Loading...
ZA22-0029-ZSP & MV PUBLIC HEARING NOTICE ZA22-0029 • Zoning Change, Site Plan & Masonry Variance on property described as Tracts 6C, 6C02, 6C03, 6C01A,, Jesse G. Allen Survey Abstract No. 18, City of Southlake, Tarrant County, Texas, located at 880-950 Davis Blvd., Southlake Texas. SPIN Neighborhood 11. • Current Zoning: “SP-1” Detailed Site Plan District. • The purpose of this request is to seek approval of a Zoning, Site Plan, and a Masonry Variance that will closely resemble the currently adopted Zoning and Detailed Site Plan. The applicant is requesting additional Retail and Commercial land uses. Dear Property Owner, Your property has been identified as being within 300 feet of the above referenced Site Plan application. If you wish to register your opposition or support to this case, you may complete the attached Notification Response Form and either mail to the Planning & Development Services Department (address listed at the top of notice), email a copy to the project case planner (e-mail listed at the bottom of the notice) or fax a copy to the department (fax number listed at the top of the notice). You are encouraged to follow the requested action through final approval because changes are often made during the review process. Please contact the Planning and Development Services Department if you have any questions: Please contact the Planning Department at (817)748-8621 if you have any questions. Thank you. CITY OF SOUTHLAKE PLANNING & DEVELOPMENT SERVICES 1400 Main St.; Suite 310 Southlake, TX 76092 Phone: (817)748-8621 Fax: (817)748-8077 www.cityofsouthlake.com Planning and Zoning Commission Thursday, August 4, 2022 6:30 PM Town Hall Council Chambers 1400 Main Street Southlake, Texas Notification Response Form ZA22-0029: Zoning for 880-950 Davis Blvd. Meeting Date: August 4, 2022 at 6:30 PM Fill out: Owner: _____________________________ Address: ____________________________ City, State, Zip Code: __________________ PLEASE PROVIDE COMPLETED FORMS VIA MAIL, FAX OR HAND DELIVERY BEFORE THE START OF THE SCHEDULED PUBLIC HEARING. Being the owner(s) of the property so noted above, are hereby in favor of opposed to undecided about (circle or underline one) the proposed Site Plan referenced above. Space for comments regarding your position: ___________________________________________________________ ___________________________________________________________ ___________________________________________________________ ___________________________________________________________ ___________________________________________________________ Signature: _______________________________________ Date: ______ Additional Signature: _______________________________ Date: ______ Printed Name(s): _____________________________________________ Must be property owner(s). Otherwise contact the Planning Department. One form per property. Phone Number (optional): ______________________________________ Direct questions and mail responses to: City of Southlake Planning & Development Services Notification Response 1400 Main St; Ste 310 Southlake, TX 76092 Phone: (817) 748-8621 Fax: (817) 748-8077 DAVIS BLVDUN ION C HU RC H MICHAEL DR SIENA DRSIENADR 2113 2107 9508802365 864239524252445 2440 2420 2390 2300 11559008808609118557559559452152 2150 910 9 1 4 918 1008100410009179138058017 1 5 921 1005 1009 1013 9 2 5 929 1 0 0 1 10102745 2435 2110 10251125100011001200612 6 1 6 700 704 708 750Vicinity Map ® 0 180 36090Feet 880-950 Davis Blvd. ZA22-0029Zoning S ite Plan DAVIS BOULEVARD10'TYPE 'D'BUFFERYARD15'SIDEBUILDINGSETBACK10'TYPE 'F1'BUFFERYARD10' TYPE ' F 2' BUFFE R Y A R D 15' TYPE 'T' BUFFERYARD 50' FRONT BUILDING SETBACK 10' TYPE 'F2' BUFFERYARD 15' REAR BUILDING SETBACK 50' FRONT BUILDING SETBACKAUTOMATIC GATE AUTOMATIC GATE AUTOMATIC GATE RETAIN EXISTING FENCE. TO BE MAINTAINED BY PROPERTY OWNER. 5' CONCRETE SIDEWALK 5' CONCRETE SIDEWALK RETAIN EXISTING FENCE. TO BE MAINTAINED BY PROPERTY OWNER. RETAIN EXISTING FENCE. TO BE MAINTAINED BY PROPERTY OWNER. SITE SIGN10'TYPE 'F1'BUFFERYARDBUILDING 1B - 18,950 S.F. BUILDING 3 - 22,624 S.F. BUILDING 4 - 16,167 S.F. BUILDING 5 - 9,863 S.F. BUILDING 2 15,547 S.F.BUILDING 1A2,569 S.F.Legend Existing Saved Tree Interior Landscape Canopy Tree - 4" Interior Landscape Accent Tree - 6' Height Min. Interior Landscape Shrub - 3 Gallon Min. Groundcover - 4" Containers Min. (12" O.C.) Seasonal Color - 4" Containers Min. Bufferyard 6' Decorative Metal Fence 11 4" SQUARE (14 GA.) DECORATIVE IRON TOP & BOTTOM RAILS, SPACED AS SHOWN 2"x2" DECORATIVE IRON POSTS, 8'-0" O.C. MAX. TYP., REFER TO PLANS FOR EXACT LOCATIONS 3/4" SQUARE (16 GA.) DECORATIVE IRON PICKETS AT 4" O.C. (MEASURED FROM CENTER OF PANEL OUT) 3" x 3" X 1 2" DECORATIVE IRON POST CAPS, "PYRAMIDAL TOP" 8'-0" O.C.6'1/2" = 1'-0"Elevation Decorative Metal Fence1 Southlake, Tarrant County, Texas Landscape Plan Tracts 6C, 6C01A, 6C02 & 6C03 Jesse G. Allen Survey, Abstract No. 18 0 40'80'160' 1" = 40' SAGE GROUP, INC. Master Planning Urban Design Architecture Landscape Architecture 1130 N. Carroll Ave., Ste. 200 Southlake, Texas 76092 TEL. 817-424-2626 Planner: Case No. ZA22-0029 The WheelHouse 18 JUL 22 NOTE: The Interior Landscape calculations are based on the I-1 & I-2 Building 10,000 S.F. or greater criteria at 15% of floor area. *Provided Canopy trees include existing trees to be saved. NOTE: * The North Bufferyard calculations do not include the area of the buildings that fall within the bufferyard. The East bufferyard calculations do not include the driveway dimensions that cross the bufferyard. Landscape Architect: Sage Group, Inc. 1130 N. Carroll Ave., Suite 200 Southlake, TX 76092 817-424-2626 Attn: Curtis Young, AIA Engineer: Redinger Group, LLC P.O. Box 93206 Southlake, Texas 76092 817-253-5727 Attn: Clayton Redinger, P.E. Developers: Wyndham Properties 1807 Keller Parkway Keller, Texas 76248 817-307-3600 Attn: Terry Wilkinson Gary R. Shimmin 1313 Danbury Parks Drive Keller, Texas 76248 559-871-0084 Property Owner: wheelhouse Garages, LLC Wheelhouse Retail, LLC 1313 Danbury Parks Drive Keller, Texas 76248 Architect: Prism Architects 580 Decker Drive, Suite 170 Irving, Texas 75062 972-714-0420 Attn: Rodney St. John, AIA Detailed Site Plan (SP-1) District- Land Use and Development Regulations for The WheelHouse, on a 6.235 acre parcel, at 880, 900 & 950 Davis Blvd. Southlake, Texas Zoning Case #: ZA22-00XX Prepared by Sage Group, Inc. June 27, 2022 The WheelHouse will be a mixed-use development that will provide an update to the area’s current appearance and uses. These developments will remove the two houses currently functioning as offices and remove the outside storage that exists on site. The residential lots which adjoin the west boundary of the development is separated by a heavily wooded creek which will be preserved and will serve as a natural buffer. The buildings fronting on Davis Blvd will be office showroom with retail sales and restaurant. The buildings located behind will be sold to individuals for auto storage. This Detailed Site Plan (SP-1) district shall abide by the all conditions of the City of Southlake Comprehensive Zoning Ordinance No. 480, as amended, as it pertains to the “I-1” Industrial, “C- 2” Local Retail, “C-1” Neighborhood Commercial & “O-1” Office zoning districts; and the City of Southlake Subdivision Ordinance No. 483, as amended, and as limited below. Permitted Uses: Permitted uses shall be as follows: Building 1A on Lot 1 & Building 2 on Lot 2: Uses shall be restricted to the uses within the C-2, C- 1 & O-1 Zoning District- except for the non-permitted uses listed below; and the additional permitted uses listed: Non-Permitted Uses: • Chamber of Commerce. • Duplication and mailing services. • Radio recording and television broadcasting offices and studios. • Savings and loan. • Stenographic services. • Utility offices. • Cleaners, laundries and/or laundromats. • Newsstands and/or bookstores. • Community Facility Uses. • Farrier. • Antique shops. • Blueprinting or photostating. • Book or stationary stores to include large newsstands. • Business colleges or private schools for vocational training. • Cigar or tobacco stores. • Cleaning, dying and pressing works. • Custom dress making or millinery shops. • Day nurseries. • Dog and cat hospitals or small animal hospitals. • Drug stores. • Frozen food lockers for individual or family use. • Grocery stores or meat markets. • Leather or leather good shops. • Radio and television sales and servicing. • Tires, batteries and automobile accessory sales. • Variety stores. Additional Permitted Uses: • Office showroom or office warehouse • Automobile and motorcycle sales and service, not to include any outside sales or service and storage areas. • Retail sales as an auxiliary operation of office showroom or office warehouse. • Laboratory, chemical analysis, general analysis, physical testing. Buildings 1B, 3, 4, & 5, on Lots 1, & 3: Uses shall be limited to the following uses within the I-1 Zoning District: • Garage & Storage Additional Permitted Uses: • Maintenance of personal vehicles. • Hobby Shop, for personal use only. Lot 4: The use shall be reserved only for passive open space. Regulations: Parking: Required parking ratios shall be based on 1 space per 240 square feet of the “Office/Retail/Showroom” buildings only (Buildings 1A and 2), and no additional parking required for the garage and storage buildings. Such required parking for all built uses shall be provided within the “SP-1” boundary; parking requirements for individual lots shall not apply. A reciprocal parking, cross-access and maintenance agreement shall be provided. Impervious Coverage: The maximum impervious coverage for the overall development SP-1 boundary site shall be 85%, however the maximum impervious coverage shall not apply to individual lots within the boundary. Building Materials and Facades: The building front facades are a combination of stone, stucco or a sprayed type coating over concrete panels, such as “Sherwin Williams ConFlex XL, Textured High Build A5-800 Series” or similar Elastomeric Stucco finish material (Please note the stucco finish will not be applied directly to Styrofoam board as in EFIS). Vertical wall heights may be modified slightly to accommodate screening of mechanical units, and/or stepped down to accommodate grade changes, as contract documents are developed. Vertical and Horizontal Articulation shall be as shown on the Site Plan and Elevations, and will not be reduced. To accommodate the needs of individual purchasers, the number and size of garage doors for the spaces may be increased or decreased, however the overall look and materials will be consistent with the elevations shown. Setback Lines: A 50’ front building line is provided along Davis Blvd. No other setbacks are shown, but all buildings will be set back from the property lines as dimensioned on the Site Plan. Bufferyards: We request the bufferyards be allowed as shown on the Site Plan. Bufferyards along internal lot lines shall not be required. In lieu of the required F2 8’ masonry wall on the west property line, the existing fence- owned and maintained by the adjacent Siena neighborhood shall remain. Fences: A 6’ Ornamental Iron fence shall be built along the western boundary of Lots 1, & 3. Requested Variances: The following variances are requested within the boundaries of this SP-1 district: • Variance to Driveway Ordinance No. 634, as amended, Section 5.2(d) regarding stacking depth, to minimum 33’, for the entrance from Davis Blvd. • Variance to Subdivision Ordinance No. 483, as amended, Section 8.01.A, regarding lots abutting a street, to allow the lots as shown on the Site Plan. • Variance to Subdivision Ordinance No. 483, as amended, Section 8.01.D, regarding side lot lines, to allow the lots as shown on the Site Plan. • Variance to Subdivision Ordinance No. 483, as amended, and the Master Pathways Plan, to provide an easement for possible future needs, but not require construction of an 8’ multi-use trail running north/south through the flood plain in Lot 6, as shown on the Site Plan. • Variance to the Driveway Ord. No. 634, as amended, Section 5.1, which requires a minimum 500' driveway spacing for commercial driveways along F.M. 1938, to allow the spacings of 154' and 423' as shown. • Variance to the Masonry Ord, No. 557-A, as amended, to allow the use of a sprayed insulated cork barrier type coating, such as “Duro-Pro Cork Barrier” or similar Elastomeric Stucco finish material, and the metal screening on the north elevations of Buildings 6 and 7, as shown on the building elevations. Open Space Management Plan: All sidewalks are intended for pedestrian traffic, shall be kept in good condition, and accessible to the occupants and customers. Any significant changes to the plan must be approved by the City Council. All Open Space which is a part of The WheelHouse SP-1 boundary shall be maintained by the property owners or the Property Owners Association (POA). All property owners shall be required to be a member of the POA. Dues assessments, required for the maintenance of the open space areas and other POA activities, shall be mandatory. The POA shall be responsible for the maintenance and operation of the open space within the development. The expenses required to maintain the common areas at a quality level shall be estimated annually by the POA Board, and dues shall be determined and assessed on each property owner in an equitable fashion at such a rate as necessary to maintain such a level of quality. Authority to enforce these requirements, and to place a lien on the property if such dues are not paid, shall be in the form of written Deed Restrictions and Covenants, agreed to by all property owners at purchase, and shall run with the land. Provisions shall be made, in the POA bylaws and Deed Restrictions, that in the unlikely event the POA fails to maintain all or a portion of the open space in reasonable order and condition, the City of Southlake may, but is not required to, assume responsibility for such maintenance and take corrective action, including the provision of extended maintenance. The costs of such maintenance may be charged to the POA or individual property owners that make up the POA, and may include administrative costs and penalties which shall become a lien on all property in the development. UPUPUP27' - 6"30' - 0"19' - 0"25' - 0"151214211716ELECTRICAL METERS REF: ELECTRICAL SHEETS30' - 0"25' - 0"10' - 1"27' - 6"1221162710' - 0"25' - 0"19' - 0"30' - 0"10' - 0"8' - 0"14' - 1"8' - 0"9' - 1"10' - 0"14' - 10"11' - 0"2830EQEQEQ3129161632272727211213121312121925166' - 7"17171717Level 10' -0"T.O. UNIT WALL27' -6"14' - 0"5' - 0"22' - 0"4' - 0"16' - 0"8' - 6"9' - 0"9' - 0"252417172121122719' - 0"3' - 4"3' - 8"3328292927161717171212192719303021P&Z-11P&Z-12P&Z-13P&Z-14P&Z-15UNITA-102UNITA-103UNITA-104UNITA-105UNITA-106UNITA-107UNITA-108UNITA-109UNITA-110UNITA-111UNITA-112UNITA-113UNITA-114UNITA-115UNITA-116CLUB HOUSEA-117RISER ROOM101UNITA-101OFFICE100N34' - 10 5/8"457' - 10 5/8"45' - 0"P&Z-1.11P&Z-1.12P&Z-1.13P&Z-1.14P&Z-1.1532' - 0"3' - 0"14' - 4"21' - 0"15' - 5 3/4"5' - 0"3' - 0"3' - 0"REVISIONS:THIS DOCUMENT IS FOR INTERIMREVIEW ONLY AND NOTINTENDED TO BE USED FORCONSTRUCTION, BIDDING, ORPERMIT PURPOSES.RODNEY C. St. JOHNREGISTERED ARCHITECTTEXAS NO. 14791OWNER:WHEELHOUSE GARAGES, LLCWHEELHOUSE RETAIL, LLC1313 DANBURY PARKS DRIVEKELLER, TEXAS 76348DEVELOPERS:GARY R. SHIMMIN1313 DANBURY PARKS DRIVRKELLER, TEXAS 76348(559) 871-0684WYNDHAM PROPERTIES1807 KELLER PARKWAYKELLER, TEXAS 76248(817) 307-3600CONTACT: TERRY WILKINSONWHEELHOUSE GARAGESSt. JohnARCHITECTS, PLLC2217 JOHN GLENN PARKWAYMESQUITE, TEXAS 75150214-502-40942154321DCBADC54BA366FILENAME:ISSUED:PROJECT NUMBER:CHECKED BY:DRAWN BY:TRACTS 6C01A AND 6C02, JESSE G. ALLEN SURVEY, ABSTRACT NO. 18C:\Projects\Gary Shimmin\Wheelhouse\REVIT\WHG-P&Z.rvt7/15/22WHEELHOUSE GARAGESDAVIS BOULEVARDSOUTHLAKE, TEXAS0.002.03227/15/22AuthorCheckerLOT 1, BLDG 1P&Z-11/16" = 1'-0"1SOUTH ELEVATION BLDG 11/16" = 1'-0"2NORTH ELEVATION BLDG 11/8" = 1'-0"3EAST ELEVATION BLDG 11/8" = 1'-0"4WEST ELEVATION BLDG 11/8" = 1'-0"5WEST ELEVATION BLDG 1 @ OFFICESHEET KEYED NOTES# KEYNOTE12 ALUMINUM STOREFRONT AND WINDOWS KAWNEER 451UT OR EQUAL. REF: GLASS SCHEDULE13 ALUMINUM STOREFRONT ENTRANCE14 INSULATED METAL DOOR AND FRAME. REFER TO DOOR TYPES.15 OVERHEAD INSULATED METAL ROLL-UP DOOR. REFER DOOR TYPES.16 8" HI-TECH WALL PANEL SYSTEM BY OTHER.17 HI-TECH SYSTEM PANEL REVEAL (OR PANEL JOINT). IF PANEL JOINT PROVIDE BACKER ROD AND SEALANT. VERIFYLOCATION W/ FINAL LAYOUT BY PANEL ENGINEER.19 DOWNSPOUT LEADER. PROVIDE SPLASH BLOCK AND DRAIN AWAY FROM FACE OF BUILDING.21 WALL SCONCE. REFER ELECTRICAL24 HI LIFT ROLL-UP DOOR W/ GLASS PANELS.25 ALUMINUM AWNING SYSTEM BY GC27 CONT. PRE-FINISHED 26 GA. CAP FLASHING28 ALUMINUM FACIA / SOFFIT PANEL SYSTEM OVER OVER WRB ON 1/2" EXTERIOR SHEATHING. COLOR AS PER OWNER29 METAL SUPPORTS BY GC30 STUCCO SYSTEM: 3-STEP PROCESS OVER DIAMOND METAL MESH TO A 7/8" THICKNESS OR BY OTHER PROCESSPRODUCING COMPARABLE STUCCO FINIS W/ EQUAL OR GREATER STRENGTH AND DURABILITY SPECIFICATION.INSTALLED AS PER MANUFACTURES RECOMMENDATION. COLOR AS PER OWNER.31 STUCCO 'V' REVEAL32 STONE VENEER SYSTEM33 GUTTER SYSTEM WITH DOWNSPOUT TO ROOF BELOW. PROVIDE SPLASH BLOCK @ ROOF.1" = 30'-0"7KEY PLAN BUILDING 1 Copy 11.ALL ROOF TOP MECHANICAL UNITS SHALL BE SCREENED FROM PUBLIC VIEW FROM DAVIS BLVD.2.ALL EXPOSED UTILITY BOXES AND CONDUITS SHALL BE PAINTED TO MATCH THE BUILDING.3.SIGNAGE AREAS AND LOCATIONS ARE SUBJECT TO APPROVAL BY THE BUILDING INSPECTIONDEPARTMENT.4.EXTERIOR FINISH MATERIAL, MANUFACTURES AND COLORS ARE YET TO BE DETERMINED .5.DOOR LOCATIONS MAY VARY DEPENDING ON TENANT CONFIGURATIONS AND EXITING REQUIREMENTS.GENERAL NOTESSTUCCO NOTE:STUCCO SHALL BE APPLIED USING 3-STEP PROCESS OVER DIAMOND METAL MESH TO A 7/8 INCH THICKNESS OR BY OTHER PROCESS PRODUCING COMPARABLE STUCCO FINISH WITH EQUAL OR GREATER STRENGTH AND DURABILITY SPECIFICATION.MATERIALS COLORS123STONE: EARTH TONESTUCCO SYSTEM: LIGHT EARTH TONESTUCCO SYSTEM: DARK EARTH TONE ALUM. (MATCH STUCCO COLOR #3)COPING (MATCH STUCCO COLOR #3)ALUM. (MATCH STUCCO COLOR #3)1314151/8" = 1'-0"6ARTICULATION PLAN - FRONT11111122222223313131414141414133151520'4'8'16'32'ZONING CASE#: ZA22-0029 UPUPUP27' - 6"30' - 0"19' - 0"25' - 0"151214211716ELECTRICAL METERS REF: ELECTRICAL SHEETS30' - 0"25' - 0"10' - 1"27' - 6"1221162710' - 0"25' - 0"19' - 0"30' - 0"10' - 0"8' - 0"14' - 1"8' - 0"9' - 1"10' - 0"14' - 10"11' - 0"2830EQEQEQ3129161632272727211213121312121925166' - 7"17171717Level 10' -0"T.O. UNIT WALL27' -6"14' - 0"5' - 0"22' - 0"4' - 0"16' - 0"8' - 6"9' - 0"9' - 0"252417172121122719' - 0"3' - 4"3' - 8"3328292927161717171212192719303021P&Z-11P&Z-12P&Z-13P&Z-14P&Z-15P&Z-1.11P&Z-1.12P&Z-1.13P&Z-1.14P&Z-1.15UNITA-102UNITA-103UNITA-104UNITA-105UNITA-106UNITA-107UNITA-108UNITA-109UNITA-110UNITA-111UNITA-112UNITA-113UNITA-114UNITA-115UNITA-116CLUB HOUSEA-117RISER ROOM101UNITA-101OFFICE100N34' - 10 5/8"457' - 10 5/8"45' - 0"32' - 0"3' - 0"14' - 4"21' - 0"15' - 5 3/4"5' - 0"3' - 0"3' - 0"REVISIONS:THIS DOCUMENT IS FOR INTERIMREVIEW ONLY AND NOTINTENDED TO BE USED FORCONSTRUCTION, BIDDING, ORPERMIT PURPOSES.RODNEY C. St. JOHNREGISTERED ARCHITECTTEXAS NO. 14791OWNER:WHEELHOUSE GARAGES, LLCWHEELHOUSE RETAIL, LLC1313 DANBURY PARKS DRIVEKELLER, TEXAS 76348DEVELOPERS:GARY R. SHIMMIN1313 DANBURY PARKS DRIVRKELLER, TEXAS 76348(559) 871-0684WYNDHAM PROPERTIES1807 KELLER PARKWAYKELLER, TEXAS 76248(817) 307-3600CONTACT: TERRY WILKINSONWHEELHOUSE GARAGESSt. JohnARCHITECTS, PLLC2217 JOHN GLENN PARKWAYMESQUITE, TEXAS 75150214-502-40942154321DCBADC54BA366FILENAME:ISSUED:PROJECT NUMBER:CHECKED BY:DRAWN BY:TRACTS 6C01A AND 6C02, JESSE G. ALLEN SURVEY, ABSTRACT NO. 18C:\Projects\Gary Shimmin\Wheelhouse\REVIT\WHG-P&Z.rvt7/15/22WHEELHOUSE GARAGESDAVIS BOULEVARDSOUTHLAKE, TEXAS0.002.03227/15/22AuthorCheckerLOT 1, BLDG 1P&Z-1.11/16" = 1'-0"1SOUTH ELEVATION BLDG 11/16" = 1'-0"2NORTH ELEVATION BLDG 11/8" = 1'-0"3EAST ELEVATION BLDG 11/8" = 1'-0"4WEST ELEVATION BLDG 11/8" = 1'-0"5WEST ELEVATION BLDG 1 @ OFFICESHEET KEYED NOTES# KEYNOTE12 ALUMINUM STOREFRONT AND WINDOWS KAWNEER 451UT OR EQUAL. REF: GLASS SCHEDULE13 ALUMINUM STOREFRONT ENTRANCE14 INSULATED METAL DOOR AND FRAME. REFER TO DOOR TYPES.15 OVERHEAD INSULATED METAL ROLL-UP DOOR. REFER DOOR TYPES.16 8" HI-TECH WALL PANEL SYSTEM BY OTHER.17 HI-TECH SYSTEM PANEL REVEAL (OR PANEL JOINT). IF PANEL JOINT PROVIDE BACKER ROD AND SEALANT. VERIFYLOCATION W/ FINAL LAYOUT BY PANEL ENGINEER.19 DOWNSPOUT LEADER. PROVIDE SPLASH BLOCK AND DRAIN AWAY FROM FACE OF BUILDING.21 WALL SCONCE. REFER ELECTRICAL24 HI LIFT ROLL-UP DOOR W/ GLASS PANELS.25 ALUMINUM AWNING SYSTEM BY GC27 CONT. PRE-FINISHED 26 GA. CAP FLASHING28 ALUMINUM FACIA / SOFFIT PANEL SYSTEM OVER OVER WRB ON 1/2" EXTERIOR SHEATHING. COLOR AS PER OWNER29 METAL SUPPORTS BY GC30 STUCCO SYSTEM: 3-STEP PROCESS OVER DIAMOND METAL MESH TO A 7/8" THICKNESS OR BY OTHER PROCESSPRODUCING COMPARABLE STUCCO FINIS W/ EQUAL OR GREATER STRENGTH AND DURABILITY SPECIFICATION.INSTALLED AS PER MANUFACTURES RECOMMENDATION. COLOR AS PER OWNER.31 STUCCO 'V' REVEAL32 STONE VENEER SYSTEM33 GUTTER SYSTEM WITH DOWNSPOUT TO ROOF BELOW. PROVIDE SPLASH BLOCK @ ROOF.1" = 30'-0"7KEY PLAN BUILDING 1 Copy 1 Copy 21.ALL ROOF TOP MECHANICAL UNITS SHALL BE SCREENED FROM PUBLIC VIEW FROM DAVIS BLVD.2.ALL EXPOSED UTILITY BOXES AND CONDUITS SHALL BE PAINTED TO MATCH THE BUILDING.3.SIGNAGE AREAS AND LOCATIONS ARE SUBJECT TO APPROVAL BY THE BUILDING INSPECTIONDEPARTMENT.4.EXTERIOR FINISH MATERIAL, MANUFACTURES AND COLORS ARE YET TO BE DETERMINED .5.DOOR LOCATIONS MAY VARY DEPENDING ON TENANT CONFIGURATIONS AND EXITING REQUIREMENTS.GENERAL NOTESSTUCCO NOTE:STUCCO SHALL BE APPLIED USING 3-STEP PROCESS OVER DIAMOND METAL MESH TO A 7/8 INCH THICKNESS OR BY OTHER PROCESS PRODUCING COMPARABLE STUCCO FINISH WITH EQUAL OR GREATER STRENGTH AND DURABILITY SPECIFICATION.MATERIALS COLORS123STONE: EARTH TONESTUCCO SYSTEM: LIGHT EARTH TONESTUCCO SYSTEM: DARK EARTH TONE ALUM. (MATCH STUCCO COLOR #3)COPING (MATCH STUCCO COLOR #3)ALUM. (MATCH STUCCO COLOR #3)1314151/8" = 1'-0"6ARTICULATION PLAN - FRONT11111122222223313131414141414133151520'4'8'16'32'ZONING CASE#: ZA22-0029 31' - 0"26' - 0"10' - 0"10' - 0"31' - 0"22' - 0"20' - 0"26' - 0"10' - 0"10' - 0"40' - 0"LED WALL WASHER LIGHT BEHIND PARAPETLED WALL WASHER LIGHT BEHIND PARAPETLED WALL WASHER LIGHT BEHIND PARAPET11' - 0"100' - 0 3/8"40' - 0"EQEQEQEQEQEQ282916172730313130212119273212121316211727272528291617273031312112133031173021191916272725211717322521212829291716303132161631' - 0"31' - 0"10' - 0"12' - 0"EQEQ11711201918142134272718' - 0"321421212121212121141414141414141414191919191926262626262618181818555555555531' - 0"10' - 0"20' - 0"3' - 4"2' - 0"3' - 4"2' - 0"3' - 4"2' - 0"3' - 4"1' - 4"EQEQ12' - 0"4' - 0"25' - 0"202716171712121212282930311221271926' - 0"3412' - 0"4' - 0"1' - 4"3' - 4"2' - 0"3' - 4"2' - 0"3' - 4"2' - 0"3' - 4"4' - 0"10' - 0"10' - 0"20' - 0"26' - 0"25' - 0"2829162727171632301621121219343131P&Z-21P&Z-25P&Z-23P&Z-24270' - 0"RETAIL/RESTUARANT2.100RISER ROOM2.101NROOF ACCESS2.10260' - 0"P&Z-2.11P&Z-2.15P&Z-2.13P&Z-2.14270' - 0"N280' - 0"2' - 0"18' - 2 1/2"11' - 9 1/2"3' - 0"6' - 0"21' - 0"6' - 0"21' - 0"6' - 0"3' - 0"26' - 0"3' - 0"26' - 0"3' - 0"26' - 0"3' - 0"6' - 0"21' - 0"6' - 0"21' - 0"6' - 0"3' - 0"11' - 9 1/2"18' - 2 1/2"2' - 0"3' - 0"5' - 0"3' - 0"3' - 0"3' - 0"5' - 0"3' - 0"3' - 0"3' - 0"5' - 0"3' - 0"3' - 0"3' - 0"5' - 0"3' - 0"REVISIONS:THIS DOCUMENT IS FOR INTERIMREVIEW ONLY AND NOTINTENDED TO BE USED FORCONSTRUCTION, BIDDING, ORPERMIT PURPOSES.RODNEY C. St. JOHNREGISTERED ARCHITECTTEXAS NO. 14791OWNER:WHEELHOUSE GARAGES, LLCWHEELHOUSE RETAIL, LLC1313 DANBURY PARKS DRIVEKELLER, TEXAS 76348DEVELOPERS:GARY R. SHIMMIN1313 DANBURY PARKS DRIVRKELLER, TEXAS 76348(559) 871-0684WYNDHAM PROPERTIES1807 KELLER PARKWAYKELLER, TEXAS 76248(817) 307-3600CONTACT: TERRY WILKINSONWHEELHOUSE GARAGESSt. JohnARCHITECTS, PLLC2217 JOHN GLENN PARKWAYMESQUITE, TEXAS 75150214-502-40942154321DCBADC54BA366FILENAME:ISSUED:PROJECT NUMBER:CHECKED BY:DRAWN BY:TRACTS 6C01A AND 6C02, JESSE G. ALLEN SURVEY, ABSTRACT NO. 18C:\Projects\Gary Shimmin\Wheelhouse\REVIT\WHG-P&Z.rvt7/15/22WHEELHOUSE GARAGESDAVIS BOULEVARDSOUTHLAKE, TEXAS0.002.03227/15/22AuthorCheckerLOT 2, BLDG 2P&Z-23/32" = 1'-0"1EAST ELEVATION BLDG 23/32" = 1'-0"3WEST ELEVATION BLDG 21/8" = 1'-0"4SOUTH ELEVATION BLDG 21/8" = 1'-0"5NORTH ELEVATION BLDG 2SHEET KEYED NOTES# KEYNOTE7 ELECTRICAL SERVICE. REFER TO ELECTRICAL11 FIRE DEPARTMENT KEY LOCK BOX. VERIFY WITH FIRE MARSHALL.12 ALUMINUM STOREFRONT AND WINDOWS KAWNEER 451UT OR EQUAL.REF: GLASS SCHEDULE13 ALUMINUM STOREFRONT ENTRANCE14 INSULATED METAL DOOR AND FRAME. REFER TO DOOR TYPES.16 8" HI-TECH WALL PANEL SYSTEM BY OTHER.17 HI-TECH SYSTEM PANEL REVEAL (OR PANEL JOINT). IF PANEL JOINTPROVIDE BACKER ROD AND SEALANT. VERIFY LOCATION W/ FINALLAYOUT BY PANEL ENGINEER.18 STONE VENNER: THIN SET OVER HI-TECH PANEL SYSTEM. INSTALLEDAS PER MANUFACTURES SPECIFICATIONS.19 DOWNSPOUT LEADER. PROVIDE SPLASH BLOCK AND DRAIN AWAYFROM FACE OF BUILDING.20 GAS METER. REFER MEP21 WALL SCONCE. REFER ELECTRICAL25 ALUMINUM AWNING SYSTEM BY GC26 EMERGENCY LIGHT @ EACH EXIT DOOR. REF: ELECTRICAL SHEETS27 CONT. PRE-FINISHED 26 GA. CAP FLASHING28 ALUMINUM FACIA / SOFFIT PANEL SYSTEM OVER OVER WRB ON 1/2"EXTERIOR SHEATHING. COLOR AS PER OWNER29 METAL SUPPORTS BY GC30 STUCCO SYSTEM: 3-STEP PROCESS OVER DIAMOND METAL MESH TO A7/8" THICKNESS OR BY OTHER PROCESS PRODUCING COMPARABLESTUCCO FINIS W/ EQUAL OR GREATER STRENGTH AND DURABILITYSPECIFICATION. INSTALLED AS PER MANUFACTURESRECOMMENDATION. COLOR AS PER OWNER.31 STUCCO 'V' REVEAL32 STONE VENEER SYSTEM34 LINE OF ROOF BEYOND55 STONE CAP TRIM1" = 30'-0"6KEY PLAN BUILDING 23/32" = 1'-0"2ARTICULATION PLAN - FRONT1.ALL ROOF TOP MECHANICAL UNITS SHALL BE SCREENED FROM PUBLIC VIEW FROM DAVIS BLVD.2.ALL EXPOSED UTILITY BOXES AND CONDUITS SHALL BE PAINTED TO MATCH THE BUILDING.3.SIGNAGE AREAS AND LOCATIONS ARE SUBJECT TO APPROVAL BY THE BUILDING INSPECTIONDEPARTMENT.4.EXTERIOR FINISH MATERIAL, MANUFACTURES AND COLORS ARE YET TO BE DETERMINED .5.DOOR LOCATIONS MAY VARY DEPENDING ON TENANT CONFIGURATIONS AND EXITING REQUIREMENTS.GENERAL NOTESSTUCCO NOTE:STUCCO SHALL BE APPLIED USING 3-STEP PROCESS OVER DIAMOND METAL MESH TO A 7/8 INCH THICKNESS OR BY OTHER PROCESS PRODUCING COMPARABLE STUCCO FINISH WITH EQUAL OR GREATER STRENGTH AND DURABILITY SPECIFICATION.MATERIALS COLORS123STONE: EARTH TONESTUCCO SYSTEM: LIGHT EARTH TONESTUCCO SYSTEM: DARK EARTH TONE ALUM. (MATCH STUCCO COLOR #3)COPING (MATCH STUCCO COLOR #3)ALUM. (MATCH STUCCO COLOR #3)1314150'4'8'16'32'ZONING CASE#: ZA22-00291111111122222222223313131313131414141414141414 31' - 0"26' - 0"10' - 0"10' - 0"31' - 0"22' - 0"20' - 0"26' - 0"10' - 0"10' - 0"40' - 0"LED WALL WASHER LIGHT BEHIND PARAPETLED WALL WASHER LIGHT BEHIND PARAPETLED WALL WASHER LIGHT BEHIND PARAPET11' - 0"100' - 0 3/8"40' - 0"EQEQEQEQEQEQ282916172730313130212119273212121316211727272528291617273031312112133031173021191916272725211717322521212829291716303132161631' - 0"31' - 0"10' - 0"12' - 0"EQEQ11711201918142134272718' - 0"321421212121212121141414141414141414191919191926262626262618181818555555555531' - 0"10' - 0"20' - 0"3' - 4"2' - 0"3' - 4"2' - 0"3' - 4"2' - 0"3' - 4"1' - 4"EQEQ12' - 0"4' - 0"25' - 0"202716171712121212282930311221271926' - 0"3412' - 0"4' - 0"1' - 4"3' - 4"2' - 0"3' - 4"2' - 0"3' - 4"2' - 0"3' - 4"4' - 0"10' - 0"10' - 0"20' - 0"26' - 0"25' - 0"2829162727171632301621121219343131P&Z-21P&Z-25P&Z-23P&Z-24P&Z-2.11P&Z-2.15P&Z-2.13P&Z-2.14270' - 0"RETAIL/RESTUARANT2.100RISER ROOM2.101NROOF ACCESS2.10260' - 0"270' - 0"N280' - 0"2' - 0"18' - 2 1/2"11' - 9 1/2"3' - 0"6' - 0"21' - 0"6' - 0"21' - 0"6' - 0"3' - 0"26' - 0"3' - 0"26' - 0"3' - 0"26' - 0"3' - 0"6' - 0"21' - 0"6' - 0"21' - 0"6' - 0"3' - 0"11' - 9 1/2"18' - 2 1/2"2' - 0"3' - 0"5' - 0"3' - 0"3' - 0"3' - 0"5' - 0"3' - 0"3' - 0"3' - 0"5' - 0"3' - 0"3' - 0"3' - 0"5' - 0"3' - 0"REVISIONS:THIS DOCUMENT IS FOR INTERIMREVIEW ONLY AND NOTINTENDED TO BE USED FORCONSTRUCTION, BIDDING, ORPERMIT PURPOSES.RODNEY C. St. JOHNREGISTERED ARCHITECTTEXAS NO. 14791OWNER:WHEELHOUSE GARAGES, LLCWHEELHOUSE RETAIL, LLC1313 DANBURY PARKS DRIVEKELLER, TEXAS 76348DEVELOPERS:GARY R. SHIMMIN1313 DANBURY PARKS DRIVRKELLER, TEXAS 76348(559) 871-0684WYNDHAM PROPERTIES1807 KELLER PARKWAYKELLER, TEXAS 76248(817) 307-3600CONTACT: TERRY WILKINSONWHEELHOUSE GARAGESSt. JohnARCHITECTS, PLLC2217 JOHN GLENN PARKWAYMESQUITE, TEXAS 75150214-502-40942154321DCBADC54BA366FILENAME:ISSUED:PROJECT NUMBER:CHECKED BY:DRAWN BY:TRACTS 6C01A AND 6C02, JESSE G. ALLEN SURVEY, ABSTRACT NO. 18C:\Projects\Gary Shimmin\Wheelhouse\REVIT\WHG-P&Z.rvt7/15/22WHEELHOUSE GARAGESDAVIS BOULEVARDSOUTHLAKE, TEXAS0.002.03227/15/22AuthorCheckerLOT 2, BLDG 2P&Z-2.13/32" = 1'-0"1EAST ELEVATION BLDG 23/32" = 1'-0"3WEST ELEVATION BLDG 21/8" = 1'-0"4SOUTH ELEVATION BLDG 21/8" = 1'-0"5NORTH ELEVATION BLDG 2SHEET KEYED NOTES# KEYNOTE7 ELECTRICAL SERVICE. REFER TO ELECTRICAL11 FIRE DEPARTMENT KEY LOCK BOX. VERIFY WITH FIRE MARSHALL.12 ALUMINUM STOREFRONT AND WINDOWS KAWNEER 451UT OR EQUAL.REF: GLASS SCHEDULE13 ALUMINUM STOREFRONT ENTRANCE14 INSULATED METAL DOOR AND FRAME. REFER TO DOOR TYPES.16 8" HI-TECH WALL PANEL SYSTEM BY OTHER.17 HI-TECH SYSTEM PANEL REVEAL (OR PANEL JOINT). IF PANEL JOINTPROVIDE BACKER ROD AND SEALANT. VERIFY LOCATION W/ FINALLAYOUT BY PANEL ENGINEER.18 STONE VENNER: THIN SET OVER HI-TECH PANEL SYSTEM. INSTALLEDAS PER MANUFACTURES SPECIFICATIONS.19 DOWNSPOUT LEADER. PROVIDE SPLASH BLOCK AND DRAIN AWAYFROM FACE OF BUILDING.20 GAS METER. REFER MEP21 WALL SCONCE. REFER ELECTRICAL25 ALUMINUM AWNING SYSTEM BY GC26 EMERGENCY LIGHT @ EACH EXIT DOOR. REF: ELECTRICAL SHEETS27 CONT. PRE-FINISHED 26 GA. CAP FLASHING28 ALUMINUM FACIA / SOFFIT PANEL SYSTEM OVER OVER WRB ON 1/2"EXTERIOR SHEATHING. COLOR AS PER OWNER29 METAL SUPPORTS BY GC30 STUCCO SYSTEM: 3-STEP PROCESS OVER DIAMOND METAL MESH TO A7/8" THICKNESS OR BY OTHER PROCESS PRODUCING COMPARABLESTUCCO FINIS W/ EQUAL OR GREATER STRENGTH AND DURABILITYSPECIFICATION. INSTALLED AS PER MANUFACTURESRECOMMENDATION. COLOR AS PER OWNER.31 STUCCO 'V' REVEAL32 STONE VENEER SYSTEM34 LINE OF ROOF BEYOND55 STONE CAP TRIM1" = 30'-0"6KEY PLAN BUILDING 23/32" = 1'-0"2ARTICULATION PLAN - FRONT1.ALL ROOF TOP MECHANICAL UNITS SHALL BE SCREENED FROM PUBLIC VIEW FROM DAVIS BLVD.2.ALL EXPOSED UTILITY BOXES AND CONDUITS SHALL BE PAINTED TO MATCH THE BUILDING.3.SIGNAGE AREAS AND LOCATIONS ARE SUBJECT TO APPROVAL BY THE BUILDING INSPECTIONDEPARTMENT.4.EXTERIOR FINISH MATERIAL, MANUFACTURES AND COLORS ARE YET TO BE DETERMINED .5.DOOR LOCATIONS MAY VARY DEPENDING ON TENANT CONFIGURATIONS AND EXITING REQUIREMENTS.GENERAL NOTESSTUCCO NOTE:STUCCO SHALL BE APPLIED USING 3-STEP PROCESS OVER DIAMOND METAL MESH TO A 7/8 INCH THICKNESS OR BY OTHER PROCESS PRODUCING COMPARABLE STUCCO FINISH WITH EQUAL OR GREATER STRENGTH AND DURABILITY SPECIFICATION.MATERIALS COLORS123STONE: EARTH TONESTUCCO SYSTEM: LIGHT EARTH TONESTUCCO SYSTEM: DARK EARTH TONE ALUM. (MATCH STUCCO COLOR #3)COPING (MATCH STUCCO COLOR #3)ALUM. (MATCH STUCCO COLOR #3)1314150'4'8'16'32'ZONING CASE#: ZA22-00291111111122222222223313131313131414141414141414 UPUP28293033' - 6"27' - 6"22' - 0"16' - 0"1621212121211212121212171719191919193488888814141414141515151515151515181818161618182626262611' - 8 5/8"5556555627272730273' - 0"22' - 0"22' - 0"2718' - 0"1' - 4"4' - 0"29' - 4"4' - 0"1' - 4"13' - 0"5' - 0"10' - 0"29' - 2"302727323214272128293031311216161717348273.2133' - 6"22' - 0"10' - 0"18' - 0"EQEQ22' - 0"27' - 6"115' - 0"1' - 4"4' - 0"4' - 0"1' - 4"SF-2SF-23.421414P&Z-31P&Z-32P&Z-33P&Z-34UNITC-110UNITC-109UNITC-108UNITC-107UNITC-106UNITC-105UNITC-104UNITC-103UNITC-102UNITC-101UNITB-101UNITB-102UNITB-103UNITB-104UNITB-105UNITB-106UNITB-107UNITB-108UNITB-109UNITB-110RISER ROOM300NUTILITY301ELEC302UTILITY303250' - 0"90' - 0"P&Z-3.11P&Z-3.12P&Z-3.13P&Z-3.14REVISIONS:THIS DOCUMENT IS FOR INTERIMREVIEW ONLY AND NOTINTENDED TO BE USED FORCONSTRUCTION, BIDDING, ORPERMIT PURPOSES.RODNEY C. St. JOHNREGISTERED ARCHITECTTEXAS NO. 14791OWNER:WHEELHOUSE GARAGES, LLCWHEELHOUSE RETAIL, LLC1313 DANBURY PARKS DRIVEKELLER, TEXAS 76348DEVELOPERS:GARY R. SHIMMIN1313 DANBURY PARKS DRIVRKELLER, TEXAS 76348(559) 871-0684WYNDHAM PROPERTIES1807 KELLER PARKWAYKELLER, TEXAS 76248(817) 307-3600CONTACT: TERRY WILKINSONWHEELHOUSE GARAGESSt. JohnARCHITECTS, PLLC2217 JOHN GLENN PARKWAYMESQUITE, TEXAS 75150214-502-40942154321DCBADC54BA366FILENAME:ISSUED:PROJECT NUMBER:CHECKED BY:DRAWN BY:TRACTS 6C01A AND 6C02, JESSE G. ALLEN SURVEY, ABSTRACT NO. 18C:\Projects\Gary Shimmin\Wheelhouse\REVIT\WHG-P&Z.rvt7/15/22WHEELHOUSE GARAGESDAVIS BOULEVARDSOUTHLAKE, TEXAS0.002.03227/15/22AuthorCheckerLOT 3, BLDG 3P&Z-33/32" = 1'-0"1SOUTH ELEVATION3/32" = 1'-0"2NORTH ELEVATION1/8" = 1'-0"4WEST ELEVATION1/8" = 1'-0"3EAST ELEVATIONSEE ELEVATION ABOVE FOR ADDITIONAL INFORMATIONSHEET KEYED NOTES# KEYNOTE8 6" DIA. CONCRETE FILLED PIPE BOLLARD BY G.C. (TYP)11 FIRE DEPARTMENT KEY LOCK BOX. VERIFY WITH FIREMARSHALL.12 ALUMINUM STOREFRONT AND WINDOWS KAWNEER 451UTOR EQUAL. REF: GLASS SCHEDULE14 INSULATED METAL DOOR AND FRAME. REFER TO DOORTYPES.15 OVERHEAD INSULATED METAL ROLL-UP DOOR. REFERDOOR TYPES.16 8" HI-TECH WALL PANEL SYSTEM BY OTHER.17 HI-TECH SYSTEM PANEL REVEAL (OR PANEL JOINT). IFPANEL JOINT PROVIDE BACKER ROD AND SEALANT.VERIFY LOCATION W/ FINAL LAYOUT BY PANEL ENGINEER.18 STONE VENNER: THIN SET OVER HI-TECH PANEL SYSTEM.INSTALLED AS PER MANUFACTURES SPECIFICATIONS.19 DOWNSPOUT LEADER. PROVIDE SPLASH BLOCK ANDDRAIN AWAY FROM FACE OF BUILDING.21 WALL SCONCE. REFER ELECTRICAL1" = 30'-0"5KEY PLAN BUILDING 31.ALL ROOF TOP MECHANICAL UNITS SHALL BE SCREENED FROM PUBLIC VIEW FROM DAVIS BLVD.2.ALL EXPOSED UTILITY BOXES AND CONDUITS SHALL BE PAINTED TO MATCH THE BUILDING.3.SIGNAGE AREAS AND LOCATIONS ARE SUBJECT TO APPROVAL BY THE BUILDING INSPECTIONDEPARTMENT.4.EXTERIOR FINISH MATERIAL, MANUFACTURES AND COLORS ARE YET TO BE DETERMINED .5.DOOR LOCATIONS MAY VARY DEPENDING ON TENANT CONFIGURATIONS AND EXITING REQUIREMENTS.GENERAL NOTESSTUCCO NOTE:STUCCO SHALL BE APPLIED USING 3-STEP PROCESS OVER DIAMOND METAL MESH TO A 7/8 INCH THICKNESS OR BY OTHER PROCESS PRODUCING COMPARABLE STUCCO FINISH WITH EQUAL OR GREATER STRENGTH AND DURABILITY SPECIFICATION.MATERIALS COLORS123STONE: EARTH TONESTUCCO SYSTEM: LIGHT EARTH TONESTUCCO SYSTEM: DARK EARTH TONE ALUM. (MATCH STUCCO COLOR #3)COPING (MATCH STUCCO COLOR #3)ALUM. (MATCH STUCCO COLOR #3)1314150'4'8'16'32'ZONING CASE#: ZA22-002911111122222223333141414141413131313151515SHEET KEYED NOTES# KEYNOTE26 EMERGENCY LIGHT @ EACH EXIT DOOR. REF: ELECTRICALSHEETS27 CONT. PRE-FINISHED 26 GA. CAP FLASHING28 ALUMINUM FACIA / SOFFIT PANEL SYSTEM OVER OVERWRB ON 1/2" EXTERIOR SHEATHING. COLOR AS PEROWNER29 METAL SUPPORTS BY GC30 STUCCO SYSTEM: 3-STEP PROCESS OVER DIAMOND METALMESH TO A 7/8" THICKNESS OR BY OTHER PROCESSPRODUCING COMPARABLE STUCCO FINIS W/ EQUAL ORGREATER STRENGTH AND DURABILITY SPECIFICATION.INSTALLED AS PER MANUFACTURES RECOMMENDATION.COLOR AS PER OWNER.31 STUCCO 'V' REVEAL32 STONE VENEER SYSTEM34 LINE OF ROOF BEYOND55 STONE CAP TRIM56 STONE WINDOW SILL TRIM UPUP28293033' - 6"27' - 6"22' - 0"16' - 0"1621212121211212121212171719191919193488888814141414141515151515151515181818161618182626262611' - 8 5/8"5556555627272730273' - 0"22' - 0"22' - 0"2718' - 0"1' - 4"4' - 0"29' - 4"4' - 0"1' - 4"13' - 0"5' - 0"10' - 0"29' - 2"302727323214272128293031311216161717348273.2133' - 6"22' - 0"10' - 0"18' - 0"EQEQ22' - 0"27' - 6"115' - 0"1' - 4"4' - 0"4' - 0"1' - 4"SF-2SF-23.421414P&Z-31P&Z-32P&Z-33P&Z-34P&Z-3.11P&Z-3.12P&Z-3.13P&Z-3.14UNITC-110UNITC-109UNITC-108UNITC-107UNITC-106UNITC-105UNITC-104UNITC-103UNITC-102UNITC-101UNITB-101UNITB-102UNITB-103UNITB-104UNITB-105UNITB-106UNITB-107UNITB-108UNITB-109UNITB-110RISER ROOM300NUTILITY301ELEC302UTILITY303250' - 0"90' - 0"REVISIONS:THIS DOCUMENT IS FOR INTERIMREVIEW ONLY AND NOTINTENDED TO BE USED FORCONSTRUCTION, BIDDING, ORPERMIT PURPOSES.RODNEY C. St. JOHNREGISTERED ARCHITECTTEXAS NO. 14791OWNER:WHEELHOUSE GARAGES, LLCWHEELHOUSE RETAIL, LLC1313 DANBURY PARKS DRIVEKELLER, TEXAS 76348DEVELOPERS:GARY R. SHIMMIN1313 DANBURY PARKS DRIVRKELLER, TEXAS 76348(559) 871-0684WYNDHAM PROPERTIES1807 KELLER PARKWAYKELLER, TEXAS 76248(817) 307-3600CONTACT: TERRY WILKINSONWHEELHOUSE GARAGESSt. JohnARCHITECTS, PLLC2217 JOHN GLENN PARKWAYMESQUITE, TEXAS 75150214-502-40942154321DCBADC54BA366FILENAME:ISSUED:PROJECT NUMBER:CHECKED BY:DRAWN BY:TRACTS 6C01A AND 6C02, JESSE G. ALLEN SURVEY, ABSTRACT NO. 18C:\Projects\Gary Shimmin\Wheelhouse\REVIT\WHG-P&Z.rvt07/15/22WHEELHOUSE GARAGESDAVIS BOULEVARDSOUTHLAKE, TEXAS0.002.03227/15/22AuthorCheckerLOT 3, BLDG 3P&Z-3.13/32" = 1'-0"1SOUTH ELEVATION3/32" = 1'-0"2NORTH ELEVATION1/8" = 1'-0"4WEST ELEVATION1/8" = 1'-0"3EAST ELEVATIONSEE ELEVATION ABOVE FOR ADDITIONAL INFORMATIONSHEET KEYED NOTES# KEYNOTE8 6" DIA. CONCRETE FILLED PIPE BOLLARD BY G.C. (TYP)11 FIRE DEPARTMENT KEY LOCK BOX. VERIFY WITH FIREMARSHALL.12 ALUMINUM STOREFRONT AND WINDOWS KAWNEER 451UTOR EQUAL. REF: GLASS SCHEDULE14 INSULATED METAL DOOR AND FRAME. REFER TO DOORTYPES.15 OVERHEAD INSULATED METAL ROLL-UP DOOR. REFERDOOR TYPES.16 8" HI-TECH WALL PANEL SYSTEM BY OTHER.17 HI-TECH SYSTEM PANEL REVEAL (OR PANEL JOINT). IFPANEL JOINT PROVIDE BACKER ROD AND SEALANT.VERIFY LOCATION W/ FINAL LAYOUT BY PANEL ENGINEER.18 STONE VENNER: THIN SET OVER HI-TECH PANEL SYSTEM.INSTALLED AS PER MANUFACTURES SPECIFICATIONS.19 DOWNSPOUT LEADER. PROVIDE SPLASH BLOCK ANDDRAIN AWAY FROM FACE OF BUILDING.21 WALL SCONCE. REFER ELECTRICAL1" = 30'-0"5KEY PLAN BUILDING 3SHEET KEYED NOTES# KEYNOTE26 EMERGENCY LIGHT @ EACH EXIT DOOR. REF: ELECTRICALSHEETS27 CONT. PRE-FINISHED 26 GA. CAP FLASHING28 ALUMINUM FACIA / SOFFIT PANEL SYSTEM OVER OVERWRB ON 1/2" EXTERIOR SHEATHING. COLOR AS PEROWNER29 METAL SUPPORTS BY GC30 STUCCO SYSTEM: 3-STEP PROCESS OVER DIAMOND METALMESH TO A 7/8" THICKNESS OR BY OTHER PROCESSPRODUCING COMPARABLE STUCCO FINIS W/ EQUAL ORGREATER STRENGTH AND DURABILITY SPECIFICATION.INSTALLED AS PER MANUFACTURES RECOMMENDATION.COLOR AS PER OWNER.31 STUCCO 'V' REVEAL32 STONE VENEER SYSTEM34 LINE OF ROOF BEYOND55 STONE CAP TRIM56 STONE WINDOW SILL TRIM1.ALL ROOF TOP MECHANICAL UNITS SHALL BE SCREENED FROM PUBLIC VIEW FROM DAVIS BLVD.2.ALL EXPOSED UTILITY BOXES AND CONDUITS SHALL BE PAINTED TO MATCH THE BUILDING.3.SIGNAGE AREAS AND LOCATIONS ARE SUBJECT TO APPROVAL BY THE BUILDING INSPECTIONDEPARTMENT.4.EXTERIOR FINISH MATERIAL, MANUFACTURES AND COLORS ARE YET TO BE DETERMINED .5.DOOR LOCATIONS MAY VARY DEPENDING ON TENANT CONFIGURATIONS AND EXITING REQUIREMENTS.GENERAL NOTESSTUCCO NOTE:STUCCO SHALL BE APPLIED USING 3-STEP PROCESS OVER DIAMOND METAL MESH TO A 7/8 INCH THICKNESS OR BY OTHER PROCESS PRODUCING COMPARABLE STUCCO FINISH WITH EQUAL OR GREATER STRENGTH AND DURABILITY SPECIFICATION.MATERIALS COLORS123STONE: EARTH TONESTUCCO SYSTEM: LIGHT EARTH TONESTUCCO SYSTEM: DARK EARTH TONE ALUM. (MATCH STUCCO COLOR #3)COPING (MATCH STUCCO COLOR #3)ALUM. (MATCH STUCCO COLOR #3)1314150'4'8'16'32'ZONING CASE#: ZA22-002911111122222223333141414141413131313151515 P&Z 42P&Z 4P&Z 4P&Z 443516809 SFAreaP&Z 4.12P&Z 4.14P&Z 4.13P&Z 4.151231213146115109' - 1"10' - 11"8' - 0"24' - 0"8' - 0"10' - 11"9' - 1"24' - 0"121361030' - 0"9' - 3"10' - 11"8' - 0"24' - 0"8' - 0"10' - 11"9' - 3"30' - 0"20' - 0"213637111918' - 0"7' - 4"9' - 2"16' - 0"1' - 0"6' - 4"1' - 8"16' - 0"1' - 0"6' - 4"1' - 8"16' - 0"1' - 0"6' - 4"1' - 8"16' - 0"1' - 0"6' - 4"1' - 8"16' - 0"1' - 0"6' - 4"1' - 8"16' - 0"1' - 0"6' - 4"1' - 8"16' - 0"1' - 0"6' - 4"1' - 8"16' - 0"1' - 0"6' - 5"7' - 1"30' - 0"20' - 0"26' - 0"2136371119' - 1"10' - 11"8' - 0"24' - 0"8' - 0"10' - 11"9' - 1"1' - 1"7' - 3"1' - 6"9' - 3"10' - 11"8' - 0"24' - 0"8' - 0"10' - 11"9' - 3"7' - 2"1' - 1"1' - 6"REVISIONS:THIS DOCUMENT IS FOR INTERIMREVIEW ONLY AND NOTINTENDED TO BE USED FORCONSTRUCTION, BIDDING, ORPERMIT PURPOSES.RODNEY C. St. JOHNREGISTERED ARCHITECTTEXAS NO. 14791OWNER:WHEELHOUSE GARAGES, LLCWHEELHOUSE RETAIL, LLC1313 DANBURY PARKS DRIVEKELLER, TEXAS 76348DEVELOPERS:GARY R. SHIMMIN1313 DANBURY PARKS DRIVRKELLER, TEXAS 76348(559) 871-0684WYNDHAM PROPERTIES1807 KELLER PARKWAYKELLER, TEXAS 76248(817) 307-3600CONTACT: TERRY WILKINSONWHEELHOUSE GARAGESSt. JohnARCHITECTS, PLLC2217 JOHN GLENN PARKWAYMESQUITE, TEXAS 75150214-502-40942154321DCBADC54BA366FILENAME:ISSUED:PROJECT NUMBER:CHECKED BY:DRAWN BY:TRACTS 6C01A AND 6C02, JESSE G. ALLEN SURVEY, ABSTRACT NO. 18C:\Projects\Gary Shimmin\Wheelhouse\REVIT\Wheelhouse-LOT4 BLDG 4.rvt6/24/22THE WHEELHOUSEDAVIS BOULEVARDSOUTHLAKE, TEXAS0.011.04197/15/22PARCSLOT 4, BLDG 4P&Z 41/64" = 1'-0"1ELEVATION KEY PLAN3/32" = 1'-0"2EAST ELEVATION3/32" = 1'-0"3WEST ELEVATION3/32" = 1'-0"4NORTH ELEVATION3/32" = 1'-0"5SOUTH ELEVATION63D View 1MATERIALS KEYMATERIALS COLORS#1.STONE2.STUCCO SYSTEM3.STUCCO SYSTEM 4.ALUM. CANOPY5.ENTRANCE DOOR SYSTEM6.WALL SCONCE LIGHT FIXTURE7.ROLL-UP OVERHEAD DOOR9.GUTTER AND DOWNSPOUT10.ALUMINUM WINDOW SYSTEM WITH CLEAR GLAZING11. SERVICE/EXIT DOOR12.OUTLINE OF ROOF13.ALUM. COPING14.ALUM. FACIA15.ALUM. SUPPORT TUBES123STONE: EARTH TONESTUCCO SYSTEM: LIGHT EARTH TONESTUCCO SYSTEM: DARK EARTH TONE ALUM. (MATCH STUCCO COLOR #3)ALUM. (MATCH STUCCO COLOR #3)ALUM. (MATCH STUCCO COLOR #3)1.ALL ROOF TOP MECHANICAL UNITS SHALL BE SCREENED FROM PUBLIC VIEW FROM DAVIS BLVD.2.ALL EXPOSED UTILITY BOXES AND CONDUITS SHALL BE PAINTED TO MATCH THE BUILDING.3.SIGNAGE AREAS AND LOCATIONS ARE SUBJECT TO APPROVAL BY THE BUILDING INSPECTIONDEPARTMENT.4.EXTERIOR FINISH MATERIAL, MANUFACTURES AND COLORS ARE YET TO BE DETERMINED .5.DOOR LOCATIONS MAY VARY DEPENDING ON TENANT CONFIGURATIONS AND EXITING REQUIREMENTS.GENERAL NOTES0'8'24'48'ZONING CASE#: ZA22-0029ELEVATIONS131415STUCCO NOTE:STUCCO SHALL BE APPLIED USING 3-STEP PROCESS OVER DIAMOND METAL MESH TO A 7/8 INCH THICKNESS OR BY OTHER PROCESS PRODUCING COMPARABLE STUCCO FINISH WITH EQUAL OR GREATER STRENGTH AND DURABILITY SPECIFICATION.TRACTS 6C01A AND 6C02, JESSE G. ALLEN SURVEY, ABSTRACT NO. 183/32" = 1'-0"7FLOOR PLAN ARTICULATION - EAST3/32" = 1'-0"8FLOOR PLAN ARTICULATION - WEST P&Z 42P&Z 4P&Z 4P&Z 4435P&Z 4.12P&Z 4.14P&Z 4.13P&Z 4.1516809 SFArea1231213146115109' - 1"10' - 11"8' - 0"24' - 0"8' - 0"10' - 11"9' - 1"24' - 0"121361030' - 0"9' - 3"10' - 11"8' - 0"24' - 0"8' - 0"10' - 11"9' - 3"30' - 0"20' - 0"213637111918' - 0"7' - 4"9' - 2"16' - 0"1' - 0"6' - 4"1' - 8"16' - 0"1' - 0"6' - 4"1' - 8"16' - 0"1' - 0"6' - 4"1' - 8"16' - 0"1' - 0"6' - 4"1' - 8"16' - 0"1' - 0"6' - 4"1' - 8"16' - 0"1' - 0"6' - 4"1' - 8"16' - 0"1' - 0"6' - 4"1' - 8"16' - 0"1' - 0"6' - 5"7' - 1"30' - 0"20' - 0"26' - 0"2136371119' - 1"10' - 11"8' - 0"24' - 0"8' - 0"10' - 11"9' - 1"1' - 1"7' - 3"1' - 6"9' - 3"10' - 11"8' - 0"24' - 0"8' - 0"10' - 11"9' - 3"7' - 2"1' - 1"1' - 6"REVISIONS:THIS DOCUMENT IS FOR INTERIMREVIEW ONLY AND NOTINTENDED TO BE USED FORCONSTRUCTION, BIDDING, ORPERMIT PURPOSES.RODNEY C. St. JOHNREGISTERED ARCHITECTTEXAS NO. 14791OWNER:WHEELHOUSE GARAGES, LLCWHEELHOUSE RETAIL, LLC1313 DANBURY PARKS DRIVEKELLER, TEXAS 76348DEVELOPERS:GARY R. SHIMMIN1313 DANBURY PARKS DRIVRKELLER, TEXAS 76348(559) 871-0684WYNDHAM PROPERTIES1807 KELLER PARKWAYKELLER, TEXAS 76248(817) 307-3600CONTACT: TERRY WILKINSONWHEELHOUSE GARAGESSt. JohnARCHITECTS, PLLC2217 JOHN GLENN PARKWAYMESQUITE, TEXAS 75150214-502-40942154321DCBADC54BA366FILENAME:ISSUED:PROJECT NUMBER:CHECKED BY:DRAWN BY:TRACTS 6C01A AND 6C02, JESSE G. ALLEN SURVEY, ABSTRACT NO. 18C:\Projects\Gary Shimmin\Wheelhouse\REVIT\Wheelhouse-LOT4 BLDG 4.rvt7/15/22THE WHEELHOUSEDAVIS BOULEVARDSOUTHLAKE, TEXAS0.011.04197/15/22PARCSLOT 4, BLDG 4P&Z 4.11/64" = 1'-0"1ELEVATION KEY PLAN3/32" = 1'-0"2EAST ELEVATION3/32" = 1'-0"3WEST ELEVATION3/32" = 1'-0"4NORTH ELEVATION3/32" = 1'-0"5SOUTH ELEVATION63D VIEWMATERIALS KEYMATERIALS COLORS#1.STONE2.STUCCO SYSTEM3.STUCCO SYSTEM 4.ALUM. CANOPY5.ENTRANCE DOOR SYSTEM6.WALL SCONCE LIGHT FIXTURE7.ROLL-UP OVERHEAD DOOR9.GUTTER AND DOWNSPOUT10.ALUMINUM WINDOW SYSTEM WITH CLEAR GLAZING11. SERVICE/EXIT DOOR12.OUTLINE OF ROOF13.ALUM. COPING14.ALUM. FACIA15.ALUM. SUPPORT TUBES123STONE: EARTH TONESTUCCO SYSTEM: LIGHT EARTH TONESTUCCO SYSTEM: DARK EARTH TONE ALUM. (MATCH STUCCO COLOR #3)ALUM. (MATCH STUCCO COLOR #3)ALUM. (MATCH STUCCO COLOR #3)1.ALL ROOF TOP MECHANICAL UNITS SHALL BE SCREENED FROM PUBLIC VIEW FROM DAVIS BLVD.2.ALL EXPOSED UTILITY BOXES AND CONDUITS SHALL BE PAINTED TO MATCH THE BUILDING.3.SIGNAGE AREAS AND LOCATIONS ARE SUBJECT TO APPROVAL BY THE BUILDING INSPECTIONDEPARTMENT.4.EXTERIOR FINISH MATERIAL, MANUFACTURES AND COLORS ARE YET TO BE DETERMINED .5.DOOR LOCATIONS MAY VARY DEPENDING ON TENANT CONFIGURATIONS AND EXITING REQUIREMENTS.GENERAL NOTES0'8'24'48'ZONING CASE#: ZA22-0029ELEVATIONS131415STUCCO NOTE:STUCCO SHALL BE APPLIED USING 3-STEP PROCESS OVER DIAMOND METAL MESH TO A 7/8 INCH THICKNESS OR BY OTHER PROCESS PRODUCING COMPARABLE STUCCO FINISH WITH EQUAL OR GREATER STRENGTH AND DURABILITY SPECIFICATION.3/32" = 1'-0"7ARTICULATION PLAN - EAST3/32" = 1'-0"8ARTICULATION PLAN - WEST P&Z 52P&Z 5P&Z 5P&Z 543510683 SFArea8' - 0"24' - 0"8' - 0"10' - 11"9' - 3"7' - 2"175' - 0"7' - 3"231213146115107' - 11"24' - 1"7' - 11"10' - 11"9' - 1"121361030' - 0"20' - 0"18' - 0"24' - 0"9' - 1"10' - 11"7' - 11"24' - 1"7' - 11"24' - 0"18' - 0"14' - 0"30' - 0"20' - 0"213637111918' - 8"6' - 4"18' - 8"6' - 4"18' - 8"6' - 4"18' - 8"6' - 4"18' - 8"6' - 4"18' - 8"6' - 4"18' - 8"6' - 6"7' - 0"30' - 0"20' - 0"26' - 0"2133314' - 0"24' - 0"7' - 2"5' - 8"14' - 0"11' - 0"14' - 0"11' - 0"14' - 0"11' - 0"14' - 0"11' - 0"14' - 0"11' - 0"14' - 0"11' - 0"14' - 0"5' - 4"7' - 3"109' - 3"10' - 11"8' - 0"24' - 0"8' - 0"1' - 6"7' - 2"1' - 1"8' - 0"24' - 0"8' - 0"10' - 11"9' - 1"7' - 3"1' - 1"1' - 6"REVISIONS:THIS DOCUMENT IS FOR INTERIMREVIEW ONLY AND NOTINTENDED TO BE USED FORCONSTRUCTION, BIDDING, ORPERMIT PURPOSES.RODNEY C. St. JOHNREGISTERED ARCHITECTTEXAS NO. 14791OWNER:WHEELHOUSE GARAGES, LLCWHEELHOUSE RETAIL, LLC1313 DANBURY PARKS DRIVEKELLER, TEXAS 76348DEVELOPERS:GARY R. SHIMMIN1313 DANBURY PARKS DRIVRKELLER, TEXAS 76348(559) 871-0684WYNDHAM PROPERTIES1807 KELLER PARKWAYKELLER, TEXAS 76248(817) 307-3600CONTACT: TERRY WILKINSONWHEELHOUSE GARAGESSt. JohnARCHITECTS, PLLC2217 JOHN GLENN PARKWAYMESQUITE, TEXAS 75150214-502-40942154321DCBADC54BA366FILENAME:ISSUED:PROJECT NUMBER:CHECKED BY:DRAWN BY:TRACTS 6C01A AND 6C02, JESSE G. ALLEN SURVEY, ABSTRACT NO. 18C:\Projects\Gary Shimmin\Wheelhouse\REVIT\Wheelhouse-LOT5 BLDG 5.rvt7/15/22THE WHEELHOUSEDAVIS BOULEVARDSOUTHLAKE, TEXAS0.011.04197/15/22PARCSLOT 5, BLDG 5P&Z 51/64" = 1'-0"1ELEVATION KEY PLAN3/32" = 1'-0"2EAST SIDE ELEVATION3/32" = 1'-0"3WEST ELEVATION3/32" = 1'-0"4NORTH ELEVATION3/32" = 1'-0"5SOUTH ELEVATION63D View 1MATERIALS KEYMATERIALS COLORS#1.STONE2.STUCCO SYSTEM3.STUCCO SYSTEM 4.ALUM. CANOPY5.ENTRANCE DOOR SYSTEM6.WALL SCONCE LIGHT FIXTURE7.ROLL-UP OVERHEAD DOOR9.GUTTER AND DOWNSPOUT10.ALUMINUM WINDOW SYSTEM WITH CLEAR GLAZING11. SERVICE/EXIT DOOR12.OUTLINE OF ROOF13.ALUM. COPING14.ALUM. FACIA15.ALUM. SUPPORT TUBES123STONE: EARTH TONESTUCCO SYSTEM: LIGHT EARTH TONESTUCCO SYSTEM: DARK EARTH TONE ALUM. (MATCH STUCCO COLOR #3)ALUM. (MATCH STUCCO COLOR #3)ALUM. (MATCH STUCCO COLOR #3)1.ALL ROOF TOP MECHANICAL UNITS SHALL BE SCREENED FROM PUBLIC VIEW FROM DAVIS BLVD.2.ALL EXPOSED UTILITY BOXES AND CONDUITS SHALL BE PAINTED TO MATCH THE BUILDING.3.SIGNAGE AREAS AND LOCATIONS ARE SUBJECT TO APPROVAL BY THE BUILDING INSPECTIONDEPARTMENT.4.EXTERIOR FINISH MATERIAL, MANUFACTURES AND COLORS ARE YET TO BE DETERMINED .5.DOOR LOCATIONS MAY VARY DEPENDING ON TENANT CONFIGURATIONS AND EXITING REQUIREMENTS.GENERAL NOTES0'8'24'48'ZONING CASE#: ZA22-0029ELEVATIONS131415STUCCO NOTE:STUCCO SHALL BE APPLIED USING 3-STEP PROCESS OVER DIAMOND METAL MESH TO A 7/8 INCH THICKNESS OR BY OTHER PROCESS PRODUCING COMPARABLE STUCCO FINISH WITH EQUAL OR GREATER STRENGTH AND DURABILITY SPECIFICATION.TRACTS 6C01A AND 6C02, JESSE G. ALLEN SURVEY, ABSTRACT NO. 183/32" = 1'-0"7FLOOR PLAN ARTICULATION - WEST3/32" = 1'-0"8FLOOR PLAN ARTICULATION - EAST P&Z 5.12P&Z 5.14P&Z 5.15P&Z 5.1310683 SFArea23121314611510121361024' - 0"18' - 0"14' - 0"30' - 0"20' - 0"213637111930' - 0"20' - 0"26' - 0"23314' - 0"24' - 0"8' - 0"24' - 0"8' - 0"10' - 11"9' - 1"7' - 3"1' - 1"1' - 6"9' - 3"10' - 11"8' - 0"24' - 0"8' - 0"1' - 6"7' - 2"1' - 1"REVISIONS:THIS DOCUMENT IS FOR INTERIMREVIEW ONLY AND NOTINTENDED TO BE USED FORCONSTRUCTION, BIDDING, ORPERMIT PURPOSES.RODNEY C. St. JOHNREGISTERED ARCHITECTTEXAS NO. 14791OWNER:WHEELHOUSE GARAGES, LLCWHEELHOUSE RETAIL, LLC1313 DANBURY PARKS DRIVEKELLER, TEXAS 76348DEVELOPERS:GARY R. SHIMMIN1313 DANBURY PARKS DRIVRKELLER, TEXAS 76348(559) 871-0684WYNDHAM PROPERTIES1807 KELLER PARKWAYKELLER, TEXAS 76248(817) 307-3600CONTACT: TERRY WILKINSONWHEELHOUSE GARAGESSt. JohnARCHITECTS, PLLC2217 JOHN GLENN PARKWAYMESQUITE, TEXAS 75150214-502-40942154321DCBADC54BA366FILENAME:ISSUED:PROJECT NUMBER:CHECKED BY:DRAWN BY:TRACTS 6C01A AND 6C02, JESSE G. ALLEN SURVEY, ABSTRACT NO. 18C:\Projects\Gary Shimmin\Wheelhouse\REVIT\Wheelhouse-LOT5 BLDG 5.rvt07/15/22THE WHEELHOUSEDAVIS BOULEVARDSOUTHLAKE, TEXAS0.011.04197/15/22AuthorCheckerLOT 5, BLDG 5P&Z 5.1MATERIALS KEYMATERIALS COLORS#1.STONE2.STUCCO SYSTEM3.STUCCO SYSTEM 4.ALUM. CANOPY5.ENTRANCE DOOR SYSTEM6.WALL SCONCE LIGHT FIXTURE7.ROLL-UP OVERHEAD DOOR9.GUTTER AND DOWNSPOUT10.ALUMINUM WINDOW SYSTEM WITH CLEAR GLAZING11. SERVICE/EXIT DOOR12.OUTLINE OF ROOF13.ALUM. COPING14.ALUM. FACIA15.ALUM. SUPPORT TUBES123STONE: EARTH TONESTUCCO SYSTEM: LIGHT EARTH TONESTUCCO SYSTEM: DARK EARTH TONE ALUM. (MATCH STUCCO COLOR #3)ALUM. (MATCH STUCCO COLOR #3)ALUM. (MATCH STUCCO COLOR #3)1.ALL ROOF TOP MECHANICAL UNITS SHALL BE SCREENED FROM PUBLIC VIEW FROM DAVIS BLVD.2.ALL EXPOSED UTILITY BOXES AND CONDUITS SHALL BE PAINTED TO MATCH THE BUILDING.3.SIGNAGE AREAS AND LOCATIONS ARE SUBJECT TO APPROVAL BY THE BUILDING INSPECTIONDEPARTMENT.4.EXTERIOR FINISH MATERIAL, MANUFACTURES AND COLORS ARE YET TO BE DETERMINED .5.DOOR LOCATIONS MAY VARY DEPENDING ON TENANT CONFIGURATIONS AND EXITING REQUIREMENTS.GENERAL NOTES0'8'24'48'ZONING CASE#: ZA22-0029ELEVATIONS131415STUCCO NOTE:STUCCO SHALL BE APPLIED USING 3-STEP PROCESS OVER DIAMOND METAL MESH TO A 7/8 INCH THICKNESS OR BY OTHER PROCESS PRODUCING COMPARABLE STUCCO FINISH WITH EQUAL OR GREATER STRENGTH AND DURABILITY SPECIFICATION.1/64" = 1'-0"1ELEVATION KEY PLAN3/32" = 1'-0"2EAST SIDE ELEVATION COLOR3/32" = 1'-0"3WEST ELEVATION COLOR3/32" = 1'-0"4NORTH ELEVATION COLOR3/32" = 1'-0"5SOUTH ELEVATION COLOR3/32" = 1'-0"6FLOOR PLAN ARTICULATION - EAST3/32" = 1'-0"7FLOOR PLAN ARTICULATION - WEST83D VIEW 4'-8"17'-4" @ SINGLE13'-8"12'-0" @ SINGLE18"6"18"4'-8"20'-4"13'-8"29'-8"12'-4"3'-4"JAMB DETAILPLAN VIEWELEVATION VIEWSECTIONFOUNDATION VIEW8'-0""METAL SLEEVES FOR CANE1" DIA. x 4" DEEP GALV.BOLTS EMBEDED IN CONC.SLAB4" BARRIER POST1/2"DIA. X 8" BARREL BOLT LOCK2 PAIR McKINNEY T4B3781HINGES EA. GATE WELDED TOGATE & POSTGROUT SOLID W/ CONCRETEANGLE DIAGONAL BRACE3"X 4"X 1/4" METAL ANGLE1" X 18 GA. METAL DECKFRAME 4 SIDES EA. GATE1 1/2"X 1 1/2"X 3/16" METAL#5 BARS CONT. TOP& BOTTOMPAVEMENT SURFACEAS SPECIFIEDSOLID GROUT ALL#5 BARS @ 48" O.C. CONT. THRUWALL & INTO FTG. W/ 3" HOOK.#5 HORIZ. BAR @ TOP (TYP.)WALL W/ DUR-O-WALLW/ #4xCONT.EVERY SECOND COURSE.6" THK. CONC SLABE.W. @ 2'-0" O.C.CORESTIE TO #5 VERT. BARS8"X 8"X 16" C.M.UCAST CAP STONEEL. 8'-0"T.O. CMU18 GA. PAINTED METALGATE8"X 8"X 16"CMUSLAB4" BARRIER POSTMETAL SLEEVES FOR CANE1" DIA. x 4" DEEP GALV.BOLTS EMBEDED IN CONC.GATE & POSTGROUT SOLID W/ CONCRETEW/ #4xCONT.6" THK. CONC SLABE.W. @ 2'-0" O.C.C.J.C.J.C.J.EXP. JT.6"Hx12"W CURBGRADE BEAM18"Wx18"D PERIMETERW/ 2-#5 T&BTO MATCH BLDG.8"X 8"X 16"CMU TO MATCH BLDG.8"X 8"X 16"CMU8"X 8"X 16"CMUSTUCCO OVERTO MATCH BLDG.STUCCOTO MATCH BLDG.STUCCO24'-0"@ DOUBLERECYCLE OIL BARRELNOTE: DOUBLE TRASH ENCLOSURE WILL HAVE 4 GATES.26'-0" @ DOUBLEREVISIONS:THIS DOCUMENT IS FOR INTERIMREVIEW ONLY AND NOTINTENDED TO BE USED FORCONSTRUCTION, BIDDING, ORPERMIT PURPOSES.RODNEY C. St. JOHNREGISTERED ARCHITECTTEXAS NO. 14791OWNER:WHEELHOUSE GARAGES, LLCWHEELHOUSE RETAIL, LLC1313 DANBURY PARKS DRIVEKELLER, TEXAS 76348DEVELOPERS:GARY R. SHIMMIN1313 DANBURY PARKS DRIVRKELLER, TEXAS 76348(559) 871-0684WYNDHAM PROPERTIES1807 KELLER PARKWAYKELLER, TEXAS 76248(817) 307-3600CONTACT: TERRY WILKINSONWHEELHOUSE GARAGESSt. JohnARCHITECTS, PLLC2217 JOHN GLENN PARKWAYMESQUITE, TEXAS 75150214-502-40942154321DCBADC54BA366FILENAME:ISSUED:PROJECT NUMBER:CHECKED BY:DRAWN BY:TRACTS 6C01A AND 6C02, JESSE G. ALLEN SURVEY, ABSTRACT NO. 18C:\Projects\Gary Shimmin\Wheelhouse\REVIT\WHG-P&Z.rvt07/15/22WHEELHOUSE GARAGESDAVIS BOULEVARDSOUTHLAKE, TEXAS0.002.03227/15/22AuthorCheckerTRASH ENCLOSUREP&Z-6ZONING CASE#: ZA22-0029 THE WHEELHOUSE( IN FEET )1 INCH = FTNORTH DAVIS BOULEVARD432.64'125.19'234.67' 836.12'10'TYPE 'D'BUFFERYARD15'SIDEBUILDINGSETBACK10'TYPE 'F1'BUFFERYARD10' TYPE ' F 2' BUFFE R Y A R D 15' TYPE 'T' BUFFERYARD 50' FRONT BUILDING SETBACK 10' TYPE 'F2' BUFFERYARD 15' REAR BUILDING SETBACK 50' FRONT BUILDING SETBACKAUTOMATIC GATE AUTOMATIC GATE AUTOMATIC GATE RETAIN EXISTING FENCE. TO BE MAINTAINED BY PROPERTY OWNER. 5' CONCRETE SIDEWALK 5' CONCRETE SIDEWALK RETAIN EXISTING FENCE. TO BE MAINTAINED BY PROPERTY OWNER. RETAIN EXISTING FENCE. TO BE MAINTAINED BY PROPERTY OWNER. SITE SIGN10'TYPE 'F1'BUFFERYARDBUILDING 1B - 18,950 S.F. BUILDING 3 - 22,624 S.F. BUILDING 4 - 16,167 S.F. BUILDING 5 - 9,863 S.F. BUILDING 2 15,547 S.F.BUILDING 1A2,569 S.F.Trees Net of R.O.W. 0 0 0 Tree % 65.82 34.08 100.00 Total Trees 118 61 179 Trees Saved Trees Trees to be Altered Less R.O.W - - 0 Tree Canopy Coverage Total site area (gross)271,596 s.f. Net Site area (less R.O.W.)271,596 s.f. Total existing canopy 102,176 s.f. --> 37.62% Preserved tree canopy (green) 45,776 s.f. --> 44.80% Removed tree canopy (red) 56,400 s.f. --> 55.20% 102,176 s.f. --> 100.00% Tree Canopy Coverage Total site area (gross) 31,123 s.f. Net Site area (less R.O.W.) 31,123 s.f. Total existing canopy 10,638 s.f. --> 34.18% 10,638 s.f. --> 100.00% Southlake, Tarrant County, Texas Existing Tree Conservation Plan Tracts 6C, 6C01A, 6C02 & 6C03, Jesse G. Allen Survey, Abstract No. 18 0 40'80'160' 1" = 40' SAGE GROUP, INC. Master Planning Urban Design Architecture Landscape Architecture 1130 N. Carroll Ave., Ste. 200 Southlake, Texas 76092 TEL. 817-424-2626 Planner: Case No. ZA22-0029 The WheelHouse 18 JUL 22 Landscape Architect: Sage Group, Inc. 1130 N. Carroll Ave., Suite 200 Southlake, TX 76092 817-424-2626 Attn: Curtis Young, AIA Engineer: Redinger Group, LLC P.O. Box 93206 Southlake, Texas 76092 817-253-5727 Attn: Clayton Redinger, P.E. Developers: Wyndham Properties 1807 Keller Parkway Keller, Texas 76248 817-307-3600 Attn: Terry Wilkinson Gary R. Shimmin 1313 Danbury Parks Drive Keller, Texas 76248 559-871-0084 Property Owner: wheelhouse Garages, LLC Wheelhouse Retail, LLC 1313 Danbury Parks Drive Keller, Texas 76248 Architect: Prism Architects 580 Decker Drive, Suite 170 Irving, Texas 75062 972-714-0420 Attn: Rodney St. John, AIA LOTS 1-6 LOT 5 NOTE: Lot 5 will be required to meet the requirements of the Tree Preservation Ordinance in effect at the time of lot development.