Item 6B - Site PlanF-------— — — — — — — — -- — — — — — — — `" — — — — —
10' SETBACK
-----------------------------------
TK-30M-1
TK—SOM-7
67' 0 TANK
110' 0 TANK
O. F. 589.3
* TO '
T.0. F. 589.3
CONY. SUPER
RFG
1
UNLEADED
Al
48' HIGH
170' 0 TANK
80M2 BBL TANK
UNLEADED
15' SEWER EAR
-Pole
GRA VEL)
DRUM STORAGE
AREA
con
0
❑-
BOX Q
NEW GA
4 13
BOX MINA
R..,
584.9
2-36"
RCP ICUL VERTS
I 7-361 RCP
CULVERT -
1584.6
I I
I I I
OIL/WA TER
SEPARATOR "" r,
us-----us-
\�
n
nn
o
m
8" CONCRETE
o,
0
W - /
H /
W - /
51
�n
- -- W'
g
X- X-X-X-X-X-X
z"i
/ FOR APPROVAL ONLY
X
/ / NOT FOR CONSTRUCTION
DATE: 10/XX/23
®
27.81 ACRES IN THE J.N. GIBSON SURVEY, A-591
/ LOT I, BLOCK 1, BRUMLOW INDUSTRIAL DISTRICT
EXISTING ZONING - I-2
NOTES:
1) CONTRACTOR TO FIELD VERIFY ALL DIMENSIONS AND
REFERENCE DRAWINGS:
PROJECT LOCATION: TARRANT
COUNTY, TEXAS
SOUTHLAKE TERMINAL
ELEVATIONS PRIOR TO FABRICATION AND INSTALLATION.
19003 lx-10 WEST
DRAWN BY: R.STORM
DATE: 8/25/23
GENERAL LAYOUT
SITE PLAN
San Antonio, Texas 78257
taIr
CHECKED:
DATE:
u Tel: (210) 918-2000
ORIGINAL PROJECT NO.CW_0003235
A
ISSUED FOR APPROVAL PER CW_0003235
IRS
10/XX/23
1-800-866-9060
APPROVED:
DATE:
N0.
REVISION
BY
DATE
APR
P:ner I,.P.
>;3'
SCALE: 1" = 40'-0"
DRAWING NO. SLPL-SOUT-21-101 REV• A