ZA03-088 Staff Report
City of Southlake
Department of Planning
S T A F F R E P O R T
January 30, 2004
CASE NO: ZA03-088
PROJECT: Chapel Hill Office Park
REQUEST: Realty Capitol Corporation is requesting approval of a site plan.
ACTION NEEDED: 1. Conduct public hearing
2. Consider site plan approval
ATTACHMENTS: (A) Background Information
(B) Vicinity Map
(C) Plans and Support Information
(D) Site Plan Review Summary
(E) Surrounding Property Owners Map
(F) Surrounding Property Owners Responses
(G) Full Size Plans (for Commission and Council Members Only)
STAFF CONTACT: Dennis Killough (481-2073)
Bruce Payne (481-2036)
Case No.
ZA03-088
BACKGROUND INFORMATION
OWNER: RCP Southlake Blvd. #1 Ltd.
APPLICANT: Realty Capitol Corporation
PURPOSE: The purpose of this request is to receive approval of a site plan and building
elevations in order to begin construction of 4 office buildings.
PROPERTY SITUATION: The property is located at 205 E. Southlake Blvd., approximately 800’ east of
the intersection of Southlake Blvd. and White Chapel.
LEGAL DESCRIPTION: Tract 5F, OW Knight Survey, Abstract No. 899
LAND USE CATEGORY: Office Commercial
CURRENT ZONING: “S-P-2” General Site Plan District
HISTORY: -A zoning change with a concept plan was approved by City Council on
September 2, 2003.
TRANSPORTATION
ASSESSMENT: Master Thoroughfare Plan
The Master Thoroughfare Plan recommends Southlake Boulevard to have
130’ of right-of-way. Adequate right-of-way exists for this road.
Existing Area Road Network and Conditions
The proposed site will have one (1) access directly onto E. Southlake
Boulevard (F.M. 1709). The plan shows common access drives to both the
West and the East giving the site access to S. White Chapel Boulevard and
the future Parkwood Drive.
E. Southlake Boulevard is a 5-lane, undivided thoroughfare with a
continuous, two-way, center left-turn lane. The roadway will ultimately be
widened to a 7-lane roadway.
May , 2003 traffic counts on E. Southlake Blvd (between White Chapel
Blvd and Byron Nelson Pkwy)
24hr West Bound (WB) (23,940) East Bound (EB) (22,576)
WB Peak A.M. (1,182) 11 – 12 a.m. Peak P.M. (2,938) 5 – 6 p.m.
EB Peak A.M. (2,158) 7 – 8 a.m. Peak P.M. (1,465) 4 – 5 p.m.
Traffic Impact
Case No. Attachment A
ZA03-088 Page 1
Use Sq. Ft. Vtpd* AM-AM-PM-PM-
IN OUT IN OUT
Office 21,200 233 29 4 5 26
*Vehicle Trips Per Day
**The AM/PM times represent the potential number of vehicle trips generated during the
peak travel times on Southlake Boulevard.
WATER & SEWER: A 12” water line extension is proposed from the east side of the future
Parkwood Drive approximately 350’ away. An 8” sewer line extension is
proposed from the west side of Parkwood Drive approximately 250’ away.
STAFF COMMENTS: Attached is Site Plan Review Summary No. 3, dated January 30, 2004.
N:\\Community Development\\WP-FILES\\MEMO\\2003cases\\03-088SP.doc
Case No. Attachment A
ZA03-088 Page 2
Case No. Attachment B
ZA03-088 Page 1
Case No. Attachment C
ZA03-088 Page 1
Case No. Attachment C
ZA03-088 Page 2
Case No. Attachment C
ZA03-088 Page 3
Case No. Attachment C
ZA03-088 Page 4
Case No. Attachment C
ZA03-088 Page 5
Case No. Attachment C
ZA03-088 Page 6
Case No. Attachment C
ZA03-088 Page 7
Case No. Attachment C
ZA03-088 Page 8
Case No. Attachment C
ZA03-088 Page 9
Case No. Attachment C
ZA03-088 Page 10
Case No. Attachment C
ZA03-088 Page 11
SITE PLAN REVIEW SUMMARY
Case No.: ZA03-088 Review No.: Three Date of Review: 01/30/04
Project Name: Site Plan – Chapel Hill Office Park
APPLICANT: Realty Capital Corporation ARCHITECT: Baird, Hampton & Brown, Inc.
Steve Isbell Konstantine Bakintas
th
32 Village Lane, Suite 200 309 W. 7 St., Suite 500
Colleyville, TX 76034 Fort Worth, TX 76102
Phone: (817) 488-4200 Phone: (817) 338-1277
Fax: (817) 424-2448 Fax: (817) 338-9245
CITY STAFF HAS REVIEWED THE ABOVE REFERENCED PROJECT RECEIVED BY THE CITY ON 01/20/04 AND WE
OFFER THE FOLLOWING STIPULATIONS. THESE STIPULATIONS ARE HEREBY MADE CONDITIONS OF SITE
PLAN APPROVAL UNLESS SPECIFICALLY AMENDED BY THE CITY COUNCIL. IF YOU HAVE ANY QUESTIONS
OR NEED FURTHER CLARIFICATION, PLEASE CONTACT BEN BRYNER AT (817) 481-2086.
General Development Standards Applies Comments
Corridor Overlay Regulations Y Complies
Residential Adjacency Y Complies
Building Articulation Y Complies
Masonry Standards Y Complies
Impervious Coverage Y Complies
Bufferyards Y Complies
Interior Landscape Y Complies
Driveways Y See Comments No. 1
Lighting Y Must comply with Outdoor Lighting Ordinance No. 693-B
1. Correctly show the articulation off-sets on the building footprints of the site plan.
INFORMATIONAL COMMENTS
* A copy of the filed Reciprocal Parking and Access Agreement has been provided to the City.
* A variance for the driveway location on E. Southlake Blvd was approved with the zoning/concept
plan.
* A variance for the stacking depth of 41’ was approved for the drive on E. Southlake Blvd with the
zoning/concept plan.
Case No. Attachment D
ZA03-088 Page 1
* The proposed site shall not exceed the maximum permitted impervious coverage area percentage of
65% for the “O-1” Zoning District. The impervious coverage area percentage approved on the
concept plan is approximately 60%.
* No review of proposed signs is intended with this site plan. A separate building permit is required
prior to construction of any signs.
* The applicant should be aware that prior to issuance of a building permit a Plat must be processed
and filed in the County Plat Records, a fully corrected site plan, landscape plan, irrigation plan, and
building plans, must be submitted for approval and all required fees must be paid. This may include
but not be limited to the following fees: Park Fee, Perimeter Street Fee, Water & Sewer Impact and
Tap Fees, and related Permit Fees.
* A letter of permission from the adjacent property owner(s) on the west must be obtained prior to
issuance of a building permit for the construction of the off-site pavement and a permit from TxDOT
must be obtained prior to any curb cut along F.M. 1709.
* Please be aware that any change of tenant/owners with a request for a new C.O. will require that all
parking areas meet the "all weather surface" requirement in the zoning ordinance and all fire lanes
shall be per the Fire Department's requirements.
Case No. Attachment D
ZA03-088 Page 2
Articulation Evaluation No. 2
Case No. ZA 03-088Date of Evaluation: 01/12/04
Elevations for Chapel Hill Office Park -
Building 1
Received: 12/29/03
Front - facing:East
Wall ht. =12
Horizontal articulationVertical articulation
RequiredProvidedDeltaOkay?RequiredProvidedDeltaOkay?
Max. wall length3621-42%Yes3621-42%Yes
Min. artic. offset220%Yes2350%Yes
Min. artic. length5980%Yes5980%Yes
Case No. Attachment D
ZA03-088 Page 3
Rear - facingWest
Wall ht. =12
Horizontal articulationVertical articulation
RequiredProvidedDeltaOkay?RequiredProvidedDeltaOkay?
Max. wall length3624-33%Yes3624-33%Yes
Min. artic. offset220%Yes213550%Yes
Min. artic. length660%Yes660%Yes
Right - facing:North
Wall ht. =12
Horizontal articulationVertical articulation
RequiredProvidedDeltaOkay?RequiredProvidedDeltaOkay?
Max. wall length3619-47%Yes3621-42%Yes
Min. artic. offset220%Yes28300%Yes
Min. artic. length5980%Yes5620%Yes
Left - facing:South
Wall ht. =12
Horizontal articulationVertical articulation
RequiredProvidedDeltaOkay?RequiredProvidedDeltaOkay?
Max. wall length3619-47%Yes3621-42%Yes
Min. artic. offset220%Yes28300%Yes
Min. artic. length5980%Yes5620%Yes
Articulation Evaluation No.2
Case No. ZA 03-088Date of Evaluation: 01/30/04
Elevations for Chapel Hill Office Park -
Building 2
Received: 01/20/04
Front - facing:East
Wall ht. =12
Horizontal articulationVertical articulation
RequiredProvidedDeltaOkay?RequiredProvidedDeltaOkay?
Max. wall length3623-36%Yes3622-39%Yes
Min. artic. offset220%Yes2350%Yes
Min. artic. length6950%Yes61067%Yes
Case No. Attachment D
ZA03-088 Page 4
Rear - facingWest
Wall ht. =12
Horizontal articulationVertical articulation
RequiredProvidedDeltaOkay?RequiredProvidedDeltaOkay?
Max. wall length3625-31%Yes3629-19%Yes
Min. artic. offset220%Yes213550%Yes
Min. artic. length6717%Yes7814%Yes
Right - facing:North
Wall ht. =12
Horizontal articulationVertical articulation
RequiredProvidedDeltaOkay?RequiredProvidedDeltaOkay?
Max. wall length3614-61%Yes3619-47%Yes
Min. artic. offset220%Yes26200%Yes
Min. artic. length49125%Yes550%Yes
Left - facing:South
Wall ht. =12
Horizontal articulationVertical articulation
RequiredProvidedDeltaOkay?RequiredProvidedDeltaOkay?
Max. wall length3614-61%Yes3619-47%Yes
Min. artic. offset220%Yes26200%Yes
Min. artic. length49125%Yes550%Yes
Articulation Evaluation No. 3
Case No. ZA 03-088Date of Evaluation: 01/30/04
Elevations for Chapel Hill Office Park -
Building 6
Received: 01/20/04
Front - facing:West
Wall ht. =12
Horizontal articulationVertical articulation
RequiredProvidedDeltaOkay?RequiredProvidedDeltaOkay?
Max. wall length3625-31%Yes3625-31%Yes
Min. artic. offset220%Yes2350%Yes
Min. artic. length6950%Yes6950%Yes
Case No. Attachment D
ZA03-088 Page 5
Rear - facingEast
Wall ht. =12
Horizontal articulationVertical articulation
RequiredProvidedDeltaOkay?RequiredProvidedDeltaOkay?
Max. wall length3627-25%Yes3627-25%Yes
Min. artic. offset220%Yes213550%Yes
Min. artic. length770%Yes770%Yes
Right - facing:South
Wall ht. =12
Horizontal articulationVertical articulation
RequiredProvidedDeltaOkay?RequiredProvidedDeltaOkay?
Max. wall length3621-42%Yes3621-42%Yes
Min. artic. offset220%Yes218800%Yes
Min. artic. length5620%Yes5620%Yes
Left - facing:North
Wall ht. =12
Horizontal articulationVertical articulation
RequiredProvidedDeltaOkay?RequiredProvidedDeltaOkay?
Max. wall length3621-42%Yes3621-42%Yes
Min. artic. offset220%Yes218800%Yes
Min. artic. length5620%Yes5620%Yes
Articulation Evaluation No. 2
Case No. ZA 03-088Date of Evaluation: 01/12/04
Elevations for Chapel Hill Office Park -
Building 7
Received: 12/29/03
Front - facing:North
Wall ht. =15
Horizontal articulationVertical articulation
RequiredProvidedDeltaOkay?RequiredProvidedDeltaOkay?
Max. wall length4525-44%Yes4526-42%Yes
Min. artic. offset29350%Yes2350%Yes
Min. artic. length615150%Yes615150%Yes
Case No. Attachment D
ZA03-088 Page 6
Rear - facingSouth
Wall ht. =15
Horizontal articulationVertical articulation
RequiredProvidedDeltaOkay?RequiredProvidedDeltaOkay?
Max. wall length4516-64%Yes4519-58%Yes
Min. artic. offset220%Yes212500%Yes
Min. artic. length49125%Yes5620%Yes
Right - facing:West
Wall ht. =12
Horizontal articulationVertical articulation
RequiredProvidedDeltaOkay?RequiredProvidedDeltaOkay?
Max. wall length3614-61%Yes3615-58%Yes
Min. artic. offset220%Yes2350%Yes
Min. artic. length49125%Yes49125%Yes
Left - facing:East
Wall ht. =12
Horizontal articulationVertical articulation
RequiredProvidedDeltaOkay?RequiredProvidedDeltaOkay?
Max. wall length3614-61%Yes3615-58%Yes
Min. artic. offset220%Yes2350%Yes
Min. artic. length49125%Yes49125%Yes
Surrounding Property Owners
Chapel Hill Office Park Addition
Owner Zoning Land Use Acreage
1. GCSW, Ltd 1. O-1 1. Office Commercial 1. 0.98
2. D. Stoner 2. SF-1A 2. Low Density Residential 2. 1.04
3. S. Bryant 3. SF-1A 3. Low Density Residential 3. 1.00
4. D. Johnston 4. SF-1A 4. Low Density Residential 4. 0.91
5. Fairbanks Capital Corp. 5. SF-1A 5. Low Density Residential 5. 0.94
6. Bes-Tex Financial Serv. 6. S-P-2 6. Low Density Residential 6. 5.91
7. White Chapel United 7. CS 7. Low Density Residential 7. 6.32
Methodist
8. White Chapel United 8. CS 8. Public/Semi Public 8. 9.50
Methodist
9. White Chapel United 9. CS 9. Public/Semi Public 9. 0.79
Methodist
10. S. Garrett 10. AG 10. Low Density Residential 10. 3.69
Case No. Attachment E
ZA03-088 Page 1
Surrounding Property Owner Responses
Chapel Hill Office Park
Notices Sent: Nine (9)
Responses: None (0)
Case No. Attachment F
ZA03-088 Page 1