Item 6 - PlansEXISTINGPARKINGSTRUCTURE255 SPACESEXISTING BUILDING896712121281311766191417LAWN24' FIRE LANE24' FIRE LANE24' FIRE LANEPOOLPATIOPOOLDECK24' FIRE LANE26' FIRE LANECHARGING STATIONS; (TYP. OF 6); REF. MEPGRACE LANEGRACE LANEACCESSIBLE ROUTEA1.033'-0"8'-0"3'-0"8'-0"3'-0"8'-0"5'-0"9'-0"11'-0"5'-0"9'-0"9'-0"5'-0"9'-0"A1.08NEW CAR CHARGING STATION, TYPICAL (5)EXISTING LANDSCAPINGEXISTING SIDEWALKNOTE:CAR CHARGING STATIONS SHALL BE CENTERED WITH PARKING STRIPE. NEW DIRECTIONAL SIGN, SEE DETAIL 6/A1.0ACCESSIBLE CAR CHARGING STATION. CONTROLS AND OPERATING MECHANISMS FOR THE ACCESSIBLE CHARGING STATION SHALL COMPLY WITH TAS 309 ANDSHALL BE WITHIN THE FORWARD REACH RANGES SPECIFIED IN TAS 308.29 " T Y P .9"NEW DIRECTIONAL SIGN, SEE DETAIL 6/A1.0NEW 5" DIA. 36" HIGH HIDDEN BASE BOLLARD. SEE DETAIL 4/A1.10. TYP. OF (2)NEW 5" DIA. 36" HIGH HIDDEN BASE BOLLARD. SEE DETAIL 4/A1.0 TYP. OF (5)NEW HC PARKING SIGN. SEE DETAIL 5/A1.01'-4"WHEEL STOP, PAINTED TO MATCH BOLLARDS, TYP.24" TYP.NEW HC PARKING SIGN. SEE DETAIL 5/A1.09 " T Y P .9" TYP.NEW SURFACE MOUNTED FIRE EXTINGUISHER TYPE 2-A:20-B:CNEW CAR CHARGING STATION, TYPICAL (5)NEW DIRECTIONAL SIGN NEW ACCESSIBLE CAR CHARGING STATION. CONTROLS AND OPERATING MECHANISMS FOR THE ACCESSIBLE CHARGING STATION SHALL COMPLY WITH TAS 309 AND SHALL BE WITHIN THE FORWARD REACH RANGES SPECIFIED IN TAS 308.2NEW DIRECTIONAL SIGNNEW BOLLARDNEW HC PARKING SIGNELECTR
I
C
VEHIC
L
E
PARKING EXCEPT FOR ELECTRIC VEHICLE CHAR
G
I
N
G
ONLY WHILE CHARGING 100' - 0"A1.06A1.06A1.04A1.05NEW BOLLARD, TYP.ELECTRIC VEHICLE PARKING A1.07FASTENERGALV. STEEL TUBE, PAINTED1/4" GALV. STEEL PLATE CAP, CONTINUOUS WELD GRIND SMOOTHEXCEPT FOR ELECTRIC VEHICLE CHARGING ONLY WHILE CHARGING FINISH GRADE24" MIN.7'-6"BEVEL TOP OF FOOTING 1" FOR DRAINAGE10" DIA. CONCRETE FOOTING (3,000 PSI)STEEL TUBE SUPPORTSPACERALUMINUM PARKING SIGNFASTENERPARKINGVIOLATORS FASTENERS12"x18" ACCESSIBLE PARKING SIGN 0.63 ALUMINUM, REFLECTIVE WHITE LINES AND LETTERING ON REFLECTIVE BLUE FIELD. MATCH EXISTING SIGN1/4" GALV. STEEL PLATE CAP, CONTINUOUS WELD GRIND SMOOTHPENALTY SIGN IN 1" LETTERS (MIN.)FINISH GRADESUBJECT TO FINE AND TOWINGGALV. STEEL TUBE, PAINTED.MATCH EXISTING POST HEIGHTA1.0724" MIN.BEVEL TOP OF FOOTING 1" FOR DRAINAGE10" DIA. CONCRETE FOOTING (3,000 PSI)EXISTING PAVING5" DIA. 36" HIGH HIDDEN BASE BOLLARDBY IDEALSHIELD.COM 1/4" LIME GREEN BOLLARD COVER BY IDEALSHIELD.COM3'-0"ATTS XETEFOSAREGISTEREDARCHIT E CT RICHARDL.WILL I A MS 17482DRAWINGS, SPECIFICATIONS AND OTHER DOCUMENTS, PREPARED BY OXLEY WILLIAMS THARP ARCHITECTS, PLLC ARE INSTRUMENTS OF SERVICE FOR USE SOLELY WITH RESPECT TO THIS PROJECT. THIS INCLUDES DOCUMENTS IN ELECTRONIC FORM. OXLEY WILLIAMS THARP ARCHITECTS, PLLC SHALL BE DEEMED THE AUTHORS AND OWNERS OF THEIR RESPECTIVE INSTRUMENTS OF SERVICE AND SHALL RETAIN ALL COMMON LAW, STATUTORY AND OTHER RESERVED RIGHTS, INCLUDING COPYRIGHTS. THE INSTRUMENTS OF SERVICE SHALL NOT BE USED BY THE OWNER FOR FUTURE ADDITIONS OR ALTERATIONS TO THIS PROJECT OR FOR OTHER PROJECTS, WITHOUT THE PRIOR WRITTEN AGREEMENT OF OXLEY WILLIAMS THARP ARCHITECTS, PLLC. ANY UNAUTHORIZED USE OF THE INSTRUMENTS OF SERVICE SHALL BE WITHOUT LIABILITY TO OXLEY WILLIAMS THARP ARCHITECTS, PLLC AND ITS CONSULTANTS.24 FEBRUARY 2022509 PECAN STREETSUITE 100FORT WORTH, TX 76102817.993.9844www.owtarchitects.comCONSTRUCTION DOCUMENTSFIRM REGISTRATION #: BR 301WESTIN HOTELSOUTHLAKE1200 E. STATE HWY 114,SOUTHLAKE, TX 760922014-001-0024 FEBRUARY, 2022A1.0CHARGINGSTATIONSSCALE: 1" = 30'-0" A1.01SITE PLAN - CAR CHARGING STATIONSTOTAL PARKING SPACES - 424 SPACESNUMBER OF CHARGING STATIONS - 12 SPACES, 2.8% SCALE: 3/32" = 1'-0" A1.03ENLARGED SITE PLAN -CAR CHARGING STATIONSSCALE: 1/8" = 1'-0" A1.08PARTIAL ELEVATIONSCALE: 1/2" = 1'-0" A1.06DIRECTIONAL SIGNNOT TO SCALEA1.02CAR CHARGING STATIONSCALE: 3" = 1'-0" A1.07SIGN DETAILSCALE: 1/2" = 1'-0" A1.05ACCESSIBLEPARKING SIGNSCALE: 1/2" = 1'-0" A1.04TYPICALBOLLARD DETAILRevision ScheduleRev.#RevisionDescriptionRevisionDate1 City Comments 03-14-2022 14 MARCH 2022 11111111NORTHZA21-0103
ZA21-0103
DUAL PORT 30A LEVEL 2
CHARGING PROTOCOL: SAE J-1772
7.2 KW PER PORT
NEMA 3R HOUSING
OCPP COMPLIANT
7” COLOR SCREEN
UL COMPLIANT—ETL CERTIFIED
OPTIONS
CABLE RETRACTOR
CREDIT CARD SCANNER
3G/4G GPRS Modem
V2G per ISO 15118 (June 2018)
DUAL PORT 30A AMP LEVEL 2
COMMERCIAL CHARGING STATION
PEDESTAL
www.btcpower.com 1719 Grand Ave , Santa Ana, CA 92705
Model # EVP‐2002‐30
Power per Port 7.2 kW (240V AC @ 30A)
Electrical Service
Power 240/208 VAC, 30A Load with 40A Branch Circuit Per Port
Service Panel 40A Dual Breakers Per Port
(No GFCI)
Service Wiring 3‐wire (L1, L2, Earth Ground)
FuncƟonal Interfaces
Connector Type SAE J1772
Charging Protocol SAE J1772
Standard Cable Length >18 Ō
Cable Retractor (opƟon) Counter Weight Overhead Retractor ADA compliant
LCD Display 1500 nits 7" color, 800 x 480, UV protected
Card Reader ISO 14443 Type A&B, ISO 18092 NFC
Vehicle to Grid (opƟon) ISO 15118 (available June 2018)
Safety and ConnecƟvity
Ground Fault DetecƟon 5mA CCID trip with 3 x automaƟc restarts
Detect Coupler Removal Per SAE J1772™
Power Measurement Accuracy: + 2% from 5% to full scale (30A)
Power Report Interval Every 15 minute on the hour
LAN (OpƟonal) 2.4 GHz Wi‐Fi (802.11 b/g/n)
Wide Area Network 3G/4G GSM, 3G/4G CDMA
CommunicaƟon Protocols OCPP 1.5, OCPP 1.6
Safety and OperaƟon
Enclosure RaƟng NEMA 3R
Regulatory Compliance
ETL cerƟfied for USA and cUL cerƟfied for Canada; complies with
UL 2594, UL 2231‐1, UL 2231‐2, and NEC ArƟcle 625, EMC: FCC
Part 15 Class A
Surge ProtecƟon 6KV @ 3000A
OperaƟng Temperature ‐30°C to +50°C (‐22°F to 122°F)
Storage Temperature ‐30°C to +50°C (‐22°F to 122°F)
AlƟtude 6000 Ō
Humidity 85% non condensing
ZA21-0103
User Manual & Installation Instructions
This document is the Property of Broadband Telecom
Power Inc. and will not be copied, reproduced, or used as
the basis for sale or manufacture of apparatus without
written permission.
BTCPower EVP Series EVSE
Installation and Operations Manual
Rev O
1 | P a g e
EVP-1001-XX EVP-1002-XX EVP-2001-XX EVP-2002-XX
Part Number Description
EVP-1001-00 30 Amp Installation
EVP-1001-40 40 Amp Installation
EVP-1001-70 70 Amp Installation
EVP-2001-30 30 Amp Installation
EVP-2001-40 40 Amp Installation
EVP-2001-70 70 Amp Installation
EVP-2002-30 30 Amp Installation
EVP-2002-40 40 Amp Installation
EVP-2002-30 30 Amp Installation
EVP-2002-40 40 Amp Installation
Note: Display and Retractable Assemblies are Optional
Credit Card Reader Can Be RFID or Both (RFID & Credit Card Reader)
User Manual & Installation Instructions
This document is the Property of Broadband Telecom
Power Inc. and will not be copied, reproduced, or used as
the basis for sale or manufacture of apparatus without
written permission.
BTCPower EVP Series EVSE
Installation and Operations Manual
Rev O
2 | P a g e
REVISION HISTORY
Rev Date ECN # Description of BTC Power EVSE Engineer
C 3/2/2013 1001 Initial Release Cortes
D 4/10/2013 1002 Added warnings per ETL Hymel
E 4/12/2013 1003 Added user instructions Schulz
F 5/13/2013 1004 Added WiFi modem/ Level 2 without meter Hymel
G 11/20/2014 1005 Updated to new hardware Paryani
H 11/02/2015 1009,
1006 Updated hardware as well as payment controller Cortes
I 1/5/2017 Added updated charger images Moinee
J 3/22/2017 Updated Entire Manual Elmassry
K 8/9/17 Updated Entire Manual. Add Spec Dwgs. Elmassry
L 10/9/17 Updated Entire Manual. Added Troubleshooting and
Warranty Information. Elmassry
M 11/10/17 Updated I-sheets Elmassry
N 6/5/18 Added Display and WiFi Instructions Elmassry
O 6/18/2018 Service Breaker requirements Moinee
User Manual & Installation Instructions
This document is the Property of Broadband Telecom
Power Inc. and will not be copied, reproduced, or used as
the basis for sale or manufacture of apparatus without
written permission.
BTCPower EVP Series EVSE
Installation and Operations Manual
Rev O
3 | P a g e
PLEASE NOTE
This user’s manual includes the latest information at the time of printing. BTC Power, Inc. (BTC
Power) reserves the right to make changes to this product without further notice. Changes or
modifications to this product by other than an authorized service facility could void the product
warranty.
If you have questions about the use of this product, contact your customer service
representative. Refer to the Customer Support section located in this guide.
User Manual & Installation Instructions
This document is the Property of Broadband Telecom
Power Inc. and will not be copied, reproduced, or used as
the basis for sale or manufacture of apparatus without
written permission.
BTCPower EVP Series EVSE
Installation and Operations Manual
Rev O
4 | P a g e
Table of Contents
1 IMPORTANT SAFETY INSTRUCTIONS ............................................................................................ 5
1.1 Safety Guidelines ............................................................................................................................. 5
1.2 GROUNDING INSTRUCTIONS .................................................................................................... 7
2 INSTALLATION ...................................................................................................................................... 8
2.1 Before Installing ............................................................................................................................... 8
2.2 Safety Requirements ....................................................................................................................... 8
2.3 Tools and Ancillary Equipment ...................................................................................................... 9
2.4 Special Tools & Hardware Torque Value ................................................................................... 10
2.5 Installation Procedure for Pedestal Chargers ........................................................................... 11
2.6 Installation Procedure for Wall Mounted EVSE Chargers ....................................................... 14
3 ELECTRICAL CONNECTIONS ......................................................................................................... 16
3.1 EVP-30 Single and dual charge system electrical connection ............................................... 16
3.2 Single Port EVSE Charger .......................................................................................................... 17
3.3 Dual Port EVSE Charger .............................................................................................................. 18
4 Operation ................................................................................................................................................ 20
4.1 Screen Scenarios ......................................................................................................................... 20
4.2 WIFI Network .................................................................................................................................. 23
5 TESTING ................................................................................................................................................ 26
6 TROUBLESHOOTING ........................................................................................................................ 27
7 SPECIFICATIONS ............................................................................................................................... 28
7.1 DUAL PEDESTAL GENERAL DIMENSIONS ........................................................................... 29
7.2 SINGLE PEDESTAL GENERAL DIMENSIONS ....................................................................... 30
7.3 DUAL WALL MOUNT GENERAL DIMENSIONS ..................................................................... 31
7.4 SINGLE WALL MOUNT GENERAL DIMENSIONS ................................................................. 33
User Manual & Installation Instructions
This document is the Property of Broadband Telecom
Power Inc. and will not be copied, reproduced, or used as
the basis for sale or manufacture of apparatus without
written permission.
BTCPower EVP Series EVSE
Installation and Operations Manual
Rev O
5 | P a g e
1 IMPORTANT SAFETY INSTRUCTIONS
1.1 Safety Guidelines
WARNING
READ THIS MANUAL BEFORE YOU BEGIN
EVSE (Electric Vehicle Supply Equipment) manages electricity and may be hazardous.
Failure to follow the below precautions and the Danger, Warning and Caution instructions in
this manual may result in serious injury. Follow all rules, codes and laws that apply to your
area and installation guidelines.
IMPORTANT SAFETY INSTRUCTIONS
The following symbols may be found in your handbook or on labels affixed to your conductive
charge station:
DANGER
Danger indicates a hazard or unsafe practice which, if
not avoided, will result in severe injury or possibly
death.
WARNING
Warning indicates a hazard or unsafe practice which, if
not avoided, may result in severe injury or possibly
death.
CAUTION
Caution indicates a hazard or unsafe practice which, if
not avoided, may result in minor injury
NOTE:
Important information to consider, otherwise, improper
installation and/or damage to components may occur.
User Manual & Installation Instructions
This document is the Property of Broadband Telecom
Power Inc. and will not be copied, reproduced, or used as
the basis for sale or manufacture of apparatus without
written permission.
BTCPower EVP Series EVSE
Installation and Operations Manual
Rev O
6 | P a g e
SAFETY GUIDELINES
Use this charge station to charge electric vehicles equipped with an SAE J1772 charge port
connector only. To determine if your vehicle is equipped with one please review the vehicle
owner handbook.
When installing the equipment and during regular operation please ensure the charge
station’s supply cable is located in such a way that the cable will not be tripped over, stepped
on, pulled from the wall socket, or somehow subjected to damage or stress during normal
operation or while stored.
Read all the instructions before using this product.
This device should be supervised when used around children
Do not put fingers into the electric vehicle connector
Do not use this product if the flexible power cord or EV cable is frayed, has broken insulation
or other signs of damage
Do not use this product if the enclosure or the EV connector is broken, cracked, open, or
shows other indication of damage
SAVE THESE INSTRUCTIONS
This manual contains important instructions for Models 30A,40A, and 70A Pedestal, wall
mount, in single and dual configurations.
WARNING
• If your supply cable is somehow damaged do not operate your charge station. Contact
your service representative for service immediately. Shut down the power to the unit by
switching the breaker on the supply panel to the off position.
• Turn off input power to your charge station at the circuit breaker panel before servicing or
cleaning the unit.
• VENTILATION: Some electric vehicles require an external ventilation system to prevent
the accumulation of hazardous or explosive gases when charging indoors. Check the
vehicle’s owner’s handbook to determine if your vehicle requires ventilation during indoor
charging.
• Those vehicles which follow the SAE J1772 standard for communication with the charging
station can inform the EVP EVSE that they require an exhaust fan. The EVP EVSE is not
equipped to control ventilation fans.
• This device utilizes high voltages do not attempt to install this equipment if you are not a
qualified electrician.
• There are no user serviceable parts inside. For service please contact customer service or
your local distributor. DO NOT ATTEMPT TO REPAIR THE CHARGE STATION
YOURSELF ONLY FACTORY QUALIFIED PERSONEL.
CAUTION
Do not charge your vehicle indoors if it requires ventilation. Contact your service
representative for information.
User Manual & Installation Instructions
This document is the Property of Broadband Telecom
Power Inc. and will not be copied, reproduced, or used as
the basis for sale or manufacture of apparatus without
written permission.
BTCPower EVP Series EVSE
Installation and Operations Manual
Rev O
7 | P a g e
Please refer to local municipalities for Electrical, structural and mechanical engineering
relating to the installation of this L2 commercial charging station.
1.2 GROUNDING INSTRUCTIONS
This product must be connected to a grounded, metal, permanent wiring system, or an
equipment-grounding conductor must be run with the circuit conductors and connected to the
equipment grounding terminal or lead on the product.
This device shall be mounted at a sufficient height from grade such that the height of the
storage means for the coupling device is located between 600 mm (24 inches) and 1.2 m (4
feet) from grade
Do not connect to these systems
Do not connect ChargePoint stations to the following types of power sources:
• 120/208 VAC 3 phase wye, ungrounded
• 120/240 VAC 3 phase delta, corner-grounded
• Any system where the center point of the AC power source is not grounded
User Manual & Installation Instructions
This document is the Property of Broadband Telecom
Power Inc. and will not be copied, reproduced, or used as
the basis for sale or manufacture of apparatus without
written permission.
BTCPower EVP Series EVSE
Installation and Operations Manual
Rev O
8 | P a g e
2 INSTALLATION
2.1 Before Installing
Before any installation work is performed, study all drawings furnished by the supplier for the
particular installation. These include arrangement drawings (front, end, and plan views),
connections to the equipment that may be required to meet any local codes (such as mats,
screens, or railings) is not furnished.
2.2 Safety Requirements
The EVSE (Electric vehicle supply equipment) should be installed by a qualified electrician in
accordance with local codes and all applicable ordinances
The charging station is required to be connected to a ground, metal, permanent wiring system.
Connections to the charge station should comply with all local codes and ordinances.
Read all installations instructions carefully prior to performing the installation.
Safety Equipment included with EVSE
BTCP EVSE’s are equipped with a ground fault current interrupting device for user protection.
The GFCI is automatically software tested so no user interaction is required to verify proper
operation. In the event of a failure, the system will indicate a fault via a red LED or a message
on the User Interface screen indicating an error code. DO NOT PROVIDE GFCI AT THE
PANEL AS THE UNIT HAS A BUILT IN GFCI.
User Manual & Installation Instructions
This document is the Property of Broadband Telecom
Power Inc. and will not be copied, reproduced, or used as
the basis for sale or manufacture of apparatus without
written permission.
BTCPower EVP Series EVSE
Installation and Operations Manual
Rev O
9 | P a g e
2.3 Tools and Ancillary Equipment
¼” Lag Bolt
QTY 6
Concrete Expansion Bolts
QTY 4
¼” Torque Wrench
1/4“ Washer
QTY 6
Back Door Key
3/16” Allen Wrench
Phillips Screw Driver
Instruction Manual
User Manual & Installation Instructions
This document is the Property of Broadband Telecom
Power Inc. and will not be copied, reproduced, or used as
the basis for sale or manufacture of apparatus without
written permission.
BTCPower EVP Series EVSE
Installation and Operations Manual
Rev O
10 | P a g e
2.4 Special Tools & Hardware Torque Value
Tools/Hardware Torque
Specification
Configuration
6-32 UNC 13 in-lbs. +/- 2 in-lbs.
10-32 UNF 30 in-lbs. +/- 5 in-lbs.
1/4-20 UNC 53 in-lbs. +/- 7 in-lbs.
1/2-13 UNC 48 in-lbs. +/- 7 in-lbs.
M6 x 1 LIGUIDTIGHT FITTING 30 in-lbs. +/- 5 in-lbs.
FUSE BLOCK LUGS, 8 AWG 40 in-lbs. +/- 5 in-lbs.
FUSE BLOCK LUGS, 6 AWG 45 in-lbs. +/- 5 in-lbs.
GROUND TERM. SCREWS, 14-10
AWG 34 in-lbs. +/- 5 in-lbs.
GROUND TERM. SCREWS, 8 AWG 38 in-lbs. +/- 5 in-lbs.
¼-20" LOCKNUT 12 ft-lbs. EVP-2001-XX-P
EVP-2002-XX-P
User Manual & Installation Instructions
This document is the Property of Broadband Telecom
Power Inc. and will not be copied, reproduced, or used as
the basis for sale or manufacture of apparatus without
written permission.
BTCPower EVP Series EVSE
Installation and Operations Manual
Rev O
11 | P a g e
2.5 Installation Procedure for Pedestal Chargers
To mount dual and single Pedestal Chargers follow these steps:
1. Remove Pedestal Charger from Packaging
2. Open rear door assembly to expose nuts
3. Remove Qty 4 Nuts to release Pedestal from EVSE Charger Unit
Note: Before bolting Pedestal Base to Concrete Slab, ensure that AC Powerlines are
properly placed inside of conduit in the center of the pedestal base mounting location
Remove rear door assembly so you
can expose the nuts needed to
release the enclosure from the
Pedestal Base.
Relative Location for 1” Conduit
Pedestal MUST be installed on a minimum
4” Concrete Slab per Local Code.
User Manual & Installation Instructions
This document is the Property of Broadband Telecom
Power Inc. and will not be copied, reproduced, or used as
the basis for sale or manufacture of apparatus without
written permission.
BTCPower EVP Series EVSE
Installation and Operations Manual
Rev O
12 | P a g e
4. After freeing Pedestal Base from EVSE Charger Unit, use concrete expansion bolts to bolt
pedestal base to concrete slab.
5. After bolting pedestal base to concrete, attached EVSE Charger by using the nut that was
previously removed in step 3 to attached EVSE Charger to Pedestal Base.
6. Fasten Locknuts to 12ft-lbs as shown in figure below
Qty 4 expansion bolts.
Use pedestal base as a
drill template
Pedestal Base
Dimensions
Use Pedestal Base as a Drill Template
Center of Conduit
User Manual & Installation Instructions
This document is the Property of Broadband Telecom
Power Inc. and will not be copied, reproduced, or used as
the basis for sale or manufacture of apparatus without
written permission.
BTCPower EVP Series EVSE
Installation and Operations Manual
Rev O
13 | P a g e
Note: Before bolting Pedestal Base to Concrete Slab, ensure that AC Powerlines are
properly placed inside of conduit in the center of the pedestal base mounting location.
Power entry from
Bottom of Enclosure
is a 3” Square.
Bolt Qty 4 ¼-20 nuts. Secure tightly
onto chassis (12 ft-lbs)
User Manual & Installation Instructions
This document is the Property of Broadband Telecom
Power Inc. and will not be copied, reproduced, or used as
the basis for sale or manufacture of apparatus without
written permission.
BTCPower EVP Series EVSE
Installation and Operations Manual
Rev O
14 | P a g e
2.6 Installation Procedure for Wall Mounted EVSE Chargers
To mount the dual and single wall mount chargers, follow these steps:
1. Remove EVSE Wall Charger from packaging.
2. Locate key in same packaging to open charger exposing four mounting holes shown in the
figure below.
3. Mount and secure rear EVSE hold bracket as shown in fig 8.
Mounting hole locations
Figure
8
Open Door with Key to
Expose Mounting
Holes
User Manual & Installation Instructions
This document is the Property of Broadband Telecom
Power Inc. and will not be copied, reproduced, or used as
the basis for sale or manufacture of apparatus without
written permission.
BTCPower EVP Series EVSE
Installation and Operations Manual
Rev O
15 | P a g e
4. Use expansion bolts to anchor the EVSE Wall Mount Charger to the wall as shown below
for the Dual and Single EVSE Wall Mount Chargers.
Use Level to Install Wall Mount
User Manual & Installation Instructions
This document is the Property of Broadband Telecom
Power Inc. and will not be copied, reproduced, or used as
the basis for sale or manufacture of apparatus without
written permission.
BTCPower EVP Series EVSE
Installation and Operations Manual
Rev O
16 | P a g e
3 ELECTRICAL CONNECTIONS
The (wall mount) is provisioned to receive an electrical power connection from the bottom of the
pedestal as shown in Fig. 11
Fig. 10
Electrical conduit bottom entry onto enclosure
WARNING:
Failure to provide adequate structural strength for this component can result in serious personal
injury or damage to equipment! It is the installer’s responsibility to make sure the structure to
which this component is attached can support five times the combined weight of all equipment.
3.1 BTCPower Single and dual charge system electrical connection
System electrical power needs to be provisioned with the following:
Single sided charger connections
• 2 appropriately gauged hot leads (typically 10 AWG for 30A installs and 8 AWG for 40A
installs)
• 1 appropriately gauge ground (green) lead
• Install electrical conduit per all applicable state and federal regulations
Power entry into assembly from
bottom as shown here
UL Listed water tight conduit entry
fitting used at conduit / chassis
interface
Conduit hole opening is 1” dia.
Recommended to enlarge Hole
Opening
AC input here
Lower Door Opening:
Terminal Block Location: Use Allen
Wrench to Torque down Cables
User Manual & Installation Instructions
This document is the Property of Broadband Telecom
Power Inc. and will not be copied, reproduced, or used as
the basis for sale or manufacture of apparatus without
written permission.
BTCPower EVP Series EVSE
Installation and Operations Manual
Rev O
17 | P a g e
• EVSE power should be inserted thru bottom of EVSE enclosure
• Electrical connections shall be made as shown
• Note, for the dual units, two separate line pairs need to be connected from independent
service panel breakers of the appropriate rating.
Note: Each hot lead should measure 120VAC to ground.
Service Connections
Electrical Input SINGLE PORT DUAL PORT
AC Voltage 208/240VAC 208/240VAC
Current
Input Power Connection Required Service
Panel Breaker
Current
Input Power Connection Required Service
Panel Breaker
Standard
30A
One 40A branch circuit 40A dual pole
(non-GFCI type)
30A x 2 Two independent 40A branch
circuits
40A dual pole
(non-GFCI type) x 2
40A One 50A branch circuit 50A Dual pole
(non-GFCI type) 40A x 2 Two independent 50A branch
circuits
50A dual pole
(non-GFCI type) x 2
70A One 100A branch circuit 100A Dual pole
(non-GFCI type) NA NA NA
Service Panel GFCI Do not provide external GFCI as it may conflict with internal GFCI (CCID)
Wiring - Standard 3-wire (L1, L2, Earth) 5-wire (L1, L1, L2, L2, Earth)
3.2 Single Port EVSE Charger
Connect L1 and L2 to the input safety breaker. BTC Power highly recommends crimp ferrule
lugs to be used to make all electrical connection to the input safety breaker. In addition, a
torque wrench should be used on the input breaker screw terminals. Set the wrench to a
torque of 2.4NM or 21.2 in/lbs. A pull test should be done on the wire connections to ensure
proper connection.
L1 L2
GN
D
GN
D
User Manual & Installation Instructions
This document is the Property of Broadband Telecom
Power Inc. and will not be copied, reproduced, or used as
the basis for sale or manufacture of apparatus without
written permission.
BTCPower EVP Series EVSE
Installation and Operations Manual
Rev O
18 | P a g e
3.3 Dual Port EVSE Charger
Connect L1 L2 on both phases to the input safety breaker. BTC Power highly recommends
crimp ferrule lugs to be used to make all electrical connection to the input safety breaker. This
requires the correct crimping tool. In addition, a torque wrench should be used on the input
breaker screw terminals. Set the wrench to a torque of 2.4NM or 21.2 in/lbs. A pull test should
be done on the wire connections to ensure proper connection.
Fig. 7a
L1, L2 for left hand side charger
L1, L2 for right hand side charger
NOTE: SEPARATE LINES PER PORT ARE REQUIRED
L2 L1
L2 L1
User Manual & Installation Instructions
This document is the Property of Broadband Telecom
Power Inc. and will not be copied, reproduced, or used as
the basis for sale or manufacture of apparatus without
written permission.
BTCPower EVP Series EVSE
Installation and Operations Manual
Rev O
19 | P a g e
Check for ground cable on the door.
Ground wire input
208/240V single phase AC
Line 1 and Line 2 of the single phase
AC voltage lines
Main Field
Ground
GND
User Manual & Installation Instructions
This document is the Property of Broadband Telecom
Power Inc. and will not be copied, reproduced, or used as
the basis for sale or manufacture of apparatus without
written permission.
BTCPower EVP Series EVSE
Installation and Operations Manual
Rev O
20 | P a g e
4 Operation
4.1 Screen Scenarios
User Manual & Installation Instructions
This document is the Property of Broadband Telecom
Power Inc. and will not be copied, reproduced, or used as
the basis for sale or manufacture of apparatus without
written permission.
BTCPower EVP Series EVSE
Installation and Operations Manual
Rev O
21 | P a g e
User Manual & Installation Instructions
This document is the Property of Broadband Telecom
Power Inc. and will not be copied, reproduced, or used as
the basis for sale or manufacture of apparatus without
written permission.
BTCPower EVP Series EVSE
Installation and Operations Manual
Rev O
22 | P a g e
User Manual & Installation Instructions
This document is the Property of Broadband Telecom
Power Inc. and will not be copied, reproduced, or used as
the basis for sale or manufacture of apparatus without
written permission.
BTCPower EVP Series EVSE
Installation and Operations Manual
Rev O
23 | P a g e
4.2 WIFI Network
User Manual & Installation Instructions
This document is the Property of Broadband Telecom
Power Inc. and will not be copied, reproduced, or used as
the basis for sale or manufacture of apparatus without
written permission.
BTCPower EVP Series EVSE
Installation and Operations Manual
Rev O
24 | P a g e
User Manual & Installation Instructions
This document is the Property of Broadband Telecom
Power Inc. and will not be copied, reproduced, or used as
the basis for sale or manufacture of apparatus without
written permission.
BTCPower EVP Series EVSE
Installation and Operations Manual
Rev O
25 | P a g e
User Manual & Installation Instructions
This document is the Property of Broadband Telecom
Power Inc. and will not be copied, reproduced, or used as
the basis for sale or manufacture of apparatus without
written permission.
BTCPower EVP Series EVSE
Installation and Operations Manual
Rev O
26 | P a g e
5 TESTING
1. Once the charger has been installed by a qualified electrician and the breaker panel has
been turned on and the breaker inside the charger has been turned on then the display
should turn on and the system should turn on. Screen as shown in previous page should
indicate operation.
2. If a vehicle is available, connect the EVP EVSE to the vehicle and verify that the contactor
closes
The main contactor should close and you should see charging on the main screen followed by
power measurements displayed on the main screen.
A) Free Vending Mode
Remove the charging connector from its holder on the front of the charging station
Open the J1772 plug cover on your vehicle (refer to the vehicles owner’s manual.
Plug the J1772 plug into the vehicle’s charge port.
Upon insertion, push down on the handle to lock it into place. Normally, the vehicle will
immediately request a charge and the contactor inside the EVP EVSE can be heard closing.
The display will show ready for charge followed by charging.
To remove the connector from the vehicle, depress the button in the middle of the handle to
release the connector.
Place the charge connector back into the connector provided on the charge station.
B) Access Control Mode
• RFID
• Credit Card Payment
• Phone Application
Front Display Panel
The front panel display, will let the user know the status of the charger and if charging is
taking place.
If charging does not start
User Manual & Installation Instructions
This document is the Property of Broadband Telecom
Power Inc. and will not be copied, reproduced, or used as
the basis for sale or manufacture of apparatus without
written permission.
BTCPower EVP Series EVSE
Installation and Operations Manual
Rev O
27 | P a g e
In the event of a problem, charging will stop and an error message will appear on the front
screen. If this happens, please try the two simple steps below before calling your field service
representative.
1. Remove the cable connector from the vehicle socket. The error message on the screen
may go off. Plug the connector back into the socket, and see if charging begins normally.
If charging does not start, then call customer service.
2. If error code appears on screen and persists after removing the connector consider
calling the Service group to investigate the issue. The user should record the Error Code
shown on the display along with the station ID and date and time of the occurrence.
3. Alternatively if the error message does not go out when the connector is removed, be
sure the connector is removed from the vehicle socket and switch off power at the circuit
breaker feeding power to the EVSE. Wait a few seconds and switch the circuit breaker
back on again. If the Protection light does not come back on, re-connect the cable to the
vehicle. Charging should begin normally. If charging does not begin, call for Field
Service.
6 TROUBLESHOOTING
5.1 Fault Codes
Please look at the below data base for explanation of Fault Codes.
No Fault 0
Welded Contactor 1
Broken Ground Pin 2
No Ventilation Available 3
Disconnected While Locked 4
Contactor Failed to Close 5
Contactor Failed to Open 6
GFCI Test Failed 7
GFCI Leak Detected 8
Program CRC Bad 9
**Note: Fault Codes only available with LCD equipped chargers
User Manual & Installation Instructions
This document is the Property of Broadband Telecom
Power Inc. and will not be copied, reproduced, or used as
the basis for sale or manufacture of apparatus without
written permission.
BTCPower EVP Series EVSE
Installation and Operations Manual
Rev O
28 | P a g e
7 SPECIFICATIONS
Input Power - Service Entrance
Voltage & Wiring 208/240V AC single-phase -L1, L2, and Earth Ground
Separate Branch Circuit per each EVSE Port.
3-wire (L1, L2, G) – for a single port
5-wire (L1, L2, G, L1, L2) – for a dual port
Maximum Output Power.
6.2KW to 7.2KW per 30 amp per charge station
8.3KW to 9.6KW per 40 amp charge station
14.5KW to 16.8KW per 70 amp charge station
Cable Length approximately (18-20ft.)
Environmental rating
Operating Temperature -30°C / + 60°C
NEMA Rating 3R; outdoor use with rain, snow, and sleet conditions.
Weights:
Single Port Pedestal: 70 lbs
Single Port Wall mount: 52 lbs
Dual Port Pedestal: 83 lbs
Dual Port Wall mount: 65 lbs
User Manual & Installation Instructions
This document is the Property of Broadband Telecom
Power Inc. and will not be copied, reproduced, or used as
the basis for sale or manufacture of apparatus without
written permission.
BTCPower EVP Series EVSE
Installation and Operations Manual
Rev O
29 | P a g e
7.1 DUAL PEDESTAL GENERAL DIMENSIONS
User Manual & Installation Instructions
This document is the Property of Broadband Telecom
Power Inc. and will not be copied, reproduced, or used as
the basis for sale or manufacture of apparatus without
written permission.
BTCPower EVP Series EVSE
Installation and Operations Manual
Rev O
30 | P a g e
7.2 SINGLE PEDESTAL GENERAL DIMENSIONS
User Manual & Installation Instructions
This document is the Property of Broadband Telecom
Power Inc. and will not be copied, reproduced, or used as
the basis for sale or manufacture of apparatus without
written permission.
BTCPower EVP Series EVSE
Installation and Operations Manual
Rev O
31 | P a g e
7.3 DUAL WALL MOUNT GENERAL DIMENSIONS
User Manual & Installation Instructions
This document is the Property of Broadband Telecom
Power Inc. and will not be copied, reproduced, or used as
the basis for sale or manufacture of apparatus without
written permission.
BTCPower EVP Series EVSE
Installation and Operations Manual
Rev O
32 | P a g e
User Manual & Installation Instructions
This document is the Property of Broadband Telecom
Power Inc. and will not be copied, reproduced, or used as
the basis for sale or manufacture of apparatus without
written permission.
BTCPower EVP Series EVSE
Installation and Operations Manual
Rev O
33 | P a g e
7.4 SINGLE WALL MOUNT GENERAL DIMENSIONS
User Manual & Installation Instructions
This document is the Property of Broadband Telecom
Power Inc. and will not be copied, reproduced, or used as
the basis for sale or manufacture of apparatus without
written permission.
BTCPower EVP Series EVSE
Installation and Operations Manual
Rev O
34 | P a g e
LEVEL 2 AC CHARGE STATION COMMISSIONING GUIDELINE:
User Manual & Installation Instructions
This document is the Property of Broadband Telecom
Power Inc. and will not be copied, reproduced, or used as
the basis for sale or manufacture of apparatus without
written permission.
BTCPower EVP Series EVSE
Installation and Operations Manual
Rev O
35 | P a g e
Following the instructions on the installation manual are the AC input lines properly plugged in:
Input voltages
Single sided
Charger (SIDE A)
L1 VAC
L2 VAC
Charger (SIDE B)
L1 VAC
L2 VAC
a. Is grounding lug properly secured?
b. Is grounding wire connected to rear door?
CHARGER INFORMATION:
Charger Information
Installation address
Installation city
State
Charge box Serial Number
Level 2 AC Single or Dual
Installer name
Installer phone number
Installer email
Install date
Communications
Cradle point IP
Cradle point Serial number
RFID Enabled
NRG logo enabled
TEST CHARGE SESSION PASS / FAIL
INSTALLER SIGNATURE
DATE
PLEASE NOTE: ONCE INSTALLED PLEASE FAX THIS SHEET TO
BTCPOWER:714.259.7998
User Manual & Installation Instructions
This document is the Property of Broadband Telecom
Power Inc. and will not be copied, reproduced, or used as
the basis for sale or manufacture of apparatus without
written permission.
BTCPower EVP Series EVSE
Installation and Operations Manual
Rev O
36 | P a g e
BTCPOWER PRODUCT
WARRANTY
This Limited Product Warranty applies to customers who have purchased a BTCPower
Electric Vehicle Charging Station(s) and/or a related product (“Product(s)”) from Broadband
Telecom Power, Inc., or one of its authorized distributors.
LIMITED WARRANTY: Subject to the exclusions from warranty coverage set forth below,
BTCPower warrants that the Product will be free from any defects in materials and/or
workmanship (the “Limited Warranty”) for a period of two (2) years after the date of the
initial installation of the Product (the “Warranty Period”). If the Product becomes defective
in breach of the Limited Warranty, BTCPower will, upon written notice of the defect
received during the Warranty Period, either repair or replace, at BTCPower’s election, the
Product if it proves to be defective; provided, that BTCPower will not be responsible for the
cost of any labor associated with the repair or replacement of any defective Product.
You acknowledge that replacement products provided by BTCPower under the Limited
Warranty may be remanufactured or reconditioned Products or, if the exact Product is no
longer manufactured by BTCPower, a Product with substantially similar functionality
(“Replacement Products”) will be supplied. Any Replacement Products so furnished will be
warranted for the remainder of the original Warranty Period or ninety (90) days from the
date of delivery of such Replacement Product, whichever is greater. Should BTCPower be
unable to repair the Product, BTCPower will replace the Product with the latest
model/version of a similar product in current production.
EXCLUSIONS FROM LIMITED WARRANTY
IMPORTANT: The Limited Warranty and on your Product, shall not apply to defects, or
service repairs, resulting from any of the following:
▪ Force Majeure – any occurrence or extraordinary event or circumstance beyond
the control of BTCPower that is an act of God or whether that occurrence is caused
by war, riot, storm, (such as hurricane, flooding, earthquake, volcanic eruption,
etc.), or other natural forces, or acts of nature or other causes.
........................................................................................... 5
............................................................................................................................... 5
............................................................................................................................................ 5
....................................................................................... 5
........................................................................................................ 7
....................................................................................................... 7
............................................................................................................................................ 8
.............................................................................................................. 14
..................................................................................................... 14
.......................................................................................................................................... 15
................................................................................................................................. 17
Template guild screw holes
post
Tighten 4x bolts
Make sure the cord does not come
in contact with the ground
4 layers of double
sided gasket tape
•
•