Item 4F - Presentation1
Approve an Engineering Services
Agreement (ESA) with Garver, LLC for
the Shady Lane and Lonesome Dove Lift
Stations Improvements in an amount not
to exceed $310,000.
Currently, there are no permanent backup pumps
and generators at each location.
An existing project is replacing the regular pumps
each site on a three-year cycle.
Both lift stations serve as the two largest lift statign
rnr-rnix oc flnXAI frnm;nnnrnvimn+nIxi 0 nnn t-i is+nrnzii� 6`'
Schedule
• Design to commence Summer 2023 �
t
•
FXnortprl rIAcinn r_mmnliz inn Snrinn qn