CITY OF SOUTHLAKE
JOINT SPDC/JOINT UTILIZATION COMMITTEE MEETING
Monday, October 3, 1994, 6:00 p.m.
MINUTES
Joint Utilization Committee Members Present: Rick Wilhelm and Buddy Luce, Co -Chairs, and
BethAnn Scratchard.
Southlake Parks Development Corporation Members Present: Stephen Apple, President; Gary
Fickes, Jon Michael Franks, Ralph Evans, David Yelton, Janet Murphy.
Staff Present: Bill Branum, Superintendent; Lou Ann Heath, Finance Director; Kim McAdams,
Park Project Manager; Greg Last, Director of Community Development, Warren Anderson,
TPM and Bob Stoffels, Dunkin and Associates, Ted Glowacki (CISD).
Agenda Item #1, Call to Order
Meeting was called to order at 6:00 by Stephen Apple.
(W
Agenda Item #2, Approval of the MINUTES for September 22, 1994 meeting•
A motion to approve the MINUTES as amended.
Agenda Item #3, Bids for Bicentennial Park Expansion
Kim McAdams, Park Project Manager, distributed a Bid Tabulation form (attached) to the
committee and explained that the low bidder was Dean Electric; staff recommends the Base
Bid of Dean Electric and Alternate Bid #6 (adjust fields #1 & #2 - move fences and light
poles) and deduct Alternate #7, which is drill seeding. The total bid is $1.843 million budget,
which is about $200,000 more than originally estimated. Kim introduced Bob Stoffels, the
landscape architect with J.T. Dunkin and Associates. Mr. Stoffels reviewed an itemized list
(attached) of items not in the construction budget and how the project has changed since
February with original budget estimates. Kim explained that there is still about $100,000 in
furnishings that need to be budgeted for which are above and beyond the bid cost. Kim
explained that more property has been added. Mr. Stoffels discussed Dean Electric's schedule;
300 calendar days - which would bring the completion date to August; liquidation damages
would be in the range of $250-$300 per day beyond the 300 calendar days. The committee
considered Alternate #15 which allows that the contractor would receive $80,000 if selected
elements of the project are completed by April 1, 1995. Due to a number of factors, the
committee decided they would not recommend this alternate be included, but would continue
Joint Utilization Committee Meeting
October 3, 1994
Page 2
discussion of some type of incentive be given if the contractor can complete by April 1.
Mr. Stoffels presented the Preliminary Cost sheet and explained that the handout shows the
original estimates done in February 94 and bracketed [ ] items not in the construction contract
issued and bid upon.
Item #8 removed all infield/outfield sod on ballfields.
Scorekeeper stands and base anchors were deleted.
Item #11 Batting/pitching cages were deleted out of Base Bid and put in as
Alternate Bid
Picnic tables were deleted since City could do more economically.
Vinyl coated fence was deleted because at the time they did not know
what direction the playground was going to go. The fence will probably
be wrought -iron instead of chain -link.
Park signage was deleted from this construction phase.
Mr. Stoffels explained that the Revised February 1994 Budget sheet was just an itemized list
of elements that were removed, showing the overall impact on the February budget which for
Phase I construction was $1.7 million. The budget is reduced to about $1.6 million with items
removed. The two -page Costs of Additional Elements sheet takes the low bid received and
subtracts out the revised budget and shows the difference between the two budgets. Mr. Stoffel
explained the items listed are the elements which comprise the $200,000 additional costs over
the original budget. Approximately 74 additional parking spaces which cost $74,000. The
Service Walkway was recommended by city staff to accommodate vehicle traffic; also this item
would help the drainage. This item was about $25,900. Additional Recreational Amenities
Irrigation costs included a modification to the pump house and 6" line which was not included
in February estimate; also included additional irrigation to area to the south of the parking lot.
A remote control system was incorporated into the irrigation to make it easier for the City to
test and maintain the system. These items were about $58,000. Turf Establishment included
about 7 acres (south of parking) with drainage channel and seeding channel for about $10,000.
Fencing was added to extend all the way to FM 1709. The fence was originally chain -link
type at $7.50 per linear foot; but with the flute -wire fence (not barb -wire - hog wire) at $4.00
per linear foot. Wood stockade fencing is required along the northern property line which was
not in the original cost. And, an 8-foot fence around the service center yard was added.
Warm-up fencing was added at $3,750. Additional paving was added in the Plaza area to
establish a paved area and carry on tournament play at a cost of $40,000.
�w
Joint Utilization Committee Meeting
October 3, 1994
Page 3
Greg Last explained the need for the additional parking to accommodate the playground, soccer
fields and other recreational areas at the Park. Stephen Apple asked if consideration for buses
was considered.
LouAnn Heath, Finance Director, explained the financial aspects of the Park Expansion project
(see the attached memo from Kim McAdams). LouAnn said we plan to move forward on the
next bond sale.
A motion was made to accept the Dean Electric bid, Alternate Bid #6 and #7. With a motion
to second, the committee unanimously voted to approve.
Agenda Item #4, Bids and Options for the Middle School Gym Project
This item will be re -bid and advertised with a bid opening on October 24. The project will
be bid as two separate projects; the school and the gymnasium. The bids will be awarded at
the School Board on October 24 and take to Council November 1.
Agenda Item #5, Executive Session
No Executive Session was held.
Agenda Item #6, Reconvene
No action necessary.
Agenda Item 8, Adjournment
Meeting was adjourned after a unanimous motion by the committee members.
President, SPDC, Stephen Apple
Co -Chair, JUC, Buddy Luce
ATTEST:
Kevin Hugman, Assistant to the City Manager
c:1 wpfdes join[ jucndn10.03
City of Southlake, Texas
October 3, 1994
TO: Curtis E. Hawk, City Manager
FROM: Kim McAdams, Park Project Manager
SUBJECT: Bicentennial Park Expansion Project - Phase I
Re-evaluated SPDC Budget Plan
Construction bids opened Friday, September 30. The staff has reviewed the bids and recommend
the low bidder, Dean Electric for the base bid of $1,837,000, plus add alternate #6 which includes
moving fences and light poles on the current Fields #1 & #2 at $13,000 and the deduct alternate
#7 to drill seed the turf at-$7000. The grand total of the bid award to Dean Electric would
be $1,843,000.
With the construction costs of Bicentennial Park known and projected costs of the gym, staff re-
evaluated our SPDC budget plan.
SPDC BUDGET FY 199344, 1994-95 and 1995-96
Land Acquisition - Phase I (Truelove) $ 253,000
Bicentennial Park- Phase I 1,843,000
Bicentennial Park -Contingency 50,000
CMS - Gymnasium 700,000
West Beach Property 473,000
Land Acquisition -Phase II (Brunson) 225,000
Bicentennial Park - Phase II 456,000
TOTAL $ 4,000,000
Staff proposes to set aside funds for the Bicentennial Park Furnishings at $100,000 from the Park
Dedication Fee Budget in FY 1994-95.
Bid Tabulation ' Bidders
15lcentennial Park
Southlake, Texas
September 30, 1994
GrL
���kG
Wi li++e5
• Bid
�� &37 OOa
11 661, Z51
2 ZJ7; o00
Alternate #1 - Add
1350 L.F. six-foot trail
14. 75
17,SZO
&I24o
Alternate #2 - Add
C.M.U. Wall
20��
�(o�O7Z
ZZ,000
Alternate #3 - Add
Modified topsoil Mixture
"5%6, 0
34,00o
I S,oUU
Alternate #4 -Deduct Add
Sherman Poles with Musco
_ I1500
—156o
— 500
Alternate #5 -Deduct Add
Sherman Poles with Qualite
+ 9 zoo
+ (a t7zo
{- &.400
Alternate #6 - Add
Adjustments @ Fields #1 & #2
13"COO
3,f 57-5
14, L)DO
Alternate #7 - Deduct
Drill Seeding
—'7. 000
— ,Z000
—'5000
Alternate #8 - Add
Sod Adjacent to Paving
4:5oo
3m so
, S500o
mate #9 - Add
%Vding Cages
3'�� Cp0
9 , Soo
7- 5,000
Alternate #10
Add 1170 L.F. Pipe Fence
Z,, coo
�-7, 700
Z 11000
Alternate #11 - Add
Duplex Lift Station
5�cD0
42_15O
4,0oo
Alternate #12 - Add
Remove 41fAsphalt replace with
rj�j 000
r
4, 0o 0
74,000
concrete
Alternate #13
Add Pond Excavation
1 7,50U
IZ, 6OO
(3,000
Alternate #14 - Deduct Add
Rainbird Inigigation Equipment
^2,190
— I,Doo
—z ZOO
Alternate #15 - Add
Completion of selected elements
'001000
7-001 Opp
83 000
by Aril 1, 1995
Addenda #1
r
V
Addenda #2
nder Days to Completion
'3
500
ZC�)
Z 7O
Bid Guaranty
✓
✓
✓
Itam
NO.
t
I
OCT 03 194 10:46 J T DU•KIN & ASSUC FW# 553-5781 eaVp,1• a; �
PRRLI MIRY CoBT xsT=%TS FOR
RIC3 TPRNs = PARR
SOU'iEi i►M TBXAA
item Damcm-Int4 em
Subtotal Total
i. Bosavar or asT,c - Unmrapnic 6 8ouadary
3.000
2. ACQ=Rs R.O.W. AM nRAif (M MAB2at M -
Truelove Property
I. ACQUM S.2E ACMg =Aar
4. CONTRACT DOC7jU:NT PIWAAil OX - PA=
L.A. consultant, dimension coatLol plan, grading plea,
construction details, contract administration
123,000
S. COM7AtT DOCUZUM PRWARXTION - XWM Rojo -
city Ingiueer, drive frQM F.M.1709 to park, plum, bid
documents, Burraying, contract administration
12,000
6. 9Y"1'S CRADXW
50,000
7. =M Y ROAD AM DRA17uAQ= cz&2u= -
31' 2132 concrete cuth i gutter
231,000
8. R= FIXWX 4 a 5 - Mustang `y
crigation
ao,coo
tfield avd (o"rgeaded) 1.751rd.-
Infield mod (overseadad)
10,000'1
Infield draisutgt piping
3,000
27,000
KA!rhto, se LAC daiield, SO rc cuuawi 2
70,000
BRckatop fencing, 20' ht., 6 gauge
18,200
Foal line and outfield fencing, g, ht., 9 gauge
10,400
V"Outm with pl s_beaches, concrete slab. metal corers
17,000
Foul poles (151 height)
4,000
corekeeper stands
s,Qao oace
eko
as rc - 7 each field (14)
1,p00
Cecreboard conduit and V41 Kira
1,t1v0
174,600
9. FI2:LD8 6 4 7-Y/23raneo
Irrigation
Vield Rod (owrseeded) 1.75/Yd.
sod
26 ,c
0
250eld
4,40ftld
drainage piping
28,000
Sights, SO FC infield, 30 FC outfield
108,000
Backstop fencing, 20• ht., 6 gauge
201000
Foul line and outfield reaULD9, a• ht., 9 gauge
14,000
Dugouts with piayera benohee, concrete Blab, metal covers
17,000
oul pails
aeorekeeper stands
4,00
1.oc0
Bast anchors - 7 each field (14)
1,000�
Scoreboard conduit and pull wire
1,000
261,400
A
Cm
lX 1 03 ' 94 10' 46 f T DLWIN & h56o(. Nki J553-5781 , = - P. • .1
Page of 2
30. PtplbE I - PARK=a LOT DSVSLOPKM VW OTZZXr= - -
Parking area i.A. 196 parking spaces, 6" reinforced concrete.
limo stabilised
1 Access drive, 790 L.F. 5" reinforced, lime stabilized
200,000
concrete drive ♦ $2.75/S.F.
Parking
S0,000
i area 12, 71 parking spaces, 5" reinforced. lime
atabilized concrete
Pedestrian walk/Service drives - 15. wide, S" Concrete,
72,000
690 S.F. ♦ $2.75/S.F.
38,500
Parking lot lighting (10)
24,000
8" water line - 2,sSo L.£. • $1t/L.P.
39,900
Saaitaxp sewer - 1,400 L.£. • $19/L.F,
21,000
Sidewalks - 1030 L.F., V X 6' wide ♦ 2.85, reinforced w/2•
sand (playground 4501, Flasa to Elume Cool)
Si.C65
Storm sewer (parking Iota)
20,000
47049g
11. PANS$ 2 - RSCRSA2TOPAL ai0=TXSS
rigation booster pomp, 2200' 4" PVC ♦ $2.20
12,00
ca
Dattiug/plechinq "go . S• concrete alAh, CO 12, wide lanes.
00' in length with Ss' tall fencing (does not include top
netting)
12,00
Picnic ahelter, 36' diameter with 8 pienie tables, one r
grill (near playground)
picnic vnies, lneludeo concrete rlab, please ladle and
36,000
Pear
small grill
9,Oo0
our picnic tables with root (aluaiatss) in Plaza area
10,00
2300 L.l. of 4" concrete bike 4 bike trail, 6' wide
32,000
Concession/restroom building
180,000
Baseball Plats paving, 4" concrete
40,900
Field drains$e storm sewer
i0,000
Common area X=igation
20,009
Common area turf establishment
10,000
T.mndmnsping (3" cal. trees)
30,000
aalvanized chain link fence, S' Xt. 1,190 L.Y. 9 $7.00/1,.F
2`
coated fence, 4' Rt. 620 L.£. ♦ $7.50%.£. (Plsygrauad
::65�
rinyl
area)
leachers s posa,.,,eut, 10 portable
lectrieaf transformar,
la,000
service cc concession
10,00
ark ai a
10.00
491,910
12. SOCCER AM (R=X = West te0 tields)
Irrigation
12,000
Turf
7,000
101000
13. W1HTMtMCx auxLumto -
25• x $0' building with security fencing and lights, 6"
paving Lu building and sw411 stardgp yard
100,000
14. PM66M I2
Parking area, 198 parking spaces, 5" reinforced, lime
200,000
stabilized concrete
Access drive, 490 L.T. nF 5N reinforced, lime stabilised
concrete
30,000
Parking lot lighting
24,800
Parking lot irrigation
10,000
Detention basin - 3 Surf nacear fields (City mmgiaoor)
structure, basin, 160' 01 RCP, No easement
110,606
275,306
15. SOCCXR "XA (BWAAX 2i - East three Melds)
Turf establishment
t,S00
irrigation
i5.000
L,lndai,rmp(nv
51000
26.500
Construction Totals: PR 1 " 1,699,955 + Contingency (74) 110,990 1,1118,963
Pn 2 401,006 + Contingency (7%) 20,1049 - a29.032
L I Item not included in construction contract
Original Construction Estimate 1,699;965
Irtems noc Included .96,050
Revised Feb.'94 Conet.Estimate 1,603,915
OCT 03 '94 10:47 J T DU IN & RSSOC FAX# 553-5781
P.3
IM
Revised February, 1994 Budget
BICENTENNIAL PARK
Southiake, Texas
October 3, 1994
February, 1994 Budget Phase I Constnrctlon
Elements Removed From Construction Contract
Item *8, Bell Fields 4 S 5
Outfield Sod
$ 10.000
Infield Sod
3,000
Scorekeeper Stands
3,000
Base Anchors
im
Item #9, BaA Fields 6 & 7
Outfleld Sod
$ 25.000
Infield Sod
4.400
Scorekeeper Stands
3.000
Base Anchors
LM
Item 11, Recreational Amenities
Batting/Pitching Cage
$12.000
Four Picnic Units
91000
Four Picnic Tables w/Roofs
10,000
4' Vlnyt Coated Fence, 620 LF.
4,650
Perk Siignage
10.000
Total Removed Elements
Revised February 1994 Budget • Phase I Construction Contract
$17.000
33.400
$ 1,699,966
_6.4;:4
$1.603,016
OCT 03 194 ie:48 J T DUWIN & ASSOC FAX# 553-5781
P.4
Costs of Additional Elements
BICENTENNIAL PARK
Southlake, Texas
October 3, 1994
LOW BIDDER'S BASE BID S t,E37.000
REVISED FEBRUARY. 1094 PHASE I CONSTRUCTION ESTIMATE* Isaw
Budget Difference S 24085
PHASE I ADDITIONAL ELEMENTS
Item #10, Parking Lot Development h U0103
Parking:
construction Plans
341 spaces
Odglnal Estimate
M spaces
Additional Parking
74 spaces
Addklottal Coat ($1.000/apace)
S 74,000
Service Walk
Construction Plans
23.300 S.F.
OdgInW Estimate
n= S.F.
Additional Service Walk
12—%0 S.F.
Additlo l Cost (g2.00/S.F.)
25=
Item #E11 Recreational Amenities
Irrigation:
Odglnai Estimate
$ 68.000
Additkx>al Irrigation Elements
Modification to Pump House,
Additional W line
25.500
Additional Areas Irrigated 4.5
Acres (K000/Ac.)
27,000
Remote control system
&ON
Turf EstabGshmerd
5a.500
Original Estimate
$ 10,000
Additional Turfed Areas - 7.06 Ace.
" Revised Phase I construction estimate reflects the removal of elements r*t inch,ded
In
construction contract
i
>:c
OCT 03 '94 10:48 J T DUWIN & RSSOC FAX# 553-5781
P.5
Site Fencing
Weal Property Fence
Original Estimate West Property
Una Fence
Construction Plana West Property
Additional Cost
Wood Stockade Fencing
Not Included in original estimate
6' hL 605 LF. @ $15/1-F.
8' hL 200 LF. @ $20/1-F.
Additional Cost
Warm-)Jp Fencing
Not Included In orlgkW astknate
10' ht. 220 LF. ® SIT/LF.
Additional Cost
Total Additional Fencing
Plaza Paving
Construction tion Plan
Original estimate
Additional Cost
Total Cost • Additional Elements
R.j
$ 8.260
1,740
$9.075
AM
13,075
3.750
18,5%
$80.000
40.Q00
40,000
$ 227.715