Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Item 6D - SPIN Report
JUSOUTHLAKE SPIN MEETING REPORT SPIN Item Number: SPIN2023-14 City Case Number: ZA23-0049 Project Name: 2100 Mustang Ct. - Constellation SPIN Neighborhood: 8 Meeting Date: August 8, 2023 Meeting Location: 1400 Main Street, Southlake, TX City Council Chambers Total Attendance: 30 Hosts: Danny Batsalkin Applicant Presenting: Scott Ellerman City Staff Present: Madeline Prater, Business Manager Town Hall Forums can be viewed in their entirety by visiting http://www.cityofsouthiake.com and clicking on "I Want to" and "View" "Video on Demand" — forums are listed under SPIN by meeting date. FORUM SUMMARY: Property Situation: 2100 Mustang Ct. Development Details: • Property is currently a pipeline facility which we are proposing to develop a business park — approx. 33 acres. • Site Plan — four (4) office/warehouse shell buildings o Building 1 — 134,401 sq. ft. o Building 2 — 189,132 sq. ft. o Building 3 — 102,957 sq. ft. o Building 4 — 120,840 sq. ft. • Site is currently zoned heavy industrial — we are proposing a light industrial use. o Wanting to attract prospective tenants in light industrial work. • We will be landscaping and screening the property along Ira E. Woods to create a buffer. • To the residential lots on the northwest side of the site, we will construct a 15ft retaining wall and 15ft of trees to screen the operations view. • Following the Corridor Committee meeting the previous evening, there was a recommendation to add more trees, so we increased the tree coverage along the northern and northwest side of the property. Presentation: constellation real estate partners August 7, 2023 Constellation Southlake Corridor Committee Click to edit date Site Plan — Constellation Southlake Ily ASIIII 9111111111Y IElllf Y111111911 [III III •]Iln� I� I I I 9"=v f -Tr T1—T—I�T-TS j I_ 1° I sai�a.,ir.. drnnicr.�{rn I I II I - 1� 'l l................. ulluall llllalll111111 ®II II IIII� 2 SITE DATA �adnc I OFF �IlIunt4E alma 21%M 4F — IS.SSO BF113F EwSIwp ACCESS ■pAp I'Ll 1 9uapll:p7 1eg3SS 9E. Off •'Ml3E 1d,8N8F11693113F. •nIIIHIRIIIIlllllf llllllf 011lll Of HIRWNGI EIIILIHNp fAEA 1W%]9F _ oFF wntSF 10d008FR}�13 F. -I— 1 BLIILpwG1 uA_ ING$$ oiFa�xaa 1x0.e.10 ss. i IZ tppgFJ10B T.E 3.P. - ■ -- mrrssua❑rucurEa—aL - T -ET - T • I— T OM OFFICE 61, 6i0 SF AlRO PNpii3 6FFK�F NEG4 1lNpSPME4 _ M16F. FIEoy ,B1.B SPACES iOiµ PaWp 3PR0'nDEs r�aPacEs Y i I P MASTER PLAIM, t 0 constellation real -t— parcn— Project Overview —Constellation Southlake Current Pipeline Facility Proposed Business Park • constellation Footer real estate partners ----------------------------------------------------------------------------------------------------------------------------------------------------------------- Renderings - Aerials SW Corner 5E Corner ---------------------------------------------------------------------------------------------------------------------------------------------------------------- • constellation muter real estate partners ---------------------------------------------------------------------------------------------------------------------------------------------------------------- Renderings - Storefront 5 Landscape Plan i-A • constellation real estate partners 11 —; I 1- 1 1 _ �.,r.r.... MATCH--- MAMA ---� --- --- --- - = - -- --- C. ---� -- -------MAMA-- MAi CH[1NEA -—LL1 - i - l- II I I II I I- I I I I l 1 1 1 1 I _I %P 1 1 1 = l l i l i [_ 1 - I II I I I 1 1 I -- 1- I I AEFEWTO SHEFTIL]d 1- I -- RlI� Qlll$T...... �'....-:'Vi'II�-F■ I — IbE' ♦f]II!I IIII�tlIIIL@F>$Il lfll�lll lilalll=11111�11111111� � �L�. r'. :.I.]......L"',�L1:176IISLlLIiil7:EiiJi1"II Q�Trtn_ h _ ' �- ------MAMA-- ---- ------MAMA-- MAMA- ----------------MAMA----------------MAMA-- - • constellation 6 elzslmzs roots real estate partners Retaining Wall/Tree Exhibit r: a -•••• i MARIKINl RSI1ER 11m -i---- F---... - - • -- • • ---- • • ----- - --- -- • ---- - I I 1 1 I i 1 1 I t--I--}--N---}---I-- I-I---}-- 1 1 1 I I - -- I 1 I r37.��e SF 1 I (1—_4-_-4--t-4EFE.0wx�4_-1-4�-4_ 1 1 l 1 I ,I• S.•, J �� _r I NZ constellation real estate partners Comments, Questions, and Concerns: Question: The building looks great and it's much better than old tanks. I'm curious, were these tanks petroleum? Answer: Yes, these tanks hold petroleum ethanol Question: Has there been any soil testing to determine containments in the area? Answer: Yes, we are conducting extensive environmental reports and assessments of the site. These tests and assessments allow us to develop these buildings. Question: I'm trying to place where your facility is going, is it by Ira E. Woods and Hwy 26? Answer: Yes Question: Mustang is the street that dead ends? Between Kimball and Brumlow? Answer: Yes, I believe so. Question: How much traffic does the property currently have vs. what will occur with this new development? Answer: There is one point of entry and exit for this facility off Mustang Ct. As far as enhanced traffic, this pipeline terminal has heavy traffic with gas tanks entering and exiting to fill up to deliver to gas stations. This is a speculative project right now, so no tenants are signed up currently. The layout for this development could bring about a reduction in traffic or the same amount. Question: How many units/suites do you have available to be filled, eventually? Answer: We could have 4 tenants occupying each respective building, or it could be divided to attract multiple tenants from 6-8. 1 don't want to put a maximum number on it. SPIN Meeting Reports are general observations of SPIN Meetings by City staff and SPIN Representatives. The report is neither verbatim nor official meeting minutes; rather it serves to inform elected and appointed officials, City staff, and the public of the issues and questions raised by residents and the general responses made. Responses as summarized in this report should not be taken as guarantees by the applicant. Interested parties are strongly encouraged to follow the case through the Planning and Zoning Commission and final action by City Council. Southlake Connect Results for the August 8, 2023, SPIN Town Hall Forum 8/11/23, 1:26 PM Everbridge Suite Dashboard Universe Notifications Incidents Reports > Detailed Notification Analysis > SPIN Town Hall Forum -August 8th Detailed Notification Analysis SPIN Town Hall Forum - August 81h DETAILS Call Results Everbridge - Notifications Cityof Southlake - Citizen Alert (Organization Admin) Contacts Reports Settings Access Notification ID 1072506484036514 Notification Live Mode Notification Standard Type Start Date Aug 1, 2023 Start Time 10[13'14 CDT Confirmation Yes Hide Details Requested Call Throttling Yes Call Results(per Delivery Path) Duration 6 hr(s) Message Voice/Text Attempted - Confirmed Format Voicemail Message Only Confirmed. Preference Delivery Order Organization Default Attempted - Not Confirmed Delivery Methods Organization Contacts 1.Primary SMS Delivered 2.Secondary SMS 3.Primary Email 4.Primary Mobile Delivered -To Voicemail 5.Secondary Email 6.Secondary Mobile 7.Home Phone Not Delivered- No Answer B.Home Phone #2 9.Business Phone 10.TTY / TTD Device Delivered -To Handset 11.Everbridge Mobile Ap Resident Connection 1.VOIP Not Delivered- Voicemail Hung 2.1-andline Up Not Delivered -Recipient Hung Up Sent l 0 265 (2.37%) Attempted - Confirmed ■ 8470 (75.88%)Attempted - Not Confirmed 0271 (2.43%) Attempted - Not Connected I♦ 2077 (18.61 %) Not Attem pted 79 (0.71%) Other Total % of Total 265 2.37 % 33 0.30 % 1681 15.06% 122 1.09% 2829 25.34% 151 1.35% 405 3.63 % 3249 29.11 % Attempted - Not Connected Not Delivered- Invalid Number 82 0.73% Not Delivered- Out of Service 98 0.88% Not Delivered - Carrier Expired 12 0.11 % Not Delivered- Downstream Communication Error 71 0.64% ^o https:ffmanager.everbridge.net/reports/notification/View/l 072506484036514 112 8/11/23, 1:26 PM Everbridge - Notifications Call Results(per Delivery Path) Total of Total Not Delivered -Carrier Rejected 2 0.02% Not Delivered- Line Busy 6 0.05% Not Attempted Not Attempted - Inactive Path 214 1.92% Not Attempted - Unsubscribed 1083 9.70% Not Delivered - Contact Path Not Defined 6 0.05% Not Delivered- Duplicate Path 774 6.93% Other Not Delivered- Bounced Email 75 0.67% Not Delivered -Contact Unavailable 4 0.04% Attempts Over Time 7.Sk Sk 2.Sk ok Show Details '4mrbridger Privacy Policy. I Terms of Use 1 © 2023 Everbridge, Inc. 23.4.0.12-2023-07-21-09:33 FE-VERSION 8 manager-prod-us-green-i-0020bb36fOccef2ef https://manager.everbridge.net/reports/notification/view/l 072506484036514 2/2