Loading...
#07-04-093RPPCase No. ZA04-093 S T A F F R E P O R T December 3, 2004 CASE NO: ZA04-093 PROJECT: Block 2, Gateway Plaza Phase II REQUEST: Wyndham Properties II Ltd. is requesting approval of a revised preliminary plat. ACTION NEEDED: 1. Conduct public hearing 2. Consider revised preliminary plat approval ATTACHMENTS: (A) Background Information (B) Vicinity Map (C) Plans and Support Information (D) Plat Review Summary No. 2 dated December 03, 2004 (E) Surrounding Property Owners Map (F) Surrounding Property Owners Responses (G) Full Size Plans (for Commission and Council Members Only) STAFF CONTACT: Ken Baker (481-2046) Dennis Killough (481-2073) City of Southlake Department of Planning Case No. Attachment A ZA04-093 Page 1 BACKGROUND INFORMATION OWNER/APPLICANT: Wyndham Properties II Ltd. PROPERTY SITUATION: The property is bounded by State Highway 114 on the north side, E. Southlake Boulevard (FM 1709) on the south side, and N. Nolen Drive on the west side. LEGAL DESCRIPTION: Block 2, Gateway Plaza Phase II LAND USE CATEGORY: Mixed Use CURRENT ZONING: S-P-2 Generalized Site Plan District HISTORY: -A preliminary plat was approved by Council on May 16, 2000. -A zoning change from, “AG” to “S-P-2” with a concept plan was approved by City Council on June 6, 2000. -A zoning change from “S-P-2” to “S-P-2” with a concept plan was approved by City Council on April 1, 2002 creating a second option for the development of Gateway Plaza Phase 2. TRANSPORTATION ASSESSMENT: Master Thoroughfare Plan The Master Thoroughfare Plan recommends State Highway 114 to have between 300 feet and 500 feet of right-of-way and N. Nolen Drive to be a 5- lane, undivided arterial street with 84 feet of right-of-way. Adequate right- of-way exists for these roadways. Existing Area Road Network and Conditions The proposed site will have access via two (2) common access drives. One drive provides access to N. Nolen Drive while the other drive provides access to the eastbound access road for State Highway 114. The drives exist and are currently being used by the Buca Di Beppo restaurant site. N. Nolen drive is currently a 5-lane, undivided roadway with a continuous, two-way, center left-turn lane. State Highway 114 is currently a 6-lane, restricted access roadway with 3- lane frontage roads on either side. Construction of this roadway was completed in early 2004. May, 2004 traffic counts on State Highway 114 (between Kimball Ave & Southlake Blvd): Main Lanes 24 hr West Bound (WB) (35,402) East Bound (EB) (33,554) Case No. Attachment A ZA04-093 Page 2 WB Peak A.M. (2,483) 7 – 8 a.m. Peak P.M. (3,304) 5 – 6 p.m. EB Peak A.M. (3,041) 7 – 8 a.m. Peak P.M. (2,444) 5 – 6 p.m. May, 2004 traffic counts on State Highway 114 (between Kimball Ave & Southlake Blvd): Frontage Roads 24 hr West Bound (WB) (12,401) East Bound (EB) (12,460) WB Peak A.M. (654) 8 – 9 a.m. Peak P.M. (1,306) 5 – 6 p.m. EB Peak A.M. (1,579) 7 – 8 a.m. Peak P.M. (870) 5 – 6 p.m. May, 2004 traffic counts on N. Nolen Dr (between S.H. 114 & Southlake Blvd) 24hr North Bound (NB) (916) South Bound (SB) (820) NB Peak A.M. (264) 11 – 12 a.m. Peak P.M. (98) 12 – 1 p.m. SB Peak A.M. (18) 11 – 12 a.m. Peak P.M. (119) 1 – 2 p.m. PATHWAYS MASTER PLAN: The Southlake Pathways Master Plan does not recommend any trail or sidewalk improvements adjacent to the site. A 6-foot sidewalk is proposed on the west side of N. Nolen Drive. WATER & SEWER: A 12-inch water line exists along the east side of N. Nolen Drive and along the south side of State Highway 114. An 8-inch sanitary sewer line exists along the south side of State Highway 114. DRAINAGE COMMENTS: The drainage from this site is primarily carried through an under ground storm sewer system and is discharged into the creek channel along the east boundary of the property. The increased run-off is to be detained by two dams along the channel. One has been constructed upstream to the south and the other is to be constructed as part of this project. P&Z ACTION: October 21, 2004; Approved (7-0) subject to Site Plan Review Summary No. 2, dated October 15, 2004; granting the requested articulation variance on the east side of the building; noting that the entire site will have a reciprocal parking agreement; and accepting the developer’s assurance that the site will comply with our bufferyard requirements. STAFF COMMENTS: Attached is Plat Review Summary No. 2, dated December 03, 2004. N:\Community Development\MEMO\2004cases\04-093RPP.doc Case No. Attachment B ZA04-093 Page 1 Case No. Attachment C ZA04-093 Page 1 Case No. Attachment C ZA04-093 Page 2 Case No. Attachment D ZA04-093 Page 1 PLAT REVIEW SUMMARY Case No.: ZA04-093 Review No.: Two Date of Review: 12/03/04 Project Name: Revised Preliminary Plat –Block 2, Gateway Plaza Phase II APPLICANT: SURVEYOR/ENGINEER: Wyndham Properties Raymond L. Goodson, Jr., Inc. 751 E. Southlake Blvd. Ste. 130 5445 La Sierra, Ste. 300, LB 17 Southlake, Texas 76092 Dallas, Texas 75231-4138 Phone : (817) 329-4599 Phone : (214) 739-8100 Fax : (817) 488-2420 Attn: Terry Wilkinson Fax : (214) 739-6354 Attn: Stuart Marcusson CITY STAFF HAS REVIEWED THE ABOVE REFERENCED PROJECT RECEIVED BY THE CITY ON 12/01/04 AND WE OFFER THE FOLLOWING STIPULATIONS. THESE STIPULATIONS ARE HEREBY MADE CONDITIONS OF PLAT APPROVAL UNLESS SPECIFICALLY AMENDED BY THE CITY COUNCIL. IF YOU HAVE ANY QUESTIONS OR NEED FURTHER CLARIFICATION, PLEASE CONTACT DENNIS KILLOUGH AT (817) 481-2073. 1. The following changes are needed regarding easements: a. Provide easements for franchise utilities, water, sewer and/or drainage in compliance with drainage, utility & construction plans as approved. Placement of utilities and easements must consider location of existing trees to be preserved. Provide bearings, distances and dimensional ties along lot lines to all easements that are not parallel off-sets from a identified boundary. b. Provide Common Access Easements in compliance with the approved concept and site plans. Informational Comments: * It appears this property lies within the D/FW Regional Airport Overlay Zone, requiring construction standards in compliance with the Airport Compatible Land Use Zoning Ordinance No. 479. Additionally, the Avigation Easement and Release shown on the plat must be executed on subsequent Plats to be filed in the County Plat Records. * A Developers Agreement is required prior to construction of any public infrastructure. The Developer's Agreement for this addition should consider streets, drainage, park dedication requirements and fees, off-site sewer extensions, off-site drainage and utility easements and impact fees. * All development must comply with the City’s Drainage Ordinance No. 605. * Denotes Informational Comment. Case No. Attachment E ZA04-073 Page 1 Surrounding Property Owners Block 2, Gateway Plaza Phase II Within 200 Feet of the Project Boundary Owner Zoning Land Use Acreage 1. Wyndham Properties Ltd “S-P-2” Mixed Use 0.964 2. Kimco Canyon Southlake “S-P-2” Mixed Use 0.602 3. Costco Wholesale Corp “S-P-2” Mixed Use 16.370 4. Wyndham Properties Ltd “S-P-2” Mixed Use 1.380 5. Wyndham Properties Ltd “S-P-2” Mixed Use 32.000 6. S-Si Southlake, Lp “S-P-2” Retail Commercial 3.660 7. Shafer Plaza Xxv Ltd “S-P-2” Retail Commercial 5.891 8. Shaklin, Harold & Richard “AG” Retail Commercial 6.057 9. Wyndham Properties Ltd “S-P-2” Mixed Use NA Property Owners Within Case No. Attachment E ZA04-073 Page 2 Block 2, Gateway Plaza Phase II the Same Subdivision and outside of the 200 Feet Surrounding Area Owner Zoning Land Use Acreage 1. Wyndham Properties, Ltd “S-P-2” Mixed Use 0.750 2. Wyndham Properties, Ltd “S-P-2” Mixed Use 2.001 3. Wyndham Properties, Ltd “S-P-2” Mixed Use 0.811 Case No. Attachment F ZA04-093 Page 1 Surrounding Property Owner Responses Block 2, Gateway Plaza Phase II Notices Sent within 200 feet: Nine (9) Responses: None (0) Notices Sent outside 200 feet area: One (1) Responses: None (0)