da s2
'Deduction or decrease in Uontract Hrice is aenotea in parentheses.
2Net Change in Work Days shall be the sum of the Change in Work Days Approved by City.
The following change is hereby made a part of the Vendor/Member Agreement and shall be performed
under the same terms and conditions as required by the original Vendor/Member Agreement. Except as
modified herein, the original Vendor/Member Agreement and all prior amendments shall remain in full force
and effect and all of the terms of the Vendor/Member Agreement are hereby incorporated in this Change
Order.
SUMMARY OF ALL CHANGE ORDERS
ORIGINAL CONTRACT AMOUNT .... .......... ............ ...:...... $11,207,231.00
CCO01 -.: .- ......--- ................. ............... .................. ............ $41,661.00
CCO02 ............ ..........,..........,.................... ........................ $14,848.00
CCO03............ .....:........... ...:............ ......... ............................. $126,069.00
CCO04... .......... ....... ............... ....... ...... ........... ............... ......... -- ..... . $0.00
CCO05,.:................................................................................... $6,749.88
CCO06...................................................................................... $4,340.00
TOTAL.............................................................................. $11,400,898.88
SUMMARY OF WORKING DAYS
FIRST DAY OF WORK: ...... ......... ......... ...:..... .......... 11120/2023
CONTRACT WORKING DAYS:........................................................... 180
TIME EXTENSION: CCO 01 - 06.......... ................... ............. ....... --- ... 0
NEW TOTAL WORKING DAYS: .... ............... --- .............. ......... . 180
LAST DAY OF WORK: ............... -- - .......... ....... .............. 05/18/2024
SOUTHLAKE
Change Order No.: 6
CITY OF SOUTHLAKE
TIPS Contract #s: 230203, 23020102,
23020101, 23010402, 23010401
DESCRIPTION: Renovations to the Bicentennial Park Baseball Field; Bicentennial
Park Site Amenities; Bob Jones Park Soccer Fields; Bob Jones
Park Site Amenities; Bob Jones Park Softball Field; and Including
Bob Jones Park & Bicentennial Park — Add Alternates
The changes or interpretations described and noted herein are hereby authorized. The signed
original of this order is on file in the Department of Public Works. Shown as separate paragraphs:
(A) Reason for Change; (B) Description of Change; (C) Change in Contract Costs; and (D)
Change in Completion Date.
Item No. 1: Revised Scope of Work to Repair Sink Holes Below Field #6 at Bicentennnial Park,
per Contract Change Request #07 (attached).
A. Reason for Change: Contractor identified sink holes while grading Field #6 at
Bicentennial Park. City crew sent a camera to investigate the existing storm drain line and
found no evidence of separation, collapse or failure of the line. City directed Contractor to
expose the line in the areas of the sink hole. The exposed line revealed that the lift hole
cap for the line was missing. City crew replaced the lift hole cap per industry standard,
and directed Contractor to backfill and compact. Work was completed as noted in Change
Request #7 (attached).
B. Description of Change: See Change Request #7 (attached).
C. Change in Contract Cost,
Add $4,340.00
D, Chan -ge in Completion D.
Add 0 Working Days
Et�1r,. CITY OF SOUTNILAKE
�=
SOUTHLAKE
TIPS Contract #s: 230203, 23020102,
23020101, 23010402, 23010401
The original Contract Price was $11,207,231.00. Contract Change Order No. 1 increased the
Contract Price by $41,661.00. Contract Change Order No. 2 increased the Contract Price by
$14,848.00. Contract Change Order No. 3 increased the Contract Price by $126,069.00. Contract
Change Order No. 4 increased the Contract -Price by $0.00. Contract Change Order No. 5
increased the Contract Price by $6,749.88. Contract Change Order No. 6 increased the Contract
Price by $4,340.00. The new Contract Price will be $11,400,898.88, resulting in an increase of
approximately 1.69% to the original Contract.
The original Contract Time of 180 Working Days was extended by 0 Working Days per Change
Order Nos. 1 — 6 . The last contract Working Day is 05/18/2024.
t April 4, 2024�
Ordered: fAW, P-�- Date:
Project Manager
Acceptance by the Contractor:
This Change Order is in full compromise and settlement of all adjustments to Contract Time and
Contract Price, and compensation for any and all delay, extended or additional field and home
office overhead, disruption, acceleration, inefficiencies, lost labor or equipment productivity,
differing site conditions, construction interferences and other extraordinary or consequential
damages (hereinafter nailed "Impacts"), including any ripple or cumulative effect of these Impacts
on the overall Work under the Contract arising directly or indirectly from the performance of Work
described in this Change Order. By execution of this Change Order, the Contractor agrees that
this Change Orderconstitutesa complete accord and satisfaction with respect to all claims for
schedule extension; Impacts, or any costs of any nature, character or kind arising out of or
incidental to this Change Order.
Name Date:
Title: ,,,
MiTTIMEAM =-
March 4, 2024
GeoSurfaces, Inc. will make the following changes/adjustments to our Base Bid scope of work for the
above referenced project:
Field #6 Sink Hole Repairs ............................................................... 00"
I . Dig up and reveal underlaying drainage line.
2. Once repairs are completed by the City of Southlake, backfill around the drainage
line with stone.
3. Once backfilled with stone, cover with native soil and compact.
4. Change Order consists of 9 tons of stone, daily rental on the compaction roller, 2
hours of COE (Skidsteer and Excavator), and 2 hours of labor.
Change Order No. 5 Total .......................................................................... 9000
TERMSZEXCLUSIONS:
• The cost of permits, city engineering fees, water management fees or other fees, if applicable,
will be provided by owner.
• Testing for strength of concrete cylinders and proctor testing is included.
• No concrete adjustment or repair of parking lot or grass areas used for entrance is included in
this proposal. Back dragging of rutted areas is included.
• Proposed cost is applicable for one mobilization; any additional mobilizations will be charged at
a cost of $4,500.00 each.
• Clear site access is to be provided by Owner.
• No grading or sitework outside of the newly installed field areas is included.
• Installation will commence upon receipt of Purchaser's written notice and as soon as
GeoSurfaces' schedule allows,
• Completion will be within the agreed upon good weather working days.
• Utility, water, or other lines that are not marked are the responsibility of the Owner.
• Installation shall not be interrupted or delayed by Purchaser for any reason without prior written
approval from GeoSurfaces.
7080 St. Gabriel Ave. — Suite A, St. Gabriel, LA 70776 * 877.663.5968 Phone & 225.208,0243 Fax e MDDRgeosurfaces.com
Acceptance of Offer to Sell: This offer iosell (Change Request #5)bvalid for acceptance byPurchaser
by the execution of the Acceptance of Proposal below and return of an original to GeoSurfaces. If the
Acceptance of Proposal is not received by GeoSurfaces on or before the Proposal expiration date, this
offer fosell shall bedeemed automatically cancelled and withdrawn.
Proposal tendered this 4thday [fMarch 2024.
For: GeoS0rfaces,Inc.
BY
Proposal expires the 8thday ofMarch 2024.
7onoSt, Gabriel Ave, - Suite ^, St. Gabriel, ux7o7/emm,7.oas.seeuPhone e 2z6,aoouz4aFax m