Item 4C - MemoItem 4C Page 1 of 2 M E M O R A N D U M (January 17, 2023) To: Shana Yelverton, City Manager From: Rob Cohen, Director of Public Works Subject: Award the contract for the construction of the Timarron Creek and BB-8 Erosion Protection project to David-Tehoungue, Ltd., Co. in an amount not to exceed $205,000. Action Requested: Award the contract for the construction of the Timarron Creek and BB-8 Erosion Protection project to David-Tehoungue, Ltd., Co. in an amount not to exceed $205,000. Background Information: The purpose of this project is to reinforce several areas where the city’s wastewater infrastructure has been exposed to excessive erosion. Sanitary sewer manholes and pipelines are exposed to stream flows, potentially compromising the integrity of the sewer system. The Timarron Creek portion of the project is located within the drainage easement between E. Continental Boulevard and Longford Drive in the Wyndsor Creek subdivision. The improvements at this location includes the construction of permanent erosion control and stream stabilization measures at three different sites where City of Southlake sanitary sewer facilities are near or within Timarron Creek. The BB-8 site is located between W. Continental Boulevard and Independence Parkway within the Big Bear Creek tributary BB-8 drainage easement. The improvements will restore soil cover and provide armoring protection to wastewater infrastructure that has become exposed. Solicitation of bids for this project began on November 6, 2022, and sealed bids were received and opened on December 13, 2022. The two proposals received for this project are shown below: Bidder Total Bid Amount David-Tehoungue, Ltd., Co. $ 164,490 ERS of MS, Inc. $ 261,261 Item 4C Page 2 of 2 City staff and the design consultant, KSA, have reviewed and scored two proposals using best-value criteria as the basis described in the project manual. The evaluation criteria for this bid were the contract price (50%), the reputation of the bidder including key personnel (15%), the reputation and quality of the bidder's goods or services (15%), the bidder's past relationship with the city (10%), and the bidder's responsiveness (10%). The evaluation of materials and references provided led to the recommendation of David- Tehoungue, Ltd., Co. for this project. The total bid from David- Tehoungue, Ltd., Co. came in at $164,490 for anticipated work; staff is requesting authorization for a total of $205,000 which includes $40,510 in contingency for construction expenses that may arise due to unforeseen field conditions. Financial Considerations: Funding for the contract award is budgeted as part of the approved FY 2022 Capital Improvement Program. This award is within the project budget. Strategic Link: This item links to the City’s Strategy Map strategic focus area of Infrastructure. It specifically relates to the City’s Corporate Objectives, F2: Invest to Provide & Maintain High Quality Public Assets. The Critical Business Outcome is, CBO3: Engage In Thoughtful Planning To Ensure Continued High-Quality Development That Is Integrated Well Into The Current Built Environment. Citizen Input/ Board Review: None. Legal Review: This is the standard construction services contract that has been previously reviewed by the City Attorney. Alternatives: The City Council may approve or deny the contract. Staff Recommendation: Award the contract for the construction of the Timarron Creek and BB-8 Erosion Protection project to David-Tehoungue, Ltd., Co. in an amount not to exceed $205,000. Supporting Documents: Attachment A: Bid Tabulation Staff Contact: Rob Cohen, Director of Public Works Kevin Ferrer, P.E., City Engineer Kevin Taylor, P.E., Civil Engineer Bid Date: December 13, 2022 Bid Time: 10:00 AM CITY OF SOUTHLAKE TIMARRON CREEK AND BB-8 TRIBUTARY EROSION PROTECTION PROJECT KSA Project No. 100709 BID DESCRIPTION UNIT TOTAL UNIT TOTAL NO.(with unit price in words)PRICE PRICE PRICE PRICE 1.01 Mobilization LS 1 35,000.00$ 35,000.00$ 30,000.00$ 30,000.00$ 1.02 Temporary Erosion Control Measures LS 1 5,500.00$ 5,500.00$ 5,500.00$ 5,500.00$ 1.03 Site Preparation LS 1 44,000.00$ 44,000.00$ 7,000.00$ 7,000.00$ 1.04 Temporary Special Shoring LS 1 2,500.00$ 2,500.00$ 12,000.00$ 12,000.00$ 1.05 Earthwork (Embankment)CY 104 27.00$ 2,808.00$ 155.00$ 16,120.00$ 1.06 Remove 13"-24" Tree EA 2 1,970.00$ 3,940.00$ 3,250.00$ 6,500.00$ 1.07 Gravel Fill for Engineered Bank Stabilization System & Pyramattress CY 102 215.00$ 21,930.00$ 125.00$ 12,750.00$ 1.08 Seed & Cellulose Fiber Mulch for Disturbed Areas SY 366 11.00$ 4,026.00$ 35.00$ 12,810.00$ 1.09 Engineered Mattress System SY 41 250.00$ 10,250.00$ 200.00$ 8,200.00$ 1.10 Engineered Bank Stabilization System LF 206 535.00$ 110,210.00$ 210.00$ 43,260.00$ 1.11 Turf Reinforcement Mat SY 250 58.00$ 14,500.00$ 33.00$ 8,250.00$ 1.12 Tied Concrete Block Mat System SY 60 109.95$ 6,597.00$ 35.00$ 2,100.00$ Total Bid Schedule 1.00 Amount 261,261.00$ 164,490.00$ *Denotes correction by Engineer James McKenzie, P.E. ERS of MS, Inc.DAVID-TEHOUNGUE, Ltd. Co. Phone: 601.982.7788 Killeen, Texas 76549 5100 Lions Gate Lane SUMMARY OF BIDS Phone: 254.394.5752 1635 Lelia Dr., Suite 202 Jackson, Mississippi 39216 TOTAL BID SCHEDULES 1.00 UNIT QTY Project Manager Bid Schedule 1.00: 261,261.00$ 164,490.00$ 1 \\ksa.net\Gateway\Projects\100709\300 Bidding\bid opening\100709_BID TAB SPREADSHEET.xls