ZA23-0078
PUBLIC HEARING NOTICE
ZA23-0078
• ZA23-0078, Zoning Change and Site Plan for the Wheelhouse, to include a variance to
the Masonry Ordinance No. 557, as amended, on property described as Tracts 6C,
6C02, 6C03, 6C01A, Jesse G. Allen Survey Abstract No. 18, City of Southlake, Tarrant
County, Texas, and located at 880-950 Davis Blvd., Southlake, Texas.
• Current Zoning: “S-P-1” Detailed Site Plan District
• Requested Zoning: “S-P-1” Detailed Site Plan District
• The purpose of this request is to add the permitted use of “Private Club”. This use is
to be specifically related to a wine storage facility, and alcohol is not proposed to be
sold. No changes are proposed for the adopted Site Plan for the site.
Dear Property Owner,
Your property has been identified as being within 300 feet of the above referenced Site Plan
application.
If you wish to register your opposition or support to this case, you may complete the attached
Notification Response Form and either mail to the Planning & Development Services Department
(address listed at the top of notice), email a copy to the project case planner (e-mail listed at the
bottom of the notice).
You are encouraged to follow the requested action through final approval because changes
are often made during the review process.
Please contact the Planning and Development Services Department if you have any questions:
Please contact the Planning Department at (817)748-8621 if you have any questions. Thank you.
CITY OF SOUTHLAKE
PLANNING &
DEVELOPMENT SERVICES
1400 Main St.; Suite 310
Southlake, TX 76092
Phone: (817)748-8621
www.cityofsouthlake.com
Planning and Zoning Commission
Thursday, January 04, 2024
6:30 PM
Town Hall Council Chambers
1400 Main Street
Southlake, Texas
Notification Response Form
ZA23-0078:
Zoning & Site Plan for Wheelhouse Garages
Meeting Date: January 4, 2024 at 6:30 PM
Fill out:
Owner: _____________________________
Address: ____________________________
City, State, Zip Code: __________________
PLEASE PROVIDE COMPLETED FORMS VIA MAIL, FAX OR HAND DELIVERY
BEFORE THE START OF THE SCHEDULED PUBLIC HEARING.
Being the owner(s) of the property so noted above, are hereby
in favor of opposed to undecided about
(circle or underline one)
the proposed Site Plan referenced above.
Space for comments regarding your position:
___________________________________________________________
___________________________________________________________
___________________________________________________________
___________________________________________________________
___________________________________________________________
Signature: _______________________________________ Date: ______
Additional Signature: _______________________________ Date: ______
Printed Name(s): _____________________________________________
Must be property owner(s). Otherwise contact the Planning Department. One form per property.
Phone Number (optional): ______________________________________
Direct questions and mail responses to:
City of Southlake
Planning & Development Services
Notification Response
1400 Main St; Ste 310
Southlake, TX 76092
Phone: (817) 748-8621
Fax: (817) 748-8077
DAVIS BLVDCONTINENTAL BLVD
GREENBRIAR DR
UNION CHURCH RD
MICHAEL DR
SIENA DR1025
1125
855
955
860
880
2395
913
925
11001009
1008
2440 2390
2445
945
2745
2113
2365
805
918
1004
1013
1000
755
917
1005
921
950
1000 1001
911
914
21132113
855855 855 855855
1125
11251125
1125
1125
2152
1125
616
900
1155
864
7502420
24252435
929
880
880880
860
880
880
880
880
880
3
24
12
21
23
7
8
16
4 5
15
20
22
17
13
14
19
6
9
11
1
10
2
18
10001001
1002
1003
1004
Vicinity Map ZA23-0078
®
0 250 500125 Feet
880-950 Davis Blvd.
Legend
Address Points
City Parcels
Right Of Way
City Limit
Case Parcel(s)
200 Foot Buffer
300 Foot Buffer
Parcels Within Buffer
Detailed Site Plan (SP-1) District-
Land Use and Development Regulations
for
The WheelHouse, on a 6.235 acre parcel, at
880, 900 & 950 Davis Blvd.
Southlake, Texas
Zoning Case #: ZA23-0078
Prepared by Sage Group, Inc.
December 18, 2023
The WheelHouse will be a mixed-use development that will provide an update to the area’s
current appearance and uses. These developments will remove the two houses currently
functioning as offices and remove the outside storage that exists on site. The residential lots which
adjoin the west boundary of the development is separated by a heavily wooded creek which will
be preserved and will serve as a natural buffer.
The buildings fronting on Davis Blvd will be office showroom with retail sales and restaurant. The
buildings located behind will be sold to individuals for auto storage.
This Detailed Site Plan (SP-1) district shall abide by the all conditions of the City of Southlake
Comprehensive Zoning Ordinance No. 480, as amended, as it pertains to the “I-1” Industrial, “C-
2” Local Retail, “C-1” Neighborhood Commercial & “O-1” Office zoning districts; and the City of
Southlake Subdivision Ordinance No. 483, as amended, and as limited below.
Permitted Uses:
Permitted uses shall be as follows:
Building 1A on Lot 1 & Building 2 on Lot 2: Uses shall be restricted to the uses within the C-2, C-
1 & O-1 Zoning District- except for the non-permitted uses listed below; and the additional
permitted uses listed:
Non-Permitted Uses:
• Chamber of Commerce.
• Duplication and mailing services.
• Radio recording and television broadcasting offices and studios.
• Savings and loan.
• Stenographic services.
• Utility offices.
• Cleaners, laundries and/or laundromats.
• Newsstands and/or bookstores.
• Community Facility Uses.
• Farrier.
• Antique shops.
• Blueprinting or photostating.
• Book or stationary stores to include large newsstands.
• Business colleges or private schools for vocational training.
• Cigar or tobacco stores.
• Cleaning, dying and pressing works.
• Custom dress making or millinery shops.
• Day nurseries.
• Dog and cat hospitals or small animal hospitals.
• Drug stores.
• Frozen food lockers for individual or family use.
• Grocery stores or meat markets.
• Leather or leather good shops.
• Radio and television sales and servicing.
• Tires, batteries and automobile accessory sales.
• Variety stores.
Additional Permitted Uses:
• Private Club, including individual wine storage (no sales of alcohol).
• Office showroom or office warehouse
• Automobile and motorcycle sales and service, not to include any outside sales or
service and storage areas.
• Retail sales as an auxiliary operation of office showroom or office warehouse.
• Laboratory, chemical analysis, general analysis, physical testing.
Buildings 1B, 3, 4, & 5, on Lots 1, & 3: Uses shall be limited to the following uses within the I-1
Zoning District:
• Garage & Storage
Additional Permitted Uses:
• Maintenance of personal vehicles.
• Hobby Shop, for personal use only.
Lot 4: The use shall be reserved only for passive open space.
Regulations:
Parking: Required parking ratios shall be based on 1 space per 240 square feet of the
“Office/Retail/Showroom” buildings only (Buildings 1A and 2), and no additional parking required
for the garage and storage buildings. Such required parking for all built uses shall be provided
within the “SP-1” boundary; parking requirements for individual lots shall not apply. A reciprocal
parking, cross-access and maintenance agreement shall be provided.
Impervious Coverage:
The maximum impervious coverage for the overall development SP-1 boundary site shall be 85%,
however the maximum impervious coverage shall not apply to individual lots within the boundary.
Building Materials and Facades:
The building front facades are a combination of stone, stucco or a sprayed
type coating over concrete panels, such as “Sherwin Williams ConFlex XL, Textured High Build
A5-800 Series” or similar Elastomeric Stucco finish material
(Please note the stucco finish will not be applied directly to Styrofoam board as in EFIS).
Vertical wall heights may be modified slightly to accommodate screening of mechanical units,
and/or stepped down to accommodate grade changes, as contract documents are developed.
Vertical and Horizontal Articulation shall be as shown on the Site Plan and Elevations, and will
not be reduced. To accommodate the needs of individual purchasers, the number and size of
garage doors for the spaces may be increased or decreased, however the overall look and
materials will be consistent with the elevations shown.
Setback Lines: A 50’ front building line is provided along Davis Blvd. No other setbacks are
shown, but all buildings will be set back from the property lines as dimensioned on the Site Plan.
Bufferyards: We request the bufferyards be allowed as shown on the Site Plan. Bufferyards
along internal lot lines shall not be required. In lieu of the required F2 8’ masonry wall on the west
property line, the existing fence- owned and maintained by the adjacent Siena neighborhood shall
remain.
Fences: A 6’ Ornamental Iron fence shall be built along the western boundary of Lots 1, & 3.
Requested Variances:
The following variances are requested within the boundaries of this SP-1 district:
• Variance to Driveway Ordinance No. 634, as amended, Section 5.2(d) regarding stacking
depth, to minimum 33’, for the entrance from Davis Blvd.
• Variance to Subdivision Ordinance No. 483, as amended, Section 8.01.A, regarding lots
abutting a street, to allow the lots as shown on the Site Plan.
• Variance to Subdivision Ordinance No. 483, as amended, Section 8.01.D, regarding side lot
lines, to allow the lots as shown on the Site Plan.
• Variance to Subdivision Ordinance No. 483, as amended, and the Master Pathways Plan, to
provide an easement for possible future needs, but not require construction of an 8’ multi-use
trail running north/south through the flood plain in Lot 6, as shown on the Site Plan.
• Variance to the Driveway Ord. No. 634, as amended, Section 5.1, which requires a minimum
500' driveway spacing for commercial driveways along F.M. 1938, to allow the spacings of 154'
and 423' as shown.
• Variance to the Masonry Ord, No. 557-A, as amended, to allow the use of a sprayed
insulated cork barrier type coating, such as “Duro-Pro Cork Barrier” or similar Elastomeric
Stucco finish material, and the metal screening on the building elevations, as noted on the
Elevation exhibits.
Open Space Management Plan:
All sidewalks are intended for pedestrian traffic, shall be kept in good condition, and accessible to
the occupants and customers. Any significant changes to the plan must be approved by the City
Council. All Open Space which is a part of The WheelHouse SP-1 boundary shall be maintained by
the property owners or the Property Owners Association (POA). All property owners shall be
required to be a member of the POA. Dues assessments, required for the maintenance of the open
space areas and other POA activities, shall be mandatory.
The POA shall be responsible for the maintenance and operation of the open space within the
development. The expenses required to maintain the common areas at a quality level shall be
estimated annually by the POA Board, and dues shall be determined and assessed on each property
owner in an equitable fashion at such a rate as necessary to maintain such a level of quality. Authority
to enforce these requirements, and to place a lien on the property if such dues are not paid, shall be
in the form of written Deed Restrictions and Covenants, agreed to by all property owners at purchase,
and shall run with the land.
Provisions shall be made, in the POA bylaws and Deed Restrictions, that in the unlikely event the POA
fails to maintain all or a portion of the open space in reasonable order and condition, the City of
Southlake may, but is not required to, assume responsibility for such maintenance and take corrective
action, including the provision of extended maintenance. The costs of such maintenance may be
charged to the POA or individual property owners that make up the POA, and may include
administrative costs and penalties which shall become a lien on all property in the development.
DAVIS BOULEVARD10'TYPE 'D'BUFFERYARD15'SIDEBUILDINGSETBACK10'TYPE 'F1'BUFFERYARD10'
TYPE '
F
2'
BUFFE
R
Y
A
R
D
15'
TYPE 'T'
BUFFERYARD
50'
FRONT
BUILDING
SETBACK
10'
TYPE 'F2'
BUFFERYARD
15'
REAR
BUILDING
SETBACK
50' FRONT BUILDING SETBACKAUTOMATIC
GATE
AUTOMATIC
GATE
AUTOMATIC
GATE
RETAIN
EXISTING FENCE.
TO BE
MAINTAINED BY
PROPERTY
OWNER.
5' CONCRETE
SIDEWALK
5' CONCRETE
SIDEWALK
RETAIN
EXISTING FENCE.
TO BE
MAINTAINED BY
PROPERTY
OWNER.
RETAIN
EXISTING FENCE.
TO BE MAINTAINED BY
PROPERTY OWNER.
SITE SIGN10'TYPE 'F1'BUFFERYARDBUILDING 1B - 18,950 S.F.
BUILDING 3 - 22,624 S.F.
BUILDING 4 - 16,167 S.F.
BUILDING 5 - 9,863 S.F.
BUILDING 2
15,547 S.F.BUILDING 1A2,569 S.F.Legend
Existing Saved Tree
Interior Landscape Canopy Tree - 4"
Interior Landscape Accent Tree - 6' Height Min.
Interior Landscape Shrub - 3 Gallon Min.
Groundcover - 4" Containers Min. (12" O.C.)
Seasonal Color - 4" Containers Min.
Bufferyard
6' Decorative Metal Fence
11 4" SQUARE (14 GA.) DECORATIVE IRON
TOP & BOTTOM RAILS, SPACED AS SHOWN
2"x2" DECORATIVE IRON POSTS,
8'-0" O.C. MAX. TYP.,
REFER TO PLANS FOR EXACT LOCATIONS
3/4" SQUARE (16 GA.) DECORATIVE IRON PICKETS
AT 4" O.C. (MEASURED FROM CENTER OF PANEL
OUT)
3" x 3" X 1 2" DECORATIVE IRON POST
CAPS, "PYRAMIDAL TOP"
8'-0" O.C.6'1/2" = 1'-0"Elevation
Decorative Metal Fence1
Southlake, Tarrant County, Texas
Landscape Plan
Tracts 6C, 6C01A, 6C02 & 6C03 Jesse G. Allen Survey, Abstract No. 18
0 40'80'160'
1" = 40'
SAGE GROUP, INC.
Master Planning
Urban Design
Architecture
Landscape Architecture
1130 N. Carroll Ave., Ste. 200
Southlake, Texas 76092
TEL. 817-424-2626
Planner:
Case No. ZA23-0078
The WheelHouse
18 DEC 23
NOTE:
The Interior Landscape calculations are based on the I-1 & I-2 Building
10,000 S.F. or greater criteria at 15% of floor area.
*Provided Canopy trees include existing trees to be saved.
NOTE:
* The North Bufferyard calculations do not include the area of the
buildings that fall within the bufferyard.
The East bufferyard calculations do not include the driveway
dimensions that cross the bufferyard.
Landscape Architect:
Sage Group, Inc.
1130 N. Carroll Ave., Suite 200
Southlake, TX 76092
817-424-2626
Attn: Curtis Young, AIA
Engineer:
Redinger Group, LLC
P.O. Box 93206
Southlake, Texas 76092
817-253-5727
Attn: Clayton Redinger, P.E.
Developer:
Gary R. Shimmin
1313 Danbury Parks Drive
Keller, Texas 76248
559-871-0084
Property Owner:
wheelhouse Garages, LLC
Wheelhouse Retail, LLC
1313 Danbury Parks Drive
Keller, Texas 76248
Architect:
Prism Architects
580 Decker Drive, Suite 170
Irving, Texas 75062
972-714-0420
Attn: Rodney St. John, AIA
DAVIS BOULEVARD432.64'125.19'234.67'
836.12'10'TYPE 'D'BUFFERYARD15'SIDEBUILDINGSETBACK10'TYPE 'F1'BUFFERYARD10'
TYPE '
F
2'
BUFFE
R
Y
A
R
D
15'
TYPE 'T'
BUFFERYARD
50'
FRONT
BUILDING
SETBACK
10'
TYPE 'F2'
BUFFERYARD
15'
REAR
BUILDING
SETBACK
50' FRONT BUILDING SETBACKAUTOMATIC
GATE
AUTOMATIC
GATE
AUTOMATIC
GATE
RETAIN
EXISTING FENCE.
TO BE
MAINTAINED BY
PROPERTY
OWNER.
5' CONCRETE
SIDEWALK
5' CONCRETE
SIDEWALK
RETAIN
EXISTING FENCE.
TO BE
MAINTAINED BY
PROPERTY
OWNER.
RETAIN
EXISTING FENCE.
TO BE MAINTAINED BY
PROPERTY OWNER.
SITE SIGN10'TYPE 'F1'BUFFERYARDBUILDING 1B - 18,950 S.F.
BUILDING 3 - 22,624 S.F.
BUILDING 4 - 16,167 S.F.
BUILDING 5 - 9,863 S.F.
BUILDING 2
15,547 S.F.BUILDING 1A2,569 S.F.Trees Net
of R.O.W.
0
0
0
Tree
%
65.82
34.08
100.00
Total
Trees
118
61
179
Trees
Saved Trees
Trees to be Altered
Less
R.O.W
-
-
0
Tree Canopy Coverage
Total site area (gross)271,596 s.f.
Net Site area (less R.O.W.)271,596 s.f.
Total existing canopy 102,176 s.f. --> 37.62%
Preserved tree canopy (green) 45,776 s.f. --> 44.80%
Removed tree canopy (red) 56,400 s.f. --> 55.20%
102,176 s.f. --> 100.00%
Tree Canopy Coverage
Total site area (gross) 31,123 s.f.
Net Site area (less R.O.W.) 31,123 s.f.
Total existing canopy 10,638 s.f. --> 34.18%
10,638 s.f. --> 100.00%
Southlake, Tarrant County, Texas
Existing Tree Conservation Plan
Tracts 6C, 6C01A, 6C02 & 6C03, Jesse G. Allen Survey, Abstract No. 18
0 40'80'160'
1" = 40'
SAGE GROUP, INC.
Master Planning
Urban Design
Architecture
Landscape Architecture
1130 N. Carroll Ave., Ste. 200
Southlake, Texas 76092
TEL. 817-424-2626
Planner:
Case No. ZA23-0078
The WheelHouse
18 DEC 23
Landscape Architect:
Sage Group, Inc.
1130 N. Carroll Ave., Suite 200
Southlake, TX 76092
817-424-2626
Attn: Curtis Young, AIA
Engineer:
Redinger Group, LLC
P.O. Box 93206
Southlake, Texas 76092
817-253-5727
Attn: Clayton Redinger, P.E.
Developer:
Gary R. Shimmin
1313 Danbury Parks Drive
Keller, Texas 76248
559-871-0084
Property Owner:
wheelhouse Garages, LLC
Wheelhouse Retail, LLC
1313 Danbury Parks Drive
Keller, Texas 76248
Architect:
Prism Architects
580 Decker Drive, Suite 170
Irving, Texas 75062
972-714-0420
Attn: Rodney St. John, AIA
LOTS 1-6
LOT 5
NOTE:
Lot 5 will be required to meet the requirements of the Tree
Preservation Ordinance in effect at the time of lot development.
P R E L I M I N A R Y
FOR REVIEW ONLY
Not for Construction or Permit Purposes
P.E. No.
Engineer
Date
CLAYTON T. REDINGER
97497 12/13/2023
PREPARED FOR:WYMDHAM PROPERTIES
640 W. SOUTHLAKE BOULEVARD
SOUTHLAKE, TEXAS 76092
PHONE: (817) 307-3600
CONTACT: TERRY WILKINSON
REDINGER GROUP, LLC
P.O. BOX 93206
SOUTHLAKE, TEXAS 76092
PHONE: (817) 253-5727
ENGINEERING FIRM REGISTRATION NUMBER F-23328( IN FEET )1 INCH = FTNORTH
EXISTING DRAINAGE PLAN
THE WHEELHOUSE
SOUTHLAKE, TEXAS
P R E L I M I N A R Y
FOR REVIEW ONLY
Not for Construction or Permit Purposes
P.E. No.
Engineer
Date
CLAYTON T. REDINGER
97497 12/13/2023
PREPARED FOR:WYMDHAM PROPERTIES
640 W. SOUTHLAKE BOULEVARD
SOUTHLAKE, TEXAS 76092
PHONE: (817) 307-3600
CONTACT: TERRY WILKINSON
REDINGER GROUP, LLC
P.O. BOX 93206
SOUTHLAKE, TEXAS 76092
PHONE: (817) 253-5727
ENGINEERING FIRM REGISTRATION NUMBER F-23328( IN FEET )1 INCH = FTNORTH
PRELIMINARY GRADING & DRAINAGE PLAN
THE WHEELHOUSE
SOUTHLAKE, TEXAS
P R E L I M I N A R Y
FOR REVIEW ONLY
Not for Construction or Permit Purposes
P.E. No.
Engineer
Date
CLAYTON T. REDINGER
97497 12/13/2023
PREPARED FOR:WYMDHAM PROPERTIES
640 W. SOUTHLAKE BOULEVARD
SOUTHLAKE, TEXAS 76092
PHONE: (817) 307-3600
CONTACT: TERRY WILKINSON
REDINGER GROUP, LLC
P.O. BOX 93206
SOUTHLAKE, TEXAS 76092
PHONE: (817) 253-5727
ENGINEERING FIRM REGISTRATION NUMBER F-23328( IN FEET )1 INCH = FTNORTH
PRELIMINARY UTILITY PLAN
THE WHEELHOUSE
SOUTHLAKE, TEXAS
THE WHEELHOUSE( IN FEET )1 INCH = FTNORTH
UPUPUP27' - 6"30' - 0"19' - 0"25' - 0"151214211716ELECTRICAL METERS REF: ELECTRICAL SHEETS30' - 0"25' - 0"10' - 1"27' - 6"1221162710' - 0"25' - 0"19' - 0"30' - 0"10' - 0"8' - 0"14' - 1"8' - 0"9' - 1"10' - 0"14' - 10"11' - 0"2830EQEQEQ3129161632272727211213121312121925166' - 7"17171717Level 10' -0"T.O. UNIT WALL27' -6"14' - 0"5' - 0"22' - 0"4' - 0"16' - 0"8' - 6"9' - 0"9' - 0"252417172121122719' - 0"3' - 4"3' - 8"3328292927161717171212192719303021P&Z-11P&Z-12P&Z-13P&Z-14P&Z-15UNITA-102UNITA-103UNITA-104UNITA-105UNITA-106UNITA-107UNITA-108UNITA-109UNITA-110UNITA-111UNITA-112UNITA-113UNITA-114UNITA-115UNITA-116CLUB HOUSEA-117RISER ROOM101UNITA-101OFFICE100N34' - 10 5/8"457' - 10 5/8"45' - 0"P&Z-1.11P&Z-1.12P&Z-1.13P&Z-1.14P&Z-1.1532' - 0"3' - 0"14' - 4"21' - 0"15' - 5 3/4"5' - 0"3' - 0"3' - 0"REVISIONS:THIS DOCUMENT IS FOR INTERIMREVIEW ONLY AND NOTINTENDED TO BE USED FORCONSTRUCTION, BIDDING, ORPERMIT PURPOSES.RODNEY C. St. JOHNREGISTERED ARCHITECTTEXAS NO. 14791OWNER:WHEELHOUSE GARAGES, LLCWHEELHOUSE RETAIL, LLC1313 DANBURY PARKS DRIVEKELLER, TEXAS 76348DEVELOPERS:GARY R. SHIMMIN1313 DANBURY PARKS DRIVRKELLER, TEXAS 76348(559) 871-0684WYNDHAM PROPERTIES1807 KELLER PARKWAYKELLER, TEXAS 76248(817) 307-3600CONTACT: TERRY WILKINSONWHEELHOUSE GARAGESSt. JohnARCHITECTS, PLLC2217 JOHN GLENN PARKWAYMESQUITE, TEXAS 75150214-502-40942154321DCBADC54BA366FILENAME:ISSUED:PROJECT NUMBER:CHECKED BY:DRAWN BY:TRACTS 6C01A AND 6C02, JESSE G. ALLEN SURVEY, ABSTRACT NO. 18C:\Users\DELL\OneDrive\Projects\Gary Shimmin\Wheelhouse\REVIT\WHG-P&Z.rvt12/15/23WHEELHOUSE GARAGESDAVIS BOULEVARDSOUTHLAKE, TEXAS0.002.03228/26/22AuthorCheckerLOT 1, BLDGS 1A & 1BP&Z-11/16" = 1'-0"1SOUTH ELEVATION BLDG 11/16" = 1'-0"2NORTH ELEVATION BLDG 11/8" = 1'-0"3EAST ELEVATION BLDG 11/8" = 1'-0"4WEST ELEVATION BLDG 11/8" = 1'-0"5WEST ELEVATION BLDG 1 @ OFFICESHEET KEYED NOTES# KEYNOTE12 ALUMINUM STOREFRONT AND WINDOWS KAWNEER 451UT OR EQUAL. REF: GLASS SCHEDULE13 ALUMINUM STOREFRONT ENTRANCE14 INSULATED METAL DOOR AND FRAME. REFER TO DOOR TYPES.15 OVERHEAD INSULATED METAL ROLL-UP DOOR. REFER DOOR TYPES.16 8" HI-TECH WALL PANEL SYSTEM BY OTHER.17 HI-TECH SYSTEM PANEL REVEAL (OR PANEL JOINT). IF PANEL JOINT PROVIDE BACKER ROD AND SEALANT. VERIFYLOCATION W/ FINAL LAYOUT BY PANEL ENGINEER.19 DOWNSPOUT LEADER. PROVIDE SPLASH BLOCK AND DRAIN AWAY FROM FACE OF BUILDING.21 WALL SCONCE. REFER ELECTRICAL24 HI LIFT ROLL-UP DOOR W/ GLASS PANELS.25 ALUMINUM AWNING SYSTEM BY GC27 CONT. PRE-FINISHED 26 GA. CAP FLASHING28 ALUMINUM FACIA / SOFFIT PANEL SYSTEM OVER OVER WRB ON 1/2" EXTERIOR SHEATHING. COLOR AS PER OWNER29 METAL SUPPORTS BY GC30 STUCCO SYSTEM: 3-STEP PROCESS OVER DIAMOND METAL MESH TO A 7/8" THICKNESS OR BY OTHER PROCESSPRODUCING COMPARABLE STUCCO FINIS W/ EQUAL OR GREATER STRENGTH AND DURABILITY SPECIFICATION.INSTALLED AS PER MANUFACTURES RECOMMENDATION. COLOR AS PER OWNER.31 STUCCO 'V' REVEAL32 STONE VENEER SYSTEM33 GUTTER SYSTEM WITH DOWNSPOUT TO ROOF BELOW. PROVIDE SPLASH BLOCK @ ROOF.1" = 30'-0"7KEY PLAN BUILDING 1 Copy 11.ALL ROOF TOP MECHANICAL UNITS SHALL BE SCREENED FROM PUBLIC VIEWFROM DAVIS BLVD.2.ALL EXPOSED UTILITY BOXES AND CONDUITS SHALL BE PAINTED TO MATCH THEBUILDING.3.SIGNAGE AREAS AND LOCATIONS ARE SUBJECT TO APPROVAL BY THEBUILDING INSPECTIONDEPARTMENT.4.EXTERIOR FINISH MATERIAL, MANUFACTURES AND COLORS ARE YET TO BEDETERMINED .5.DOOR LOCATIONS MAY VARY DEPENDING ON TENANT CONFIGURATIONS ANDEXITING REQUIREMENTS.GENERAL NOTESSTUCCO NOTE:STUCCO SHALL BE APPLIED USING 3-STEP PROCESS OVER DIAMOND METAL MESH TO A 7/8 INCH THICKNESS OR BY OTHER PROCESS PRODUCING COMPARABLE STUCCO FINISH WITH EQUAL OR GREATER STRENGTH AND DURABILITY SPECIFICATION.MATERIALS COLORS123STONE: EARTH TONEHTT PANEL SYSTEM W/ ELASTOMERIC COATING: LIGHT EARTH TONESTUCCO SYSTEM: DARK EARTH TONE ALUM. (MATCH STUCCO COLOR #3)COPING (MATCH STUCCO COLOR #3)ALUM. (MATCH STUCCO COLOR #3)1314151/8" = 1'-0"6ARTICULATION PLAN - FRONT11111122222223313131414141414133151520'4'8'16'32'ZONING CASE#: ZA23-0078
UPUPUP27' - 6"30' - 0"19' - 0"25' - 0"151214211716ELECTRICAL METERS REF: ELECTRICAL SHEETS30' - 0"25' - 0"10' - 1"27' - 6"1221162710' - 0"25' - 0"19' - 0"30' - 0"10' - 0"8' - 0"14' - 1"8' - 0"9' - 1"10' - 0"14' - 10"11' - 0"2830EQEQEQ3129161632272727211213121312121925166' - 7"17171717Level 10' -0"T.O. UNIT WALL27' -6"14' - 0"5' - 0"22' - 0"4' - 0"16' - 0"8' - 6"9' - 0"9' - 0"252417172121122719' - 0"3' - 4"3' - 8"3328292927161717171212192719303021P&Z-11P&Z-12P&Z-13P&Z-14P&Z-15P&Z-1.11P&Z-1.12P&Z-1.13P&Z-1.14P&Z-1.15UNITA-102UNITA-103UNITA-104UNITA-105UNITA-106UNITA-107UNITA-108UNITA-109UNITA-110UNITA-111UNITA-112UNITA-113UNITA-114UNITA-115UNITA-116CLUB HOUSEA-117RISER ROOM101UNITA-101OFFICE100N34' - 10 5/8"457' - 10 5/8"45' - 0"32' - 0"3' - 0"14' - 4"21' - 0"15' - 5 3/4"5' - 0"3' - 0"3' - 0"REVISIONS:THIS DOCUMENT IS FOR INTERIMREVIEW ONLY AND NOTINTENDED TO BE USED FORCONSTRUCTION, BIDDING, ORPERMIT PURPOSES.RODNEY C. St. JOHNREGISTERED ARCHITECTTEXAS NO. 14791OWNER:WHEELHOUSE GARAGES, LLCWHEELHOUSE RETAIL, LLC1313 DANBURY PARKS DRIVEKELLER, TEXAS 76348DEVELOPERS:GARY R. SHIMMIN1313 DANBURY PARKS DRIVRKELLER, TEXAS 76348(559) 871-0684WYNDHAM PROPERTIES1807 KELLER PARKWAYKELLER, TEXAS 76248(817) 307-3600CONTACT: TERRY WILKINSONWHEELHOUSE GARAGESSt. JohnARCHITECTS, PLLC2217 JOHN GLENN PARKWAYMESQUITE, TEXAS 75150214-502-40942154321DCBADC54BA366FILENAME:ISSUED:PROJECT NUMBER:CHECKED BY:DRAWN BY:TRACTS 6C01A AND 6C02, JESSE G. ALLEN SURVEY, ABSTRACT NO. 18C:\Users\DELL\OneDrive\Projects\Gary Shimmin\Wheelhouse\REVIT\WHG-P&Z.rvt12/15/23WHEELHOUSE GARAGESDAVIS BOULEVARDSOUTHLAKE, TEXAS0.002.03228/26/22AuthorCheckerLOT 1, BLDGS 1A & 1BP&Z-1.11/16" = 1'-0"1SOUTH ELEVATION BLDG 11/16" = 1'-0"2NORTH ELEVATION BLDG 11/8" = 1'-0"3EAST ELEVATION BLDG 11/8" = 1'-0"4WEST ELEVATION BLDG 11/8" = 1'-0"5WEST ELEVATION BLDG 1 @ OFFICESHEET KEYED NOTES# KEYNOTE12 ALUMINUM STOREFRONT AND WINDOWS KAWNEER 451UT OR EQUAL. REF: GLASS SCHEDULE13 ALUMINUM STOREFRONT ENTRANCE14 INSULATED METAL DOOR AND FRAME. REFER TO DOOR TYPES.15 OVERHEAD INSULATED METAL ROLL-UP DOOR. REFER DOOR TYPES.16 8" HI-TECH WALL PANEL SYSTEM BY OTHER.17 HI-TECH SYSTEM PANEL REVEAL (OR PANEL JOINT). IF PANEL JOINT PROVIDE BACKER ROD AND SEALANT. VERIFYLOCATION W/ FINAL LAYOUT BY PANEL ENGINEER.19 DOWNSPOUT LEADER. PROVIDE SPLASH BLOCK AND DRAIN AWAY FROM FACE OF BUILDING.21 WALL SCONCE. REFER ELECTRICAL24 HI LIFT ROLL-UP DOOR W/ GLASS PANELS.25 ALUMINUM AWNING SYSTEM BY GC27 CONT. PRE-FINISHED 26 GA. CAP FLASHING28 ALUMINUM FACIA / SOFFIT PANEL SYSTEM OVER OVER WRB ON 1/2" EXTERIOR SHEATHING. COLOR AS PER OWNER29 METAL SUPPORTS BY GC30 STUCCO SYSTEM: 3-STEP PROCESS OVER DIAMOND METAL MESH TO A 7/8" THICKNESS OR BY OTHER PROCESSPRODUCING COMPARABLE STUCCO FINIS W/ EQUAL OR GREATER STRENGTH AND DURABILITY SPECIFICATION.INSTALLED AS PER MANUFACTURES RECOMMENDATION. COLOR AS PER OWNER.31 STUCCO 'V' REVEAL32 STONE VENEER SYSTEM33 GUTTER SYSTEM WITH DOWNSPOUT TO ROOF BELOW. PROVIDE SPLASH BLOCK @ ROOF.1" = 30'-0"7KEY PLAN BUILDING 1 Copy 1 Copy 21.ALL ROOF TOP MECHANICAL UNITS SHALL BE SCREENED FROM PUBLIC VIEWFROM DAVIS BLVD.2.ALL EXPOSED UTILITY BOXES AND CONDUITS SHALL BE PAINTED TO MATCH THEBUILDING.3.SIGNAGE AREAS AND LOCATIONS ARE SUBJECT TO APPROVAL BY THEBUILDING INSPECTIONDEPARTMENT.4.EXTERIOR FINISH MATERIAL, MANUFACTURES AND COLORS ARE YET TO BEDETERMINED .5.DOOR LOCATIONS MAY VARY DEPENDING ON TENANT CONFIGURATIONS ANDEXITING REQUIREMENTS.GENERAL NOTESSTUCCO NOTE:STUCCO SHALL BE APPLIED USING 3-STEP PROCESS OVER DIAMOND METAL MESH TO A 7/8 INCH THICKNESS OR BY OTHER PROCESS PRODUCING COMPARABLE STUCCO FINISH WITH EQUAL OR GREATER STRENGTH AND DURABILITY SPECIFICATION.MATERIALS COLORS1/8" = 1'-0"6ARTICULATION PLAN - FRONT11111122222223313131414141414133151520'4'8'16'32'ZONING CASE#: ZA23-0078123STONE: EARTH TONEHTT PANEL SYSTEM W/ ELASTOMERIC COATING: LIGHT EARTH TONESTUCCO SYSTEM: DARK EARTH TONE ALUM. (MATCH STUCCO COLOR #3)COPING (MATCH STUCCO COLOR #3)ALUM. (MATCH STUCCO COLOR #3)131415
31' - 0"26' - 0"10' - 0"10' - 0"31' - 0"22' - 0"20' - 0"26' - 0"10' - 0"10' - 0"40' - 0"LED WALL WASHER LIGHT BEHIND PARAPETLED WALL WASHER LIGHT BEHIND PARAPETLED WALL WASHER LIGHT BEHIND PARAPET11' - 0"100' - 0 3/8"40' - 0"EQEQEQEQEQEQ282916172730313130212119273212121316211727272528291617273031312112133031173021191916272725211717322521212829291716303132161631' - 0"31' - 0"10' - 0"12' - 0"EQEQ11711201918142134272718' - 0"321421212121212121141414141414141414191919191926262626262618181818555555555531' - 0"10' - 0"20' - 0"3' - 4"2' - 0"3' - 4"2' - 0"3' - 4"2' - 0"3' - 4"1' - 4"EQEQ12' - 0"4' - 0"25' - 0"202716171712121212282930311221271926' - 0"3412' - 0"4' - 0"1' - 4"3' - 4"2' - 0"3' - 4"2' - 0"3' - 4"2' - 0"3' - 4"4' - 0"10' - 0"10' - 0"20' - 0"26' - 0"25' - 0"2829162727171632301621121219343131P&Z-21P&Z-25P&Z-23P&Z-24270' - 0"RETAIL/RESTUARANT2.100RISER ROOM2.101NROOF ACCESS2.10260' - 0"P&Z-2.11P&Z-2.15P&Z-2.13P&Z-2.14270' - 0"N280' - 0"2' - 0"18' - 2 1/2"11' - 9 1/2"3' - 0"6' - 0"21' - 0"6' - 0"21' - 0"6' - 0"3' - 0"26' - 0"3' - 0"26' - 0"3' - 0"26' - 0"3' - 0"6' - 0"21' - 0"6' - 0"21' - 0"6' - 0"3' - 0"11' - 9 1/2"18' - 2 1/2"2' - 0"3' - 0"5' - 0"3' - 0"3' - 0"3' - 0"5' - 0"3' - 0"3' - 0"3' - 0"5' - 0"3' - 0"3' - 0"3' - 0"5' - 0"3' - 0"REVISIONS:THIS DOCUMENT IS FOR INTERIMREVIEW ONLY AND NOTINTENDED TO BE USED FORCONSTRUCTION, BIDDING, ORPERMIT PURPOSES.RODNEY C. St. JOHNREGISTERED ARCHITECTTEXAS NO. 14791OWNER:WHEELHOUSE GARAGES, LLCWHEELHOUSE RETAIL, LLC1313 DANBURY PARKS DRIVEKELLER, TEXAS 76348DEVELOPERS:GARY R. SHIMMIN1313 DANBURY PARKS DRIVRKELLER, TEXAS 76348(559) 871-0684WYNDHAM PROPERTIES1807 KELLER PARKWAYKELLER, TEXAS 76248(817) 307-3600CONTACT: TERRY WILKINSONWHEELHOUSE GARAGESSt. JohnARCHITECTS, PLLC2217 JOHN GLENN PARKWAYMESQUITE, TEXAS 75150214-502-40942154321DCBADC54BA366FILENAME:ISSUED:PROJECT NUMBER:CHECKED BY:DRAWN BY:TRACTS 6C01A AND 6C02, JESSE G. ALLEN SURVEY, ABSTRACT NO. 18C:\Users\DELL\OneDrive\Projects\Gary Shimmin\Wheelhouse\REVIT\WHG-P&Z.rvt12/15/23WHEELHOUSE GARAGESDAVIS BOULEVARDSOUTHLAKE, TEXAS0.002.03228/26/22AuthorCheckerLOT 2, BLDG 2P&Z-23/32" = 1'-0"1EAST ELEVATION BLDG 23/32" = 1'-0"3WEST ELEVATION BLDG 21/8" = 1'-0"4SOUTH ELEVATION BLDG 21/8" = 1'-0"5NORTH ELEVATION BLDG 2SHEET KEYED NOTES#KEYNOTE7 ELECTRICAL SERVICE. REFER TO ELECTRICAL11 FIRE DEPARTMENT KEY LOCK BOX. VERIFY WITH FIRE MARSHALL.12 ALUMINUM STOREFRONT AND WINDOWS KAWNEER 451UT OR EQUAL.REF: GLASS SCHEDULE13 ALUMINUM STOREFRONT ENTRANCE14 INSULATED METAL DOOR AND FRAME. REFER TO DOOR TYPES.16 8" HI-TECH WALL PANEL SYSTEM BY OTHER.17 HI-TECH SYSTEM PANEL REVEAL (OR PANEL JOINT). IF PANEL JOINTPROVIDE BACKER ROD AND SEALANT. VERIFY LOCATION W/ FINALLAYOUT BY PANEL ENGINEER.18 STONE VENNER: THIN SET OVER HI-TECH PANEL SYSTEM. INSTALLEDAS PER MANUFACTURES SPECIFICATIONS.19 DOWNSPOUT LEADER. PROVIDE SPLASH BLOCK AND DRAIN AWAYFROM FACE OF BUILDING.20 GAS METER. REFER MEP21 WALL SCONCE. REFER ELECTRICAL25 ALUMINUM AWNING SYSTEM BY GC26 EMERGENCY LIGHT @ EACH EXIT DOOR. REF: ELECTRICAL SHEETS27 CONT. PRE-FINISHED 26 GA. CAP FLASHING28 ALUMINUM FACIA / SOFFIT PANEL SYSTEM OVER OVER WRB ON 1/2"EXTERIOR SHEATHING. COLOR AS PER OWNER29 METAL SUPPORTS BY GC30 STUCCO SYSTEM: 3-STEP PROCESS OVER DIAMOND METAL MESH TO A7/8" THICKNESS OR BY OTHER PROCESS PRODUCING COMPARABLESTUCCO FINIS W/ EQUAL OR GREATER STRENGTH AND DURABILITYSPECIFICATION. INSTALLED AS PER MANUFACTURESRECOMMENDATION. COLOR AS PER OWNER.31 STUCCO 'V' REVEAL32 STONE VENEER SYSTEM34 LINE OF ROOF BEYOND55 STONE CAP TRIM1" = 30'-0"6KEY PLAN BUILDING 23/32" = 1'-0"2ARTICULATION PLAN - FRONT1.ALL ROOF TOP MECHANICAL UNITS SHALL BE SCREENED FROM PUBLIC VIEWFROM DAVIS BLVD.2.ALL EXPOSED UTILITY BOXES AND CONDUITS SHALL BE PAINTED TO MATCH THEBUILDING.3.SIGNAGE AREAS AND LOCATIONS ARE SUBJECT TO APPROVAL BY THEBUILDING INSPECTIONDEPARTMENT.4.EXTERIOR FINISH MATERIAL, MANUFACTURES AND COLORS ARE YET TO BEDETERMINED .5.DOOR LOCATIONS MAY VARY DEPENDING ON TENANT CONFIGURATIONS ANDEXITING REQUIREMENTS.GENERAL NOTESSTUCCO NOTE:STUCCO SHALL BE APPLIED USING 3-STEP PROCESS OVER DIAMOND METAL MESH TO A 7/8 INCH THICKNESS OR BY OTHER PROCESS PRODUCING COMPARABLE STUCCO FINISH WITH EQUAL OR GREATER STRENGTH AND DURABILITY SPECIFICATION.MATERIALS COLORS0'4'8'16'32'ZONING CASE#: ZA23-00781111111122222222223313131313131414141414141414123STONE: EARTH TONEHTT PANEL SYSTEM W/ ELASTOMERIC COATING: LIGHT EARTH TONESTUCCO SYSTEM: DARK EARTH TONE ALUM. (MATCH STUCCO COLOR #3)COPING (MATCH STUCCO COLOR #3)ALUM. (MATCH STUCCO COLOR #3)1314153
31' - 0"26' - 0"10' - 0"10' - 0"31' - 0"22' - 0"20' - 0"26' - 0"10' - 0"10' - 0"40' - 0"LED WALL WASHER LIGHT BEHIND PARAPETLED WALL WASHER LIGHT BEHIND PARAPETLED WALL WASHER LIGHT BEHIND PARAPET11' - 0"100' - 0 3/8"40' - 0"EQEQEQEQEQEQ282916172730313130212119273212121316211727272528291617273031312112133031173021191916272725211717322521212829291716303132161631' - 0"31' - 0"10' - 0"12' - 0"EQEQ11711201918142134272718' - 0"321421212121212121141414141414141414191919191926262626262618181818555555555531' - 0"10' - 0"20' - 0"3' - 4"2' - 0"3' - 4"2' - 0"3' - 4"2' - 0"3' - 4"1' - 4"EQEQ12' - 0"4' - 0"25' - 0"202716171712121212282930311221271926' - 0"3412' - 0"4' - 0"1' - 4"3' - 4"2' - 0"3' - 4"2' - 0"3' - 4"2' - 0"3' - 4"4' - 0"10' - 0"10' - 0"20' - 0"26' - 0"25' - 0"2829162727171632301621121219343131P&Z-21P&Z-25P&Z-23P&Z-24P&Z-2.11P&Z-2.15P&Z-2.13P&Z-2.14270' - 0"RETAIL/RESTUARANT2.100RISER ROOM2.101NROOF ACCESS2.10260' - 0"270' - 0"N280' - 0"2' - 0"18' - 2 1/2"11' - 9 1/2"3' - 0"6' - 0"21' - 0"6' - 0"21' - 0"6' - 0"3' - 0"26' - 0"3' - 0"26' - 0"3' - 0"26' - 0"3' - 0"6' - 0"21' - 0"6' - 0"21' - 0"6' - 0"3' - 0"11' - 9 1/2"18' - 2 1/2"2' - 0"3' - 0"5' - 0"3' - 0"3' - 0"3' - 0"5' - 0"3' - 0"3' - 0"3' - 0"5' - 0"3' - 0"3' - 0"3' - 0"5' - 0"3' - 0"REVISIONS:THIS DOCUMENT IS FOR INTERIMREVIEW ONLY AND NOTINTENDED TO BE USED FORCONSTRUCTION, BIDDING, ORPERMIT PURPOSES.RODNEY C. St. JOHNREGISTERED ARCHITECTTEXAS NO. 14791OWNER:WHEELHOUSE GARAGES, LLCWHEELHOUSE RETAIL, LLC1313 DANBURY PARKS DRIVEKELLER, TEXAS 76348DEVELOPERS:GARY R. SHIMMIN1313 DANBURY PARKS DRIVRKELLER, TEXAS 76348(559) 871-0684WYNDHAM PROPERTIES1807 KELLER PARKWAYKELLER, TEXAS 76248(817) 307-3600CONTACT: TERRY WILKINSONWHEELHOUSE GARAGESSt. JohnARCHITECTS, PLLC2217 JOHN GLENN PARKWAYMESQUITE, TEXAS 75150214-502-40942154321DCBADC54BA366FILENAME:ISSUED:PROJECT NUMBER:CHECKED BY:DRAWN BY:TRACTS 6C01A AND 6C02, JESSE G. ALLEN SURVEY, ABSTRACT NO. 18C:\Users\DELL\OneDrive\Projects\Gary Shimmin\Wheelhouse\REVIT\WHG-P&Z.rvt12/15/23WHEELHOUSE GARAGESDAVIS BOULEVARDSOUTHLAKE, TEXAS0.002.03228/26/22AuthorCheckerLOT 2, BLDG 2P&Z-2.13/32" = 1'-0"1EAST ELEVATION BLDG 23/32" = 1'-0"3WEST ELEVATION BLDG 21/8" = 1'-0"4SOUTH ELEVATION BLDG 21/8" = 1'-0"5NORTH ELEVATION BLDG 2SHEET KEYED NOTES#KEYNOTE7 ELECTRICAL SERVICE. REFER TO ELECTRICAL11 FIRE DEPARTMENT KEY LOCK BOX. VERIFY WITH FIRE MARSHALL.12 ALUMINUM STOREFRONT AND WINDOWS KAWNEER 451UT OR EQUAL.REF: GLASS SCHEDULE13 ALUMINUM STOREFRONT ENTRANCE14 INSULATED METAL DOOR AND FRAME. REFER TO DOOR TYPES.16 8" HI-TECH WALL PANEL SYSTEM BY OTHER.17 HI-TECH SYSTEM PANEL REVEAL (OR PANEL JOINT). IF PANEL JOINTPROVIDE BACKER ROD AND SEALANT. VERIFY LOCATION W/ FINALLAYOUT BY PANEL ENGINEER.18 STONE VENNER: THIN SET OVER HI-TECH PANEL SYSTEM. INSTALLEDAS PER MANUFACTURES SPECIFICATIONS.19 DOWNSPOUT LEADER. PROVIDE SPLASH BLOCK AND DRAIN AWAYFROM FACE OF BUILDING.20 GAS METER. REFER MEP21 WALL SCONCE. REFER ELECTRICAL25 ALUMINUM AWNING SYSTEM BY GC26 EMERGENCY LIGHT @ EACH EXIT DOOR. REF: ELECTRICAL SHEETS27 CONT. PRE-FINISHED 26 GA. CAP FLASHING28 ALUMINUM FACIA / SOFFIT PANEL SYSTEM OVER OVER WRB ON 1/2"EXTERIOR SHEATHING. COLOR AS PER OWNER29 METAL SUPPORTS BY GC30 STUCCO SYSTEM: 3-STEP PROCESS OVER DIAMOND METAL MESH TO A7/8" THICKNESS OR BY OTHER PROCESS PRODUCING COMPARABLESTUCCO FINIS W/ EQUAL OR GREATER STRENGTH AND DURABILITYSPECIFICATION. INSTALLED AS PER MANUFACTURESRECOMMENDATION. COLOR AS PER OWNER.31 STUCCO 'V' REVEAL32 STONE VENEER SYSTEM34 LINE OF ROOF BEYOND55 STONE CAP TRIM1" = 30'-0"6KEY PLAN BUILDING 23/32" = 1'-0"2ARTICULATION PLAN - FRONT1.ALL ROOF TOP MECHANICAL UNITS SHALL BE SCREENED FROM PUBLIC VIEWFROM DAVIS BLVD.2.ALL EXPOSED UTILITY BOXES AND CONDUITS SHALL BE PAINTED TO MATCH THEBUILDING.3.SIGNAGE AREAS AND LOCATIONS ARE SUBJECT TO APPROVAL BY THEBUILDING INSPECTIONDEPARTMENT.4.EXTERIOR FINISH MATERIAL, MANUFACTURES AND COLORS ARE YET TO BEDETERMINED .5.DOOR LOCATIONS MAY VARY DEPENDING ON TENANT CONFIGURATIONS ANDEXITING REQUIREMENTS.GENERAL NOTESSTUCCO NOTE:STUCCO SHALL BE APPLIED USING 3-STEP PROCESS OVER DIAMOND METAL MESH TO A 7/8 INCH THICKNESS OR BY OTHER PROCESS PRODUCING COMPARABLE STUCCO FINISH WITH EQUAL OR GREATER STRENGTH AND DURABILITY SPECIFICATION.MATERIALS COLORS0'4'8'16'32'ZONING CASE#: ZA23-00781111111122222222223313131313131414141414141414123STONE: EARTH TONEHTT PANEL SYSTEM W/ ELASTOMERIC COATING: LIGHT EARTH TONESTUCCO SYSTEM: DARK EARTH TONE ALUM. (MATCH STUCCO COLOR #3)COPING (MATCH STUCCO COLOR #3)ALUM. (MATCH STUCCO COLOR #3)131415333
UPUP28293033' - 6"27' - 6"22' - 0"16' - 0"1621212121211212121212171719191919193488888814141414141515151515151515181818161618182626262611' - 8 5/8"5556555627272730273' - 0"22' - 0"22' - 0"2718' - 0"1' - 4"4' - 0"29' - 4"4' - 0"1' - 4"13' - 0"5' - 0"10' - 0"29' - 2"302727323214272128293031311216161717348273.2133' - 6"22' - 0"10' - 0"18' - 0"EQEQ22' - 0"27' - 6"115' - 0"1' - 4"4' - 0"4' - 0"1' - 4"SF-2SF-23.421414P&Z-31P&Z-32P&Z-33P&Z-34UNITC-110UNITC-109UNITC-108UNITC-107UNITC-106UNITC-105UNITC-104UNITC-103UNITC-102UNITC-101UNITB-101UNITB-102UNITB-103UNITB-104UNITB-105UNITB-106UNITB-107UNITB-108UNITB-109UNITB-110RISER ROOM300NUTILITY301ELEC302UTILITY303250' - 0"90' - 0"P&Z-3.11P&Z-3.12P&Z-3.13P&Z-3.14REVISIONS:THIS DOCUMENT IS FOR INTERIMREVIEW ONLY AND NOTINTENDED TO BE USED FORCONSTRUCTION, BIDDING, ORPERMIT PURPOSES.RODNEY C. St. JOHNREGISTERED ARCHITECTTEXAS NO. 14791OWNER:WHEELHOUSE GARAGES, LLCWHEELHOUSE RETAIL, LLC1313 DANBURY PARKS DRIVEKELLER, TEXAS 76348DEVELOPERS:GARY R. SHIMMIN1313 DANBURY PARKS DRIVRKELLER, TEXAS 76348(559) 871-0684WYNDHAM PROPERTIES1807 KELLER PARKWAYKELLER, TEXAS 76248(817) 307-3600CONTACT: TERRY WILKINSONWHEELHOUSE GARAGESSt. JohnARCHITECTS, PLLC2217 JOHN GLENN PARKWAYMESQUITE, TEXAS 75150214-502-40942154321DCBADC54BA366FILENAME:ISSUED:PROJECT NUMBER:CHECKED BY:DRAWN BY:TRACTS 6C01A AND 6C02, JESSE G. ALLEN SURVEY, ABSTRACT NO. 18C:\Users\DELL\OneDrive\Projects\Gary Shimmin\Wheelhouse\REVIT\WHG-P&Z.rvt12/15/23WHEELHOUSE GARAGESDAVIS BOULEVARDSOUTHLAKE, TEXAS0.002.03228/26/22AuthorCheckerLOT 1, BLDG 3P&Z-33/32" = 1'-0"1SOUTH ELEVATION3/32" = 1'-0"2NORTH ELEVATION1/8" = 1'-0"4WEST ELEVATION1/8" = 1'-0"3EAST ELEVATIONSEE ELEVATION ABOVE FOR ADDITIONAL INFORMATIONSHEET KEYED NOTES# KEYNOTE8 6" DIA. CONCRETE FILLED PIPE BOLLARD BY G.C. (TYP)11 FIRE DEPARTMENT KEY LOCK BOX. VERIFY WITH FIREMARSHALL.12 ALUMINUM STOREFRONT AND WINDOWS KAWNEER 451UTOR EQUAL. REF: GLASS SCHEDULE14 INSULATED METAL DOOR AND FRAME. REFER TO DOORTYPES.15 OVERHEAD INSULATED METAL ROLL-UP DOOR. REFERDOOR TYPES.16 8" HI-TECH WALL PANEL SYSTEM BY OTHER.17 HI-TECH SYSTEM PANEL REVEAL (OR PANEL JOINT). IFPANEL JOINT PROVIDE BACKER ROD AND SEALANT.VERIFY LOCATION W/ FINAL LAYOUT BY PANEL ENGINEER.18 STONE VENNER: THIN SET OVER HI-TECH PANEL SYSTEM.INSTALLED AS PER MANUFACTURES SPECIFICATIONS.19 DOWNSPOUT LEADER. PROVIDE SPLASH BLOCK ANDDRAIN AWAY FROM FACE OF BUILDING.21 WALL SCONCE. REFER ELECTRICAL1" = 30'-0"5KEY PLAN BUILDING 31.ALL ROOF TOP MECHANICAL UNITS SHALL BE SCREENED FROM PUBLIC VIEWFROM DAVIS BLVD.2.ALL EXPOSED UTILITY BOXES AND CONDUITS SHALL BE PAINTED TO MATCH THEBUILDING.3.SIGNAGE AREAS AND LOCATIONS ARE SUBJECT TO APPROVAL BY THEBUILDING INSPECTIONDEPARTMENT.4.EXTERIOR FINISH MATERIAL, MANUFACTURES AND COLORS ARE YET TO BEDETERMINED .5.DOOR LOCATIONS MAY VARY DEPENDING ON TENANT CONFIGURATIONS ANDEXITING REQUIREMENTS.GENERAL NOTESSTUCCO NOTE:STUCCO SHALL BE APPLIED USING 3-STEP PROCESS OVER DIAMOND METAL MESH TO A 7/8 INCH THICKNESS OR BY OTHER PROCESS PRODUCING COMPARABLE STUCCO FINISH WITH EQUAL OR GREATER STRENGTH AND DURABILITY SPECIFICATION.MATERIALS COLORS0'4'8'16'32'ZONING CASE#: ZA23-007811111122222223333141414141413131313151515SHEET KEYED NOTES# KEYNOTE26 EMERGENCY LIGHT @ EACH EXIT DOOR. REF: ELECTRICALSHEETS27 CONT. PRE-FINISHED 26 GA. CAP FLASHING28 ALUMINUM FACIA / SOFFIT PANEL SYSTEM OVER OVERWRB ON 1/2" EXTERIOR SHEATHING. COLOR AS PEROWNER29 METAL SUPPORTS BY GC30 STUCCO SYSTEM: 3-STEP PROCESS OVER DIAMOND METALMESH TO A 7/8" THICKNESS OR BY OTHER PROCESSPRODUCING COMPARABLE STUCCO FINIS W/ EQUAL ORGREATER STRENGTH AND DURABILITY SPECIFICATION.INSTALLED AS PER MANUFACTURES RECOMMENDATION.COLOR AS PER OWNER.31 STUCCO 'V' REVEAL32 STONE VENEER SYSTEM34 LINE OF ROOF BEYOND55 STONE CAP TRIM56 STONE WINDOW SILL TRIM123STONE: EARTH TONEHTT PANEL SYSTEM W/ ELASTOMERIC COATING: LIGHT EARTH TONESTUCCO SYSTEM: DARK EARTH TONE ALUM. (MATCH STUCCO COLOR #3)COPING (MATCH STUCCO COLOR #3)ALUM. (MATCH STUCCO COLOR #3)131415
UPUP28293033' - 6"27' - 6"22' - 0"16' - 0"1621212121211212121212171719191919193488888814141414141515151515151515181818161618182626262611' - 8 5/8"5556555627272730273' - 0"22' - 0"22' - 0"2718' - 0"1' - 4"4' - 0"29' - 4"4' - 0"1' - 4"13' - 0"5' - 0"10' - 0"29' - 2"302727323214272128293031311216161717348273.2133' - 6"22' - 0"10' - 0"18' - 0"EQEQ22' - 0"27' - 6"115' - 0"1' - 4"4' - 0"4' - 0"1' - 4"SF-2SF-23.421414P&Z-31P&Z-32P&Z-33P&Z-34P&Z-3.11P&Z-3.12P&Z-3.13P&Z-3.14UNITC-110UNITC-109UNITC-108UNITC-107UNITC-106UNITC-105UNITC-104UNITC-103UNITC-102UNITC-101UNITB-101UNITB-102UNITB-103UNITB-104UNITB-105UNITB-106UNITB-107UNITB-108UNITB-109UNITB-110RISER ROOM300NUTILITY301ELEC302UTILITY303250' - 0"90' - 0"REVISIONS:THIS DOCUMENT IS FOR INTERIMREVIEW ONLY AND NOTINTENDED TO BE USED FORCONSTRUCTION, BIDDING, ORPERMIT PURPOSES.RODNEY C. St. JOHNREGISTERED ARCHITECTTEXAS NO. 14791OWNER:WHEELHOUSE GARAGES, LLCWHEELHOUSE RETAIL, LLC1313 DANBURY PARKS DRIVEKELLER, TEXAS 76348DEVELOPERS:GARY R. SHIMMIN1313 DANBURY PARKS DRIVRKELLER, TEXAS 76348(559) 871-0684WYNDHAM PROPERTIES1807 KELLER PARKWAYKELLER, TEXAS 76248(817) 307-3600CONTACT: TERRY WILKINSONWHEELHOUSE GARAGESSt. JohnARCHITECTS, PLLC2217 JOHN GLENN PARKWAYMESQUITE, TEXAS 75150214-502-40942154321DCBADC54BA366FILENAME:ISSUED:PROJECT NUMBER:CHECKED BY:DRAWN BY:TRACTS 6C01A AND 6C02, JESSE G. ALLEN SURVEY, ABSTRACT NO. 18C:\Users\DELL\OneDrive\Projects\Gary Shimmin\Wheelhouse\REVIT\WHG-P&Z.rvt12/15/23WHEELHOUSE GARAGESDAVIS BOULEVARDSOUTHLAKE, TEXAS0.002.03228/26/22AuthorCheckerLOT 1, BLDG 3P&Z-3.13/32" = 1'-0"1SOUTH ELEVATION3/32" = 1'-0"2NORTH ELEVATION1/8" = 1'-0"4WEST ELEVATION1/8" = 1'-0"3EAST ELEVATIONSEE ELEVATION ABOVE FOR ADDITIONAL INFORMATIONSHEET KEYED NOTES# KEYNOTE8 6" DIA. CONCRETE FILLED PIPE BOLLARD BY G.C. (TYP)11 FIRE DEPARTMENT KEY LOCK BOX. VERIFY WITH FIREMARSHALL.12 ALUMINUM STOREFRONT AND WINDOWS KAWNEER 451UTOR EQUAL. REF: GLASS SCHEDULE14 INSULATED METAL DOOR AND FRAME. REFER TO DOORTYPES.15 OVERHEAD INSULATED METAL ROLL-UP DOOR. REFERDOOR TYPES.16 8" HI-TECH WALL PANEL SYSTEM BY OTHER.17 HI-TECH SYSTEM PANEL REVEAL (OR PANEL JOINT). IFPANEL JOINT PROVIDE BACKER ROD AND SEALANT.VERIFY LOCATION W/ FINAL LAYOUT BY PANEL ENGINEER.18 STONE VENNER: THIN SET OVER HI-TECH PANEL SYSTEM.INSTALLED AS PER MANUFACTURES SPECIFICATIONS.19 DOWNSPOUT LEADER. PROVIDE SPLASH BLOCK ANDDRAIN AWAY FROM FACE OF BUILDING.21 WALL SCONCE. REFER ELECTRICAL1" = 30'-0"5KEY PLAN BUILDING 3SHEET KEYED NOTES# KEYNOTE26 EMERGENCY LIGHT @ EACH EXIT DOOR. REF: ELECTRICALSHEETS27 CONT. PRE-FINISHED 26 GA. CAP FLASHING28 ALUMINUM FACIA / SOFFIT PANEL SYSTEM OVER OVERWRB ON 1/2" EXTERIOR SHEATHING. COLOR AS PEROWNER29 METAL SUPPORTS BY GC30 STUCCO SYSTEM: 3-STEP PROCESS OVER DIAMOND METALMESH TO A 7/8" THICKNESS OR BY OTHER PROCESSPRODUCING COMPARABLE STUCCO FINIS W/ EQUAL ORGREATER STRENGTH AND DURABILITY SPECIFICATION.INSTALLED AS PER MANUFACTURES RECOMMENDATION.COLOR AS PER OWNER.31 STUCCO 'V' REVEAL32 STONE VENEER SYSTEM34 LINE OF ROOF BEYOND55 STONE CAP TRIM56 STONE WINDOW SILL TRIM1.ALL ROOF TOP MECHANICAL UNITS SHALL BE SCREENED FROM PUBLIC VIEWFROM DAVIS BLVD.2.ALL EXPOSED UTILITY BOXES AND CONDUITS SHALL BE PAINTED TO MATCH THEBUILDING.3.SIGNAGE AREAS AND LOCATIONS ARE SUBJECT TO APPROVAL BY THEBUILDING INSPECTIONDEPARTMENT.4.EXTERIOR FINISH MATERIAL, MANUFACTURES AND COLORS ARE YET TO BEDETERMINED .5.DOOR LOCATIONS MAY VARY DEPENDING ON TENANT CONFIGURATIONS ANDEXITING REQUIREMENTS.GENERAL NOTESSTUCCO NOTE:STUCCO SHALL BE APPLIED USING 3-STEP PROCESS OVER DIAMOND METAL MESH TO A 7/8 INCH THICKNESS OR BY OTHER PROCESS PRODUCING COMPARABLE STUCCO FINISH WITH EQUAL OR GREATER STRENGTH AND DURABILITY SPECIFICATION.MATERIALS COLORS0'4'8'16'32'ZONING CASE#: ZA23-007811111122222223333141414141413131313151515123STONE: EARTH TONEHTT PANEL SYSTEM W/ ELASTOMERIC COATING: LIGHT EARTH TONESTUCCO SYSTEM: DARK EARTH TONE ALUM. (MATCH STUCCO COLOR #3)COPING (MATCH STUCCO COLOR #3)ALUM. (MATCH STUCCO COLOR #3)131415
P&Z 42P&Z 4P&Z 4P&Z 443516809 SFAreaP&Z 4.12P&Z 4.14P&Z 4.13P&Z 4.151231213146115109' - 1"10' - 11"8' - 0"24' - 0"8' - 0"10' - 11"9' - 1"24' - 0"121361030' - 0"9' - 3"10' - 11"8' - 0"24' - 0"8' - 0"10' - 11"9' - 3"30' - 0"20' - 0"213637111918' - 0"7' - 4"9' - 2"16' - 0"1' - 0"6' - 4"1' - 8"16' - 0"1' - 0"6' - 4"1' - 8"16' - 0"1' - 0"6' - 4"1' - 8"16' - 0"1' - 0"6' - 4"1' - 8"16' - 0"1' - 0"6' - 4"1' - 8"16' - 0"1' - 0"6' - 4"1' - 8"16' - 0"1' - 0"6' - 4"1' - 8"16' - 0"1' - 0"6' - 5"7' - 1"230' - 0"20' - 0"26' - 0"21363711129' - 1"10' - 11"8' - 0"24' - 0"8' - 0"10' - 11"9' - 1"1' - 1"7' - 3"1' - 6"9' - 3"10' - 11"8' - 0"24' - 0"8' - 0"10' - 11"9' - 3"7' - 2"1' - 1"1' - 6"REVISIONS:THIS DOCUMENT IS FOR INTERIMREVIEW ONLY AND NOTINTENDED TO BE USED FORCONSTRUCTION, BIDDING, ORPERMIT PURPOSES.RODNEY C. St. JOHNREGISTERED ARCHITECTTEXAS NO. 14791OWNER:WHEELHOUSE GARAGES, LLCWHEELHOUSE RETAIL, LLC1313 DANBURY PARKS DRIVEKELLER, TEXAS 76348DEVELOPERS:GARY R. SHIMMIN1313 DANBURY PARKS DRIVRKELLER, TEXAS 76348(559) 871-0684WYNDHAM PROPERTIES1807 KELLER PARKWAYKELLER, TEXAS 76248(817) 307-3600CONTACT: TERRY WILKINSONWHEELHOUSE GARAGESSt. JohnARCHITECTS, PLLC2217 JOHN GLENN PARKWAYMESQUITE, TEXAS 75150214-502-40942154321DCBADC54BA366FILENAME:ISSUED:PROJECT NUMBER:CHECKED BY:DRAWN BY:TRACTS 6C01A AND 6C02, JESSE G. ALLEN SURVEY, ABSTRACT NO. 18C:\Users\DELL\OneDrive\Projects\Gary Shimmin\Wheelhouse\REVIT\Wheelhouse-LOT3BLDG 4.rvt12/15/23THE WHEELHOUSEDAVIS BOULEVARDSOUTHLAKE, TEXAS0.011.04198/26/22PARCSLOT 3, BLDG 4P&Z 41/64" = 1'-0"1ELEVATION KEY PLAN3/32" = 1'-0"2EAST ELEVATION3/32" = 1'-0"3WEST ELEVATION3/32" = 1'-0"4NORTH ELEVATION3/32" = 1'-0"5SOUTH ELEVATION63D View 1MATERIALS KEYMATERIALS COLORS#1.STONE2.HTT PANEL SYSTEM3.STUCCO SYSTEM4.ALUM. CANOPY5.ENTRANCE DOOR SYSTEM6.WALL SCONCE LIGHT FIXTURE7.ROLL-UP OVERHEAD DOOR9.GUTTER AND DOWNSPOUT10.ALUMINUM WINDOW SYSTEM WITH CLEAR GLAZING11.SERVICE/EXIT DOOR12.OUTLINE OF ROOF13.ALUM. COPING14.ALUM. FACIA15.ALUM. SUPPORT TUBES1.ALL ROOF TOP MECHANICAL UNITS SHALL BE SCREENED FROM PUBLIC VIEWFROM DAVIS BLVD.2.ALL EXPOSED UTILITY BOXES AND CONDUITS SHALL BE PAINTED TO MATCH THEBUILDING.3.SIGNAGE AREAS AND LOCATIONS ARE SUBJECT TO APPROVAL BY THEBUILDING INSPECTIONDEPARTMENT.4.EXTERIOR FINISH MATERIAL, MANUFACTURES AND COLORS ARE YET TO BEDETERMINED .5.DOOR LOCATIONS MAY VARY DEPENDING ON TENANT CONFIGURATIONS ANDEXITING REQUIREMENTS.GENERAL NOTES0'8'24'48'ZONING CASE#: ZA23-0078ELEVATIONSSTUCCO NOTE:STUCCO SHALL BE APPLIED USING 3-STEP PROCESS OVER DIAMOND METAL MESH TO A 7/8 INCH THICKNESS OR BY OTHER PROCESS PRODUCING COMPARABLE STUCCO FINISH WITH EQUAL OR GREATER STRENGTH AND DURABILITY SPECIFICATION.3/32" = 1'-0"7FLOOR PLAN ARTICULATION - EAST3/32" = 1'-0"8FLOOR PLAN ARTICULATION - WEST123STONE: EARTH TONEHTT PANEL SYSTEM W/ ELASTOMERIC COATING: LIGHT EARTH TONESTUCCO SYSTEM: DARK EARTH TONE ALUM. (MATCH STUCCO COLOR #3)COPING (MATCH STUCCO COLOR #3)ALUM. (MATCH STUCCO COLOR #3)131415
P&Z 42P&Z 4P&Z 4P&Z 4435P&Z 4.12P&Z 4.14P&Z 4.13P&Z 4.1516809 SFArea1231213146115109' - 1"10' - 11"8' - 0"24' - 0"8' - 0"10' - 11"9' - 1"24' - 0"121361030' - 0"9' - 3"10' - 11"8' - 0"24' - 0"8' - 0"10' - 11"9' - 3"30' - 0"20' - 0"213637111918' - 0"7' - 4"9' - 2"16' - 0"1' - 0"6' - 4"1' - 8"16' - 0"1' - 0"6' - 4"1' - 8"16' - 0"1' - 0"6' - 4"1' - 8"16' - 0"1' - 0"6' - 4"1' - 8"16' - 0"1' - 0"6' - 4"1' - 8"16' - 0"1' - 0"6' - 4"1' - 8"16' - 0"1' - 0"6' - 4"1' - 8"16' - 0"1' - 0"6' - 5"7' - 1"30' - 0"20' - 0"26' - 0"2136371119' - 1"10' - 11"8' - 0"24' - 0"8' - 0"10' - 11"9' - 1"1' - 1"7' - 3"1' - 6"9' - 3"10' - 11"8' - 0"24' - 0"8' - 0"10' - 11"9' - 3"7' - 2"1' - 1"1' - 6"REVISIONS:THIS DOCUMENT IS FOR INTERIMREVIEW ONLY AND NOTINTENDED TO BE USED FORCONSTRUCTION, BIDDING, ORPERMIT PURPOSES.RODNEY C. St. JOHNREGISTERED ARCHITECTTEXAS NO. 14791OWNER:WHEELHOUSE GARAGES, LLCWHEELHOUSE RETAIL, LLC1313 DANBURY PARKS DRIVEKELLER, TEXAS 76348DEVELOPERS:GARY R. SHIMMIN1313 DANBURY PARKS DRIVRKELLER, TEXAS 76348(559) 871-0684WYNDHAM PROPERTIES1807 KELLER PARKWAYKELLER, TEXAS 76248(817) 307-3600CONTACT: TERRY WILKINSONWHEELHOUSE GARAGESSt. JohnARCHITECTS, PLLC2217 JOHN GLENN PARKWAYMESQUITE, TEXAS 75150214-502-40942154321DCBADC54BA366FILENAME:ISSUED:PROJECT NUMBER:CHECKED BY:DRAWN BY:TRACTS 6C01A AND 6C02, JESSE G. ALLEN SURVEY, ABSTRACT NO. 18C:\Users\DELL\OneDrive\Projects\Gary Shimmin\Wheelhouse\REVIT\Wheelhouse-LOT3BLDG 4.rvt12/15/23THE WHEELHOUSEDAVIS BOULEVARDSOUTHLAKE, TEXAS0.011.04198/26/22PARCSLOT 3, BLDG 4P&Z 4.11/64" = 1'-0"1ELEVATION KEY PLAN3/32" = 1'-0"2EAST ELEVATION3/32" = 1'-0"3WEST ELEVATION3/32" = 1'-0"4NORTH ELEVATION3/32" = 1'-0"5SOUTH ELEVATION63D VIEWMATERIALS KEYMATERIALS COLORS#1.STONE2.HTT PANEL SYSTEM3.STUCCO SYSTEM4.ALUM. CANOPY5.ENTRANCE DOOR SYSTEM6.WALL SCONCE LIGHT FIXTURE7.ROLL-UP OVERHEAD DOOR9.GUTTER AND DOWNSPOUT10.ALUMINUM WINDOW SYSTEM WITH CLEAR GLAZING11.SERVICE/EXIT DOOR12.OUTLINE OF ROOF13.ALUM. COPING14.ALUM. FACIA15.ALUM. SUPPORT TUBES1.ALL ROOF TOP MECHANICAL UNITS SHALL BE SCREENED FROM PUBLIC VIEWFROM DAVIS BLVD.2.ALL EXPOSED UTILITY BOXES AND CONDUITS SHALL BE PAINTED TO MATCH THEBUILDING.3.SIGNAGE AREAS AND LOCATIONS ARE SUBJECT TO APPROVAL BY THEBUILDING INSPECTIONDEPARTMENT.4.EXTERIOR FINISH MATERIAL, MANUFACTURES AND COLORS ARE YET TO BEDETERMINED .5.DOOR LOCATIONS MAY VARY DEPENDING ON TENANT CONFIGURATIONS ANDEXITING REQUIREMENTS.GENERAL NOTES0'8'24'48'ZONING CASE#: ZA23-0078ELEVATIONSSTUCCO NOTE:STUCCO SHALL BE APPLIED USING 3-STEP PROCESS OVER DIAMOND METAL MESH TO A 7/8 INCH THICKNESS OR BY OTHER PROCESS PRODUCING COMPARABLE STUCCO FINISH WITH EQUAL OR GREATER STRENGTH AND DURABILITY SPECIFICATION.3/32" = 1'-0"7ARTICULATION PLAN - EAST3/32" = 1'-0"8ARTICULATION PLAN - WEST123STONE: EARTH TONEHTT PANEL SYSTEM W/ ELASTOMERIC COATING: LIGHT EARTH TONESTUCCO SYSTEM: DARK EARTH TONE ALUM. (MATCH STUCCO COLOR #3)COPING (MATCH STUCCO COLOR #3)ALUM. (MATCH STUCCO COLOR #3)131415
P&Z 52P&Z 5P&Z 5P&Z 543510683 SFArea8' - 0"24' - 0"8' - 0"10' - 11"9' - 3"7' - 2"175' - 0"7' - 3"231213146115107' - 11"24' - 1"7' - 11"10' - 11"9' - 1"121361030' - 0"20' - 0"18' - 0"24' - 0"9' - 1"10' - 11"7' - 11"24' - 1"7' - 11"24' - 0"18' - 0"14' - 0"30' - 0"20' - 0"213637111918' - 8"6' - 4"18' - 8"6' - 4"18' - 8"6' - 4"18' - 8"6' - 4"18' - 8"6' - 4"18' - 8"6' - 4"18' - 8"6' - 6"7' - 0"230' - 0"20' - 0"26' - 0"2133114' - 0"24' - 0"7' - 2"5' - 8"14' - 0"11' - 0"14' - 0"11' - 0"14' - 0"11' - 0"14' - 0"11' - 0"14' - 0"11' - 0"14' - 0"11' - 0"14' - 0"5' - 4"7' - 3"109' - 3"10' - 11"8' - 0"24' - 0"8' - 0"1' - 6"7' - 2"1' - 1"8' - 0"24' - 0"8' - 0"10' - 11"9' - 1"7' - 3"1' - 1"1' - 6"REVISIONS:THIS DOCUMENT IS FOR INTERIMREVIEW ONLY AND NOTINTENDED TO BE USED FORCONSTRUCTION, BIDDING, ORPERMIT PURPOSES.RODNEY C. St. JOHNREGISTERED ARCHITECTTEXAS NO. 14791OWNER:WHEELHOUSE GARAGES, LLCWHEELHOUSE RETAIL, LLC1313 DANBURY PARKS DRIVEKELLER, TEXAS 76348DEVELOPERS:GARY R. SHIMMIN1313 DANBURY PARKS DRIVRKELLER, TEXAS 76348(559) 871-0684WYNDHAM PROPERTIES1807 KELLER PARKWAYKELLER, TEXAS 76248(817) 307-3600CONTACT: TERRY WILKINSONWHEELHOUSE GARAGESSt. JohnARCHITECTS, PLLC2217 JOHN GLENN PARKWAYMESQUITE, TEXAS 75150214-502-40942154321DCBADC54BA366FILENAME:ISSUED:PROJECT NUMBER:CHECKED BY:DRAWN BY:TRACTS 6C01A AND 6C02, JESSE G. ALLEN SURVEY, ABSTRACT NO. 18C:\Users\DELL\OneDrive\Projects\Gary Shimmin\Wheelhouse\REVIT\Wheelhouse-LOT3BLDG 5.rvt12/15/23THE WHEELHOUSEDAVIS BOULEVARDSOUTHLAKE, TEXAS0.011.04198/26/22PARCSLOT 3, BLDG 5P&Z 51/64" = 1'-0"1ELEVATION KEY PLAN3/32" = 1'-0"2EAST SIDE ELEVATION3/32" = 1'-0"3WEST ELEVATION3/32" = 1'-0"4NORTH ELEVATION3/32" = 1'-0"5SOUTH ELEVATION63D View 1MATERIALS KEYMATERIALS COLORS#1.STONE2.HTT PANEL SYSTEM3.STUCCO SYSTEM4.ALUM. CANOPY5.ENTRANCE DOOR SYSTEM6.WALL SCONCE LIGHT FIXTURE7.ROLL-UP OVERHEAD DOOR9.GUTTER AND DOWNSPOUT10.ALUMINUM WINDOW SYSTEM WITH CLEAR GLAZING11.SERVICE/EXIT DOOR12.OUTLINE OF ROOF13.ALUM. COPING14.ALUM. FACIA15.ALUM. SUPPORT TUBES1.ALL ROOF TOP MECHANICAL UNITS SHALL BE SCREENED FROM PUBLIC VIEWFROM DAVIS BLVD.2.ALL EXPOSED UTILITY BOXES AND CONDUITS SHALL BE PAINTED TO MATCH THEBUILDING.3.SIGNAGE AREAS AND LOCATIONS ARE SUBJECT TO APPROVAL BY THEBUILDING INSPECTIONDEPARTMENT.4.EXTERIOR FINISH MATERIAL, MANUFACTURES AND COLORS ARE YET TO BEDETERMINED .5.DOOR LOCATIONS MAY VARY DEPENDING ON TENANT CONFIGURATIONS ANDEXITING REQUIREMENTS.GENERAL NOTES0'8'24'48'ZONING CASE#: ZA23-0078ELEVATIONSSTUCCO NOTE:STUCCO SHALL BE APPLIED USING 3-STEP PROCESS OVER DIAMOND METAL MESH TO A 7/8 INCH THICKNESS OR BY OTHER PROCESS PRODUCING COMPARABLE STUCCO FINISH WITH EQUAL OR GREATER STRENGTH AND DURABILITY SPECIFICATION.TRACTS 6C01A AND 6C02, JESSE G. ALLEN SURVEY, ABSTRACT NO. 183/32" = 1'-0"7FLOOR PLAN ARTICULATION - WEST3/32" = 1'-0"8FLOOR PLAN ARTICULATION - EAST123STONE: EARTH TONEHTT PANEL SYSTEM W/ ELASTOMERIC COATING: LIGHT EARTH TONESTUCCO SYSTEM: DARK EARTH TONE ALUM. (MATCH STUCCO COLOR #3)COPING (MATCH STUCCO COLOR #3)ALUM. (MATCH STUCCO COLOR #3)131415
P&Z 5.12P&Z 5.14P&Z 5.15P&Z 5.1310683 SFArea23121314611510121361024' - 0"18' - 0"14' - 0"30' - 0"20' - 0"2136371119230' - 0"20' - 0"26' - 0"23114' - 0"24' - 0"8' - 0"24' - 0"8' - 0"10' - 11"9' - 1"7' - 3"1' - 1"1' - 6"9' - 3"10' - 11"8' - 0"24' - 0"8' - 0"1' - 6"7' - 2"1' - 1"REVISIONS:THIS DOCUMENT IS FOR INTERIMREVIEW ONLY AND NOTINTENDED TO BE USED FORCONSTRUCTION, BIDDING, ORPERMIT PURPOSES.RODNEY C. St. JOHNREGISTERED ARCHITECTTEXAS NO. 14791OWNER:WHEELHOUSE GARAGES, LLCWHEELHOUSE RETAIL, LLC1313 DANBURY PARKS DRIVEKELLER, TEXAS 76348DEVELOPERS:GARY R. SHIMMIN1313 DANBURY PARKS DRIVRKELLER, TEXAS 76348(559) 871-0684WYNDHAM PROPERTIES1807 KELLER PARKWAYKELLER, TEXAS 76248(817) 307-3600CONTACT: TERRY WILKINSONWHEELHOUSE GARAGESSt. JohnARCHITECTS, PLLC2217 JOHN GLENN PARKWAYMESQUITE, TEXAS 75150214-502-40942154321DCBADC54BA366FILENAME:ISSUED:PROJECT NUMBER:CHECKED BY:DRAWN BY:TRACTS 6C01A AND 6C02, JESSE G. ALLEN SURVEY, ABSTRACT NO. 18C:\Users\DELL\OneDrive\Projects\Gary Shimmin\Wheelhouse\REVIT\Wheelhouse-LOT3BLDG 5.rvt12/15/23THE WHEELHOUSEDAVIS BOULEVARDSOUTHLAKE, TEXAS0.011.04198/26/22AuthorCheckerLOT 3, BLDG 5P&Z 5.1MATERIALS KEYMATERIALS COLORS#1.STONE2.HTT PANEL SYSTEM3.STUCCO SYSTEM4.ALUM. CANOPY5.ENTRANCE DOOR SYSTEM6.WALL SCONCE LIGHT FIXTURE7.ROLL-UP OVERHEAD DOOR9.GUTTER AND DOWNSPOUT10.ALUMINUM WINDOW SYSTEM WITH CLEAR GLAZING11.SERVICE/EXIT DOOR12.OUTLINE OF ROOF13.ALUM. COPING14.ALUM. FACIA15.ALUM. SUPPORT TUBES1.ALL ROOF TOP MECHANICAL UNITS SHALL BE SCREENED FROM PUBLIC VIEWFROM DAVIS BLVD.2.ALL EXPOSED UTILITY BOXES AND CONDUITS SHALL BE PAINTED TO MATCH THEBUILDING.3.SIGNAGE AREAS AND LOCATIONS ARE SUBJECT TO APPROVAL BY THEBUILDING INSPECTIONDEPARTMENT.4.EXTERIOR FINISH MATERIAL, MANUFACTURES AND COLORS ARE YET TO BEDETERMINED .5.DOOR LOCATIONS MAY VARY DEPENDING ON TENANT CONFIGURATIONS ANDEXITING REQUIREMENTS.GENERAL NOTES0'8'24'48'ZONING CASE#: ZA23-0078ELEVATIONSSTUCCO NOTE:STUCCO SHALL BE APPLIED USING 3-STEP PROCESS OVER DIAMOND METAL MESH TO A 7/8 INCH THICKNESS OR BY OTHER PROCESS PRODUCING COMPARABLE STUCCO FINISH WITH EQUAL OR GREATER STRENGTH AND DURABILITY SPECIFICATION.1/64" = 1'-0"1ELEVATION KEY PLAN3/32" = 1'-0"2EAST SIDE ELEVATION COLOR3/32" = 1'-0"3WEST ELEVATION COLOR3/32" = 1'-0"4NORTH ELEVATION COLOR3/32" = 1'-0"5SOUTH ELEVATION COLOR3/32" = 1'-0"6FLOOR PLAN ARTICULATION - EAST3/32" = 1'-0"7FLOOR PLAN ARTICULATION - WEST83D VIEW123STONE: EARTH TONEHTT PANEL SYSTEM W/ ELASTOMERIC COATING: LIGHT EARTH TONESTUCCO SYSTEM: DARK EARTH TONE ALUM. (MATCH STUCCO COLOR #3)COPING (MATCH STUCCO COLOR #3)ALUM. (MATCH STUCCO COLOR #3)131415
4'-8"17'-4" @ SINGLE13'-8"12'-0" @ SINGLE18"6"18"4'-8"20'-4"13'-8"29'-8"12'-4"3'-4"JAMB DETAILPLAN VIEWELEVATION VIEWSECTIONFOUNDATION VIEW8'-0""METAL SLEEVES FOR CANE1" DIA. x 4" DEEP GALV.BOLTS EMBEDED IN CONC.SLAB4" BARRIER POST1/2"DIA. X 8" BARREL BOLT LOCK2 PAIR McKINNEY T4B3781HINGES EA. GATE WELDED TOGATE & POSTGROUT SOLID W/ CONCRETEANGLE DIAGONAL BRACE3"X 4"X 1/4" METAL ANGLE1" X 18 GA. METAL DECKFRAME 4 SIDES EA. GATE1 1/2"X 1 1/2"X 3/16" METAL#5 BARS CONT. TOP& BOTTOMPAVEMENT SURFACEAS SPECIFIEDSOLID GROUT ALL#5 BARS @ 48" O.C. CONT. THRUWALL & INTO FTG. W/ 3" HOOK.#5 HORIZ. BAR @ TOP (TYP.)WALL W/ DUR-O-WALLW/ #4xCONT.EVERY SECOND COURSE.6" THK. CONC SLABE.W. @ 2'-0" O.C.CORESTIE TO #5 VERT. BARS8"X 8"X 16" C.M.UCAST CAP STONEEL. 8'-0"T.O. CMU18 GA. PAINTED METALGATE8"X 8"X 16"CMUSLAB4" BARRIER POSTMETAL SLEEVES FOR CANE1" DIA. x 4" DEEP GALV.BOLTS EMBEDED IN CONC.GATE & POSTGROUT SOLID W/ CONCRETEW/ #4xCONT.6" THK. CONC SLABE.W. @ 2'-0" O.C.C.J.C.J.C.J.EXP. JT.6"Hx12"W CURBGRADE BEAM18"Wx18"D PERIMETERW/ 2-#5 T&BTO MATCH BLDG.8"X 8"X 16"CMU TO MATCH BLDG.8"X 8"X 16"CMU8"X 8"X 16"CMUSTUCCO OVERTO MATCH BLDG.STUCCOTO MATCH BLDG.STUCCO24'-0"@ DOUBLERECYCLE OIL BARRELNOTE: DOUBLE TRASH ENCLOSURE WILL HAVE 4 GATES.26'-0" @ DOUBLEREVISIONS:THIS DOCUMENT IS FOR INTERIMREVIEW ONLY AND NOTINTENDED TO BE USED FORCONSTRUCTION, BIDDING, ORPERMIT PURPOSES.RODNEY C. St. JOHNREGISTERED ARCHITECTTEXAS NO. 14791OWNER:WHEELHOUSE GARAGES, LLCWHEELHOUSE RETAIL, LLC1313 DANBURY PARKS DRIVEKELLER, TEXAS 76348DEVELOPERS:GARY R. SHIMMIN1313 DANBURY PARKS DRIVRKELLER, TEXAS 76348(559) 871-0684WYNDHAM PROPERTIES1807 KELLER PARKWAYKELLER, TEXAS 76248(817) 307-3600CONTACT: TERRY WILKINSONWHEELHOUSE GARAGESSt. JohnARCHITECTS, PLLC2217 JOHN GLENN PARKWAYMESQUITE, TEXAS 75150214-502-40942154321DCBADC54BA366FILENAME:ISSUED:PROJECT NUMBER:CHECKED BY:DRAWN BY:TRACTS 6C01A AND 6C02, JESSE G. ALLEN SURVEY, ABSTRACT NO. 18C:\Users\DELL\OneDrive\Projects\Gary Shimmin\Wheelhouse\REVIT\WHG-P&Z.rvt12/15/23WHEELHOUSE GARAGESDAVIS BOULEVARDSOUTHLAKE, TEXAS0.002.03228/26/22AuthorCheckerTRASH ENCLOSUREP&Z-6ZONING CASE#: ZA23-0078