Item 4G - MemoItem 4G CITY OF SOUTHLAKE MEMORANDUM (September 20, 2022) To: Shana Yelverton, City Manager From: Rob Cohen, Director of Public Works Subject: Reject all bid proposals for the Water Distribution System & Sidewalk Improvements at S. Pearson Lane & Union Church Road, E. Dove Road, and Oak Bend Court project. Action Requested: Reject all bid proposals for the Water Distribution System & Sidewalk Improvements at S. Pearson Lane Union Church Road, E. Dove Road, and Oak Bend Court project. Background Information: This project included improvements along S. Pearson Lane & Union Church Road, E. Dove, and Oak Bend Court. Solicitation of bids for this project began on March 27, 2022, and one sealed bid was received and opened on April 26, 2022. The lone bid received for this project is shown below in bid tabulation: Bidder Bid Amount Canary Construction $ 2,348,707.00 The designer -produced Opinion of Probable Construction Cost (OPCC) of this project was $1,606,000.00. One sealed bid was received above the OPCC value. The consultant attributed discrepancies between the OPCC and bid to a uniform increase in materials cost and an unusually high increase in the cost of concrete and sod (sidewalk construction). City review of current concrete flatwork prices and landscape restoration, including contingencies agrees with this assessment. Due to bid exceeding the authorized project amount, the bid prevents the project team from selecting a best value bidder. Additional funding was requested in the FY 2023 budget. This project will be re -advertised for best value bids this fall, for award winter 2023. Financial Considerations: None. Page 1 of 2 Item 4G Strategic Link: This item links to the City's Strategy Map strategic focus areas of Infrastructure and Performance Management & Service Delivery. It specifically relates to the City's Corporate Objective, F1: Adhere To Financial Management Principles & Budget. The Critical Business Outcome is, CB05: Improve quality of life through progressive implementation of Southlake's Comprehensive Plan recommendations. Citizen Input/ Board Review: None. Legal Review: None. Alternatives: The City Council may deny the request and award the contract. Supporting Documents: Attachment A: Bid Tabulation Staff Recommendation: Reject all bid proposals for the Waterlines design project. Staff Contact: Rob Cohen, Director of Public Works Jeff Ginn, Project Manager Page 2 of 2 BHB No. 2015.724.001 Baird,Hampton & Brown Engineering & Surveying 3801 William D. Tate, suite 500 Grapedne, Tx 76051 Tel (81916YMMI data, Water & Sidewalk Improvements - Pearson, Dove, & Union Church Southlake, Texas April 26, 2022 Canary Construction Baird, Hampton & Brown Provided Bid Bond Opinion of Probable Cost Water & Sidewalk Improvements Item no. Item Description Quantity Unit Unit Cost Amount Unit Cost Amount 1 Project sign 4 EA $ 1,200 $ 4,800.00 $ 600 $ 2,400.00 2 Implement and Maintain Erosion Control Measures 6 MO $ 3,000 $ 18,000.00 $ 3,000 $ 18,000.00 3 Implement and Maintain Traffic Control 6 MO $ 3,000 $ 18,000.00 $ 2,000 $ 12,000.00 4 Allowance for Miscellaneous Utility Adjustments (including sprinklers) 1 LS $ 12,500 $ 12,500.00 $ 12,500 $ 12,500.00 5 Cut, Plug, Fill With CLSM and Abandon 8" Water Pipe 145 LF $ 45 $ 6,525.00 $ 6 $ 870.00 6 lAbandon 6" Water Pipe and Remove & Dispose 6" valves 1025 LF $ 45 1 $ 46,125.00 $ 2 $ 2,050.00 7 IFill Abandoned 6" Water Pipe Under Pavement with CLSM 150 LF $ 45 $ 6,750.00 $ 5 $ 750.00 8 IFill Abandoned 3" Water Pipe Under Pavement with CLSM 53 LF $ 30 $ 1,590.00 $ 2 $ 106.00 9 1 Connect Proposed 8" Water to Existing 6" with Tee plus Reducer at Oak Bend Ct. 1 EA $ 2,000 $ 2,000.00 $ 1,750 $ 1,750.00 10 1 Exploratory Excavation to Locate Existing 6" Waterline within School Property 1 LS $ 980 $ 980.00 $ 15,000 $ 15,000.00 11 12" PVC Water Pipe By HDD 2121 LF $ 250 $ 530,250.00 $ 285 $ 604,485.00 12 12" PVC Water Pipe By Open Trench 1722 LF $ 165 $ 284,130.00 $ 115 $ 198,030.00 13 8" PVC Water Pipe By HDD 117 LF $ 200 $ 23,400.00 $ 225 $ 26,325.00 14 8" PVC Water Pipe By Open Trench 104 LF $ 105 $ 10,920.00 $ 75 $ 7,800.00 15 6" PVC Water Pipe By Open Trench 117 LF $ 95 $ 11,115.00 $ 60 $ 7,020.00 16 12" Main Gate Valve w/ Box & Lid 15 EA $ 4,500 $ 67,500.00 $ 2,500 $ 37,500.00 17 8" Main Gate Valve w/ Box & Lid 4 EA $ 2,500 $ 10,000.00 $ 1,600 $ 6,400.00 18 6" Main Gate Valve w/ Box & Lid 2 EA $ 2,000 $ 4,000.00 $ 1,300 $ 2,600.00 19 Fire Hydrant 13 EA $ 6,500 $ 84,500.00 $ 3,750 $ 48,750.00 20 Install 12"x6" Tapping Sleeve and 6" Hydrant Gate Valve w/ Box & Lid 13 EA $ 6,500 $ 84,500.00 $ 3,500 $ 45,500.00 21 C.I./D.I. Fittings 3 TON $ 10,000 $ 30,000.00 $ 5,500 $ 16,500.00 22 2" Service Tap 4 EA $ 3,500 $ 14,000.00 $ 425 $ 1,700.00 23 2" Type'K' Copper Water Service Line 40 LF $ 95 $ 3,800.00 $ 30 $ 1,200.00 24 Furnish & Set 2" Meter Box & Lid 4 EA $ 2,000 $ 8,000.00 $ 475 $ 1,900.00 25 1" Service Tap 13 EA $ 3,000 $ 39,000.00 $ 350 $ 4,550.00 26 1" Type'K' Copper Water Service Line 130 LF $ 90 $ 11,700.00 $ 25 $ 3,250.00 27 Furnish & Set 1" Meter Box & Lid 13 EA $ 2,000 $ 26,000.00 $ 350 $ 4,550.00 28 Disconnect Existing Services (3/4" - 2"), Plug, and Abandon 8 EA $ 900 $ 7,200.00 $ 150 $ 1,200.00 29 Sawcut, Demolish, Remove, Dispose and Reconstruct Concrete Drainage Flume in Chesapeake Park 15 LF $ 200 $ 3,000.00 $ 85 $ 1,275.00 30 Restoration of Drainage Crossing in Chesapeake Park to include Compaction, Topsoil, and Anchored 130 LF $ 20 $ 2,600.00 $ 10 $ 1,300.00 31 Relocate Vaults, Meters, and Backflow Prevention at Chesapeake Park 1 LS $ 15,600 $ 15,600.00 $ 1,500 $ 1,500.00 32 Trench Excavation Safety for Water Line Depths> 5' 1943 LF $ 2 $ 3,886.00 $ 3 $ 5,829.00 33 4" Thick Top Soil in Disturbed (Open Cut) Areas 1943 LF $ 5 $ 9,715.00 $ 5 $ 9,715.00 34 Solid Sod for Disturbed (Open Cut) Areas 1943 LF $ 15 $ 29,145.00 $ 5 $ 9,715.00 35 Remove, Salvage, Repair, Reinstall or Replace Decorative Street Light with Integrated Traffic Sign 1 EA $ 3,000 $ 3,000.00 $ 1,750 $ 1,750.00 36 Sawcut, Demolish, Remove, Dispose and Reconstruct Concrete Sidewalk (Trench Repair) 15 LF $ 200 $ 3,000.00 $ 75 $ 1,125.00 37 Sawcut, Demolish, Remove, Dispose and Reconstruct Concrete Pavement and Curb & Gutter (Trench 15 LF $ 200 $ 3,000.00 $ 85 $ 1,275.00 38 Sawcut, Demolish, Remove, Dispose, Reconstruct and Restripe Asphalt Parking Lot (Trench Repair) 65 LF $ 120 $ 7,800.00 $ 75 $ 4,875.00 39 Sawcut, Demolish, Remove, Dispose and Reconstruct Concrete Driveway With High Early Strength C 36 LF $ 130 $ 4,680.00 $ 85 $ 3,060.00 40 Sawcut, Demolish, Remove, Dispose and Reconstruct Asphalt Driveway (Trench Repair) 139 LF $ 130 $ 18,070.00 $ 55 $ 7,645.00 41 Demolish, Remove, Dispose and Reconstruct Gravel Driveway (Trench Repair) 20 LF $ 60 $ 1,200.00 $ 35 $ 700.00 42 Sawcut, Demolish, Remove, and Dispose Existing Concrete Drive Approach (See Sheet 28) 1646 SF $ 20 $ 32,920.00 $ 3 $ 4,938.00 43 Demolish, Remove, and Dispose Existing Driveway Culverts 4 EA $ 2,000 $ 8,000.00 $ 1,500 $ 6,000.00 44 Provide and Install Class III 18" RCP Driveway Culvert 95 LF $ 250 $ 23,750.00 $ 85 $ 8,075.00 45 Regrade Roadside Ditches to Facilitate Positive Drainage (See Sheet 28) 285 LF $ 65 $ 18,525.00 $ 1.50 $ 427.50 46 Remove, Salvage, and Reinstall Chain Link Fence 541 LF $ 65 $ 35,165.00 $ 30 $ 16,230.00 47 Relocate Driveway Swing Gate & Operator 1 EA $ 3,000 $ 3,000.00 $ 1,500 $ 1,500.00 48 Construct Concrete Residential Drive Approach (See Sheet 28) 1646 SF $ 16 $ 26,336.00 $ 8 $ 13,168.00 49 Remove, Salvage, Repair, Reinstall, or Replace 6' Iron Fence 20 LF $ 85 $ 1,700.00 $ 75 $ 1,500.00 50 4" Thick Top Soil in Disturbed Areas 225 CY $ 5 $ 1,125.00 $ 50 $ 11,250.00 51 Solid Sod for Disturbed Areas 2029 SY $ 15 $ 30,435.00 $ 5 $ 10,145.00 Contingency 1 $ - $ 121,317 $ 121,316.50 Public Water Improvements Total $ 1,652,937.00 $ 1,329,000.00 24% Over OPC 52 Implement and Maintain Erosion Control Measures 2 MO $ 300 $ 600.00 $ 3,000 $ 6,000.00 53 Implement and Maintain Traffic Control 2 MO $ 300 $ 600.00 $ 2,000 $ 4,000.00 54 Remove 12"-24" Tree 2 EA $ 2,000 $ 4,000.00 $ 800 $ 1,600.00 55 Remove 12"-24" Tree at Citys Discretion 1 LS $ 8,000 $ 8,000.00 $ 8,000 $ 8,000.00 56 Remove, Salvage, and Reinstall Traffic Control Signs in Parkway 1 EA $ 5,000 $ 5,000.00 $ 550 $ 550.00 57 aawcuc, uemousn, rcemove, and ­­­lullrcesiaennai unveway w en. as uueccec oy 645 SF $ 20 $ 12,900.00 $ 8 $ 5,160.00 58 Unclassified Excavation / Grading & Haul -Off 818 CY $ 50 $ 40,900.00 $ 15 $ 12,270.00 59 Construct 6-ft. Wide, 4-in. Thick Concrete Sidewalk in Parkway 1 27611 SY 1 $ 200 1 $ 552,200.00 1 $ 60 1 $ 165,660.00 60 4" Thick Top Soil in Disturbed Areas 5111 CY I $ 5 1 $ 2,555.00 1 $ 50 1 $ 25,550.00 61 Solid Sod for Disturbed Areas 46011 SY 1 $ 15 1 $ 69,015.00 1 $ 5 1 $ 23,005.00 Contingency 1 $ -I $ 25,205 1 $ 25,205.00 0 Denotes notable bid item amount / significant portion of contract Public Sidewalk Improvements Total $ 695,770.00 151% Over OPC Water & Sidewalk Improvements Total $ 2,348,707.00 46% Over OPC $ 277,000.00 $ 1,606,000.00 9/1/2022 Tabulated and checked by: Lindsay Lafferty, PE Bid Evaluation - Pearson, Dove, Union ChurchAs Page 1 of 1