Loading...
Item 4Q - SPIN ReportJUSOUTHLAKE SPIN MEETING REPORT SPIN Item Number: SPIN2022-11 City Case Number: ZA22-0018 Project Name: 101 E. Highland St. SPIN Neighborhood: 7 Meeting Date: May 10, 2022 Meeting Location: 1400 Main Street, Southlake, TX City Council Chambers Total Attendance: 8 Hosts: Madeline Oujesky Applicant Presenting: Kosse Maykus, Hat Creek Development, Phone: (817) 991-8182, Email: kosse(@_maykus.com City Staff Present: Madeline Oujesky, Assistant to the Director Town Hall Forums can be viewed in their entirety by visiting http://www.cityofsouthiake.com and clicking on "I Want to" and "View" "Video on Demand" — forums are listed under SPIN by meeting date. FORUM SUMMARY: Property Situation: A request for SF-20A zoning for a 9-lot residential neighborhood of high -end luxury single-family residences on a 5.4 acre site on White Chapel Blvd, just south of Highland St. This property is currently owned by the Southlake Assemblies of God Church (dba New Day Church). They are retaining enough land for their purposes and are selling the excess acreage. Development Details: Near Highland White Chapel, near the newly completed traffic circle. 5.4 acres total of land used. Site has very good traffic flow; only access on to White Chapel. Proposed 9 minimum of 20,000 sq ft lots; a couple of lots 23,000-24,000 sq ft. Developed/build custom home builders. 2.5-3.5 million dollar homes. Presentation: Highland Terrace Presentation to SPIN em-dor D E V E L 0 P M E N I Hat Creek Development P.O. Box 92747 Southlake, Texas 76092 TEL.817-329-3111 iw9 I ]iP SAGE GROUP, INC. Master Planning Urban D-g V t! ,ape Ar Lata ndscape ArChiEe[turP "30 N. C-01 Are., 5[e 200 'a0uulake, Tew 76092 TEL 817.424..2626 Concept Plan A Questions and Concerns: Mark Bracker, 1105 Tina TO. — No issue with dev. Tough topography, drains into neighborhood (lot 4). 1 What are you going to do during construction as well as after that prevents drainage into the neighborhood? 2 Should we be concerned about drainage from our own neighborhood as well as your neighborhood during heavy rain? Al: when designed Chelsea neighborhood, large detention area designed to accommodate the ultimate drainage from new development track. There is piping that goes along the eastern boundary that will be designed and developed to gather water into piping and into detention pond. A2: We will do an analysis to make sure that the detention pod is not silted up over the years and that the space can hold the needed volume of drainage water for the area. We will make sure the pond has capacity. Erosion controls are better now than 10 years ago. Best Practices — silt fence, birming, siltation traps — during construction. Mark Skidlaric, behind lot 5 — 1 concerned with draining issues and mud 2 concerned with large 2 story homes directly behind back fence 3 Church had thought about expanding but the retention pond was sized to accommodate residential 4 Will the city validate infrastructure? 5 With adding an 8ft fence, does that mean you're replacing our 6ft fence? Which side will face our property? 6 Time frame of start to finish? 7 will you be providing road hazard for any tire punctures during that 36 months. 8 will there be sidewalks? Al: Drainage — mudding conditions — property has no vegetation holding soil down. We will put in prevention, acceptance from free flowing water, transmit to detention pond. We are very aware drainage is an issue. A2: Privacy — no builder selected, or houses designed. Typically, 4,000-4,400 sq ft houses spread over the property. I will take your concerns into consideration. Architectural control process can allow me to try to influence builder/homeowner, but I cannot promise. I will try to mitigate that. I will do what I can. A3: On the city plans as medium density which is what we are totally complying with. A4: All of the appropriate modeling has been and will be done. A5: I won't do it without your permission but I would hope that you would allow me to replace it and put the new fence on the property line. I will face the smooth side of the fence to you, and put the silver post on our side and box them. A& P&Z next week, city council in June, entitlements after 3-5 months. My hope is to start development in late fall, November/December. Hope to start building homes in late spring, April/May. Suspect high demand for the houses, take 18-24 months to build. Complete neighborhood expected in 30-36 months. A7: I shouldn't have any materials in your neighborhood. A8: yes Citizen 3 — 1 retention pond? 2 At least half acre lots? 3 1 can see church lights in my house, 4 1 would like to see a retention wall 5 1 have 3-4 good size trees pushing my fence in 6 Erosion under my fence line, I have bricks stacked up. 7 Can you send us the plans? 8 If lot 4 puts in a pool, what would that do to the ground? 9 Inquires about traffic on new White Chapel during school year. 10 What is the privacy plan for Lots 1/9? Al: we built the retention pond to accommodate this property as well. The pond will be evaluated for accommodation. A2: 20,000-25,000 sq ft lots. A3: probably going to add 8ft fence. I don't think lights will be a problem from vehicles. A4: I am happy with an 8ft wood fence. In addition between lots 4/5 1 don't think we would have a problem creating a landscape buffer. A5: we can get over there and make some kind of arrangement on the fence, maybe a new fence. A6: A7: We will send them to you and walk through them with you if you want. A8: It will be in the back, not on your side of the lot. A9: The traffic circle will help with the flow. The 4 lane road will function better than it does today. A10: Lot 1 could face White Chapel, but currently we hope to put and entire masonry wall on White Chapel. JD Pardy — 1 What is the current land use plan? 2 Planning and Zoning use? 3 How will the water on lots 4/5 drain? 4 Will you be 4/5 raising the elevation? 5 East side Lot 4— retaining walls for water west to east? Al: It is currently community facility (church) and changing to Medium residential consistent with surroundings. A2: Currently Ag going to SM 20A. A3: Using a storm water sewer in cul-de-sac. There will be a curb inlet into pipe to existing detention pond. Drains in backyard of lots 9-5 to prevent runoff from draining across the other lots and instead collected immediately. Design low to the drop drain inlet between 4/5; adding burming to try to decrease flow; goal is to capture the water and take underground to detention pond. A4: We will be leveling not raising. Online Comments: - Is there going to be connecting sidewalks on Highland to connect to White Chapel? o Full sidewalk on our frontage road and in our neighborhood. Students could walk to the 9/10th school. Ere,eneye s�rte cm a strmua. c.��ae, m�wnmea.er.,i u..nra a wi�.r menr.un, wn.m x.wm s<aN• n�.e ��. un.e., xm,.-.umwMx, �xra..xa em...ra,raem Detailed Notification Analysis ❑lrw�s u. e...ro eaer.,�,io:nm�sxyns.xs, ' wno.n .aaa ■tea - an,m. ix.xr.ascm ■u,z �u:ax�rn 1� O a 1133W4` rei„�r�u uar. �iM�rm.oP x�rM�mmq�em•;xrooti .>y�p iurie� tar x.` oa Eveaafl0�e - Rep❑M YHY— D�7 A1Mnp! M1ertp1 AtLaniPa AtEm,P[ A1Rmpt A,[4rap[ h[IemQl AMeny1 A1MnP! iotek i. MAud 1 2 a 4 S 6 7 e 9 a— d-y 4 17 0 0 Q ❑ ❑ u u 21 AIob4 7 3d tr tl tl 0 d tr tr .7 Ph— lxn. Ph.x d a Q tl 0 0 0 0 Q � n !w� a n a 0 Q d d Q Q TT mi 1Ta 0 2 0 0 Q 0 a 6 0 2 Qwiu M7 DA �1rz2 'ate aax 2ee2 a o a 0 d 8 0 Sid col• 9� Todls M7 OR 4C?tz P.ner 0 0 0 tl tl 0 0 8 0 tl 1a� 7sa.s CDT s., a.y WS Eveaafl0�e - Rep❑M YHY— D�7 A1Mnp! M1ertp1 AtLaniPa AtEm,P[ A1Rmpt A,[4rap[ h[IemQl AMeny1 A1MnP! iotek i. MAud 1 2 a 4 S 6 7 e 9 a— d-y 4 17 0 0 Q ❑ ❑ u u 21 AIob4 7 3d tr tl tl 0 d tr tr .7 Ph— lxn. Ph.x d a Q tl 0 0 0 0 Q � n !w� a n a 0 Q d d Q Q TT mi 1Ta 0 2 0 0 Q 0 a 6 0 2 Qwiu M7 DA �1rz2 'ate aax 2ee2 a o a 0 d 8 0 Sid col• 9� Todls M7 OR 4C?tz P.ner 0 0 0 tl tl 0 0 8 0 tl 1a� 7sa.s CDT s., a.y WS Q 0 6 0 a 0 a 6 6 0 P- 7 a 0 esa o a 0 tr tl 0 700 Ereel P—, 7 aA�lle d 0 627 451 a 0 0 0 Q 1102 9emn d 0 lion I" a 0 0 0 Q 2A 9ee1 9emn Moble sa n 0 d tr tl o l.a Ph— ba dtl a 0 d 6 tr 155 T-6 2M 24.2 1570 eS2 cN 226 ao I 5 M�. Eyemrlage - Repw% A1le "M' At pt M1mV Al pt Atb t AR pl M"V AMmol M1m pl Al pl Tub ft. Mdiod 1 2 a d 5 6 3 5 9 Ph r Phone ❑ 0 6 a 0 0 0 a a 9 n 8.h. ❑ i�hnrle Trej TM ❑ 0 Y 31 a 0 0 a a 29 hoax MUW K 2022 l aaa d d 1570 as2 a411 d 8 a d cdT To k MW K 2022 timer P a P a d 6 d 6 6 0 l alx ySMIS 4t CDT ^ec�vn dry P Q P a P Q P Q P a W9 Pd— r 0 d Y a a d 0 d a a Prmer r ❑ ❑ 0 a 0 0 0 a a a MuhYc Scrnn dry ❑ ❑ u u m d d a a =4 s neY sewn dry ❑ ❑ P d 150 0 0 a a 157 MnhYe 0 a 6 a #2 0 a 6 6 as Phone ❑ ❑ a 0 0 0 0 a a a n 8.h. Flrone ❑ ❑ Y a b d 8 a a 25 �� A -V ll . Tek ���� Trey TTD a a 0 a 17 a a 0 0 17 d.4. d.F� 0 0 6 0 0 td7 0 6 6 1a8 MohYe Phone— h P ❑ ❑ 0 u ❑ as 3e 0 0 73 lbn,e Pere ❑ ❑ 0 u a a + 0 0 7 9 GFe Phone 0 0 6 O 0 16 16 0 6 21 TTY TTD DM- 0 0 6 0 0 d a 6 6 9 7." 2Y]l 2 U 1576 852 464 2m a❑ 17 a seal TeY+ '�%; 1ETd RR2 ldl ffi4 ea 13 2 Ilal Evmbddge - RepnNc. Amp bdr y An pl am^^ 0 ■ pl mm" Auvpt mwrgpt an 0 —pi w P- Tat Tk— Ydnd 1 2 a i 6 6 } 2 9 M22 I V& 8 d 6 tl 0 ms 60 6 6 2m 41 Cm rmh. w-f aa. 2= P— o 0 0 tl 0 a a a a a task ysw no Cm 5— a.y P 0 6 0 P a 0 Q P P aas PT— y o 0 0 0 o a o Q P o EmeY Rinr y 0 0 6 0 0 a 0 a a 0 9won EmY LIdM� Ph PIvM 0 0 Q tl 0 d 0 Q P 0 Plvx o 0 0 tl 0 a 0 6 a 5 n BusFte 8 h 0 tl d 8 h tt t t3 a A lb#2 task 00 cm aA rat Tat iTG 8 0 h tl d 8 0 t 3 3 �b 0 0 0 0 0 0 o t7 a ad 2s7a U62 1M6 = 16i 226 60 17 a e6aY