Loading...
SB Item 5 - PlansAddress Approval / Date Sheet 0629161AR9 IH 6/10/21 # 1450 Plaza Pl, Southlake, TX Acct. Rep.Coordinator DEBBIE MOLTZLAUREN STACKHOUSE FINAL ELECTRICALCONNECTION BYCUSTOMER 2301 River RoadSuite 201Louisville, KY 40206 (502) 897-9800 Cell (502) 554-2575 14201 Sovereign Road #101Fort Worth, TX 76155 R1(6-15-21)IH: - Update page 1 with revised plan from architect. Updated elevations. - Delete F.- On front elevation - see architect notes about angling the "E" light bars, and adding some around the corners.- Sign B1/B2- Increase the stroke of the outer ring to match the letter "O" in their name.- Change sign C to open channel with exposed white LED stroke(s) in the letters- Change sign B2 to an EVO Entertainment sign instead of play button R2(6-17-21)IH: Block out the floor plan details so we just show the shape of the building and not all the details of what's inside. R3(7-16-21)IH: - Add the trellis on the plan view (at an angle) & draw it up as a separate item on the art so that we can send it to the engineer.- Add a separate item ID for the support bars behind sign A3 as well for the engineer. 7-27-21 IH: add dimensions for "F" to the drawing for estimating. There will be 1 strip of vertical white Contour LED on the face of each as shown on the latest renderings in Downloads. - Correct the item IDs on the floor plan- they seem to be labeled as G instead of F. R4(8-12-21)IH: Delete sign B, re-letter. Include power requirements for each sign R5(8-30-21)IH: Removals will be on a separate order. Delete page 2. G- Vertical supports to be provided by GC (size TBD per engineering). Our scope will be to sleeve them with brushed stainless finish and the horizontal trellis is in our scope and will need to match that same finish.(9/7/21)JGZ: Add electrical details. R6(9-20-21)IH: Remove the trellis for sign A1 & the horizontal frame structure for A3 from #0629161Ar5 (change to R6). Create new design #0630292A with these items. The GC is supplying the 5 vertical supports for the A1 trellis - see email for the plan view with placement/size. Add painted pole cover with silver Matthews paint finish (TBD) & clear coat over the 5 vertical supports & this will be the same paint finish for the trellis pieces we are building. R7(10-18-21)IH: A - We probably need to separate out signs A1, A2, A3 on separate pages so we can add individual attachment/electrical details for each. For A1/A3, note the steel tube structure will be supplied by GC & note to reference stamped engineering for attachment details.We need to be sure our drawings include dimensions for installation of all signs - A2 needs a dimension from top of wall down. See notes on survey PDF - they are going to have to remove that light so the sign can be fully above the T-Bar ceiling dimension.C - Survey notes we need raceways but we want to pre-wire instead. Add pre-wiring notes to the art with a survey note for location of power supplies.Sign D will also need to be pre-wired.B- We need to provide amp draw per each tower rather than a total for all since they are all around the building and likely will not all be tied together to the same.E- Revise the detail for these to the new detail Dennis Mitchell provided. Sketch & estimate included in PT Art References folder dated 10/15 so you can also update power requirements. R8(10-28-21)IH: See Survey PDF in PT dated 10/26/21. Add note for all sign types: primary electrical 277v.**The art will be posted this week for us to release the job so we need to clean it up and remove as many survey notes as possible on this revision.A - Color temperature of LEDs is confirmed 6500k white for these signs.Can we note for A1/A3 that the power supplies will be located in transformer boxes on the back side of the letters concealed on the frame with all conduit/boxes painted silver? Then we can delete the TBD note?Sign A2: Add note that GC is to remove or relocate the existing light and add the dimensions from the survey & information about location of leads per survey. Power supplies will be located behind wall. Delete TBD note.B - Change color temperature to 6500k white rather than warm white.C - Add notes for location of power supplies/leads per survey. 6500k white LEDD - 6500k white LED confirmed. The wiring/power supply details are still TBD on this one.E - Survey still needed for lengths so leave that note on the art. Use 5000k white LED. Add note from survey re: j-boxes and no prewiring needed. R9(11-8-21)IH: Sign A3 is going to be moved to the wall instead of mounted on the horizontal bars. See Art References folder for new location. Update attachment method- should be like A2 now. 1 of 9 SCALE 1/32" = 1'-0" A2 C E1 E1 B5B6 B1 B2 B4 B3 E2 A3 A1 E2 E3 Address Approval / Date Sheet 0629161AR9 IH 6/10/21 # 1450 Plaza Pl, Southlake, TX Acct. Rep.Coordinator DEBBIE MOLTZLAUREN STACKHOUSE FINAL ELECTRICALCONNECTION BYCUSTOMER 2301 River RoadSuite 201Louisville, KY 40206 (502) 897-9800 Cell (502) 554-2575 14201 Sovereign Road #101Fort Worth, TX 76155 R1(6-15-21)IH: - Update page 1 with revised plan from architect. Updated elevations. - Delete F.- On front elevation - see architect notes about angling the "E" light bars, and adding some around the corners.- Sign B1/B2- Increase the stroke of the outer ring to match the letter "O" in their name.- Change sign C to open channel with exposed white LED stroke(s) in the letters- Change sign B2 to an EVO Entertainment sign instead of play button R2(6-17-21)IH: Block out the floor plan details so we just show the shape of the building and not all the details of what's inside. R3(7-16-21)IH: - Add the trellis on the plan view (at an angle) & draw it up as a separate item on the art so that we can send it to the engineer.- Add a separate item ID for the support bars behind sign A3 as well for the engineer. 7-27-21 IH: add dimensions for "F" to the drawing for estimating. There will be 1 strip of vertical white Contour LED on the face of each as shown on the latest renderings in Downloads. - Correct the item IDs on the floor plan- they seem to be labeled as G instead of F. R4(8-12-21)IH: Delete sign B, re-letter. Include power requirements for each sign R5(8-30-21)IH: Removals will be on a separate order. Delete page 2. G- Vertical supports to be provided by GC (size TBD per engineering). Our scope will be to sleeve them with brushed stainless finish and the horizontal trellis is in our scope and will need to match that same finish.(9/7/21)JGZ: Add electrical details. R6(9-20-21)IH: Remove the trellis for sign A1 & the horizontal frame structure for A3 from #0629161Ar5 (change to R6). Create new design #0630292A with these items. The GC is supplying the 5 vertical supports for the A1 trellis - see email for the plan view with placement/size. Add painted pole cover with silver Matthews paint finish (TBD) & clear coat over the 5 vertical supports & this will be the same paint finish for the trellis pieces we are building. R7(10-18-21)IH: A - We probably need to separate out signs A1, A2, A3 on separate pages so we can add individual attachment/electrical details for each. For A1/A3, note the steel tube structure will be supplied by GC & note to reference stamped engineering for attachment details.We need to be sure our drawings include dimensions for installation of all signs - A2 needs a dimension from top of wall down. See notes on survey PDF - they are going to have to remove that light so the sign can be fully above the T-Bar ceiling dimension.C - Survey notes we need raceways but we want to pre-wire instead. Add pre-wiring notes to the art with a survey note for location of power supplies.Sign D will also need to be pre-wired.B- We need to provide amp draw per each tower rather than a total for all since they are all around the building and likely will not all be tied together to the same.E- Revise the detail for these to the new detail Dennis Mitchell provided. Sketch & estimate included in PT Art References folder dated 10/15 so you can also update power requirements. R8(10-28-21)IH: See Survey PDF in PT dated 10/26/21. Add note for all sign types: primary electrical 277v.**The art will be posted this week for us to release the job so we need to clean it up and remove as many survey notes as possible on this revision.A - Color temperature of LEDs is confirmed 6500k white for these signs.Can we note for A1/A3 that the power supplies will be located in transformer boxes on the back side of the letters concealed on the frame with all conduit/boxes painted silver? Then we can delete the TBD note?Sign A2: Add note that GC is to remove or relocate the existing light and add the dimensions from the survey & information about location of leads per survey. Power supplies will be located behind wall. Delete TBD note.B - Change color temperature to 6500k white rather than warm white.C - Add notes for location of power supplies/leads per survey. 6500k white LEDD - 6500k white LED confirmed. The wiring/power supply details are still TBD on this one.E - Survey still needed for lengths so leave that note on the art. Use 5000k white LED. Add note from survey re: j-boxes and no prewiring needed. R9(11-8-21)IH: Sign A3 is going to be moved to the wall instead of mounted on the horizontal bars. See Art References folder for new location. Update attachment method- should be like A2 now. 2 of 9 3'-0"7'-0"406'-4"53'-8"406'-4" 222'-10"222'-9" 32'-0" 32'-0" SCALE 1/32" = 1'-0" 76'-0"38’-0”27'-4"3'-10"38'-2"2’-6 3/8”30’-8”LED SHOWN IN RED FOR VISUAL PURPOSES ONLY 19’-4” A2 A1 A3 D C E2 E1 E3 B1 B1 B3 B3 B3 B6 B6 B5 B5 B2 B2 B4 B4 5’-0” +5 FT AROUND LEFT CORNER+5 FT AROUND LEFT CORNER 2 1/4” 30’-8” 30’-8” 30’-8” 30’-8” 43’-8”43’-8”43'-8"8'-0"T- BAR CEILING INSIDE 20'-2"2'-11"22'-3"22'-1"PRE-WIRING REQUIRED FOR SIGN D.24'-4"E1 CENTER SIGN BETWEEN DOWN SPOUTS 5'-0"RELOCATED LAMP Address Approval / Date Sheet 0629161AR9 IH 6/10/21 # 1450 Plaza Pl, Southlake, TX Acct. Rep.Coordinator DEBBIE MOLTZLAUREN STACKHOUSE FINAL ELECTRICALCONNECTION BYCUSTOMER 2301 River RoadSuite 201Louisville, KY 40206 (502) 897-9800 Cell (502) 554-2575 14201 Sovereign Road #101Fort Worth, TX 76155 R1(6-15-21)IH: - Update page 1 with revised plan from architect. Updated elevations. - Delete F.- On front elevation - see architect notes about angling the "E" light bars, and adding some around the corners.- Sign B1/B2- Increase the stroke of the outer ring to match the letter "O" in their name.- Change sign C to open channel with exposed white LED stroke(s) in the letters- Change sign B2 to an EVO Entertainment sign instead of play button R2(6-17-21)IH: Block out the floor plan details so we just show the shape of the building and not all the details of what's inside. R3(7-16-21)IH: - Add the trellis on the plan view (at an angle) & draw it up as a separate item on the art so that we can send it to the engineer.- Add a separate item ID for the support bars behind sign A3 as well for the engineer. 7-27-21 IH: add dimensions for "F" to the drawing for estimating. There will be 1 strip of vertical white Contour LED on the face of each as shown on the latest renderings in Downloads. - Correct the item IDs on the floor plan- they seem to be labeled as G instead of F. R4(8-12-21)IH: Delete sign B, re-letter. Include power requirements for each sign R5(8-30-21)IH: Removals will be on a separate order. Delete page 2. G- Vertical supports to be provided by GC (size TBD per engineering). Our scope will be to sleeve them with brushed stainless finish and the horizontal trellis is in our scope and will need to match that same finish.(9/7/21)JGZ: Add electrical details. R6(9-20-21)IH: Remove the trellis for sign A1 & the horizontal frame structure for A3 from #0629161Ar5 (change to R6). Create new design #0630292A with these items. The GC is supplying the 5 vertical supports for the A1 trellis - see email for the plan view with placement/size. Add painted pole cover with silver Matthews paint finish (TBD) & clear coat over the 5 vertical supports & this will be the same paint finish for the trellis pieces we are building. R7(10-18-21)IH: A - We probably need to separate out signs A1, A2, A3 on separate pages so we can add individual attachment/electrical details for each. For A1/A3, note the steel tube structure will be supplied by GC & note to reference stamped engineering for attachment details.We need to be sure our drawings include dimensions for installation of all signs - A2 needs a dimension from top of wall down. See notes on survey PDF - they are going to have to remove that light so the sign can be fully above the T-Bar ceiling dimension.C - Survey notes we need raceways but we want to pre-wire instead. Add pre-wiring notes to the art with a survey note for location of power supplies.Sign D will also need to be pre-wired.B- We need to provide amp draw per each tower rather than a total for all since they are all around the building and likely will not all be tied together to the same.E- Revise the detail for these to the new detail Dennis Mitchell provided. Sketch & estimate included in PT Art References folder dated 10/15 so you can also update power requirements. R8(10-28-21)IH: See Survey PDF in PT dated 10/26/21. Add note for all sign types: primary electrical 277v.**The art will be posted this week for us to release the job so we need to clean it up and remove as many survey notes as possible on this revision.A - Color temperature of LEDs is confirmed 6500k white for these signs.Can we note for A1/A3 that the power supplies will be located in transformer boxes on the back side of the letters concealed on the frame with all conduit/boxes painted silver? Then we can delete the TBD note?Sign A2: Add note that GC is to remove or relocate the existing light and add the dimensions from the survey & information about location of leads per survey. Power supplies will be located behind wall. Delete TBD note.B - Change color temperature to 6500k white rather than warm white.C - Add notes for location of power supplies/leads per survey. 6500k white LEDD - 6500k white LED confirmed. The wiring/power supply details are still TBD on this one.E - Survey still needed for lengths so leave that note on the art. Use 5000k white LED. Add note from survey re: j-boxes and no prewiring needed. R9(11-8-21)IH: Sign A3 is going to be moved to the wall instead of mounted on the horizontal bars. See Art References folder for new location. Update attachment method- should be like A2 now. 3 of 9 5" DEEP ALUM. OPEN LETTERS TO BE LIT WITH GE CONTOUR 6500K WHITE L.E.D.’S. RETURNS ON THE OUTSIDE P.T.M. SW 7674 PEPPERCORN. RETURNS IN THE INSIDE AND BACKS TO BE PAINTED WHITE. LOCATION OF POWER SUPPLIES T.B.D. WHITE ACRYLIC FACE WITH DIGITALLY PRINTED GRAPHICS APPLIED ON 1ST SURFACE. INT. LIT WITH WHITE L.E.D. TRIMCAP TO MATCH AS CLOSE AS POSSIBLE TO SW 7674 PEPPERCORN GE 6500K TETRA CONTOUR SYSTEM NOTE TO ELECTRICAL CONTRACTOR DENOTES APPROX. LOCATION OF J-BOX(ES) PROVIDED and INSTALLED BY ELECTRICAL CONTRACTOR 120v ELECTRICAL REQUIRED ELECTRICAL CONTRACTOR TO PROVIDE PRIMARY ELECTRICAL AND TO PROVIDE FINAL ELECTRICAL HOOK-UP 3M VINYL LIME GREEN 3630-136 (PMS 368) 3M VINYL ORANGE 3630-44 (PMS 1655)3M VINYL TEAL GREEN 3630-246 (PMS 322) MATCH PMS 7405 MATCH PMS 3285 MATCH PMS 326 3M VINYL OLYMPIC BLUE 3630-57 (MATCH PMS 298) NEW COLORS UTILIZING PMS MATCH AND VINYL COLORS COLOR CALLOUT SHOWN FOR PRODUCTION 477.68 SQ FT 5" DEEP ALUM. OPEN LETTERS TO BE LIT WITH GE CONTOUR 6500K WHITE L.E.D.’S. RETURNS ON THE OUTSIDE P.T.M. SW 7674 PEPPERCORN. RETURNS IN THE INSIDE AND BACKS TO BE PAINTED WHITE. POWER SUPPLIES WILL BE LOCATED IN TRANSFORMER BOXES ON THE BACK SIDE OF THE LETTERS CONCEALED ON THE FRAME WITH ALL CONDUIT/BOXES PAINTED SILVER OCL “EVO” / PLEX CHANNEL LOGO ONE (1) REQUIRED - MANUFACTURE & INSTALL SCALE: 3/16" = 1' - 0"A1 OCL “ENTERTAINMENT” LETTERS ONE (1) REQUIRED - MANUFACTURE & INSTALL SCALE: 3/16" = 1' - 0" 32'-0" 9’-0 3/4”11’-6 1/4”11’-4 5/8”5’-3 5/8”11’-3”2’-7 3/4”14'-11"4 1/2”1’-11”5'-7 1/2"5'-7 1/2"U.L. LABELS REQUIRED LABELS TO BE ATTACHED IN VISIBLE AREA, DIRECTLY BELOW ON/OFF SWITCH APPROX. AMP DRAW: 11.1 AMPS PER SIGN REQ'D FOR EACH SET OF CHANNEL LETTERS GE CONTOUR - TOTAL FEET 511’-0” 24v TETRAMAX - 29 TOTAL MODULES - 20FT TOTAL NOTE: THE STEEL TUBE STRUCTURE WILL BE SUPPLIED BY GC. REFERENCE STAMPED ENGINEERING FOR ATTACHMENT DETAILS. PRIMARY ELECTRICAL 277V. Address Approval / Date Sheet 0629161AR9 IH 6/10/21 # 1450 Plaza Pl, Southlake, TX Acct. Rep.Coordinator DEBBIE MOLTZLAUREN STACKHOUSE FINAL ELECTRICALCONNECTION BYCUSTOMER 2301 River RoadSuite 201Louisville, KY 40206 (502) 897-9800 Cell (502) 554-2575 14201 Sovereign Road #101Fort Worth, TX 76155 R1(6-15-21)IH: - Update page 1 with revised plan from architect. Updated elevations. - Delete F.- On front elevation - see architect notes about angling the "E" light bars, and adding some around the corners.- Sign B1/B2- Increase the stroke of the outer ring to match the letter "O" in their name.- Change sign C to open channel with exposed white LED stroke(s) in the letters- Change sign B2 to an EVO Entertainment sign instead of play button R2(6-17-21)IH: Block out the floor plan details so we just show the shape of the building and not all the details of what's inside. R3(7-16-21)IH: - Add the trellis on the plan view (at an angle) & draw it up as a separate item on the art so that we can send it to the engineer.- Add a separate item ID for the support bars behind sign A3 as well for the engineer. 7-27-21 IH: add dimensions for "F" to the drawing for estimating. There will be 1 strip of vertical white Contour LED on the face of each as shown on the latest renderings in Downloads. - Correct the item IDs on the floor plan- they seem to be labeled as G instead of F. R4(8-12-21)IH: Delete sign B, re-letter. Include power requirements for each sign R5(8-30-21)IH: Removals will be on a separate order. Delete page 2. G- Vertical supports to be provided by GC (size TBD per engineering). Our scope will be to sleeve them with brushed stainless finish and the horizontal trellis is in our scope and will need to match that same finish.(9/7/21)JGZ: Add electrical details. R6(9-20-21)IH: Remove the trellis for sign A1 & the horizontal frame structure for A3 from #0629161Ar5 (change to R6). Create new design #0630292A with these items. The GC is supplying the 5 vertical supports for the A1 trellis - see email for the plan view with placement/size. Add painted pole cover with silver Matthews paint finish (TBD) & clear coat over the 5 vertical supports & this will be the same paint finish for the trellis pieces we are building. R7(10-18-21)IH: A - We probably need to separate out signs A1, A2, A3 on separate pages so we can add individual attachment/electrical details for each. For A1/A3, note the steel tube structure will be supplied by GC & note to reference stamped engineering for attachment details.We need to be sure our drawings include dimensions for installation of all signs - A2 needs a dimension from top of wall down. See notes on survey PDF - they are going to have to remove that light so the sign can be fully above the T-Bar ceiling dimension.C - Survey notes we need raceways but we want to pre-wire instead. Add pre-wiring notes to the art with a survey note for location of power supplies.Sign D will also need to be pre-wired.B- We need to provide amp draw per each tower rather than a total for all since they are all around the building and likely will not all be tied together to the same.E- Revise the detail for these to the new detail Dennis Mitchell provided. Sketch & estimate included in PT Art References folder dated 10/15 so you can also update power requirements. R8(10-28-21)IH: See Survey PDF in PT dated 10/26/21. Add note for all sign types: primary electrical 277v.**The art will be posted this week for us to release the job so we need to clean it up and remove as many survey notes as possible on this revision.A - Color temperature of LEDs is confirmed 6500k white for these signs.Can we note for A1/A3 that the power supplies will be located in transformer boxes on the back side of the letters concealed on the frame with all conduit/boxes painted silver? Then we can delete the TBD note?Sign A2: Add note that GC is to remove or relocate the existing light and add the dimensions from the survey & information about location of leads per survey. Power supplies will be located behind wall. Delete TBD note.B - Change color temperature to 6500k white rather than warm white.C - Add notes for location of power supplies/leads per survey. 6500k white LEDD - 6500k white LED confirmed. The wiring/power supply details are still TBD on this one.E - Survey still needed for lengths so leave that note on the art. Use 5000k white LED. Add note from survey re: j-boxes and no prewiring needed. R9(11-8-21)IH: Sign A3 is going to be moved to the wall instead of mounted on the horizontal bars. See Art References folder for new location. Update attachment method- should be like A2 now. 4 of 9 5" DEEP ALUM. OPEN LETTERS TO BE LIT WITH GE CONTOUR 6500K WHITE L.E.D.’S. RETURNS ON THE OUTSIDE P.T.M. SW 7674 PEPPERCORN. RETURNS IN THE INSIDE AND BACKS TO BE PAINTED WHITE. LOCATION OF POWER SUPPLIES T.B.D. WHITE ACRYLIC FACE WITH DIGITALLY PRINTED GRAPHICS APPLIED ON 1ST SURFACE. INT. LIT WITH WHITE L.E.D. TRIMCAP TO MATCH AS CLOSE AS POSSIBLE TO SW 7674 PEPPERCORN GE 6500K TETRA CONTOUR SYSTEM NOTE TO ELECTRICAL CONTRACTOR DENOTES APPROX. LOCATION OF J-BOX(ES) PROVIDED and INSTALLED BY ELECTRICAL CONTRACTOR 120v ELECTRICAL REQUIRED ELECTRICAL CONTRACTOR TO PROVIDE PRIMARY ELECTRICAL AND TO PROVIDE FINAL ELECTRICAL HOOK-UP 3M VINYL LIME GREEN 3630-136 (PMS 368) 3M VINYL ORANGE 3630-44 (PMS 1655)3M VINYL TEAL GREEN 3630-246 (PMS 322) MATCH PMS 7405 MATCH PMS 3285 MATCH PMS 326 3M VINYL OLYMPIC BLUE 3630-57 (MATCH PMS 298) NEW COLORS UTILIZING PMS MATCH AND VINYL COLORS COLOR CALLOUT SHOWN FOR PRODUCTION 477.68 SQ FT 5" DEEP ALUM. OPEN LETTERS TO BE LIT WITH GE CONTOUR 6500K WHITE L.E.D.’S. RETURNS ON THE OUTSIDE P.T.M. SW 7674 PEPPERCORN. RETURNS IN THE INSIDE AND BACKS TO BE PAINTED WHITE. REMOTE POWER SUPPLIES WILL BE LOCATED BEHIND WALL OCL “EVO” / PLEX CHANNEL LOGO TWO (2) REQUIRED - MANUFACTURE & INSTALL SCALE: 3/16" = 1' - 0"A3A2 OCL “ENTERTAINMENT” LETTERS ONE (1) REQUIRED - MANUFACTURE & INSTALL SCALE: 3/16" = 1' - 0" 32'-0" 9’-0 3/4”11’-6 1/4”11’-4 5/8”5’-3 5/8”11’-3”2’-7 3/4”14'-11"4 1/2”1’-11”5'-7 1/2"5'-7 1/2"U.L. LABELS REQUIRED LABELS TO BE ATTACHED IN VISIBLE AREA, DIRECTLY BELOW ON/OFF SWITCH APPROX. AMP DRAW: 11.1 AMPS PER SIGN REQ'D FOR EACH SET OF CHANNEL LETTERS GE CONTOUR - TOTAL FEET 511’-0” 24v TETRAMAX - 29 TOTAL MODULES - 20FT TOTAL PRIMARY ELECTRICAL 277V. A2 SIGN WALL NOTE: GC IS TO REMOVE EXISTING LIGHT AND RELOCATE 2 FT UNDER NEW SIGN. Address Approval / Date Sheet 0629161AR9 IH 6/10/21 # 1450 Plaza Pl, Southlake, TX Acct. Rep.Coordinator DEBBIE MOLTZLAUREN STACKHOUSE FINAL ELECTRICALCONNECTION BYCUSTOMER 2301 River RoadSuite 201Louisville, KY 40206 (502) 897-9800 Cell (502) 554-2575 14201 Sovereign Road #101Fort Worth, TX 76155 R1(6-15-21)IH: - Update page 1 with revised plan from architect. Updated elevations. - Delete F.- On front elevation - see architect notes about angling the "E" light bars, and adding some around the corners.- Sign B1/B2- Increase the stroke of the outer ring to match the letter "O" in their name.- Change sign C to open channel with exposed white LED stroke(s) in the letters- Change sign B2 to an EVO Entertainment sign instead of play button R2(6-17-21)IH: Block out the floor plan details so we just show the shape of the building and not all the details of what's inside. R3(7-16-21)IH: - Add the trellis on the plan view (at an angle) & draw it up as a separate item on the art so that we can send it to the engineer.- Add a separate item ID for the support bars behind sign A3 as well for the engineer. 7-27-21 IH: add dimensions for "F" to the drawing for estimating. There will be 1 strip of vertical white Contour LED on the face of each as shown on the latest renderings in Downloads. - Correct the item IDs on the floor plan- they seem to be labeled as G instead of F. R4(8-12-21)IH: Delete sign B, re-letter. Include power requirements for each sign R5(8-30-21)IH: Removals will be on a separate order. Delete page 2. G- Vertical supports to be provided by GC (size TBD per engineering). Our scope will be to sleeve them with brushed stainless finish and the horizontal trellis is in our scope and will need to match that same finish.(9/7/21)JGZ: Add electrical details. R6(9-20-21)IH: Remove the trellis for sign A1 & the horizontal frame structure for A3 from #0629161Ar5 (change to R6). Create new design #0630292A with these items. The GC is supplying the 5 vertical supports for the A1 trellis - see email for the plan view with placement/size. Add painted pole cover with silver Matthews paint finish (TBD) & clear coat over the 5 vertical supports & this will be the same paint finish for the trellis pieces we are building. R7(10-18-21)IH: A - We probably need to separate out signs A1, A2, A3 on separate pages so we can add individual attachment/electrical details for each. For A1/A3, note the steel tube structure will be supplied by GC & note to reference stamped engineering for attachment details.We need to be sure our drawings include dimensions for installation of all signs - A2 needs a dimension from top of wall down. See notes on survey PDF - they are going to have to remove that light so the sign can be fully above the T-Bar ceiling dimension.C - Survey notes we need raceways but we want to pre-wire instead. Add pre-wiring notes to the art with a survey note for location of power supplies.Sign D will also need to be pre-wired.B- We need to provide amp draw per each tower rather than a total for all since they are all around the building and likely will not all be tied together to the same.E- Revise the detail for these to the new detail Dennis Mitchell provided. Sketch & estimate included in PT Art References folder dated 10/15 so you can also update power requirements. R8(10-28-21)IH: See Survey PDF in PT dated 10/26/21. Add note for all sign types: primary electrical 277v.**The art will be posted this week for us to release the job so we need to clean it up and remove as many survey notes as possible on this revision.A - Color temperature of LEDs is confirmed 6500k white for these signs.Can we note for A1/A3 that the power supplies will be located in transformer boxes on the back side of the letters concealed on the frame with all conduit/boxes painted silver? Then we can delete the TBD note?Sign A2: Add note that GC is to remove or relocate the existing light and add the dimensions from the survey & information about location of leads per survey. Power supplies will be located behind wall. Delete TBD note.B - Change color temperature to 6500k white rather than warm white.C - Add notes for location of power supplies/leads per survey. 6500k white LEDD - 6500k white LED confirmed. The wiring/power supply details are still TBD on this one.E - Survey still needed for lengths so leave that note on the art. Use 5000k white LED. Add note from survey re: j-boxes and no prewiring needed. R9(11-8-21)IH: Sign A3 is going to be moved to the wall instead of mounted on the horizontal bars. See Art References folder for new location. Update attachment method- should be like A2 now. 5 of 9 Address Approval / Date Sheet 0629161AR9 IH 6/10/21 # 1450 Plaza Pl, Southlake, TX Acct. Rep.Coordinator DEBBIE MOLTZLAUREN STACKHOUSE FINAL ELECTRICALCONNECTION BYCUSTOMER 2301 River RoadSuite 201Louisville, KY 40206 (502) 897-9800 Cell (502) 554-2575 14201 Sovereign Road #101Fort Worth, TX 76155 R1(6-15-21)IH: - Update page 1 with revised plan from architect. Updated elevations. - Delete F.- On front elevation - see architect notes about angling the "E" light bars, and adding some around the corners.- Sign B1/B2- Increase the stroke of the outer ring to match the letter "O" in their name.- Change sign C to open channel with exposed white LED stroke(s) in the letters- Change sign B2 to an EVO Entertainment sign instead of play button R2(6-17-21)IH: Block out the floor plan details so we just show the shape of the building and not all the details of what's inside. R3(7-16-21)IH: - Add the trellis on the plan view (at an angle) & draw it up as a separate item on the art so that we can send it to the engineer.- Add a separate item ID for the support bars behind sign A3 as well for the engineer. 7-27-21 IH: add dimensions for "F" to the drawing for estimating. There will be 1 strip of vertical white Contour LED on the face of each as shown on the latest renderings in Downloads. - Correct the item IDs on the floor plan- they seem to be labeled as G instead of F. R4(8-12-21)IH: Delete sign B, re-letter. Include power requirements for each sign R5(8-30-21)IH: Removals will be on a separate order. Delete page 2. G- Vertical supports to be provided by GC (size TBD per engineering). Our scope will be to sleeve them with brushed stainless finish and the horizontal trellis is in our scope and will need to match that same finish.(9/7/21)JGZ: Add electrical details. R6(9-20-21)IH: Remove the trellis for sign A1 & the horizontal frame structure for A3 from #0629161Ar5 (change to R6). Create new design #0630292A with these items. The GC is supplying the 5 vertical supports for the A1 trellis - see email for the plan view with placement/size. Add painted pole cover with silver Matthews paint finish (TBD) & clear coat over the 5 vertical supports & this will be the same paint finish for the trellis pieces we are building. R7(10-18-21)IH: A - We probably need to separate out signs A1, A2, A3 on separate pages so we can add individual attachment/electrical details for each. For A1/A3, note the steel tube structure will be supplied by GC & note to reference stamped engineering for attachment details.We need to be sure our drawings include dimensions for installation of all signs - A2 needs a dimension from top of wall down. See notes on survey PDF - they are going to have to remove that light so the sign can be fully above the T-Bar ceiling dimension.C - Survey notes we need raceways but we want to pre-wire instead. Add pre-wiring notes to the art with a survey note for location of power supplies.Sign D will also need to be pre-wired.B- We need to provide amp draw per each tower rather than a total for all since they are all around the building and likely will not all be tied together to the same.E- Revise the detail for these to the new detail Dennis Mitchell provided. Sketch & estimate included in PT Art References folder dated 10/15 so you can also update power requirements. R8(10-28-21)IH: See Survey PDF in PT dated 10/26/21. Add note for all sign types: primary electrical 277v.**The art will be posted this week for us to release the job so we need to clean it up and remove as many survey notes as possible on this revision.A - Color temperature of LEDs is confirmed 6500k white for these signs.Can we note for A1/A3 that the power supplies will be located in transformer boxes on the back side of the letters concealed on the frame with all conduit/boxes painted silver? Then we can delete the TBD note?Sign A2: Add note that GC is to remove or relocate the existing light and add the dimensions from the survey & information about location of leads per survey. Power supplies will be located behind wall. Delete TBD note.B - Change color temperature to 6500k white rather than warm white.C - Add notes for location of power supplies/leads per survey. 6500k white LEDD - 6500k white LED confirmed. The wiring/power supply details are still TBD on this one.E - Survey still needed for lengths so leave that note on the art. Use 5000k white LED. Add note from survey re: j-boxes and no prewiring needed. R9(11-8-21)IH: Sign A3 is going to be moved to the wall instead of mounted on the horizontal bars. See Art References folder for new location. Update attachment method- should be like A2 now. 6 of 9 EXTERIOR PERIMETER L.E.D PROVIDE & INSTALLB B 2811 25 18 25 6 7 44 9 15 18 2438 Light Guide End CapLight Guide Mounting Clip Light Guide Connector Light Guide 18 25 2438 28 Tetra Contour Complete System All dim. in MM 13 13 Light Engine MountingClip 10 11 Light Engine Light Engine, Light Guide & Mounting Clip EXTERIOR PERIMETER WHITE LED 6500k GE CONTOUR LS STRIP LIGHTING SURVEY REQUIRED TO VERIFY DIMENSIONS 210 +/- LINEAR FOOTAGE TO BE DETERMINED 10 POWER SUPPLIES GE GEPS24-100 REQUIRED PRIMARY ELECTRICAL 277V. Address Approval / Date Sheet 0629161AR9 IH 6/10/21 # 1450 Plaza Pl, Southlake, TX Acct. Rep.Coordinator DEBBIE MOLTZLAUREN STACKHOUSE FINAL ELECTRICALCONNECTION BYCUSTOMER 2301 River RoadSuite 201Louisville, KY 40206 (502) 897-9800 Cell (502) 554-2575 14201 Sovereign Road #101Fort Worth, TX 76155 R1(6-15-21)IH: - Update page 1 with revised plan from architect. Updated elevations. - Delete F.- On front elevation - see architect notes about angling the "E" light bars, and adding some around the corners.- Sign B1/B2- Increase the stroke of the outer ring to match the letter "O" in their name.- Change sign C to open channel with exposed white LED stroke(s) in the letters- Change sign B2 to an EVO Entertainment sign instead of play button R2(6-17-21)IH: Block out the floor plan details so we just show the shape of the building and not all the details of what's inside. R3(7-16-21)IH: - Add the trellis on the plan view (at an angle) & draw it up as a separate item on the art so that we can send it to the engineer.- Add a separate item ID for the support bars behind sign A3 as well for the engineer. 7-27-21 IH: add dimensions for "F" to the drawing for estimating. There will be 1 strip of vertical white Contour LED on the face of each as shown on the latest renderings in Downloads. - Correct the item IDs on the floor plan- they seem to be labeled as G instead of F. R4(8-12-21)IH: Delete sign B, re-letter. Include power requirements for each sign R5(8-30-21)IH: Removals will be on a separate order. Delete page 2. G- Vertical supports to be provided by GC (size TBD per engineering). Our scope will be to sleeve them with brushed stainless finish and the horizontal trellis is in our scope and will need to match that same finish.(9/7/21)JGZ: Add electrical details. R6(9-20-21)IH: Remove the trellis for sign A1 & the horizontal frame structure for A3 from #0629161Ar5 (change to R6). Create new design #0630292A with these items. The GC is supplying the 5 vertical supports for the A1 trellis - see email for the plan view with placement/size. Add painted pole cover with silver Matthews paint finish (TBD) & clear coat over the 5 vertical supports & this will be the same paint finish for the trellis pieces we are building. R7(10-18-21)IH: A - We probably need to separate out signs A1, A2, A3 on separate pages so we can add individual attachment/electrical details for each. For A1/A3, note the steel tube structure will be supplied by GC & note to reference stamped engineering for attachment details.We need to be sure our drawings include dimensions for installation of all signs - A2 needs a dimension from top of wall down. See notes on survey PDF - they are going to have to remove that light so the sign can be fully above the T-Bar ceiling dimension.C - Survey notes we need raceways but we want to pre-wire instead. Add pre-wiring notes to the art with a survey note for location of power supplies.Sign D will also need to be pre-wired.B- We need to provide amp draw per each tower rather than a total for all since they are all around the building and likely will not all be tied together to the same.E- Revise the detail for these to the new detail Dennis Mitchell provided. Sketch & estimate included in PT Art References folder dated 10/15 so you can also update power requirements. R8(10-28-21)IH: See Survey PDF in PT dated 10/26/21. Add note for all sign types: primary electrical 277v.**The art will be posted this week for us to release the job so we need to clean it up and remove as many survey notes as possible on this revision.A - Color temperature of LEDs is confirmed 6500k white for these signs.Can we note for A1/A3 that the power supplies will be located in transformer boxes on the back side of the letters concealed on the frame with all conduit/boxes painted silver? Then we can delete the TBD note?Sign A2: Add note that GC is to remove or relocate the existing light and add the dimensions from the survey & information about location of leads per survey. Power supplies will be located behind wall. Delete TBD note.B - Change color temperature to 6500k white rather than warm white.C - Add notes for location of power supplies/leads per survey. 6500k white LEDD - 6500k white LED confirmed. The wiring/power supply details are still TBD on this one.E - Survey still needed for lengths so leave that note on the art. Use 5000k white LED. Add note from survey re: j-boxes and no prewiring needed. R9(11-8-21)IH: Sign A3 is going to be moved to the wall instead of mounted on the horizontal bars. See Art References folder for new location. Update attachment method- should be like A2 now. 7 of 9 PRIMARY ELECTRICAL AND BLOCKING BY OTHERS (NOT INCLUDED BY CSI). 3M VINYL TEAL GREEN 3630-246 3M VINYL TEAL GREEN 3630-246 3M VINYL LIME GREEN 3630-136 3M VINYL LIME GREEN 3630-136 3M VINYL ORANGE 3630-44 3M VINYL ORANGE 3630-44 FACE-LIT CHANNEL LETTERS ONE (1) REQUIRED - MANUFACTURE & INSTALL SCALE: 3/16" = 1' - 0"D D C 38’-3”2’-4 5/8”19’-4”3’-7”6 3/4”6 1/4" 2 1/4” 1 5/8”2 1/2"16’-3 3/4” 5/8”91.38 SQ FT 315.35 SQ FT 3" DEEP ALUM. OPEN LETTERS TO BE LIT WITH GE CONTOUR 6500K WHITE L.E.D.’S. RETURNS ON THE OUTSIDE P.T.M. SW 7674 PEPPERCORN. RETURNS IN THE INSIDE AND BACKS PTM VINYL COLORS. REMOTE POWER SUPPLIES BEHIND WALL FLUSH MOUNT TO WALL. 4 3/4” 7”2 1/4”APPROX. AMP DRAW: 3.3 AMPS PER SIGN REQ'D FOR EACH SET OF CHANNEL LETTERS APPROX. AMP DRAW: 3.3 AMPS PER SIGN REQ'D FOR EACH SET OF CHANNEL LETTERS ALL ACCESS FOR INSTALL AND PER SURVEY SERVICE INSIDE THEATER ABOVE T-BAR CIELING PRE-WIRING REQUIRED FOR SIGN D. TO DETERMINESURVEY REQUIRED LOCATION OF POWER SUPPLIES PRIMARY ELECTRICAL 277V. ELECTRICAL AT BOTTOM ELECTRICAL IN MIDDLE ELECTRICAL AT TOP FACE-LIT CHANNEL LETTERS ONE (1) REQUIRED - MANUFACTURE & INSTALL SCALE: 3/16" = 1' - 0"C Address Approval / Date Sheet 0629161AR9 IH 6/10/21 # 1450 Plaza Pl, Southlake, TX Acct. Rep.Coordinator DEBBIE MOLTZLAUREN STACKHOUSE FINAL ELECTRICALCONNECTION BYCUSTOMER 2301 River RoadSuite 201Louisville, KY 40206 (502) 897-9800 Cell (502) 554-2575 14201 Sovereign Road #101Fort Worth, TX 76155 R1(6-15-21)IH: - Update page 1 with revised plan from architect. Updated elevations. - Delete F.- On front elevation - see architect notes about angling the "E" light bars, and adding some around the corners.- Sign B1/B2- Increase the stroke of the outer ring to match the letter "O" in their name.- Change sign C to open channel with exposed white LED stroke(s) in the letters- Change sign B2 to an EVO Entertainment sign instead of play button R2(6-17-21)IH: Block out the floor plan details so we just show the shape of the building and not all the details of what's inside. R3(7-16-21)IH: - Add the trellis on the plan view (at an angle) & draw it up as a separate item on the art so that we can send it to the engineer.- Add a separate item ID for the support bars behind sign A3 as well for the engineer. 7-27-21 IH: add dimensions for "F" to the drawing for estimating. There will be 1 strip of vertical white Contour LED on the face of each as shown on the latest renderings in Downloads. - Correct the item IDs on the floor plan- they seem to be labeled as G instead of F. R4(8-12-21)IH: Delete sign B, re-letter. Include power requirements for each sign R5(8-30-21)IH: Removals will be on a separate order. Delete page 2. G- Vertical supports to be provided by GC (size TBD per engineering). Our scope will be to sleeve them with brushed stainless finish and the horizontal trellis is in our scope and will need to match that same finish.(9/7/21)JGZ: Add electrical details. R6(9-20-21)IH: Remove the trellis for sign A1 & the horizontal frame structure for A3 from #0629161Ar5 (change to R6). Create new design #0630292A with these items. The GC is supplying the 5 vertical supports for the A1 trellis - see email for the plan view with placement/size. Add painted pole cover with silver Matthews paint finish (TBD) & clear coat over the 5 vertical supports & this will be the same paint finish for the trellis pieces we are building. R7(10-18-21)IH: A - We probably need to separate out signs A1, A2, A3 on separate pages so we can add individual attachment/electrical details for each. For A1/A3, note the steel tube structure will be supplied by GC & note to reference stamped engineering for attachment details.We need to be sure our drawings include dimensions for installation of all signs - A2 needs a dimension from top of wall down. See notes on survey PDF - they are going to have to remove that light so the sign can be fully above the T-Bar ceiling dimension.C - Survey notes we need raceways but we want to pre-wire instead. Add pre-wiring notes to the art with a survey note for location of power supplies.Sign D will also need to be pre-wired.B- We need to provide amp draw per each tower rather than a total for all since they are all around the building and likely will not all be tied together to the same.E- Revise the detail for these to the new detail Dennis Mitchell provided. Sketch & estimate included in PT Art References folder dated 10/15 so you can also update power requirements. R8(10-28-21)IH: See Survey PDF in PT dated 10/26/21. Add note for all sign types: primary electrical 277v.**The art will be posted this week for us to release the job so we need to clean it up and remove as many survey notes as possible on this revision.A - Color temperature of LEDs is confirmed 6500k white for these signs.Can we note for A1/A3 that the power supplies will be located in transformer boxes on the back side of the letters concealed on the frame with all conduit/boxes painted silver? Then we can delete the TBD note?Sign A2: Add note that GC is to remove or relocate the existing light and add the dimensions from the survey & information about location of leads per survey. Power supplies will be located behind wall. Delete TBD note.B - Change color temperature to 6500k white rather than warm white.C - Add notes for location of power supplies/leads per survey. 6500k white LEDD - 6500k white LED confirmed. The wiring/power supply details are still TBD on this one.E - Survey still needed for lengths so leave that note on the art. Use 5000k white LED. Add note from survey re: j-boxes and no prewiring needed. R9(11-8-21)IH: Sign A3 is going to be moved to the wall instead of mounted on the horizontal bars. See Art References folder for new location. Update attachment method- should be like A2 now. 8 of 9 D C Address Approval / Date Sheet 0629161AR9 IH 6/10/21 # 1450 Plaza Pl, Southlake, TX Acct. Rep.Coordinator DEBBIE MOLTZLAUREN STACKHOUSE FINAL ELECTRICALCONNECTION BYCUSTOMER 2301 River RoadSuite 201Louisville, KY 40206 (502) 897-9800 Cell (502) 554-2575 14201 Sovereign Road #101Fort Worth, TX 76155 R1(6-15-21)IH: - Update page 1 with revised plan from architect. Updated elevations. - Delete F.- On front elevation - see architect notes about angling the "E" light bars, and adding some around the corners.- Sign B1/B2- Increase the stroke of the outer ring to match the letter "O" in their name.- Change sign C to open channel with exposed white LED stroke(s) in the letters- Change sign B2 to an EVO Entertainment sign instead of play button R2(6-17-21)IH: Block out the floor plan details so we just show the shape of the building and not all the details of what's inside. R3(7-16-21)IH: - Add the trellis on the plan view (at an angle) & draw it up as a separate item on the art so that we can send it to the engineer.- Add a separate item ID for the support bars behind sign A3 as well for the engineer. 7-27-21 IH: add dimensions for "F" to the drawing for estimating. There will be 1 strip of vertical white Contour LED on the face of each as shown on the latest renderings in Downloads. - Correct the item IDs on the floor plan- they seem to be labeled as G instead of F. R4(8-12-21)IH: Delete sign B, re-letter. Include power requirements for each sign R5(8-30-21)IH: Removals will be on a separate order. Delete page 2. G- Vertical supports to be provided by GC (size TBD per engineering). Our scope will be to sleeve them with brushed stainless finish and the horizontal trellis is in our scope and will need to match that same finish.(9/7/21)JGZ: Add electrical details. R6(9-20-21)IH: Remove the trellis for sign A1 & the horizontal frame structure for A3 from #0629161Ar5 (change to R6). Create new design #0630292A with these items. The GC is supplying the 5 vertical supports for the A1 trellis - see email for the plan view with placement/size. Add painted pole cover with silver Matthews paint finish (TBD) & clear coat over the 5 vertical supports & this will be the same paint finish for the trellis pieces we are building. R7(10-18-21)IH: A - We probably need to separate out signs A1, A2, A3 on separate pages so we can add individual attachment/electrical details for each. For A1/A3, note the steel tube structure will be supplied by GC & note to reference stamped engineering for attachment details.We need to be sure our drawings include dimensions for installation of all signs - A2 needs a dimension from top of wall down. See notes on survey PDF - they are going to have to remove that light so the sign can be fully above the T-Bar ceiling dimension.C - Survey notes we need raceways but we want to pre-wire instead. Add pre-wiring notes to the art with a survey note for location of power supplies.Sign D will also need to be pre-wired.B- We need to provide amp draw per each tower rather than a total for all since they are all around the building and likely will not all be tied together to the same.E- Revise the detail for these to the new detail Dennis Mitchell provided. Sketch & estimate included in PT Art References folder dated 10/15 so you can also update power requirements. R8(10-28-21)IH: See Survey PDF in PT dated 10/26/21. Add note for all sign types: primary electrical 277v.**The art will be posted this week for us to release the job so we need to clean it up and remove as many survey notes as possible on this revision.A - Color temperature of LEDs is confirmed 6500k white for these signs.Can we note for A1/A3 that the power supplies will be located in transformer boxes on the back side of the letters concealed on the frame with all conduit/boxes painted silver? Then we can delete the TBD note?Sign A2: Add note that GC is to remove or relocate the existing light and add the dimensions from the survey & information about location of leads per survey. Power supplies will be located behind wall. Delete TBD note.B - Change color temperature to 6500k white rather than warm white.C - Add notes for location of power supplies/leads per survey. 6500k white LEDD - 6500k white LED confirmed. The wiring/power supply details are still TBD on this one.E - Survey still needed for lengths so leave that note on the art. Use 5000k white LED. Add note from survey re: j-boxes and no prewiring needed. R9(11-8-21)IH: Sign A3 is going to be moved to the wall instead of mounted on the horizontal bars. See Art References folder for new location. Update attachment method- should be like A2 now. 9 of 9 E2E1 SCALE: 1/16" = 1'-0" MANUFACTURE AND INSTALLE3E2E1LED WALL WASHER (HORIZONTAL) FABRICATED PAN PANELS WITH MINIMUM SEAMS. PAINTED WHITE. CHANNELS INSTALLED FLUSH TO WALL WITH NON-CORROSIVE FASTENERS. INTERNALLY ILLUMINATED WITH WHITE 5000k TETRA BATTEN L.E.D. TO ILLUMINATE ON ONE SIDE. CHANNELS INSTALLED FLUSH TO WALL WITH NON-CORROSIVE FASTENERS. NOTE: CUSTOMER TO PROVIDE PHOTOCELL @ THE WALL OR TIMECLOCK AT SERVICE PANEL. SHUT OFF BREAKER AT LOCKABLE SERVICE PANEL TO DISCONNECT FIXTURES FOR SERVICE. ALL PENETRATIONS TO EXTERIOR OF BUILDING FOR MOUNTING HARDWARE, ELECTRICAL, OR OTHER WILL BE SEALED WITH SILICONE OR OTHER 20 YEAR SEALANT TO PREVENT WATER INTRUSION AT PENETRATIONS. E3 5’-0” 5’-0” 28’-0”91’-1 5/8” 63’-0 7/8”3 1/2"3 1/2”3 1/2”DECOR ELEMENTS 384’-8” (+/-) TOTAL LINEAR FT. 476’-7” (+/-) TOTAL LINEAR FT. 196’-0” (+/-) TOTAL LINEAR FT. 2”3 1/2"WALL2” x 2” ALUM. ANGLE WHITE L.E.D. PRE FINISHED WHITE ALUM. BENT COVER EASILY DAISY CHAIN UP TO 172 FT PRIMARY ELECTRICAL 277V. PER SURVEY: J BOXES WILL BE INSIDE OF BUILDING, NO PRE-WIRING OR EXTERIOR J BOXES WILL BE NEEDED. 2021, 5Gstudio_collaboartive, llc. Allrights reserved12.7.2021 5Gstudio_Collabrative, llc. 1217 Main Street, Suite 500 Dallas, TX 75202 SOUTHLAKE, TEXASEVO ENTERTAINMENT EVO Entertainment 05 05 +0'-0" +38'-0" +45'-0" +49'-0" +41'-0" +0'-0" 05 05 +0'-0" +38'-0" +45'-0" +49'-0" +45'-0" +0'-0" 05 05 +0'-0" +38'-0" +45'-0" +38'-0" +0'-0" +45'-0" 05 05 +0'-0" +41'-0" +49'-0" +45'-0" +0'-0" 03 03 01 01 01 02 01 01 01 03 01 01 01 01 01 01 01 02 0303 03 03 01 01 01 01 03 03 02 01 01 01 01 03 02 01 01 03 01 01 03 03 04 030506 06 03 EXTERIOR ELEVATION KEYNOTES 01 CONCRETE TILT WALL WITH MEDIUM TEXTURE COATING AND ACRYLIC PAINT 02 1/2" STUCCO FINISH COAT ON EXISTING TILT WALL. MEDIUM TEXTURE AND ACRYLIC PAINT 03 INTERNALLY ILLUMINATED SIGNAGE ELEMENT 04 ALUMINUM DECORATIVE TRELLIS 05 THIN BRICK VENEER ON CONCRETE SITE CAST WALL 06 STAINLESS STEEL GUARDRAIL 07 INTERNALLY ILLUMINATED POSTER CASE A3 EXTERIOR ELEVATIONS NORTHWEST EXTERIOR ELEVATION : PLAZA PLACE SCALE 1/16" = 1'-0" EXTERIOR ELEVATION GENERAL NOTES A CONCRETE TILT PANELS TO BE PREPPED TO HAVE SMOOTH AND UNIFORM SURFACE PRIOR TO FINISHES. B COLORS SUBJECT TO ARCHITECT AND OWNER'S APPROVAL OF 4' X 4' BUILDING APPLIED SAMPLES PRIOR TO WORK. ADDITIONAL SAMPLES MAY BE REQUIRED PRIOR TO FINAL APPROVAL. C ALL SIGNAGE REQUIRES SEPARATE PERMIT REVIEW AND APPROVAL PROCESS EXCEPT ADDRESS NUMBERS. SOUTHWEST EXTERIOR ELEVATION : FEDERAL WAY SCALE 1/16" = 1'-0" SOUTHEAST EXTERIOR ELEVATION : CENTRAL AVENUE SCALE 1/16" = 1'-0" NORTHEAST EXTERIOR ELEVATION : HIGHWAY 114 SCALE 1/16" = 1'-0" EXTERIOR SIGN VARIANCE PROPOSALEVO ENTERTAINMENTSOUTHLAKE, TEXAS12.7.20212021, 5Gstudio_collaboartive, llc. 1217 Main Street, Suite 500 Dallas, Tx 75202 All Rights Reservedwww.5Gstudio.com