Loading...
1994-02-1416M SOUTHLARE PARR DEVELOPMENT CORPORATION MEETING 667 NORTH CARROLL AVENUE, SOUTHLARE FEBRUARY 14, 1994 6:00 P.M. MEMBERS PRESENT: Chairman, Stephen Apple; Vice -Chairman, Larry Goldstein; Secretary, David Yelton; Treasurer; LouAnn Heath. Members: Gary Fickes, Janet Murphy, Jon Michael Franks and W. Ralph Evans. STAFF PRESENT: Curtis E. Hawk, Cit City Manager; Greg Last, Director Sandra L. LeGrand, City Secretary. Agenda Item #1, Call to order. y Manager; Shana Rice, Assistant of Community Development; and, The meeting was called to order at 6:00 p.m. by Stephen Apple, Chairman of the Southlake Parks Development Corporation. Agenda Item #2, Administrative Comments. Janet Murphy, stated a representative of the Grapevine Playground Initiative asked that a representative from the Southlake Parks Development Corporation meet with them at their regular meeting to be held on February 21, 1994, at 5:00 p.m. in regard to Bicentennial Park expansion. It was noted that Greg Last will attend the meeting with Janet Murphy. Agenda Item #3, ARoroval of the Minutes, January 3, 1994. The Minutes of the January 3, 1994, SPDC meeting were approved as presented. Motion: Fickes Second: Evans Ayes: Fickes, Evans, Franks, Apple, Goldstein, Murphy, Yelton Nays: None Approved: 7-0 vote Agenda Item #4, Southlake Park Development Corporation Plan and Budget. LouAnn Heath, Treasurer for S.P.D.C. presented the budget, stating the budget combines funding from three (3) sources: Park Dedication Fees, the 1/2 Cent Sales Tax Operating Fund, and the 1/2 Cent Sales Tax Project Fund. It was explained the Park Dedication Fees come from the City of Southlake operating budget; the Operating Fund comes from the collection of 1/2 cent sales tax; and the Project Fund is capital and comes from revenues. The current plan is to sell 2.5 million dollars in June in Bonds. Regular SPDC Meeting Minutes February 14, 1994 page two Agenda Item #4, Continued Greg Last, Director of Community Development with the City, presented the three (3) planned projects, including: Bicentennial Park Expansion; Joint Utilization Project; and, U.S. Corp of Engineer Property. A copy of the SPDC Plan and Budget is hereby attached to the minutes. Gary Fickes suggested the group discuss the qualifications of the Park Project Coordinator. Curtis Hawk, City Manager, stated he met with the school staff and architects last Monday evening, April 7, 1994, making a presentation to the Joint Utilization Committee. The architect with the school system made a presentation on the gymnasium project at Carroll Senior High School, stating the project will include a 50'X 84" court with bleachers to seat approximately 150 people. The bleachers will be three (3) rows high, and further described as fixed bleachers. There will be dressing rooms, custodial room, activity room and a control room. The flooring will be rubber type tartan floor, with an alternate bid for wood floors. Janet Murphy asked what if the bond package does not pass? What about parking? It was noted the parking will be part of Phase II project. Phase I will use existing parking. Richard Wilkinson, Principal of Carroll Middle School, stated he feels the plan looks great and gives some options. Bethann Scratchard stated the Joint Utilization Committee and the Park and Recreation Board are happy with the plan. A discussion was held in regard to the need for soccer fields. The City Manager stated the City cannot do much to remove the trees on the Corp property, therefore, they would not be good for soccer fields. We need to acquire property contiguous to the Corp property that will be suitable for soccer. PUBLIC HEARING: Dennis McGrath, 2103 North Carroll Avenue, Southlake. Mr. McGrath stated he likes what has been done in putting this project together. He questioned the cost estimate of $35,000 for landscaping at Bicentennial Park. He stated he feels a good job has been done, however, we need to look to other areas to get fl trees, prior to spending money at the park. Regular SPDC Meeting Minutes February 14, 1994 page three Agenda Item #4, Continued With no further comments the public hearing was closed. Motion was made to approve the Southlake Park Development Corporation Plan, including the three (3) projects and the budget. Motion: Fickes Second: Yelton Ayes: Fickes, Yelton, Franks, Evans, Goldstein, Murphy, Apple Nays: None Approved: 7-0 vote Agenda Item #5, Adjournment The Meeting was adjourned by Chairman, Stephen Apple at 7:00 p.m. Respe ully Su mitted A# w. CoRPoJq4l�oy David Ye n o *' Secreta w 7 /sl SOUTHLAKE PARKS DEVELOPMENT CORPORATION Park Development Plan February 1994 - September 19% TABLE OF CONTENTS INTRODUCTION ............................................ 2 PLANNED PROJECTS ........................................ 3 Bicentennial Park Expansion ................................. 3 Joint Utilization Project .................................... 4 U.S. Corps of Engineer Property .............................. 5 BUDGET INFORMATION ...................................... 6 Exhibit.................................................11 Exhibit.................................................12 Exhibit.................................................13 Exhibit.................................................14 Exhibit.................................................19 SOUTHLAKE PARKS DEVELOPMENT CORPORATION 4 Park Development Plan February 1994 - September 1996 EXECUTIVE SUMMARY INTRODUCTION On November 2, 1993, Southlake voters overwhelmingly approved a referendum to levy a half -cent sales tax for the development of park and recreation facilities for use by Southlake residents of all ages. State legislation specifies when such taxes can begin to be collected, and in Southlake's case, collection will begin in April 1994. It is anticipated that, based on previous sales tax collections, the half -cent sales tax will generate approximately $300,000 per fiscal year for park development. This figure does not factor in any additional growth in Southlake's commercial sector. Proceeds from the sale of revenue bonds, backed by the City's ability to collect the half -cent sales tax, will be used to finance the construction of park projects. The first offering will yield approximately $2.5 million. A subsequent offering, tentatively scheduled for the summer of 1995, will yield approximately $1.5 million. Please see Exhibit A for a history of Southlake's tax collections. In accordance with State legislation, a Corporation has been created and a Board appointed to oversee the expenditure of half -cent sales tax funds. The corporation is called the Southlake Parks Development Corporation (SPDC), and the Board is comprised of City Council, Park Board, and citizen representatives. Please see Exhibit B for a listing of Board members. The SPDC is responsible for the development of a plan detailing projects slated for construction and an annual budget detailing projected revenues and expenditures. Exhibit C illu4trates the relationship between the SPDC, City Council, Park and Recreation Board, Joint Utilization Committee, and other neighborhood and community groups. The following is an Executive Summary of the proposed SPDC plan for the period of February 1994 through September 1996. The formal plan will be discussed and approved at the c. 2 A ' SPDC Plan - Executive Summary February 14, 1994 SPDC meeting (public hearing), and considered by the City Council will take place on Tuesday, February 15, 1994. Questions regarding the SPDC plan and/or budget may be addressed to the City Manager's Office, 481-5581 extension 705. PLANNED PROJECTS During the campaign to pass the sales tax referendum, three categories of potential projects were identified and presented to the voters. These categories included: 1) expansion of Bicentennial Park, 2) joint utilization projects with Carroll Independent School District (CISD), and 3) use of U.S. Corps of Engineers property along Lake Grapevine. The SPDC, therefore, is considering projects in conformance with the identified categories of projects. Bicentennial Park Expansion - The need for athletic fields has grown steadily as the population of Southlake has grown. It is estimated that 574 children participate in organized baseball, 448 participate in organized softball, and 500 participate in organized soccer through a joint program with Grapevine. Only three baseball diamonds are available at Bicentennial Park. The lack of fields creates problems with scheduling for games, as well as practice. Bicentennial Park expansion plans primarily address the need for additional athletic fields. Bicentennial Park consisted of 14.3 acres, and an additional 15.49 acres to the west of the existing park was purchased in January, 1994. Staff is already working with consultants on the topographic and boundary site surveys of the new property, and other preliminary work to ensure that construction can begin as quickly as possible after the revenue from the bond sale becomes available. Exhibit D is a schedule of proposed construction activities/items and estimated costs for Bicentennial Park expansion. The expansion plans call for the construction of four additional baseball diamonds, consisting of Mustang, Pony & Bronco sized fields. Additionally, the plans provide for the construction of soccer fields, although it is anticipated that these fields will be ,,, 3 (W SPDC Plan - Executive Summary used on a temporary basis until a permanent soccer complex can be constructed on another site. The plan also shows the site of the community playground to be built by residents under the guidance of the Southlake Playground Initiative. Many recreational amenities will be included in the expansion as well, including items such as batting cages, picnic tables and shelter, grills, hike and bike trail, bleachers, a concession building, fencing, common area plaza and turf establishment. The plans also call for the construction of a maintenance building with security fencing. Parking and access are a large part of the expansion plans as well. The City is in the process of negotiating for parcels of land contiguous to the park which, if acquired, will provide access to the park from FM 1709 or from the existing park through to the expansion site. If the best of circumstances prevail during construction, the first phase could be completed as early as spring of 1995. However, it is anticipated that a more realistic completion date on the ball fields and access/parking is the fall of 1995. The Southlake Playground Initiative plans to begin construction of the playground in the spring of 1995. Joint Utilization Project - The City and Carroll Independent School District have adopted the concept of "joint utilization", and are beginning to make strides to implement the idea in Southlake. The City and school district have already worked together on a number of recreational projects and the Joint Utilization Committee has proposed another, to be funded through the SPDC. The growth of the student population in CISD has made it difficult for the district to provide sufficient recreational facilities. CISD officials have known that a new gymnasium is needed at the Middle School, but demands for additional classroom space limit their ability to build a gym. The Joint Utilization Committee reviewed the problem and suggested to the school board, and the SPDC, that the new gymnasium be built in such a way that it could "double" as a recreation center for the City. School children could use the facility during the day, and citizens could have access during non -school hours. Having such a facility would also provide I SPDC Plan - Executive Summary opportunities for expanded recreational programs offered by the City. As presented by the Joint Utilization Committee, the gymnasium/recreation center would be constructed on district property, adjacent to the current gymnasium at the Middle School on North Carroll Avenue at Dove Road. District architects are working with CISD and the City of Southlake to draw up plans for a gymnasium/recreation center. Actual construction costs would be borne by the SPDC. It is estimated that the initial construction will cost about $500,000. Please see Exhibit E, tentative floor plan of the proposed gymnasium/recreation center. U.S. Corps of Engineer Property - Southlake is fortunate to have several hundred acres of Corps property within its corporate boundaries. There are currently two parks on Corps property, Walnut Grove and Marshall Creek. Both parks consist of undeveloped shoreline and woodlands, and Walnut Grove Park has several miles of pedestrian and equestrian trails. Corps (W officials have indicated that they are willing to work with the City of Southlake to develop these areas into parks for the citizens of Southlake to enjoy. The City has been in discussions with the Town of Trophy club concerning the development of Marshall Creek Park, which lies predominately within the extra territorial jurisdictions (ETJs) of the respective cities. Since the development of Marshall Creek is envisioned as a cooperative effort by both cities, the specifics of an implementation plan is not immediately ascertainable: The acreage possesses significant open space features and natural beauty. An informal, preliminary site analysis of the area indicates that the usage of the land should possibly be limited to passive recreational activities, preserving the rich natural beauty of the area. The SPDC has discussed potential uses of the property, and believes that the desire of the citizens to retain the natural state of the area, coupled with tree mitigation issues with the Corps, will limit the uses of the property. Given the lack of suitability of this property for development of athletic fields, and the need for athletic fields in Southlake, the SPDC has (,W 5 I SPDC Plan - Executive Summary C IM instructed staff to explore options for the property's development and the possibility of purchasing land contiguous to the Corps property for athletic field development. BUDGET INFORMATION A three year budget is presented for the Southlake Parks Development Corporation, beginning with the fiscal year October 1, 1993. The budget combines funding from three sources: Park Dedication Fees, the SPDC Operating Fund and the SPDC Revenue Bond Project Fund. Revenues from Park Dedication Fees for fiscal years 1995 and 1996 are estimated at $50,400 annually. Sales tax receipts are estimated to increase 10% annually with no provision for major new commercial/retail additions. Interest income is calculated based on an average invested balance annually at 3%. FY1993-94 Park Dedication Fee Fund Revenues: The budget includes $146,128 in anticipated Park Dedication Fee receipts and $2,500 in interest earnings. As of January 31, 1994, there has been $89,770 in fees collected, and an additional $56,358 is anticipated. Expenditures: The Park Dedication Fee Fund reflects budgeted amounts that were approved by the City Council when the City's annual operating budget was adopted. There is $467,710 budgeted for the purchase of a 15.49 acre tract of land adjacent to Bicentennial Park. This expenditure is to be partially funded through cash payment and the issuance of a $320,000 five year certificate of obligation. There is also $49,157 included for Joint Use Improvements to the Carroll Intermediate School athletic field and basketball court. Bicentennial Park plan (. 6 A SPDC Plan - Executive Summary design, entry road design, engineering, bid documents, surveying and contract administration is included totalling $140,000. SPDC Operating Fund Revenues: There is $146,000 in revenues from the 1/2 cent sales tax included, which represents collections from May through September. Interest totalling $1,500 is included. Expenditures: There is $20,000 budgeted for the hiring of a Park Project Manager. SPDC Revenue Bond Project Fund Revenues: A bond sale with proceeds of $2.5 million is planned, and interest earnings are projected at $18,000. (w Expenditures: There is $225,000 included for the purchase of land adjacent to Bicentennial Park. Site grading and construction of the entry road and drainage are estimated at $50,000 and $133,000, respectively. FY 1994-95 Park Dedication Fee Fund Revenues: Revenues of $50,400 park dedication fees and $1,200 in interest earnings are included. Expenditures: There are no expenditures budgeted. SPDC Operating Fund Revenues: Revenues from the 1/2 cent sales tax are estimated at $385,800, a 10% increase from the previous year. Interest earnings are projected at $7,000. 7 c SPDC Plan - Executive Summary Expenditures: The Park Project Manager is budgeted at $50,000. Debt service on bonds is projected at $227,565. SPDC Revenue Bond Project Fund Revenues: Interest earnings of $35,000 are included. It is anticipated that the City will be able to issue an additional $1.5 million in bonds during the fiscal year. Expenditures: There is $500,000 included for the joint use gymnasium with CISD. Phase I of the Bicentennial Park improvements with contingency are estimated at $1,635,963. FY1995-96 Park Dedication Fee Fund (W Revenues: Revenues of $50,400 park dedication fees and $3,750 in interest earnings are included. Expenditures: There are no expenditures budgeted. SPDC Operating Fund Revenues: Revenues from the 1/2 cent sales tax are estimated at $424,440, a 10% increase from the previous year. Interest earnings are projected at $9,000. Expenditures: The Park Project Manager is budgeted at $50,000. Debt service on bonds is projected at $224,505. Land acquisition at Bicentennial Park is included for $235,6W. This parcel will be used to complete Phase H of the Park. SPDC Revenue Bond Project Fund Revenues: Interest earnings of $30,000 are included. 8 SPDC Plan - Executive Summary Expenditures: Phase II of the Bicentennial Park improvements and contingency are estimated at $429,932. The purchase of land adjacent to the Corps of Engineer land in the northern portion of the City is estimated at $1,000,000. (6w 9 SOLITHLAKE PARKS DEVELOPMENT CORPORATION PROPOSED BUDGET FYI993-94. FY 1994-95. FY1995-96 SPDC Park SPDC Revenue Bond Dedication Operating Project Fiscal Year 1993-94 Fee Fund Fund Fund Total Fund Balance 10/1/93 238.159 Q Q 238.159 Revenues Interest 2,500 1,500 18,000 22,000 Receipts 146,128 146,000 Q 292-128 Total Revenues E2enditures 148,628 147,500 18.000 314,128 Personnel -Project Coordinator(4 moo) 0 20,000 0 20,000 Joint Use Improvements (Annual budget) 49,157 0 0 49.157 Land (Bicentennial Park-15.49 ac) 467.710 0 0 467,710 Joint Use Improvements-Gymnasiurn 0 0 500,000 500,000 Bicentennial Park -Phase I Land acquisition 0 0 225,000 225,000 Survey, Plans/, m9 ants-park,entry 140,000 0 0 140,000 Site grackD 0 0 50,000 50,000 Entry Road- drainage Q Q 133,000 133.000 Total Expenditures 656.867 20,000 908,000 1,584,867 Proceeds from sale of bonds 320,000 0 2.500,000 2,820.000 FuPd Balance 1011/94 4>9_9XI 7-SM 1-610-000 1187.420 Fiscal Year 1994-95 Revenues Interest 1,200 7,000 35,000 43,200 Receipts 50.400 385,800 Q 436.E Total Revenues 51,600 392,800 35.000 479,400 (W FEaendiitures Personnel -Project Coordinator 0 50,000 0 50,000 Debt ServkwBonds 0 227,565 0 227,565 Bicentennial Paris -Phase I Ball Fields 4 & 5 0 0 174,600 174,600 Fields 6 & 7 0 0 261,400 261.400 Parking Lot DevelopmentlUtilities 0 0 470,055 470.055 Recreational Amenities 0 0 491,910 491,910 Soccer Area 0 0 19,000 19,000 Maintenance Building 0 0 100,000 100,000 Contingency 0 0 118,998 118,998 Total Expenditures 0 277,565 1,635.963 1,913,528 Proceeds from sale of bonds 0 0 1,500.000 1.500,000 Fund Balance 1011/95 101,520 242.735 1-509-037 353-292 Fiscal Year 1995-96 Revenues Interest 3.750 9,000 30,000 42,750 Receipts 50.400 424,440 0 474,840 Total Revenues 54.150 433,440 30,000 517,590 Expenditures Personnel -Project Coordinator 0 50.000 0 50.000 Debt Service -Bonds 0 359.505 0 359,505 Bicentennial Park -Phase II Land acquisition 0 235,000 0 235,000 Parking area, lighting, irrigation 0 0 375,306 375,306 Soccer Area -east three fields 0 0 26.500 26,500 Contingency 0 0 28,126 28.126 U.S. Corps of Engineer Property Land -Adjacent area Q 0 1,000,000 1,000,000 Total Expenditures 0 644.505 1,429.932 2,074,437 Fund Balance 10/1/96 155.670 31.670 109.105 29&445 10 SPDC Plan - Executive Summary CITY OF SOUTHLAKE' SALES TAX REVENUES six year companson Exhibit A 1993-94 collected budget balance u et to date balance percent $701.500 S326.727 74 773 53-42% MONTH FISCAL YEAR 88/89 FISCAL YEAR 89/90(Dec)90/91 % Inc FISCAL YEAR % Inc Dec FISCAL YEAR 91/92 % Inc FISCAL YEAR 92/93(Dec)93/94 % Inc FISCAL YEAR % Inc October $27,970 S371776 35.1% S44,081 16.7% S46,731 6.0% $50,956 9.0% S99;408 95.1% November 15,428 24,573 59.3% 37,117 51.0% 27,929 -24.8% 42,126 50.8% 5G.,623 20.2% December 17,830 21452' 18.1% 28,464 35.2% 33,273 16.9% 33850 1.7% 7Q,155 107.3% January 26,756 34,463. 28.8% 47,106 36.7% 40,012 -15.1 % 67,713 69.20/. 106,541' 57.3% February I5,894 25,594 61.0% 22,487 -12.1% 40,106 78.4% . 39,351 -1.90/0 March 14,778 30,657 107.5% 32,955 7.5% 37,488 13.8% 44,176 17.8% April 48,635 37;261 . -23.5% 41,445 11.4% 57543 38.80/a 68,664 19.3% May 27,824 31,501' 13.2% 36,627 16.3% 41,020 12.0% 54,623 33.2% . Aw 24,051 37 ,."7- 55.7% 37,894 1.2% ;:43,105 13.8% 52,027 20.7% July 38,630 511,3.74 33.0% 47017 -8.5% 51,357 9.2% 80,567 56.90/. August 22,699 31,969 40.8% 35,951 12.5% 48,731 35.5% 48,290 -0.9% September 31.204 32.499 4.2% 37.004 13.9% 42-741 15.5% 54.395 27.3% TOTAL S31.1,699 S396;106' 27.1% S448,148 13.1% S510,036 13.8% S636,738 24.8% $326,727. 67.9% scsrAX9,CWU (W 11 REPORT DATE 02/14/94 . SPDC PLM - Executive SUMffl9jbtY of Southfake, Texas S OUTHLAKE • PARKS DIEVELO'PIVIENT CORPORATION Exhibit B ESTABLISHED ORDINANCE NO. 597 NOVEMBER 16, 1993 Members: Term to Expire * Gary Fickes Home: 481-2898 5/31/96 155 S. Kimball Avenue Work: 329-0411 Southlake, Texas 76092 W. Ralph Evans Home: 481-3759 5/31/96 315.North Shady Oaks Drive Work: 214/387-4242 Southlake, Texas 76092 Stephen Apple, President Home: 481-5490 5/31/95 2819 Rainforest Court Work: 214/280-6794 Southlake, Texas 76092 on.Michael Franks Home: 430-1414 5/31/95 22 Sam Bass Ridge Road Work! 877-1841 Roanoke, Texas 76262 * Janet Murphy Home:-488-2884 5/31/96 1313 North White Chapel Blvd. Southlake, Texas 76092 * David Yelton, Secretary Home: 329-0610 5/31/96 1346 Lakeview Work: 214/506-2374 Southlake, Texas 76092 Larry Goldstein, vice -President Home: 329-9085 5/31/95 216 Westwood Work: 540-5442 Southlake, Texas 76092 * Incorporators 12 SPDC Plan - Executive Summary 0Aw a a ; 7 U O U 13 EahibiCC SPDF P-.Ezecudye S — � I• r sts[ As M SNAD'f OAKS! �--'—� i = i i • I••r. � i YYIIMWW t IIIIIIt11RaRAlt• ri • OIIfmIr,. 1ttIN[NMMIIAN � ( . i .'• 1 .'I t1y� —. plumninm N. WHITE CHAPEL BLVD. \ , 14 BIyENLrN AL PARK C_ITT `O!•�ta�OT[LA[[ � •yy ,�'� r MM �r w. I CONCEPT PLAN FOR EXPANSION =-- •— 2/1/94 Page 1 of 2 PRELIMINARY COST ESTIMATE FOR BICENTENNIAL PARK Item SOUTBLAKE, TES NO. Item Descvintinn SubtotalTotal' - -- costs Cost i. SURVEY OF SITE - Topographic & Boundary 3,000 2. ACQUIRE R.O.W. AND DRAINAGE EASEMENT - Truelove Property �z5aoo 3. ACQIIIRE 5.33 ACRE TRACT • a35ooa 4. CONTRACT DOCUMENT PREPARATION - PARK L.A. Consultant, dimension control plan, grading plan, construction details, contract administration 125,000 S. CONTRACT DOCUMENT PREPARATION - ENTRY ROAD - City Engineer, drive from F.M.1709 to park, plans, bid documents, surveying, contract administration 2.2,000 6. SITE GRADING 50,000 7. ENTRY ROAD AND DRAINAGE CHANNEL - 31' BB concrete curb & gutter 133,000 8. BALL FIELDS 4 & 5 - Mustang Irrigation Outfield sod (overseeded) 1.75/Yd.- 10,000 Infield sod (overseeded) 10,000 Infield drainage piping 3,000 Lights, 50 FC infield, 30 FC outfield 27,000 (W Backstop fencing, 20' ht., 6 gauge 70,000 Foul line and outfield fencing, 6' ht., 9 gauge 18,200 Dugouts with players benches, concrete slab, metal covers Foul poles (15, height) 10,400 17,000 Scorekeeper stands 4,000 Base anchors - 7 each field (14) 3,000 Scoreboard conduit and pull wire 1,000 1,000 174,600 9. FIELDS 6 & 7 - Pony/Bronco Irrigation Outfield sod (overseeded) 1.75/Yd. 26,000 Infield sod 25,000 Infield drainage g piping 4,400 Lights, 50 FC infield, 30 FC outfield 28,000 Backstop fencing, 20' ht., 6 gauge 108,000 Foul line and outfield fencing, 6' ht., 9 gauge 30,000 Dugouts with players benches, concrete slab, metal covers Foul poles 14,000 17,000 Scorekeeper stands 4,000 Base anchors - 7 each field (14) 3,000 Scoreboard conduit and pull wire 1,000 1,000 261,400 L/1/y4 Page 2 of 2 10. PHASE I - PARKING LOT DEVELOPMENT AND UTILITIES Parking area 1A, 196 parking spaces, 5" reinforced concrete, ' lime stabilized Access drive, 760 L.F. 5" reinforced, lime stabilized 200,000 ' concrete drive a $2.75/S.F. Parking area 18, 71 parking spaces, 5" reinforced, lime 50,000 stabilized concrete Pedestrian walk/Service drives - 15' wide, 5" concrete, 71,000 690 S.F. 0 $2.75/S.F. Parking lot lighting (10) 28,500 8" water line - 2,850 L.F. a $14/L.F. 28.000 Sanitary sewer - 1,400 L.F. A $15/L.F. 39,900 Sidewalks - 1050 L.F., 4" X 6' wide O 1.85, reinforced w/2" 21,000 sand (playground 450', Plaza to flume 6001) Storm sewer (parking lots) 11,655 20,000 470,055 11. PHASE I - RECREATIONAL AMENITIES Irrigation booster pump, 2200' 4" PVC 0 $2.10 Batting/pitching cage - 5" concrete slab,. (4) 12' wide lanes, 12,000 80• in length with 15• tall fencing (does not include top netting) Picnic shelter, 36' diameter with a picnic tables, one 8,. 12,000 grill (near playground) Four picnic units, includes concrete slab, picnic table and 36,000 small grill Four picnic tables with roof (aluminum) in Plaza area 9,000 2800 L.F. of 4" concrete hike Q bike trail, 6' wide 10,000 Concession/restroom building 32,000 Baseball Plaza paving, 4" concrete 180,000 Field drainage storm sewer 40,000 Common area irrigation 50,000 Common area turf establishment 0,000 20,000 Landscaping (3" cal. trees) Galvanized chain link fence, 5' Ht. 1,180 L.F. ® $7•.00/L.F 30,000 Vinyl coated fence, 4' Ht. 620 L.F. a $7.50/L.F. (Playground 8,260 area) Bleachers, 8 permanent, 10 portable 4,650 Electrical transformer, service to concession 18,000 Park signage 10,000 10,000 491,910 12. SOCCER AREA (PHASE I - West two fields) Irrigation Turf 12,000 7,000 19,000 13. MAINTENANCE BUILDING - 25' x 50' building with security fencing and lights, 6" paving to building and small storage yard 100,000 14. PHASE II Parking area, 198 parking spaces, S" reinforced, lime 200,000 stabilized concrete Access drive, 450 L.F. of 5" reinforced, lime stabilized concrete Parking lot lighting 30,000 Parking lot irrigation 24,508- Detention basin - 3 East soccer fields (City Engineer) 10,000 structure, basin, 360' 48" RCP, No easement 110,806 375,306 15. SOCCER AREA (PHASE II - East three fields) Turf establishment Irrigation 6,500 Landscaping 15,000 5,000 26,500 Construction Totals: PH 1 = 1,699,965 + Contingency 118,998 1,818,963 PH 2 = 401,806 + Contingency M) 28,126 - 429,932 ■■■ ■■■■■■■■■■ •,d■■■l'! ■■■■■■■■m■■■ ■■■■■■■■■■■ eBBBBBBiiiiiiiii^i ON Boil■■■■■■■ oBBBBBBBBBB■BBo;.■Bo BBBBBBBBBBo .®■o■■■■oo■■B■■o;RBN ■oo■000■B■o oBBBBBBBBBB■BBB1;■■■ ■ ■ SPDC Plan - Execive Summary' Exhibit E cAu. ays, EL4- "�as soi W-