Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Item 4B Bid Tabulation
BHB No. 2015.724.001Baird,Hampton & BrownEngineering & Surveying 3801 William D. Tate, Suite 500 Grapevine, TX 76051Tel (817) 251-8550, www.bhbinc.com3/8/20231 Project sign4 EA 950$ 3,800.00$ 950$ 3,800.00$ 1,200$ 4,800.00$ 10,150$ 40,600.00$ 2,000$ 8,000.00$ 2 Implement and Maintain Erosion Control Measures6 MO 2,000$ 12,000.00$ 6,750$ 40,500.00$ 3,000$ 18,000.00$ 4,660$ 27,960.00$ 1,000$ 6,000.00$ 3 Implement and Maintain Traffic Control6 MO 2,000$ 12,000.00$ 4,500$ 27,000.00$ 6,000$ 36,000.00$ 5,825$ 34,950.00$ 2,000$ 12,000.00$ 4 Provide & Install Two (2) Portable Changeable Message Signs Per Site6 MO 3,000$ 18,000.00$ 4,500$ 27,000.00$ 8,000$ 48,000.00$ 7,223$ 43,338.00$ 3,000$ 18,000.00$ 5 Allowance for Miscellaneous Utility Adjustments (including sprinklers)1 LS 12,500$ 12,500.00$ 12,500$ 12,500.00$ 12,500$ 12,500.00$ 12,500$ 12,500.00$ 12,500$ 12,500.00$ 6 Cut, Plug, Fill With CLSM and Abandon 8" Water Pipe145 LF 25$ 3,625.00$ 66$ 9,570.00$ 80$ 11,600.00$ 25$ 3,625.00$ 200$ 29,000.00$ 7 Abandon 6" Water Pipe and Remove & Dispose 6" valves1025 LF 25$ 25,625.00$ 12$ 12,300.00$ 50$ 51,250.00$ 20$ 20,500.00$ 50$ 51,250.00$ 8 Fill Abandoned 6" Water Pipe Under Pavement with CLSM150 LF 25$ 3,750.00$ 56$ 8,400.00$ 80$ 12,000.00$ 20$ 3,000.00$ 200$ 30,000.00$ 9 Fill Abandoned 3" Water Pipe Under Pavement with CLSM53 LF 10$ 530.00$ 44$ 2,332.00$ 60$ 3,180.00$ 15$ 795.00$ 200$ 10,600.00$ 10 Connect Proposed 8" Water to Existing 6" with Tee plus Reducer at Oak Bend Ct.1 EA 3,000$ 3,000.00$ 4,700$ 4,700.00$ 10,000$ 10,000.00$ 5,950$ 5,950.00$ 10,000$ 10,000.00$ 11 Exploratory Excavation to Locate Existing 6" Waterline within School Property1 LS 980$ 980.00$ 8,100$ 8,100.00$ 30,000$ 30,000.00$ 5,000$ 5,000.00$ 2,000$ 2,000.00$ 12 12" PVC Water Pipe By HDD2121 LF 210$ 445,410.00$ 348$ 738,108.00$ 280$ 593,880.00$ 307$ 651,147.00$ 300$ 636,300.00$ 13 12" PVC Water Pipe By Open Trench1722 LF 145$ 249,690.00$ 129$ 222,138.00$ 260$ 447,720.00$ 295$ 507,990.00$ 250$ 430,500.00$ 14 8" PVC Water Pipe By HDD117 LF 195$ 22,815.00$ 359$ 42,003.00$ 180$ 21,060.00$ 245$ 28,665.00$ 300$ 35,100.00$ 15 8" PVC Water Pipe By Open Trench304 LF 95$ 28,880.00$ 100$ 30,400.00$ 160$ 48,640.00$ 265$ 80,560.00$ 240$ 72,960.00$ 16 6" PVC Water Pipe By Open Trench117 LF 80$ 9,360.00$ 99$ 11,583.00$ 140$ 16,380.00$ 255$ 29,835.00$ 230$ 26,910.00$ 17 12" Main Gate Valve w/ Box & Lid15 EA 4,500$ 67,500.00$ 6,000$ 90,000.00$ 7,500$ 112,500.00$ 4,750$ 71,250.00$ 7,000$ 105,000.00$ 18 8" Main Gate Valve w/ Box & Lid4 EA 2,500$ 10,000.00$ 3,075$ 12,300.00$ 3,500$ 14,000.00$ 2,750$ 11,000.00$ 5,000$ 20,000.00$ 19 6" Main Gate Valve w/ Box & Lid2 EA 2,000$ 4,000.00$ 2,300$ 4,600.00$ 2,600$ 5,200.00$ 2,130$ 4,260.00$ 3,000$ 6,000.00$ 20 Fire Hydrant13 EA 7,500$ 97,500.00$ 6,600$ 85,800.00$ 7,500$ 97,500.00$ 8,215$ 106,795.00$ 8,000$ 104,000.00$ 21 Install 12"x6" Tapping Sleeve and 6" Hydrant Gate Valve w/ Box & Lid13 EA 6,500$ 84,500.00$ 9,500$ 123,500.00$ 8,000$ 104,000.00$ 5,785$ 75,205.00$ 9,000$ 117,000.00$ 22 C.I./D.I. Fittings3 TON 10,000$ 30,000.00$ 17,575$ 52,725.00$ 9,000$ 27,000.00$ 17,012$ 51,036.00$ 6,000$ 18,000.00$ 23 2" Service Tap 4 EA 2,000$ 8,000.00$ 1,700$ 6,800.00$ 2,500$ 10,000.00$ 3,105$ 12,420.00$ 7,000$ 28,000.00$ 24 2" Type 'K' Copper Water Service Line40 LF 95$ 3,800.00$ 59$ 2,360.00$ 180$ 7,200.00$ 100$ 4,000.00$ 190$ 7,600.00$ 25 Furnish & Set 2" Meter Box & Lid4 EA 2,000$ 8,000.00$ 800$ 3,200.00$ 3,000$ 12,000.00$ 875$ 3,500.00$ 4,000$ 16,000.00$ 26 1" Service Tap13 EA 1,500$ 19,500.00$ 900$ 11,700.00$ 2,000$ 26,000.00$ 2,475$ 32,175.00$ 3,000$ 39,000.00$ 27 1" Type 'K' Copper Water Service Line130 LF 70$ 9,100.00$ 31$ 4,030.00$ 100$ 13,000.00$ 60$ 7,800.00$ 180$ 23,400.00$ 28 Furnish & Set 1" Meter Box & Lid13 EA 1,500$ 19,500.00$ 385$ 5,005.00$ 1,200$ 15,600.00$ 177$ 2,301.00$ 3,000$ 39,000.00$ 29 Disconnect Existing Services (3/4" - 2"), Plug, and Abandon8 EA 800$ 6,400.00$ 290$ 2,320.00$ 800$ 6,400.00$ 125$ 1,000.00$ 2,000$ 16,000.00$ 30 Sawcut, Demolish, Remove, Dispose and Reconstruct Concrete Drainage Flume in Chesapeake Park15 LF 100$ 1,500.00$ 570$ 8,550.00$ 300$ 4,500.00$ 550$ 8,250.00$ 10,000$ 150,000.00$ 31 Restoration of Drainage Crossing in Chesapeake Park to include Compaction, Topsoil, and Anchored Sod130 LF 20$ 2,600.00$ 68$ 8,840.00$ 50$ 6,500.00$ 50$ 6,500.00$ 300$ 39,000.00$ 32 Relocate Vaults, Meters, and Backflow Prevention at Chesapeake Park1 LS 14,000$ 14,000.00$ 11,800$ 11,800.00$ 12,000$ 12,000.00$ 25,000$ 25,000.00$ 80,000$ 80,000.00$ 33 Trench Excavation Safety for Water Line Depths > 5'2143 LF 1$ 2,143.00$ 1$ 2,143.00$ 2$ 4,286.00$ 1$ 2,143.00$ 1$ 2,143.00$ 34 4" Thick Top Soil in Disturbed (Open Cut) Areas239 CY 60$ 14,340.00$ 82$ 19,598.00$ 100$ 23,900.00$ 99$ 23,661.00$ 60$ 14,340.00$ 35 Solid Sod for Disturbed (Open Cut) Areas2151 SY 10$ 21,510.00$ 15$ 32,265.00$ 12$ 25,812.00$ 14$ 30,114.00$ 40$ 86,040.00$ 36 Remove, Salvage, Repair, Reinstall or Replace Decorative Street Light with Integrated Traffic Sign 1 EA 3,000$ 3,000.00$ 9,550$ 9,550.00$ 35,000$ 35,000.00$ 9,000$ 9,000.00$ 25,000$ 25,000.00$ 37 Sawcut, Demolish, Remove, Dispose and Reconstruct Concrete Sidewalk (Trench Repair)15 LF 150$ 2,250.00$ 294$ 4,410.00$ 250$ 3,750.00$ 90$ 1,350.00$ 200$ 3,000.00$ 38 Sawcut, Demolish, Remove, Dispose and Reconstruct Concrete Pavement and Curb & Gutter (Trench Repair)105 LF 200$ 21,000.00$ 344$ 36,120.00$ 150$ 15,750.00$ 153$ 16,065.00$ 200$ 21,000.00$ 39 Sawcut, Demolish, Remove, Dispose, Reconstruct and Restripe Asphalt Parking Lot (Trench Repair)65 LF 120$ 7,800.00$ 359$ 23,335.00$ 75$ 4,875.00$ 145$ 9,425.00$ 100$ 6,500.00$ 40 Sawcut, Demolish, Remove, Dispose and Reconstruct Concrete Driveway With High Early Strength Concrete (Trench Repair) 36 LF 130$ 4,680.00$ 344$ 12,384.00$ 150$ 5,400.00$ 162$ 5,832.00$ 900$ 32,400.00$ 41 Sawcut, Demolish, Remove, Dispose and Reconstruct Asphalt Driveway (Trench Repair)139 LF 130$ 18,070.00$ 299$ 41,561.00$ 50$ 6,950.00$ 135$ 18,765.00$ 300$ 41,700.00$ 42 Demolish, Remove, Dispose and Reconstruct Gravel Driveway (Trench Repair)20 LF 60$ 1,200.00$ 92$ 1,840.00$ 50$ 1,000.00$ 75$ 1,500.00$ 100$ 2,000.00$ 43 Sawcut, Demolish, Remove, and Dispose Existing Concrete Drive Approach (See Sheet 28)1646 SF 15$ 24,690.00$ 25$ 41,150.00$ 4$ 6,584.00$ 15$ 24,690.00$ 10$ 16,460.00$ 44 Demolish, Remove, and Dispose Existing Driveway Culverts4 EA 800$ 3,200.00$ 2,300$ 9,200.00$ 400$ 1,600.00$ 1,200$ 4,800.00$ 3,000$ 12,000.00$ 45 Provide and Install Class III 18" RCP Driveway Culvert95 LF 200$ 19,000.00$ 109.00$ 10,355.00$ 160.00$ 15,200.00$ 300.00$ 28,500.00$ 300.00$ 28,500.00$ 46 Regrade Roadside Ditches to Facilitate Positive Drainage (See Sheet 28)285 LF 55$ 15,675.00$ 29$ 8,265.00$ 20$ 5,700.00$ 60$ 17,100.00$ 290$ 82,650.00$ 47 Remove, Salvage, and Reinstall Chain Link Fence541 LF 55$ 29,755.00$ 60$ 32,460.00$ 45$ 24,345.00$ 65$ 35,165.00$ 60$ 32,460.00$ 48 Relocate Driveway Swing Gate & Operator1 EA 3,000$ 3,000.00$ 22,000$ 22,000.00$ 3,000$ 3,000.00$ 5,000$ 5,000.00$ 2,000$ 2,000.00$ 49 Construct Concrete Residential Drive Approach (See Sheet 28)1646 SF 14$ 23,044.00$ 25$ 41,150.00$ 15$ 24,690.00$ 15$ 24,690.00$ 10$ 16,460.00$ 50 Remove, Salvage, Repair, Reinstall, or Replace 6' Iron Fence20 LF 85$ 1,700.00$ 162$ 3,240.00$ 180$ 3,600.00$ 100$ 2,000.00$ 400$ 8,000.00$ 1,453,922.00$ 1,984,990.00$ 2,049,852.00$ 2,178,707.00$ 2,631,773.00$ Denotes notable bid item amount / significant portion of contractTabulated and checked by: Lindsay Lafferty, PEProvided Bid Bond? YesYesYesYesBID TABULATIONWater Improvements - Pearson, Dove, & Union ChurchMarch 7, 2023Yes Atkins Brothers Equipment Company, Inc YesUnit Cost Amount A&B Construction, LLC YesUnit Cost Amount Blackrock Construction YesUnit Cost AmountQuantityItem no.Water Improvements TotalWater ImprovementsItem Description Acadia Services, LLC YesUnit Cost Amount Canary Construction, Inc AmountSouthlake, TexasUnitYesUnit CostAcknowledged Addendum?Bid Tabulation March 2023 - Pearson, Dove, Union Church.xlsPage 1 of 1