Loading...
No.4-04-108FP City of Southlake Department of Planning S T A F F R E P O R T February 11, 2005 CASE NO: ZA04-108 PROJECT: Final Plat for Lot 1, Block 1, Mustang Business Park REQUEST: Wright Development Company is requesting approval of a final plat. ACTION NEEDED: Consider final plat approval ATTACHMENTS: (A) Background Information (B) Vicinity Map (C) Plans and Support Information (D) Final Plat Review Summary No. 1, dated February 11, 2005 (E) 11” x 17” Size Plans (for Commission Members Only) STAFF CONTACT: Ken Baker (481-2036) Dennis Killough (481-2073) Case No. ZA04-108 BACKGROUND INFORMATION OWNER/APPLICANT: Wright Development Company PROPERTY SITUATION: At the northwest corner of Mustang Drive and State Highway 26 LEGAL DESCRIPTION: A portion of Tract 1, Brumlow Industrial District, Phase 1 and Tracts 1B3E & 1B1B1, situated in the H. Decker Survey, Abstract 438 LAND USE CATEGORY: Industrial CURRENT ZONING: “I-1” Light Industrial District HISTORY: -A final plat for Brumlow Industrial District, Phase 1 was approved by the City on May 1, 1979. -A change of zoning from ‘I-1’ to ‘I-2’ was approved for Tract 1, Brumlow Industrial District, Phase 1 on December 5, 1989. -A change of zoning from ‘AG’ to ‘I-1’ was approved for the proposed Mustang Business Park on April 16, 2002. -City Council approved a Preliminary Plat for Mustang Business Park on November 4, 2003. STAFF COMMENTS: Attached is Final Plat Review Summary No. 1, dated February 11, 2005. N:\\Community Development\\MEMO\\2004cases\\04-108FP.doc Case No. Attachment A ZA04-108 Page 1 Case No. Attachment B ZA04-108 Page 1 Case No. Attachment C ZA04-108 Page 1 PLAT REVIEW SUMMARY Case No.: ZA04-108 Review No.: One Date of Review: 02/11/05 Project Name: Final Plat – Lot 1, Block 1, Mustang Business Park APPLICANT: Wright Development Co. SURVEYOR: Arthur Surveying Co., Inc. Martin Schelling Douglas L. Arthur 601 W. Wall Street 220 Elm Street, Suite 200 Grapevine, TX 76051 Lewisville, TX 75067 Phone: (817) 481-7751 Phone: (972) 221-9439 Fax: (817) 481-2597 Fax: (972) 221-4675 CITY STAFF HAS REVIEWED THE ABOVE REFERENCED PROJECT RECEIVED BY THE CITY ON 12/22/04 AND WE OFFER THE FOLLOWING STIPULATIONS. THESE STIPULATIONS ARE HEREBY MADE CONDITIONS OF PLAT APPROVAL UNLESS SPECIFICALLY AMENDED BY THE CITY COUNCIL. IF YOU HAVE ANY QUESTIONS OR NEED FURTHER CLARIFICATION, PLEASE CONTACT BEN BRYNER AT (817) 481-2086. 1. Place the City case number “ZA 04-108” in the lower right-hand corner of the plat. 2. Provide a written scale in close proximity to the north arrow and graphic scale. 3. Revise the title block to follow Appendix 6. Correct the block number to read Block 1. 4. Correct the discrepancy between calls 1 & 7. Label all curve data for calls 5 & 7 (delta, radius, length, tangent). 5. The following changes are needed in the owner’s dedication and notary: a) Add the lot and block number to the addition name being dedicated, i.e. Lot 1, Block 1, Mustang Business Park. b) Add a lienholder statement and signature block with notary to the plat. If there is/are no lienholder(s) then add a statement to this effect. The standard language for these statements is attached. 6. The following changes are needed with regard to adjacent properties: a) Show and label the name of the record owner & corresponding deed record (volume & page) for the tract across Mustang Drive. Petroleum Company of Texas b) Correct the block number of Lot 2 to Block 2. Label the Lot 2, Block 3 from the previously approved preliminary plat. 7. Show the location of the City Limit and label with the city names. 8. Add the following notes to the face of the plat: Case No. Attachment D ZA04-108 Page 1 a) The City of Southlake reserves the right to require minimum finish floor elevations on any lot contained within this addition. b) No lot within this addition shall be allowed driveway access onto State Highway 26. 9. Remove the Avigation Easement and Release as this property does not fall within either the 65 or 75 LDN D/FW Regional Airport Overlay Zones. 10. The following changes are needed with regard to easements: a) Show and label the type, size and deed record of all existing easements on the property. A 11.5 Sanitary Sewer easement exists in Southwestern Street. A 15’ sanitary sewer easement exists along the south portion of proposed Lot 1, Block 2. b) Although the subdivision ordinance requires general utility easements along the perimeter boundary of the site where adjoining easement do not already exist, staff recommends that easement be located only where needed for public or franchise utilities and that they be located in a manner that best benefits tree preservation on the site. 11. The following changes are needed regarding the proposed lotting: a) Correct the blocks with numbers. No letters. b) A 30’ building setback line is required on all street/R.O.W. frontages for the lot. Southwestern Street, State Highway 26 and Mustang Drive. 12. Provide a minimum 60’ radius R.O.W. dedication or easement for public vehicular turnaround at the terminus of Southwestern Street. INFORMATIONAL COMMENTS * Please submit a revised blueline "check print" prior to submitting blackline mylars with original signatures. * A “Certificate of Taxes Paid” indicating that there are no delinquent taxes owed on the subject property from each taxing authority must be provided to the City prior to filing this plat in the County records. A copy of this information may be obtained from the Tarrant county Tax Assessor/Collector’s Office located at 100 E. Weatherford St. in Ft. Worth (across from the old red courthouse). There is a service charge of $10 per account for this certificate. For more information contact the Assessor/Collector’s office at (817) 884-1103. * Original signatures and seals will be required three blackline mylars prior to filing the plat. Also required are two sets of owner's dedications and notaries (8.5" x 11" or 14" paper) with original signatures and seals on each. Mylars will not be accepted if any erasures or original ink, other than signatures or seals, appear on the plat. Case No. Attachment D ZA04-108 Page 2 * A Developers Agreement is required prior to construction of any public infrastructure. The Developer's Agreement for this addition should consider streets, drainage, park dedication requirements and fees, off-site sewer extensions, off-site drainage and utility easements and impact fees. Case No. Attachment D ZA04-108 Page 3