Loading...
1992-06-04 & 05 Retreat 1992 CITY COUNCIL RETREAT Marriott Solana DAY ONE: June 4, 1992, 7:30 - 10:00 p.m. 6:30 Overview/Dinner • City wide staffing • Interns • Goals • Volunteer Project 7:30 Financial Review 8:00 Public Safety Department • Animal Control Enforcement • 800 mhz or MDTs 10:00 Adjourn DAY ONE: June 5, 1992, 8:00 a.m. - 2:00 p.m. 8:00 Buffet Breakfast/Review 8:30 Public Works • Streets • Water • Sewer • Drainage • Parks • Planning and Zoning • Building • Code Enforcement REPORT TO THE CITY COUNCIL The narrative which follows is intended to present the City Council with an overview of several topics to be discussed during the retreat. The text is not comprehensive in that not every item to be discussed is included. REPORT TO THE CITY COUNCIL City Council Retreat June 4 - 5, 1992 Table of Contents Page I.Public Works Drainage Maintenance 1 Drainage Master Plan 2 Drainage Utility District 3 Street Patching 4 Right-of-Way Mowing 4 Bond Program 5 Code Enforcement 6 Water 7 Sewer Interceptor & Main Lines 8 Neighborhood Sewers 10 II. Public Safety Animal Control 11 III. Finance Governmental Accounting 13 Summary Financial Information 14 Municipal Court Software System 16 Update Utility Billing Software 16 Utility Bills 17 Cash Receipts Software System 17 Group Health/Life Insurance 18 Depository Bank 19 PUBLIC WORKS Drainage Maintenance Bar ditch and other drainage way maintenance receives only limited attention due to the work load of the maintenance crews. In the area of drainage maintenance, the City will need to spend more work hours, budget more funds and provide more personnel to meet minimum expectations of the citizens and to provide adequate drainage for the city streets. At present, there are seven (7) employees in the Street Division. These employees provide the following functions: 1. patch potholes; 2. repair street failures and overlay with asphalt; 3. mow right-of-ways (6 months); 4. repair and replace all regulatory signs; 5. clean ditches; 6. clear right-of-way as required (brush, etc.); 7. provide street reconstruction on a limited basis; and 8. perform miscellaneous repair work on City buildings. Cleaning ditches requires a minimum of five (5) employees; two driving a truck, one on the gradall and two flagmen (sometimes one flagman is adequate). That leaves two employees to patch potholes if no one is out sick or on vacation. With the passage of the Street Bond Program, the City will be obligated to provide adequate drainage ditches and facilities for our newly constructed streets. If two additional employees were added, then two crews could be working full time; one crew cleaning 1 ditches (5) and one crew doing street repairs (4). The street repair crew would consist of a loader operator, two truck drivers and one flagman (if two flagmen are required, one truck would be used). To have two full crews working everyday, two additional dump trucks would be required. Since no streets will be completed until summer of 1993, these additional employees and trucks would not be required until the 1993-94 budget year. Another area in drainage maintenance that is becoming a problem is grass lined drainage ditches in dedicated drainage easements other than bar ditches. The City's Subdivision Ordinance does not require developers to install concrete lined drainage ditches. If a drainage ditch is in a drainage easement dedicated to the City, the City may be responsible for maintaining the ditch. If the City is to maintain the ditches, Council may want to consider requiring the developer to install concrete ditches, or concrete pilot channels in lieu of fully lined concrete ditches, where a dedicated drainage easement is required. None of the above addresses maintenance of subdivision bar ditches. We currently do not have a program of bar ditch maintenance in subdivisions. Ordinance No. 483, our subdivision ordinance, provides that property owners must maintain the ditches in front of their property. However, we receive numerous calls from individuals requesting the City to do the maintenance. In some unusual circumstances we have done so following citizens complaints. If we had a full-time drainage crew we would be able to more appropriately respond to these type complaints. Drainage Master Plan As stated in last year's budget retreat, a master drainage plan needs to be developed for the City composed of the following: 2 1.a detailed inventory of all drainage structures (box culverts, inlets, etc.); 2.a list of flood-prone areas; 3.delineation of drainage basins; 4.drainage basin flows for 100-year storm and cross sections; 5.cost estimates of all required improvements; 6.two-foot contour maps for each basin; 7.aerial photos that coincide with the contour maps (the two-foot contour map and aerials are usually done at the same time); 8.review of existing drainage ordinance; 9.minimum standards for drainage requirements; and identification of critical structures. Not all of the items listed above need to be implemented at this time. The most expensive aspects of a master drainage plan are the contour and aerial maps. For a City the size of Southlake these could cost as much as $200,000. The remaining items would cost between $40,000 to $50,000. Funding for the items listed above, excluding contour and aerial maps, could come from three different sources: 1. annual budget 2. street bond program 3. development of a Drainage Utility District (discussed below) The funding for the contour and aerial maps could be provided at a later date. A master drainage plan would provide the following: 1.identification of problem areas and their solutions; 2.identification of critical drainage structures to be budgeted for each year; and 3.proper scheduling of drainage improvements. 3 Drainage Utility District A Drainage Utility District is an alternative method by which drainage maintenance and structures could be funded with minimal financial burden on the citizens. One of the first steps in creating a utility district is a Master Drainage Plan as previously discussed. The state statutes provide guidelines to be followed by cities in creating a Drainage Utility District. The law allows a city to develop a charge for commercial and residential users that will fund ongoing drainage maintenance, capital drainage improvements, and debt service for drainage bonds. The City will have to conduct a study to determine the charge per month of each residential and commercial property owner to be added to their water bill. Area cities have implemented a Drainage Utility District. The Drainage Utility District may be the only method to enable Southlake to address drainage concerns throughout the City. Street Patching The City has a regular schedule for patching potholes. The two member patch crew travels over every road in the City at least once a month, repairing potholes as they travel. Whenever a pothole is reported by a citizen, the crew deviates from its regular route long enough to patch the pothole and then return to its original schedule. Any pothole reported to be dangerous is repaired within 24-hours. Whenever a major project requires all seven (7) employees, such as a large overlay project, the patching crew will assist the major project for the time required and then return it to its regular schedule. 4 Right-of-way Mowing There are approximately 81 miles of collector or arterial roads that the City is responsible for mowing (the City does not mow subdivision rights-of-way). The City has one tractor mower to mow the City's right-of-way. With all of the other work that has to be done, this cuts into the work force. In years past, staff has not found an independent contractor who is willing to mow the City's right-of-way at a reasonable cost ($20- $30/hour) because our right-of-ways are very rough and are hard on a mower. This year there have been two (2) inquiries about mowing the right-of-way which were within our cost range. If the contractor mowers can average two (2) miles an hour, the entire city can be mowed in a week's time at a cost of $800 to $1,200. This would allow our crews to concentrate on other repair work. If contract mowing proves to be a viable method of keeping our rights-of-ways mowed, then funding will be proposed in the budget ($10,000 to $15,000). Otherwise, the City will need to purchase a new mower ($15,000 to $20,000) and continue to mow the right-of- ways with City employees. Bond Program The passage of the Street Bond Program will allow the street crews to spend more time repairing subdivision streets when the program is completed. Currently, most of the street crew activity is on the major collectors and arterial streets that are included in the Street Bond Program. Until the bond improvements are effected, the crew will continue to repair the collector and arterial streets as in the past. Hopefully, the City will be able to utilize the County's forces as it has in the past to reconstruct streets in areas not included in the Bond Program, such as Johnson road, Randol Mill, North White 5 Chapel, and Florence. 6 Staff is currently reviewing the streets proposed to be reconstructed in the Bond Program. City Council will need to establish the priority list for the program. Code Enforcement As Southlake grows, so does the need for a pro-active code enforcement program. With the addition of the new inspector last month, the Code Enforcement Officer will be able to concentrate on code enforcement. Areas to be addressed include: 1.removal of unoccupied dangerous buildings 2.junk vehicles 3.illegal signs 4.zoning violations 5.occupied substandard housing New Programs Initial funding will be required to start an active program of removing dangerous dilapidated buildings will require initial funding. Upon the failure of a property owner to remove a dangerous building, and following proper notification process, a building condemned and scheduled to be removed, will be bid. The low bidder is awarded the bid and the house is removed. All costs associates with the removal of the building is charged against the owner and a lien is put on the property. When the owners sell their property, the liens are paid to the City. Starting the program could cost between $10,000 to $15,000. The City has not been active in the enforcement of our minimum standard housing code. The purpose of the housing code is to provide the basic minimum requirements under which residential occupancy should be controlled -- requirements deemed essential for safe and healthful living. The requirements of light and 7 ventilation, electrical systems, living space, sanitary facilities, and structural safety are addressed by the code. There are numerous buildings in areas of the community that are probably in non-compliance with the housing code. Prior to implementing a housing code enforcement program, however, our housing code needs to be updated. Water In the spring, Lewis McClain with staff reviewed the City's water and sewer rates. The results of the study indicated that for the next three years (through 1994-95 budget year) the City will not have to raise water rates if at least a 5% growth factor continues. Included in the rate structure is a proposed capital improvements program of approximately $1.3 million. The proposed $1.3 million capital improvement program consists of the following projects: 1.replacing inadequate pipe line sizes along Kimball Road, Shady Lane, Raintree, Greenbough, Rolling Hills, Hillcastle and Hilltop Drive: $465,000 2.placing in-service the high pressure plane (see below): $450,000 3.installing a 12" water line along SH 114, from White Chapel to North Carroll: $385,000 Total Cost of 1, 2 & 3 $1,300,000 The installation of larger water lines along the streets listed above will provide adequate fire protection to those areas. 8 The differences in water pressure throughout most cities is so great that the cities must be divided into two or more pressure planes. Southlake is currently serviced by one pressure plane. A second, high pressure plane is proposed to be located between Florence Road and Johnson Road and the Cross Timbers subdivision boundary. The remainder of the city is in the lower pressure plane. The implementation of the high service plane consists of the following: 1.utilization of Keller pump station and ground storage capacity on Pearson Lane; 2.installation of a 12" line from the pump station to the .5 million gallon elevated storage tank off Florence Road, which is currently empty. (When the White Chapel water tower was installed in 1988 the .5 million gallon tower which was existing on that site was relocated to its present location); and 3.installation of a 12" water line along Florence and Randol Mill Road connecting to the Cross Timbers subdivision. As growth occurs in other sections of the city, the pressure will diminish in the high pressure plane area in the summer peak periods. Since the high pressure plane has previously experienced problems with low pressure in the summer months and it appears, and given the growth potential, it is time to plan for the installation of a high pressure plane. Staff members have had conversations with the City of Keller staff about utilizing their pump station. Keller officials have indicated a willingness to consider an agreement. Utilization of the City of Keller pump station could possibly give the City of Southlake a 10 year window before a high pressure plane pump station will have to be built. Sewer Interceptor and Main Lines 9 In 1988, the City Council committed to provide municipal sewer service to the city by contracting with TRA to build two (2) major interceptor lines: the Denton Creek Pressure System and the Bear Creek Interceptor Line. The City was also one of the contracting parties that built the Denton Creek Wastewater Treatment Plant currently in service northwest of Roanoke. The Bear Creek Interceptor was completed and put in service in the spring of 1991 at a cost of $12,750,000 of which Southlake is responsible for 33% of the debt service. The Bear Creek Interceptor serves the southern half of Southlake. In 1990, Arvida built the S-4 line that connects to the Bear Creek Interceptor. Since the Bear Creek interceptor was not built at that time, the City entered into an agreement with Colleyville to utilize an existing trunk line until the Bear Creek Interceptor was built. In 1991, the S-6 and N-3 gravity lines and the N-3 lift station were completed. The lift station is located at Dove Creek and Carroll Road; the N-3 line travels from the lift station southward through Chapel Downs, Missions Hills and Diamond Circle Estates subdivisions; the S-6 line travels southward from the end on the N- 3 line through the Mobil property and connecting to the Big Bear Creek Interceptor. The N-3 lift station and gravity line are located in the Denton Creek Pressure System and the S-6 is located in the Big Bear Interceptor System. By contract with TRA, the City is diverting effluent by pumping from the Denton Creek Pressure Station to the Big Bear Interceptor until the Denton Creek Pressure Station is installed. The diversion will have to terminate prior to December 1, 1996 unless other arrangements are made. To construct the Denton Creek Pressure line to the Denton Creek Treatment Plant is 10 estimated to cost approximately $6,000,000. There are other alternatives that are being reviewed at this time to provide 11 sewerage facilities in the Denton Creek Pressure System at a lower cost. The Council entered into an agreement with two other parties in March 1992 to construct the S-2 sewer line. The design is almost complete on this line and the City will begin to acquire easements in the next few weeks. Neighborhood Sewers In 1990 the City of Southlake established a sewer assessment program to construct municipal sewer in the Continental Park Estates Subdivision neighborhood. The project was completed in January, 1991. A number of factors were considered in determining the City's participation with the benefitted property owners in the program, but special attention was warranted in the CPE neighborhood due to public health problems associated with septic tanks on the small lots in the subdivision. Other neighborhoods have requested connection to the municipal sewers. The City needs to adopt a policy or program statement to adhere to in extending sewers to the neighborhoods. The program statement should address how City participation will be determined. 12 ANIMAL CONTROL Animal control continues to be one of the recurring problems in the community. The major issues involved are the split in public sentiment toward animals at large, enforcement, and resources available. When the community was sparsely populated, controls were not needed because there were fewer citizens and fewer animals at large. Animals were free to roam, and to become a nuisance they had to travel some distance. With the population increase, smaller lot sizes, and new subdivisions, different attitudes have emerged toward animal control. These attitudes create several problems, the most prominent being calls-for-service directed toward the Police Patrol Division and its ability to deal with the problems. Currently the City has taken several steps to address animal control. A comprehensive ordinance was passed. An contract for sheltering animals is in place with the Humane Society of North Texas and the Roanoke Shelter. These efforts were essential, but stops short of successfully handling the problems. As illustrated by the attachment, animal control can be a resource-expending call- for-service. The vast majority of these calls are handled by a police officer with little training and no equipment, and the officer is taken out-of-service for the duration of these calls. The next step in animal control for the City of Southlake is to improve its handling of animal control calls, by providing some solutions to stray animals and a more visible deterrent to violations of our animal control ordinance. The Roanoke Shelter is an avenue for accomplishments part of our goals toward proper animal control, i.e., the shelter aspect, however, current funding is inadequate to provide the control 13 function. We can hire and equip animal control officers. Animal control officers currently need to be certified, but this would not prohibit providing a City worker with some training, equipment, and the ability to respond and handle these instances as they occur, and assign other responsibilities to the officer(s) when not responding to calls. Multi-city involvement is another avenue, with the cities providing personnel and equipment for enforcement, and the Roanoke Animal Shelter providing the housing. 14 FINANCE Governmental Accounting For the benefit of the new Council Members, an overview of the City of Southlake's finances and accounting methods is presented. The City accounts for all financial transactions within operating Funds. The two major funds are the General Fund and the Utility Fund. Another fund used by the City is the Capital Projects Funds, which accounts for major improvements through bond proceeds or other sources. The City also utilizes Special Revenue Funds, in which funds received are restricted for specific purposes, such as the Park Dedication Fees. The General Obligation Debt Service Fund accumulates property tax revenues for the payment of principal and interest on long term debt. The General, Debt Service, Capital Projects and Special Revenue Funds use a modified accrual basis of accounting. Revenues are recorded when received, and expenditures are recorded when incurred. Fixed assets are classified as expenditures in the year purchased, and are also recorded in the General Fixed Asset Account Group. No depreciation is recorded. The Utility Fund accounts for all costs of and revenues derived from providing water, wastewater, and sanitation service to customers. Full accrual accounting is employed, with revenues 15 recorded as earned, and expenses recorded when incurred. Depreciation on fixed assets is recorded. Summary Financial Information A brief description of the primary revenue sources of the City and areas of expenditures is included in this report. The major operating fund, the General Fund, is combined with the Debt Service Fund to facilitate comparison to last year. An overview of the Utility Fund is also made. General Fund/Debt Service Fund Revenues The City's adopted tax rate this year is $.455 per $100 of assessed valuation. Of that rate, $.31985, or 70.3% is for General Fund support, and $.13515, or 29.7% is for General Obligation Debt Service. Over 60% of revenues is derived from property tax. The other major revenue sources are sales taxes, permit/development fees, fines, and franchise fees. General Fund/ Debt Service Fund Expenditures There are four departments within the City's operations. They are General Government, Finance, Public Works, and Public Safety. Debt service on general obligation bonds is presented for comparison purposes. The Public Safety Department, due its twenty-four hour 16 per day staffing requirement, comprises the largest percentage (38%) of the total expenditures. Public Works is 22%, while General Obligation Debt Service is 17% for fiscal year 1992, up 5% over last year. The largest expenditure category is for personnel services. It comprises almost half of total expenditures. Operations cost is 28%, while capital expenditures account for 8%. Utility Fund Southlake purchases all its water from the City of Fort Worth. Wastewater treatment is provided by the Trinity River Authority. The sanitation service contract was recently awarded to Lakeside Sanitation. The cost of providing these services is accounted for within the Utility Fund. Rates are derived from the cost of providing these services and estimates of water volume to be sold during the year. The City has recently updated its cost of service study. Based upon cost and volume estimates for the next three years, no rate increase will be required, assuming annual debt service on any new debt is paid from impact fees. Infrastructure needs will continue to dominate financial planning within the Utility Fund. Some major concerns the Council needs to address is the City's financial 17 participation/commitment to extending wastewater lines to existing subdivisions. A consistent policy is important in order to adhere 18 to the annual budget and subsequent year's projections. The citizens need to know the Council's position. Municipal Court Software System In April the City Council authorized the purchase of a replacement Municipal Court computer system. This system is scheduled for delivery in late May and will be interfaced with the existing Police System. We will be working toward a smooth transition to this personal computer based system. Update Utility Billing Software In 1985, the City installed a Utility Billing computer system. In the year since its installation, no computer system upgrade has been made. An upgrade would provide several advantages. There is expanded reporting and payment record-keeping capability. Also, the system would maintain a twenty-four month history of accounts. Currently this is limited to twelve months. There is also a utility clerk input screen which has the ability to interface with a work order software system. Service, or work orders would be generated automatically from utility clerk input on accounts within the utility billing system. This upgrade has been available from our software vendor, Cameo, for over two years. This is an upgrade that should have been made when first available. It is important for the City to remain 19 current with our software provider and their products. An outdated software program can require more specialized and costly support the longer it is retained. Utility Bills The 1991-92 Budget provided funds to modify the current utility bill, which is now a 4" x 6" card. Several alternatives have been reviewed, including contracting the billing service with a company. The contractor would process the monthly bills, plus allow for items such as the monthly newsletter to be inserted with the billing. This alternative required the monthly billing data files to be submitted on a data tape. The City does not have a tape drive system on its computer. After reviewing this option, it was determined this would prove more costly than keeping the billing in-house. The utility billing clerk is in the process of reviewing all billing forms and notices. The recommendations will be evaluated by the City Manager and Finance Director. The changes can be publicized through the City's monthly newsletter. It is anticipated these new forms can be implemented before the end of the fiscal year. Cash Receipts Software System The City retains one central cashier that receives and records all 20 funds coming into the municipal coffers. This function is one of the few in the City that is not computerized. The cashier now writes receipts for payments other than for utility bills, primarily development related fees. A cash register with a cash drawer validates the amount and date on the receipt. In an effort to support internal controls over cash, it is proposed to purchase and implement a Cash Receipts software program in the next year. This program is a batch file process, whereby daily receipts are processed as of the end of the day, then updated to accounts. The general ledger account entries to record the daily business are automatically generated, eliminating the need for a keyed daily entry. The program generates a cash receipt summarizing each transaction, eliminating the need to hand-write receipts. The cost of this system is approximately $7,750 for the software licenses, plus $5,970 for the required hardware, installation, and training, for a total of $13,720. This program was proposed last year. Almost all financial activity for the City is derived from transactions processed by the Cashier. The system would provide an opportunity to integrate this activity with the General Ledger and subsidiary ledgers. Group Health/Life Insurance Some discussion has been made concerning the City's group health insurance plan. The City currently uses Texas Municipal League 21 Group Benefits Risk Pool. The City pays 100% of employee cost, and the employee pays any dependent premium. This is an indemnity program, 80%/$5,000, $200 deductible. Included for this year is a prescription card. The plan also provides dental coverage, plus life and accidental death/dismemberment up to $25,000 maximum annual salary. Texas Municipal League periodically bids each of these plans with several underwriters. For 1991-92, the City monthly pays $170.61 per employee for medical, $15.26 for dental, plus approximately $.35/$1,000 salary for life/ADD. Based on 75 employees, the annual total premium is approximately $175,000. Staff believes this is a competitive product and rate, and employees as a whole are satisfied. The TML program requires little City staff administration. Should the Council decide that TML not be used, the City could send Requests for Proposals to health care insurance providers. Insurance is not exempt from State bidding requirements as a personal service. Under state law, the City may not use a broker, or any person who may derive income from any source other than the City to place this type of insurance without first submitting to Requests for Proposals. Council can engage on a fee basis a consultant that can draft specifications and analyze needs and proposals. Consultant fees would range from $5,000 to $10,000. Depository Bank 22 The City has as its depository bank Texas National Bank. The Bank handles all demand account transactions. The City uses two demand bank accounts, Pooled Cash and Payroll. During a year approximately 2,400 accounts payable checks are issued, as well as over 2,000 payroll checks. The Bank also places all certificates of deposit for the City through Texas Independent Bank in Dallas. Certificates with maturities beyond 30 days have the interest deposited monthly to the City's Pooled Cash account, thereby maintaining the required $100,000 deposit limit with each bank. Texas National Bank is also required to pledge a portion of their investment portfolio to the City's accounts that are in excess of $100,000. The City would have claim to these pledged securities in the event of default. 23 Public Works Department I. DRAINAGE A. Drainage Maintenance: Bar ditch and other drainage way maintenance receives only limited attention due to the work load of the maintenance crews. In the area of drainage maintenance, the City will need to spend more man hours, budget more funds and provide more personnel to meet minimum expectations of the citizens and to provide adequate drainage for the city streets. At present, there are seven (7) employees in the Street Division. These employees provide the following functions: 1. patch potholes; 2. repair street failures and overlay with asphalt; 3. mow right-of-ways (6 months); 4. repair and replace all regulatory signs; 5. clean ditches; 6. clear right-of-way as required (brush, etc.); 7. provide street reconstruction on a limited basis; and 8. perform miscellaneous repair work on City buildings. Cleaning ditches requires a minimum of five (5) employees; two driving a truck, one on the gradall and two flagmen (sometimes one flagman is adequate). That leaves two employees to patch potholes if no one is out sick or on vacation. 1 With the passage of the Street Bond Program, the City will be obligated to provide adequate drainage ditches and facilities for our newly constructed streets. If two additional employees were added, then two crews could be working full time; one crew cleaning ditches (5) and one crew doing street repairs (4). The street repair crew would consist of a loader operator, two truck drivers and one flagman (if two flagmen are required, one truck would be used). To have two full crews working everyday, two additional dump trucks would be required. Since no streets will be completed until summer of 1993, these additional employees and trucks would not be required until the 1993-94 budget year. Another area in drainage maintenance that is becoming a problem is grass lined drainage ditches in dedicated drainage easements other than bar ditches. The City's Subdivision Ordinance does not require developers to install concrete lined drainage ditches. If a drainage ditch is in a drainage easement dedicated to the City, the City may be responsible for maintaining the ditch. If the City is to maintain the ditches, Council may want to consider requiring the developer to install concrete ditches or concrete pilot channels in lieu of fully lined concrete ditches where a dedicated drainage easement is required. None of the above addresses maintenance of subdivision bar ditches. We currently do not have a program of bar ditch maintenance in subdivisions. Ordinance No. 483, our subdivision regulations, provides that property owners must maintain the ditches in front of their property. However, we receive numerous calls from 2 individuals requesting the City to do the maintenance. In some circumstances we have done so following citizens complaints. If we had a full-time drainage crew we would be able to more appropriately respond to these type complaints. B. Drainage Master Plan As stated in last year's budget retreat, a master drainage plan needs to be developed for the City composed of the following: 1. a detailed inventory of all drainage structures (box culverts, inlets, etc.); 2. a list of flood-prone areas; 3. delineation of drainage basins; 4. drainage basin flows for 100-year storm and cross sections; 5. cost estimates of all required improvements; 6. two-foot contour maps for each basin; 7. aerial photos that coincide with the contour maps (the two-foot contour map and aerials are usually done at the same time); 8. review of existing drainage ordinance; 9. minimum standards for drainage requirements; and 10. identification of critical structures. Not all of the items listed above need to be implemented at this time. The most expensive aspects of a master drainage plan are the contour and aerial maps. For a City the size of Southlake these could cost as much as $200,000. The remaining items would cost between $40,000 to $50,000. Funding for the items listed above, excluding contour and aerial maps, could come from three different sources: 3 1. approved budget 2. street bond program 3. development of a Drainage Utility District (discussed below) The funding for the contour and aerial maps could be provided at a later date. A master drainage plan would provide the following: 1.identification of problem areas and their solutions; 2.identification of critical drainage structures to be budgeted for each year; and 3.proper scheduling of drainage improvements. C. Drainage Utility District: A Drainage Utility District is an alternative method by which drainage maintenance and structures could be funded with minimal financial burden on the citizens. One of the first steps in creating a utility district is a Master Drainage Plan as previously discussed. The state statutes provide guidelines to be followed by cities in creating a Drainage Utility District. The law allows a city to develop a charge for commercial and residential users that will fund ongoing drainage maintenance, capital drainage improvements, and debt service for drainage bonds. The City will have to conduct a study to determine the charge per month of each residential and commercial property owner to be added to their water bill. Area cities have implemented a Drainage Utility District and are having 4 good success. The Drainage Utility District may be the only method to enable Southlake to address drainage concerns throughout the City. II. STREETS A. Street Patching The City has a regular schedule for patching potholes. The two member patch crew travels over every road in the City at least once a month, repairing potholes as they travel. Whenever a pothole is reported by a citizen, the crew deviates from its regular route long enough to patch the pothole and then return to its original schedule. Any pothole reported to be dangerous is repaired within 24-hours. Whenever a major project requires all seven (7) employees, such as a large overlay project, the patching crew will assist the major project for the time required and then return it to its regular schedule. B. Right-of-way Mowing There are approximately 81 miles of collector or arterial roads that the City is responsible for mowing (the City does not mow subdivision rights-of-way). The City has one tractor mower to mow the City's right-of-way. With all of the other work that has to be done, this cuts into the work force. In years past, staff has not found an independent contractor who is willing to mow the City's right-of-way at a reasonable cost ($20-$30/hour) because our right-of-ways are very rough and are hard on a mower. This year there 5 have been two (2) inquiries about mowing the right-of- way which were within our cost range. If the contractor mowers can average two (2) miles an hour, the entire city can be mowed in a week's time at a cost of $800 to $1,200. This would allow our crews to concentrate on other repair work. If contract mowing proves to be a viable method of keeping our rights-of-ways mowed, then funding will be proposed in the budget ($10,000 to $15,000). Otherwise, the City will need to purchase a new mower ($15,000 to $20,000) and continue to mow the right-of-ways with City employees. C. Bond Program The passage of the Street Bond Program will allow the street crews to spend more time repairing subdivision streets when the program is completed. Currently, most of the street crew activity is on the major collectors and arterial streets that are included in the Street Bond Program. Until the bond improvements are effected, the crew will continue to repair the collector and arterial streets as in the past. Hopefully, the City will be able to utilize the County's forces as it has in the past to reconstruct streets in areas not included in the Bond Program, such as Johnson road, Randall Mill, North White Chapel, and Florence. Staff is currently reviewing the streets proposed to be reconstructed in the Bond Program. City Council will need to establish the priority list for the program. III. CODE ENFORCEMENT 6 As Southlake grows, so does the need for a pro-active code enforcement program. With the addition of the new inspector, the Code Enforcement Officer will be able to concentrate code enforcement. Areas to be addressed include: 1. removal of unoccupied dangerous buildings 2. junk vehicles 3.illegal signs 4.zoning violations 5.occupied substandard housing New Programs A.To start an active program of removing dilapidated buildings will require initial funding. Following proper notification process, when a building is condemned and scheduled to be removed, the bidding process is initiated. The low bidder is awarded the bid and the house is removed. All costs associates with the removal of the building is charged against the owner and a lien is put on the property. Starting the program could cost between $10,000 to $15,000. When the owners sell their property, the liens are paid to the City and the fund perpetuates. B.The City has not been active in the enforcement of our minimum standard housing code. The purpose of the housing code is to provide the basic minimum requirements under which residential occupancy should be controlled -- requirements deemed essential for safe and healthful living. The requirements of light and ventilation, electrical systems, living space, sanitary facilities 7 and structural safety are addressed by the code. There are numerous buildings in areas of the community that are probably in non-compliance with the housing code. Prior to implementing a housing code enforcement program, however, our housing code needs to be updated. IV. WATER In the spring, Lewis McClain with staff reviewed the City's water and sewer rates. The results of the study indicated that for the next three years (through 1994-95 budget year) the City will not have to raise water rates if at least a 5% growth factor continues. Included in the rate structure was a capital improvements program of approximately 1.3 million dollars. The 1.3 million dollar capital improvement program consisted of the following projects: 1.Replacing inadequate pipe line sizes along Kimball Road, Shady Lane, Raintree, Greenbough, Rolling Hills, Hillcastle and Hilltop Drive. $465,000 2.Putting in service the high pressure plane $450,000 3.Installing a 12" water line along SH 114, from White Chapel to North Carroll. $385,000 _________ Total Cost of 1, 2 & 3 $1,300,000 The installation of larger pipe lines along the streets listed above will provide adequate fire protection to those areas which currently do not have. 8 The differences in pressure throughout most cities are so great that the cities must be divided into two or more pressure planes. Southlake is currently serviced by one pressure plane. The high pressure plane is proposed to be located between Florence Road and Johnson Road and the Cross Timbers subdivision boundary. The remainder of the city is in the lower pressure plane. The implementation of the high service plane consists of the following: 1.Utilization of Keller pump station and ground storage capacity on Pearson Lane; 2.Installation of a 12" line from the pump station to the .5 million gallon elevated storage tank which is currently empty. (When the White Chapel water tower was installed in 1988 the .5 million gallon tower which was existing on that site was relocated to its present location); and 4.Installation of a 12" water line along Florence and Randall Mill Road connecting to the Cross Timbers subdivision. As growth occurs in other sections of the city, the pressure will diminish in the high pressure plane because it cannot meet the demand in the summer peak periods. The high pressure plane is experiencing low pressure in the summer months and it appears, with the growth potential, that now is the time to plan for the installation of a high pressure plane. Staff members have had conversations with the City of Keller about utilizing their pump station and Keller officials have indicated that an agreement could be reached. By utilizing the City of Keller pump station, this could possibly give the City of Southlake a 10 year window before a high pressure plane pump station will have to be built. 9 If these improvements are approved by the Council, staff would start the design late this year. V.SEWER In the last three years the City has made great strides in the development of its sewer infrastructure. In the mid 1980's, the City Council committed to provide gravity sewer service to the city by contracting with TRA to build two (2) major interceptor lines; the Denton Creek Pressure System and the Bear Creek Interceptor Line. The City was also one of the contracting parties that built the Denton Creek Wastewater Treatment Plant currently in service northwest of Roanoke. The Bear Creek Interceptor was completed and put in service in the spring of 1991 at a cost of $12,750,000 of which Southlake is responsible for 33% of the debt service. The Bear Creek Interceptor serves the southern half of Southlake. In 1990, Arvida built the S-4 line that connects to the Bear Creek Interceptor. Since the Bear Creek interceptor was not built at that time, the City entered into an agreement with Colleyville to utilize an existing trunk line until the Bear Creek Interceptor was built. In 1991, the S-6 and N-3 gravity lines and the N-3 lift station were completed. The lift station is located at Dove Creek and Carroll Road; the N-3 line travels from the lift station southward through Chapel Downs, Missions Hills and Diamond Circle Estates subdivisions; the S-6 line travels southward from the end on the N-3 line through the Mobil property and connecting to the Big Bear Creek Interceptor. The N-3 lift station and gravity line are located in the Denton 10 Creek Pressure System and the S-6 is located in the Big Bear Interceptor System. By contract with TRA, the City is pumping from the Denton Creek Pressure Station to the Big Bear Interceptor until the Denton Creek Pressure Station is installed. The pumping will have to terminate prior to December 1, 1996 unless other arrangements are made. To construct the Denton Creek Pressure line to the Denton Creek Treatment Plant is estimated to cost approximately $6,000,000. There are other alternatives that are being reviewed at this time to provide sewerage facilities in the Denton Creek Pressure System at a lower cost. The Council entered into an agreement with two other parties in March 1992 to construct the S-2 sewer line. The design is almost complete on this line and the City will begin to acquire easements in the next few weeks. 11 c:\wpfiles\memos\retreat.92 12