Loading...
Item 4D - MemoCITY OF Item 4D SOUTHLAKE MEMORANDUM (November 15, 2022) To: Shana Yelverton, City Manager From: Rob Cohen, Director of Public Works Subject: Award the contract for the construction of the Shady Oaks Drive Water Improvements project upsizing the existing 6-inch water main to a 12-inch water main, to Douglas Dailey Construction, LLC in an amount not to exceed $1,260,000. Action Requested: Award the contract for the construction of the Shady Oaks Drive Water Improvements project upsizing the existing 6-inch water main to a 12-inch water main, to Douglas Dailey Construction, LLC in an amount not to exceed $1,260,000. Background Information: The project will install a 12-inch water main along Shady Oaks Drive from West Highland Street to Fox Glen, replacing the existing 6-inch water. Identified in the City's Water Master Plan, the project will improve water quality and increase system capacity within the distribution system. Solicitation of bids for this project began on September 11, 2022, and sealed bids were received and opened on October 14, 2022. The three proposals received for this project are shown below: Bidder Total Bid Amount Douglas Dailey Construction, LLC $ 1,048,068.00 Quality Excavation, LLC $ 1,067,060.00 Atkins Bros. Equipment Co. $ 1,814,666.00 City staff and the design consultant, Freeman-Millican, Inc., have reviewed and scored three proposals using best -value criteria as the basis described in the project manual. The evaluation criteria for this bid were the contract price (50%), the reputation of the bidder including key personnel (15%), the reputation and quality of the bidder's goods or services (15%), the bidder's past relationship with the city (10%), and the bidder's responsiveness (10%). The evaluation of materials and references provided led to the recommendation of Douglas Dailey Construction, LLC for this project. The total bid from Douglas Dailey Construction, LLC came Page 1 of 3 Item 4D in at $1,048,068 for anticipated work plus alternate bid; staff is requesting authorization for a total of $1,260,000 which includes $211,932 in contingency for construction expenses that may arise due to unforeseen field conditions. Financial Considerations: Funding for this agreement is budgeted as part of the approved Capital Improvement Program FY2008, FY2013 and FY2023. This agreement is within the project budget. Strategic Link: This item links to the City's Strategy Map strategic focus area of Infrastructure. It specifically relates to the City's Corporate Objectives, F2: Invest To Provide & Maintain High Quality Public Assets. The Critical Business Outcomes is, CBO5: Improve Quality Of Life Through Progressive Implementation Of Southlake's Comprehensive Plan Recommendations. Citizen Input/ Board Review: None. Legal Review: The proposed agreement is a standard agreement that the City Attorney has reviewed and approved. Alternatives: The City Council may approve or deny the agreement. Staff Recommendation: Award the contract for the construction of the Shady Oaks Drive Water Improvements project to Douglas Dailey Construction, LLC in an amount not to exceed $1,260,000. Supporting Documents: Attachment A: Bid Tabulation Page 2 of 3 Item 4D Staff Contact: Rob Cohen, Director of Public Works Kevin Ferrer, P.E., City Engineer Kevin Taylor, P.E., Civil Engineer Page 3 of 3