Loading...
Item 6B - Site PlanF-------— — — — — — — — -- — — — — — — — `" — — — — — 10' SETBACK ----------------------------------- TK-30M-1 TK—SOM-7 67' 0 TANK 110' 0 TANK O. F. 589.3 * TO ' T.0. F. 589.3 CONY. SUPER RFG 1 UNLEADED Al 48' HIGH 170' 0 TANK 80M2 BBL TANK UNLEADED 15' SEWER EAR -Pole GRA VEL) DRUM STORAGE AREA con 0 ❑- BOX Q NEW GA 4 13 BOX MINA R.., 584.9 2-36" RCP ICUL VERTS I 7-361 RCP CULVERT - 1584.6 I I I I I OIL/WA TER SEPARATOR "" r, us-----us- \� n nn o m 8" CONCRETE o, 0 W - / H / W - / 51 �n - -- W' g X- X-X-X-X-X-X z"i / FOR APPROVAL ONLY X / / NOT FOR CONSTRUCTION DATE: 10/XX/23 ® 27.81 ACRES IN THE J.N. GIBSON SURVEY, A-591 / LOT I, BLOCK 1, BRUMLOW INDUSTRIAL DISTRICT EXISTING ZONING - I-2 NOTES: 1) CONTRACTOR TO FIELD VERIFY ALL DIMENSIONS AND REFERENCE DRAWINGS: PROJECT LOCATION: TARRANT COUNTY, TEXAS SOUTHLAKE TERMINAL ELEVATIONS PRIOR TO FABRICATION AND INSTALLATION. 19003 lx-10 WEST DRAWN BY: R.STORM DATE: 8/25/23 GENERAL LAYOUT SITE PLAN San Antonio, Texas 78257 taIr CHECKED: DATE: u Tel: (210) 918-2000 ORIGINAL PROJECT NO.CW_0003235 A ISSUED FOR APPROVAL PER CW_0003235 IRS 10/XX/23 1-800-866-9060 APPROVED: DATE: N0. REVISION BY DATE APR P:ner I,.P. >;3' SCALE: 1" = 40'-0" DRAWING NO. SLPL-SOUT-21-101 REV• A